Professional Documents
Culture Documents
(VER: R.N.E)
Dotacin Parcial
2000 L/d
50
L/d/m
40
L/d/m
40
60 x
50
745 x
40
Dotacin
=
=
=
=
2000
3000
29800
34800
L/d
L/d
L/d
L/d
12000 L/d
12000 L/d
=
=
8500
8500
L/d
L/d
8500
L/d
8500
L/d
1350
1500
10
Dotacin
850
USO
(Lit./da)
PRIMER NIVEL
RESTAURANTE
34800
SEGUNDO NIVEL
DEPARTAMENTOS
12000
TERCER NIVEL
DEPARTAMENTOS
8500
CUARTO NIVEL
DEPARTAMENTOS
8500
TOTAL
63800
DOTACIN
29000 L/d
66.5
x 66.5
Dotacin
133
L/d
133
L/d
Dimetro Boquilla
(pulg.)
Gasto
(L/s)
N mangueras
c/(0.5 horas)
1 1/2
1/2
3/4
0.5 x 3600 x
10800 Lit.
0.5 x 3600 x
14400 Lit.
14400 Lit.
VCI
1.20
m/s
TRAMO
J-I
I-H
H-G
G-F
F-E
E-D
D-C
C-B
B-A
UNIDADES HUNTER
9.00
17.25
17.25
28.50
64.75
77.50
81.25
85.00
97.75
Q (Lt/seg)
DIMETRO
0.320
0.485
0.485
0.720
1.307
1.430
1.463
1.500
1.648
(cm.)
1.843
2.268
2.268
2.764
3.724
3.895
3.939
3.989
4.181
(pulg.)
3/4
1 1/2
1 1/2
1 1/2
1 1/2
7.00
3.65
8.00
20.70
21.35
1.95
13.50
2.55
7.95
Long. Equiv.
0.74
0.74
1.08
1.08
1.42
2.16
2.16
2.16
2.16
Sub total
1.48
3.7
10.8
8.64
Cantidad
0.25
0.25
0.36
0.36
0.48
0.72
0.72
0.72
0.72
LONGITUD (m)
45
CODO
90
Cantidad
Long. Equiv.
1.06
1.55
1.55
2.04
3.11
3.11
3.11
3.11
Sub total
1.55
2.04
3.11
RECTO
Cantidad
Long. Equiv.
0.35
0.35
0.52
0.52
0.68
1.04
1.04
1.04
1.04
Sub total
0.7
0.35
0.52
1.04
1.04
1.04
COMP.
Cantidad
Cantidad
Long. Equiv.
0.11
0.11
0.16
0.16
0.22
0.33
0.33
0.33
0.33
Sub total
0.11
0.33
0.33
Cantidad
VLVULA
TEE
90
0
1.06
GLOBO
Sub total
Long. Equiv.
Long. Equiv.
Sub total
5.91
5.91
8.64
8.64
11.36
17.27
17.27
17.27
17.27
LONGITUD ADICIONAL
2.29
4.05
1.55
0.52
2.04
1.04
1.04
14.24
10.01
LONGITUD TOTAL
9.29
7.70
9.55
21.22
23.39
2.99
14.54
16.79
17.96
Sf (m/m)
0.067
0.055
0.055
0.045
0.033
0.032
0.032
0.031
0.030
PERDIDA DE CARGA
0.627
0.422
0.524
0.955
0.781
0.095
0.459
0.523
0.534
0.25
PRESIN DE SALIDA
1.3
1.3
2.877
3.299
3.823
4.777
5.558
5.654
6.113
7.936
9.770
PRESIN NECESARIA
Por lo tanto el primer piso que corresponde al RESTAURANTE, ser un sistema directo ya que
contamos con presin necesaria de 15 mca. Y tan solo necesitamos 9.77mca.
1.2
m/s
TRAMO
I-H
UNIDADES HUNTER
90
CODO
45
D-C
C-B
B-A
16
32
48
80
160
0.290
0.460
0.790
1.090
1.450
2.140
(cm.)
0.921
0.921
1.754
2.209
2.895
3.401
3.922
4.765
(pulg.)
1/2
1/2
3/4
3/4
1 1/2
1 1/2
1 1/2
7.80
2.25
1.25
4.20
16.00
16.00
22.95
1.05
Long. Equiv.
0.74
0.74
1.08
1.08
1.42
2.16
2.16
2.16
Sub total
4.44
4.32
2.16
8.64
Cantidad
Long. Equiv.
Sub total
Cantidad
0.25
0.25
0.36
0.36
0.48
0.72
0.72
0.72
1.06
1.06
1.55
1.55
2.04
3.11
3.11
3.11
Sub total
1.55
1.55
3.11
Long. Equiv.
0.35
0.35
0.52
0.52
0.68
1.04
1.04
1.04
Sub total
0.35
0.35
0.68
1.04
RECTO
Cantidad
COMP.
Long. Equiv.
Cantidad
Long. Equiv.
0.11
0.11
0.16
0.16
0.22
0.33
0.33
0.33
Sub total
0.11
0.16
0.33
GLOBO
90
E-D
0.080
Cantidad
TEE
F-E
LONGITUD (m)
VLVULA
G-F
0.080
Q (Lt/seg)
DIMETRO
H-G
Cantidad
5.91
5.91
8.64
8.64
11.36
17.27
17.27
17.27
Long. Equiv.
Sub total
LONGITUD ADICIONAL
4.9
0.35
1.55
6.03
0.68
1.04
5.27
8.97
LONGITUD TOTAL
12.70
2.60
2.80
10.23
16.68
17.04
28.22
10.02
Sf (m/m)
0.135
0.135
0.071
0.056
0.043
0.037
0.032
0.026
PERDIDA DE CARGA
1.714
0.351
0.199
0.576
0.716
0.623
0.895
0.261
1.1
0.95
1.64
4.814
5.165
5.364
6.889
7.606
8.229
9.124
11.025
1.2
m/s
TRAMO
I-H
UNIDADES HUNTER
90
CODO
45
D-C
C-B
B-A
16
32
48
80
160
0.290
0.460
0.790
1.090
1.450
2.140
(cm.)
0.921
0.921
1.754
2.209
2.895
3.401
3.922
4.765
(pulg.)
1/2
1/2
3/4
3/4
1 1/2
1 1/2
1 1/2
7.80
2.25
1.25
4.20
16.00
16.00
22.95
1.05
Long. Equiv.
0.74
0.74
1.08
1.08
1.42
2.16
2.16
2.16
Sub total
4.44
4.32
2.16
8.64
Cantidad
Long. Equiv.
Sub total
Cantidad
0.25
0.25
0.36
0.36
0.48
0.72
0.72
0.72
1.06
1.06
1.55
1.55
2.04
3.11
3.11
3.11
Sub total
1.55
1.55
3.11
Long. Equiv.
0.35
0.35
0.52
0.52
0.68
1.04
1.04
1.04
Sub total
0.35
0.35
0.68
1.04
RECTO
Cantidad
COMP.
Long. Equiv.
Cantidad
Long. Equiv.
0.11
0.11
0.16
0.16
0.22
0.33
0.33
0.33
Sub total
0.11
0.16
0.33
GLOBO
90
E-D
0.080
Cantidad
TEE
F-E
LONGITUD (m)
VLVULA
G-F
0.080
Q (Lt/seg)
DIMETRO
H-G
Cantidad
5.91
5.91
8.64
8.64
11.36
17.27
17.27
17.27
Long. Equiv.
Sub total
LONGITUD ADICIONAL
4.9
0.35
1.55
6.03
0.68
1.04
5.27
8.97
LONGITUD TOTAL
12.70
2.60
2.80
10.23
16.68
17.04
28.22
10.02
Sf (m/m)
0.135
0.135
0.071
0.056
0.043
0.037
0.032
0.026
PERDIDA DE CARGA
1.714
0.351
0.199
0.576
0.716
0.623
0.895
0.261
1.1
0.95
1.64
4.814
5.165
5.364
6.889
7.606
8.229
9.124
11.025
1.2
m/s
TRAMO
I-H
UNIDADES HUNTER
90
CODO
45
D-C
C-B
B-A
16
32
48
80
160
0.290
0.460
0.790
1.090
1.450
2.140
(cm.)
0.921
0.921
1.754
2.209
2.895
3.401
3.922
4.765
(pulg.)
1/2
1/2
3/4
3/4
1 1/2
1 1/2
1 1/2
7.80
2.25
1.25
4.20
16.00
16.00
22.95
1.05
Long. Equiv.
0.74
0.74
1.08
1.08
1.42
2.16
2.16
2.16
Sub total
4.44
4.32
2.16
8.64
Cantidad
Long. Equiv.
Sub total
Cantidad
0.25
0.25
0.36
0.36
0.48
0.72
0.72
0.72
1.06
1.06
1.55
1.55
2.04
3.11
3.11
3.11
Sub total
1.55
1.55
3.11
Long. Equiv.
0.35
0.35
0.52
0.52
0.68
1.04
1.04
1.04
Sub total
0.35
0.35
0.68
1.04
RECTO
Cantidad
COMP.
Long. Equiv.
Cantidad
Long. Equiv.
0.11
0.11
0.16
0.16
0.22
0.33
0.33
0.33
Sub total
0.11
0.16
0.33
GLOBO
90
E-D
0.080
Cantidad
TEE
F-E
LONGITUD (m)
VLVULA
G-F
0.080
Q (Lt/seg)
DIMETRO
H-G
Cantidad
5.91
5.91
8.64
8.64
11.36
17.27
17.27
17.27
Long. Equiv.
Sub total
LONGITUD ADICIONAL
4.9
0.35
1.55
6.03
0.68
1.04
5.27
8.97
LONGITUD TOTAL
12.70
2.60
2.80
10.23
16.68
17.04
28.22
10.02
Sf (m/m)
0.135
0.135
0.071
0.056
0.043
0.037
0.032
0.026
PERDIDA DE CARGA
1.714
0.351
0.199
0.576
0.716
0.623
0.895
0.261
1.1
0.95
1.64
4.814
5.165
5.364
6.889
7.606
8.229
9.124
11.025
- CAPACIDAD:
Adoptamos:
= 3/4(DOTACIN)
0.75
22.00 m
- PREDIMENCIONAMIEMTO:
29
21.75 m
ANCHO
/ LARGO =
Para:
LARGO =
2/3
ANCHO =
2/3
ANCHO =
2.68
(LARGO)
ENTONCES:
ANCHO (a) =
3.0
LARGO (L) =
4.0
22.00
3.0
4.0 m
1.8
0.2
Donde:
(he)
(hre)
(hr)
(he) :
Distancia vertical, entre el techo del tanque; y el eje del tubo de entrada
0.2 m
(hre) :
Distancia vertical, entre el eje de la tubera de rebose; y del eje del tubo de entrada de agua.
Es igual al doble del dimetro (tubera de rebose); y en ningn caso menor de 0.15 m.
(hr) :
Segn RNE.
12001
a 30000 Lit.
dimetro de Rebose
Por lo tanto:
(h)
(h)
0.2
0.5
1.83
2.5
0.2
0.1
0.2
0.5
''
0.1
- CAPACIDAD:
= 1/3(DOTACIN)
1/3
9.7
x
m
29
9.67 m
El volumen del tanque elevado ser 1/3(Dotacin) + VCI, pero como 1/3 de la dotacin
es menor que VCI = 14.4 m3 para dos mangueras de 40m. Entonces.
Adoptamos:
- PREDIMENCIONAMIEMTO:
14.4
ANCHO
/ LARGO =
Para:
ANCHO =
2/3
LARGO =
1.50
LARGO =
(ANCHO)
ENTONCES:
Donde:
ANCHO (a) =
LARGO (L) =
14.4
2m
(he)
(hre)
(hr)
2.40
(he) :
Distancia vertical, entre el techo del tanque; y el eje del tubo de entrada
0.2 m
(hre) :
Distancia vertical, entre el eje de la tubera de rebose; y del eje del tubo de entrada de agua.
Es igual al doble del dimetro (tubera de rebose); y en ningn caso menor de 0.15 m.
(hr) :
Segn RNE.
12001
a 30000 Lit.
dimetro de Rebose
Por lo tanto:
(h)
(h)
0.2
0.5
2.40
2.90
0.2
0.1
0.5
11.025
8.225
2.8
11.025 mca.
''
0.1
CAUDAL DE ENTRADA:
Qe
VTC
22000
4Q
DIMETRO DE TUBERA:
Velocidad mnima =
Velocidad mxima =
0.6
3.0
2.24
1.53
Lit/s
max
5.69
cm.
max
2.24
''
min
2.55
cm.
min
1.00
''
1.62
''
3600
1
2
m/s
m/s
1.00
2
2.3.2 TUBERA DE IMPULSIN:
CAUDAL DE BOMBEO:
Qb
VTE
14400
4Q
DIMETRO DE TUBERA:
Velocidad mnima =
Velocidad mxima =
0.6
3.0
2.56
m/s
2.00
Lit/s
max
6.51
cm.
max
2.56
''
min
2.91
cm.
min
1.15
''
1.86
''
3600
1
2
m/s
1.15
ADOPTAMOS:
2 1/2 ''
TANQUE CISTERNA:
4 ''
TANQUE ELEVADO:
4 ''
FORMULA:
4Q
1
2
Donde:
Q:
Caudal
v:
Velacidad
0.6
NIVEL
CAUDAL
DIMETRO
PARCIAL
ACUMUL.
(Lt/s)
(Pulg.)
1 PISO
85.00
85.00
1.500
1 1/2
2 PISO
160.00
160.00
2.140
1 1/2
3 PISO
160.00
320.00
3.370
4 PISO
160.00
480.00
4.570
2 1/2
UH
CAUDAL
DIMETRO
(Lt/s)
(Pulg.)
1 PISO
85.00
1.500
1 1/2
2 PISO
160.00
2.140
1 1/2
3 PISO
160.00
2.140
1 1/2
4 PISO
160.00
2.140
1 1/2
3.0 m
RAMAL
SUB RAMAL
DIMETRO
(Pulg.)
(Pulg.)
(Pulg.)
1 PISO
1 1/2
2 PISO
1 1/2
3 PISO
1 1/2
4 PISO
1 1/2
1.53
''
mca.
Lit/s
92
Lt/min
Pm : Presin en la matriz
15
0.5
Hf = Pm-Ht-Ps
Hf : Perdidas de carga
(Referido al nivel de RED PUBLICA)
Hf
15
Hf
12.5
mca
Hfm
0.5
Hfm
6.25
DIAMETRO
Hfm
3/4
12
4.7
1 1/2
1.3
0.5
12.5
1 1/2 ''
1
2
1
2
Q H
75 n
Donde:
Q: Caudal de bombeo:
n:
Alt. Est.
Hf
= (Le)(hf)
=
25.5 m
Altura estatica
16.7 m
Sf
2 ''
Sf
Lt/s
Altura Dinamica:
2.00
(Lr)(hl)
( del Plano)
Donde:
14
0.01655 (m/m)
2''
2.15
12.90
0.6
0.60
2.45
4.90
0.4
0.80
2 valv. Check
4.23
8.46
Entrada a la bomba
1.00
Reduccion
0.44
29.1
19.60
2''
hf
Le
25.5
29.1
54.6 m
Hf
54.6
0.017
0.9
Hf
16.7
0.904
2.00
19.60
75
0.7
POTENCIA DE LA BOMBA:
P
ADOPTAMOS:
P = 1.0 HP
0.75 HP
( 2 BOMBAS DE 0.5 HP
para uso simultaneo )
Lt/s
DIMETRO:
2 1/2
'' (mnimo)
TUBERA ALIMENTADORA:
Para el funcionamiento de dos (2) mangueras se tiene:
DIMETRO DE TUBERA:
Velocidad mnima =
Velocidad mxima =
4 Q
v
0.6
m/s
3.0
m/s
3.63
1.62
max
9.21
cm.
max
3.63
''
min
4.12
cm.
min
1.62
''
2.62
''
2
PERDIDA DE CARAGA. (al punto de conexin (G.C.I.) mas desfaborable:
Sf
Sf
0.00872
LONGITUD VERTICAL:
10.6
LONGITUD HORIZONTAL:
Donde:
5
1.3 m
33.4
4.85
14
(del PLANO)
Ducha
Lavatorio
=
=
280
8
Lt/h
Lt/h
TOTAL
=
=
=
560
16
576
Lt/h
120
Litros
Nota: El tercer y cuarto nivel son iguales por lo tanto tienen las mismas
caracteristicas en agua caliente.
4Q 2
DIMETRO DE TUBERA:
v
Gasto
=
120 Lt/h
Velocidad mnima
0.6
m/s
Velocidad mxima =
3.0
m/s
0.33
+
2
0.15 =
max
max
min
min
=
=
=
=
0.84
0.33
0.38
0.15
0.24
1/2
cm.
''
cm.
''
''