Task List

Major Outage:
1) Liner Plates, floor and side walls
a. Quote from Rollyed alloys received (48x 96)
i. Need to send them a email about side wall liner plates
b. Washers need to be ordered, with those steel pins
c. Insulation for floor to be ordered (Multiple options)
2) MOC for drain lines
a. Find drawings,
b. Talk to deltak about a fix
c. Find different type of insulation to use inside the casing
3) CO2 Tank inspection
a. Concentration tank to be done
b. Vent all CO2 and buy new
4) GT1 Generator mist eliminator
a. Bug Randall about the GE option
b. Make a CWP for the non GE Option
5) Fin-Fan coolers
a. Need a new design of bearings, bushings for better performance
b. Can they run backwards?
c. Follow up with ecodyne
6) Find out more info on the following WO
a. Inspect and Repair PO4 Quill
b. Replace inlet guide vane actuator
c. Penetration Seals Failure
d. Center baffle repairs
7) Notifications
a. Check tube bundle thickness
b. Fin-Fan cooler refurb
c. Concentration Tank test
8) Misc Work
a. Purchase Wooden Blocks for rotor placement
b. Repair Riverhawk tool
c.






Regular Work
1) Cathodic Protection
a. Athabasca survey to check for hidden liens
b. Send PO to corrpro
c. Notification:14420415
d. Jose created a PR, Randy to do a risk analysis
2) Generator Vapour Extraction System
a. CWP complete for pipe modification
b. Randall working with GE for GE proposal
3) Raw Water Heater Condensate Collection
a. Condensate skid in WTP
b. Check for Pipe thickness
c. Create a CWP for piping
4) WTP Safety Shower
a. Notification:14403734
b. Parts outside cogen
c. Need to be put on the schedule
5) Cogen Roof Ice Issues
a. Drawings & Pics send to Rong
b. Waiting on CWP
c. Work with RAT to perform job
6) Gas Chromatograph Replacement
a. CWP almost complete
b. Work with Ijad to complete the package
7) HRSG Economizer Piping (FAC)
a. Implement Randalls recommendations
8) Parts (Tent 5)
a. Meet with Rod Walsh to work on this issue
b. Notification: 14420450
9) Glycol Fin Fan Failure Analysis
a. Carl coming on site to perform inspection
b. Notification: 14433295
10) BD Tank Vent
a. Create a CWP
11) Installation of panels cogen (Jim)
a. Verify Dimensions
b. CWP for a platform structure
12) Inlet Filters
13) Cavitations on WTP
14) On-Going MOC
a. Flame Scanner HRSG & Aux Boilers
15) Misc Work
a.

Long Term Tasks:
1) Create a Structural Tool for Jason
a. CAD the Drawing
b. Perform calculations for stress analysis
2) IJAD Field Red Line
a. MOC #xx8088