iv).Construction of Retaining wall, ramp and RCC box


structure (for half portion along Northern side)
viii).Construction of Retaining wall, ramp and RCC box
structure (for remaining half portion along Southern
side)
ix).Construction of Footpath, Hand Rail, Lead Drain and
Man hole Chambers etc., (for remaining half portion
along Southern side)
x).Widening and construction of surface level road (for
remaining half portion along Southern side)
V VV V
III III III III
v).Construction of Footpath, Hand Rail, Lead Drain and
Man hole Chambers etc., (for half portion along Northern
side)
ConstructionofSignalFreeCorridoralongIdentifiedStretchesofRoadfromVellaraJunctiontoHopeFarmJunction(viaOldAirportRoad,Kundalahalliand ConstructionofSignalFreeCorridoralongIdentifiedStretchesofRoadfromVellaraJunctiontoHopeFarmJunction(viaOldAirportRoad,Kundalahalliand ConstructionofSignalFreeCorridoralongIdentifiedStretchesofRoadfromVellaraJunctiontoHopeFarmJunction(viaOldAirportRoad,Kundalahalliand ConstructionofSignalFreeCorridoralongIdentifiedStretchesofRoadfromVellaraJunctiontoHopeFarmJunction(viaOldAirportRoad,Kundalahalliand
Whitefield)inBangalore Whitefield)inBangalore Whitefield)inBangalore Whitefield)inBangalore
Tentative Construction Schedule for the Construction of Underpass at Wind Tunnel Road Junction.
Stage Stage Stage Stage ConstructionStages(Activities) ConstructionStages(Activities) ConstructionStages(Activities) ConstructionStages(Activities)
Monthwise Program
I II I
i).Mobilisation of Staff & Equipment, Soil Investigation,
Design Approval.
ii).Dismantling, Utility Shifting, Setting up of Casting
yard, Batching plant, QC laboratory etc.,
II II II II
iii). Earthwork excavation for retaining wall and box
structure (for half portion along Northern side)
vi).Widening and construction of surface level road (for
half portion along Northern side)
VI VI VI VI
xi).Road xi).Road xi).Road xi).Road Furniture, Furniture, Furniture, Furniture, Painting, Painting, Painting, Painting, Lightings, Lightings, Lightings, Lightings, Signal Signal Signal Signal and and and and Other Other Other Other
finishingworks finishingworks finishingworks finishingworks
Milestone Milestone Milestone Milestone
IV IV IV IV
vii).Earthwork excavation for retaining wall and box
structure (for remaining half portion along Southern
side)
1 2 3 4 5 6 7 8 9 10 11
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Tentative Construction Schedule for the Construction of Underpass at Wind Tunnel Road Junction.
Stage Stage Stage Stage ConstructionStages(Activities) ConstructionStages(Activities) ConstructionStages(Activities) ConstructionStages(Activities)
Monthwise Program
Activity Activity Activity Activity