Job No. Sheet No. 1 Rev.

Project Tittle:
Member/Location:
PERUNDING ZAR S/B Drg. Ref.
Job Title : Made by : Date : Remark
Sample calculation for Line 1.
P6/U1L-1 - Line 1
-
Pavement Runoff, W = m
= x
= m
Additional 15% = x m
= m
= ha
DRAINAGE R11D Bob
1125
8.0
245.0
2254
THE PROPOSED CONSTRUCTION AND COMPLETION OF
ROADWORKS PACKAGE R11D PUSAT PENTADBIRAN
KERAJAAN PERSEKUTUAN PUTRAJAYA
CH 880 CH
0.225
8.0
1960.0
1.15 1960.0
Verge Runoff, W = m
= x
= m
Additional 15% = x m
= m
= ha
Check for time overload, to
= x n x L^(1/3)
where n =
L = m
S = %
= x x ^(1/3)
^(1/2)
= min
8
2.5
1.5
8.1
245.0 8.1
1984.5
1.15 1984.5
2282.175
0.228
S^(1/2)
2.5
8
0.011
to 107
:. 107 0.011
Job No. Sheet No. 2 Rev.
Project Tittle:
Member/Location:
PERUNDING ZAR S/B Drg. Ref.
Job Title : Made by : Date : Remark
Assume Vd = m/s (average slope 2 - 4%)
= L/V
= /
= sec
= /
= min
Therefor,
Time of concentration, tc
= to + td tc
Bob
1.0
245
245 60
4.1
PERKIRAAN REKABENTUK JALAN
THE PROPOSED CONSTRUCTION AND COMPLETION OF
ROADWORKS PACKAGE R11D PUSAT PENTADBIRAN
KERAJAAN PERSEKUTUAN PUTRAJAYA
1.0
245
td
= to + td
= +
= min
Checking for Rainfall Intensity, i.
Rainfall intensity was based on frequency curve by Angkasa Consulting Services Sdn. Bhd.,
dwg no: AGHD/DUD/LCP/P5/DR03
However, the curve is only to a minimum time of concentration of 10 min. Therefor, the
actual rainfall intensity less then 10 min need to be recalculate. Based on the calculation,
in refer to the Urban Stormwater Management for Malaysia by Department of Irrigation and
Drainage Malaysia, the rainfall intensity foo 100 years (maximum).
= mm/hr (see table A)
Therefor peak flow, Q
= x x
= x x
= m/s
tc
1.5
4.1
5.6
i
360
0.637
i,100 1072
Q C A
360
Q pave 0.95 1072 0.225
Job No. Sheet No. 3 Rev.
Project Tittle:
Member/Location:
PERUNDING ZAR S/B Drg. Ref.
Job Title : Made by : Date : Remark
= x x
= m/s
Total peak flow, Qp
= +
= m/s
Calculate lined drain.
n =
S = %
B =
THE PROPOSED CONSTRUCTION AND COMPLETION OF
ROADWORKS PACKAGE R11D PUSAT PENTADBIRAN
KERAJAAN PERSEKUTUAN PUTRAJAYA
0.228
360
PERKIRAAN REKABENTUK JALAN Bob
0.046
Qp 0.637
Q pave 0.3
0.682
0.046
0.013
2.237
0.6
240
B =
Qn = x
( %)^(1/2) ( )^(8/3)
=
From chart 26.4, at Z = 0
y/B =
Then, required y = x
= m
Therefor, provide y = m
Size of drain = 600 x 600 BC -OK!
Area of BC 600 x 600 = x
= m
Checking for velocity, Va
=
= /
= m/s -OK!
0.36
1.895
0.013
Va Qp / Ap
0.682
S^(1/2) B^(8/3) 0.6
0.6
0.36
0.56 0.60
0.336
0.56
0.60
0.6
2.237
0.682
0.232
0.6