You are on page 1of 27

Company Profile

Park Centra, 1001, 10th Floor, NH-8, Gurgaon - 122002


Company Profile


1


















Excellence in Comprehensive, Cost Effective
&
Sustainable Solutions

Company Profile


2

BACKGROUND

HN Company was established in 1997 with an objective to provide complete solution of problems started
from planning to implementation of work. The quality and timely execution of work is top priority of the
company. After passing juvenile stages of establishment, the company extended its scope of work and
area of expertise in various infrastructural works. The horizon of company extended to various fields to
the satisfaction of clients, which is evident from the credentials issued by the clients. During the formation
of the company, various targeted subsidiary units were formed to handle socialized works separately for
better management practices for faster growth. Under the evolutionary changes, the planning and
consultancy umbrella of HN Company, the units were developed as separate companies. With the
evolutionary changes in policy, the planning and consultancy group has been designated as HN
Business Consultants (HNBC) to bear the responsibility of consulting services and eventually expended
with the inclusion of various specialized sectors. The HNBC was formed in 2011 to function as separate
company and registered under Registrar Firm and Society under the companies act, 1956.

The capacity enhancement of HNBC started with objective to provide proper solution of problem in cost
effective manner. The integrated approach with ensured sustainable conservation and management of
natural resources is our prime concern. The input of subject expert having National and International
repute in technological intervention is used to cope up with the environmental and developmental issues
and problems. Our capabilities range from project identification to assessment and to provide sustainable
planning, which provide us distinct recognition in the consultancy sector. Better planning and latest
technologies makes the projects viable as well as beneficial to the target groups. We provide consultancy
services in the following sectors;

Water Resource Conservation
Water And Wastewater Management
Environment And Environmental Safe Guards
Forest And Ecology
Biodiversity Conservation
Nonconventional Energy
Architecture And Heritage Conservation
Advance Technological Intervention For Cost
Effective Solutions
Infrastructure Planning And Design
Wise Use Of Natural Resources Without Destruction
Risk Assessment And Risk Management
Social Environment And Stakeholders Concern
IEC And Public Awareness
Sanitation And Health& Hygiene
City Development Plans
Road And Transport
Tourism And Ecotourism



HN Company Established in
1997 having annual turnover of
Rs. 220 Cr (2011-12)
HNBC came into existence in
2011, under the umbrella of HN
Company
Nationally and Internationally
Experienced, Qualified and
Reputed Experts especially in
Water Resources, Environment
and infrastructure
development.
Client Satisfaction and Timely
action is our Motto

Company Profile


3

VISION AND MISSION

HNBC is offshoot of the HN Company and formed with an objective to accomplish the total solution of
environmental problems and sustainable perspective planning through its vision and mission
Vision Statement
HNBC is committed to be solution provider with integrated approach through experienced and
qualified experts vision. Defining the problem and issues for techno-economically appropriate
solutions

Mission Statement
HNBC endeavours to be a one-stop consultancy delivering, optimal solutions to all your environmental
concerns. Our basic goal is to integrate environmental, ecological health and human safety
considerations in our company strategy and to capitalize on environment driven opportunities. We vow
to provide value driven output through i) value added and cost effective services to the clients, ii) to
improve current practices of the industry through green solution for sustainable development, iii) to find
out opportunity to work with the communities; and iv) to implement, conscious minded decisions to
mitigate any adverse impact on the environment.

OUR STRATEGIES

Our business strategies are to cater the need of the projects to the best satisfaction of the client. Time
and quality assurance of the deliverables and commitment towards work is our priority and we do adhere
with ToR conditions as may agree for. Our strength is qualified and experienced experts input in the
project to provide best planning alternate. We have and to develop our strength as per requirement of
project and complete task in professional manner. The recognition of our work depends on our strong
technical and professional footings to establish our self in the market.

We are efficient of providing specialized services for preparation of Master Plan, conducting Feasibility
Studies in different areas/ issues, preparation of Detailed Project Report (DPRs) with specific details of
design and drawings, cost estimates, institutional and financial framework, operation and maintenance
plan etc; conducting environmental and social impact assessments, impact evaluations of projects,
project planning, project management and monitoring during and post project implementation including
Water Resources, Solid and Hazardous Waste management, sewerage and drainage system, water
supply system, transport planning and development of road & flyovers.

Our strength is our knowledgeable technical staff and experts of various disciplines that involve
engineers, environmental scientists, planners, architects, geologists, public outreach specialists,
economists, policy experts, social scientists, and legal and regulatory analysts. The reference material
requires for current affair for latest technologies and conducive designing of work is part of our
documentation division. Instrumentation in support of investigation is equipped to strengthen the
technical team for firsthand information, besides the secondary data collected and available to us for
given project.
Our Associates provide authentic data and investigation reports by using latest techniques and software
for better planning. The field staff engaged in survey and investigation is technically sound in operation
of equipments and well versed to technology. Our association with academic institutions supports in
academic input and upgraded advance techniques. On shore and offshore input for special works are
Company Profile


4
being taken from the individual capacity as well as institutional support to attend complicated issues.
Nevertheless, our approach to the work is team work where experts of the desired disciplines are
involved and work together for the appropriate solution of tackling issues. Computer software is in
support to the analysis of data interpretation and modeling to thrive conclusive options.


OFFICE DETAILS


Office Address / Tel. Nos.
(Head Office India)
HN Business Consultants
Park Centra, 1001, 10
th
Floor,
NH-8, Gurgaon 122002
Tel. nos. 0124 4035 113 / 114
Fax no. : 0124 4035 115
Email : info@hnbc.co.in

Delhi Office
(Present Operation)

C-5/8, Ground Floor,
Safdarjang Development Area,
New Delhi-110 016
Telephone: 011-26533690,
E-mail- info@hnbc.co.in


Contact Details:

info@hnbc.co.in
www.hnbc.co.in



Chairman & Managing Director
HN Business Consultants
Email: cmd@hnbc.co.in
Cell No.: 91 9810788092



Dr. S. M. Misra
Executive Director
HOD, Water Resources
E-mail : shiv.misra@hnbc.co.in
Cell No: 91 9873979586












Company Profile


5

ORGANIZATION AND STAFFING

HNBC is subsidiary of HN Company providing environmental consultancy services, water/wastewater
management, infrastructure and technical services through employing experienced professionals, technical
experts and managers, having substantial expertise in the area of infrastructure, environment, health, safety,
and resource management.








































Chairman and Managing Director
Executive Director
Operations

Director Finance
Vice President
Finance
Director Administration Director Operations
Vice President
Admin

Vice President
Projects
(Ops)
Vice President Business
Development
Sr. Accts. Officer
Asst. Vice
President Admin
Project Manager
Office
Secretary
Executive Director
Finance
Executive Director
Administration

Accountant
Asst.
Accountant
Administrator
Sr. Manager
Sr. Engineer
Field Staff Asst.
Administrator
Asst. Manager
Engineer
CAD & Auto
Desk
Manager
HNBC- Organizational Structure
Company Profile



0






























Chairman &
Managing Director
Executive Drector
Technical
Scientist
Pool
L
i
m
n
o
l
o
g
i
s
t
2
E
n
v
i
r
o
n
m
e
n
t
a
l
s
i
s
t
7
B
i
o
t
e
c
h
n
o
l
o
g
i
s
t
A
g
r
i
c
u
l
t
u
r
e

S
c
i
e
n
t
i
s
t
M
i
c
r
o
b
i
o
l
o
g
i
s
t
E
c
o
l
o
g
i
s
t
2
Engineering
Pool
C
i
v
i
l

E
n
g
i
n
e
e
r
2
M
e
c
h
a
n
i
c
a
l
2
H
y
d
r
o
l
o
g
y
2
C
h
e
m
i
c
a
l
1
S
t
r
u
c
t
u
r
a
l
2
T
r
a
n
s
p
o
r
t

1
E
n
v
i
r
o
n
m
e
n
t
a
l

3
GIS Pool
G
I
S

E
x
p
e
r
t
2
Social
Scientist
Pool
S
o
c
i
a
l

S
c
i
e
n
t
i
s
t
2
T
e
c
h
n
i
c
a
l

S
t
r
e
n
g
t
h

T
e
c
h
n
i
c
a
l

S
t
r
e
n
g
t
h


Technical Support Staff
(30 No.)

HNBC- Technical Strength




























BUSINESS SECTORS


Company Profile


6

BUSINESS SECTORS
HN group of companies are working in diverse fields which include the turn key projects in the field roads and highways, small hydro-electric
plants, non-conventional energy, housing and real estate, development of specific economic zone while HNBC is providing consultancy services
in different sectors Water, Environment, Energy, Infrastructure, Natural Resource, Social Development and GIS. Important areas of consultancy
services being provided by HNBC are as under;















Water
Lakes & Wetlands
Rivers
Groundwater
Recycling & Reuse
Water Resources
Management

Environment
Env. Impact Assessment
Env. Management plan
Environmental Audit
Solid Waste
Hazardous Waste
Air Quality
Energy
Solar Energy
Hydro Power
Energy
Efficiency
Energy Audit
Infrastructure
Drinking water
Wastewater
Drainage & Storm water
Desalination
CDP
Real Estates & SEZ
Roads & Transport
Landscaping
Eco-planning
Rural Development
Natural Resource
Land & Soil Management
Sustainable Agricultural
Practices
Forests
Silvi-culture
Natural Resource
Management

Social Development
Information, Education and
Communication (IEC)
development
Socio-economic Study
Social Impact Assessment
Rural Development
Training & Capacity Building
Institutional Development
and capacity Building

GIS
GIS Mapping
Spatial database
designing services
GIS Modeling
Data model
designing
GIS application
consultancy

HN Company
HN Business Consultants
Pvt. Ltd.
HN Special Economic Zone HN INFRA
HN infra deals in Execution and Turn Key Projects in following sectors;
Road and Highways,
Energy and Hydro-electric
Real estate
Telecommunication
Sewerage and Sanitation
Border Fencing
River Protection
HN SEZ deals in the field of Development of
Special Economic Zones, Tourism Related
Infrastructure, Shopping complexes and Malls.


Company Profile



7

FIELDS OF RELEVANT SPECIALIZED AND AVAILABLE SERVICES

HNBC has excellent consulting capability in various sectors viz. Water Resources
Management, Environment Management, Energy, Infrastructure, Natural Resources
Management, GIS and Social Sectors which comprises all phases from conceptualization
to implementation along with the development of institutional framework and capacity-
building. The wide range of areas covered are:



I- WATER RESOURCE MANAGEMENT
Management of water resources is one of the global
challenges in the 21
st
Century as the demand of this vital
resource is increasing day by day on the one hand and its
quantity and quality is deteriorating with increasing human
pressure on the other hand. Considering the water
resources as key element of our life support system,
HNBC provides solution in the field of water resource
management with its unique and innovative technologies.
Our experts in water resource management are
undisputed leaders in management of inland waters with an
array of experience and expertise in planning and
designing the projects for various state and central
agencies under NLCP/NRCD and other agencies.
We develop management plans for:

Lakes and Wetlands
Reservoirs and Tanks
Rivers
Ground water

Water Resources
Environment Management
Energy
Infrastructure Development
Natural Resources
GIS & Mapping
Social
Company Profile



8

EXPERIENCE OF HNBC SPECIFIC TO THE FIELD OF WATER RESOURCE &
WATERSHED MANAGEMENT

HNBC having experts, undisputed leaders from different domains having experience and
exposure in the field of water resources management in various part of India for last three
decades. We were involved in planning, designing and execution of projects related to
watershed management, eco-restoration of lakes, wetlands and rivers in collaboration with
State and Central Government and other line departments. The major modules covered
under watershed conservation, Management & Planning are:

Macro & Micro Watershed
Assessment
Watershed Modeling through
SWAT, BASIN & other GIS enabled
Models
Hydrological Assessment
Water Quality Assessment
Ecosystem health Assessment
Water Budgeting & Water Balancing
Sediment Yields
Nutrients Loading & Nutrients
Budgeting
Wise Use of Resources
Planning & Designing sewage & solid
waste management in urban watershed
Catchment Area Treatments
Control over Point & Non-point Pollution
Soil & Moisture Conservation
Abatement of Siltation in inland waters
Stakeholders Consultation on uses &
entitlement issues
IEC & Capacity Building
Riparian Rights

Multidimensional Approach- for Watershed Management


II- ENVIRONMENT:
Developmental activities are often associated with varied
impacts on the environment. Accelerated pace of
infrastructure development and urbanization raised
parallel concerns for environmental management and
restoration plans. HNBC offers state of the art services
in comprehensive solutions related to environmental
restoration and management, which include services in
following sectors:

Water Quality
& Quantity
Ecology &
Livelihood
Watershed
Company Profile



9

Environment Impact Assessment
Environment Management plan
Environmental & Industrial Audit
Solid Waste management
Hazardous Waste management
Environmental Modelling
III- ENERGY:
HNBC provides comprehensive services in energy sector
including environmental, engineering, and construction
solutions associated with energy projects. Our expertise
in the field of conventional and non-conventional energy
projects allow us to successfully complete the projects
including transmission and distribution projects. We
specialize in Hydropower, which is one of the most vital
sources of energy for an environment friendly future.
HNBC offers services and solutions in the following
sectors:

Solar Energy
Hydro Power
Energy Efficiency
Energy Audit
Power Saving Devices


IV- INFRASTRUCTURE:
HNBC offers services in the field of infrastructure
development with experienced design and architects
professionals on board, and create solution-driven,
cutting-edge international design. Having strong
commitment to sound and sustainable design our
practices are techno-economically feasible and
environmentally conscientious. HNBC has a vast
experience in the design and integration in various
sectors of Township, Retail, Hospitality, Healthcare,
Commercial and Education with varied and modulated requirements.

HNBC has also an excellent track record in all aspects of
road development projects, including planning, feasibility
studies, detailed project preparation, preliminary and
detailed design, construction supervision, project
management, technical advice and audits, operation &
maintenance including studies and project preparation for
private sector participation, under BOT or Annuity or other
feasible system. HNBC has been involved in design of
state of the art for developing roads and highways mainly
in North Eastern States of India.
Company Profile



10

We have reputed and well experienced architects and design professionals on board, and
create solution-driven, cutting-edge international design. Having strong commitment to
sustainable design, and practice a holistic and environmentally conscientious approach. We
have the skills of low housing development, economical advisory, IEC and Community
Mobilization, Capacity Building, Risk Management and Administration activities and hence
we offer sustainable housing to the economy. We offer integrated expertise of the HNBC
and KGD India and together we seek your permission on the appointment of the
Consultancy of the State in order to execute the program and provide technical support to
enable the State of Nagaland to redevelop all existing slums in a holistic and integrated way
and to create new affordable housing stock in a very planned and assimilated manner.

HNBC deals in following sectors of infrastructure development:

Drinking water
Wastewater
Drainage & Storm water
Desalination
CDP & Master Plan
Real Estates & SEZ
Roads & Transport
Landscaping
Eco-planning
V- NATURAL RESOURCES MANAGEMENT:
Management of natural resources is a vital issue as increasing demand on finite natural
resources vis-a-vis poor resource management is causing degradation of natural resources.
We, at HNBC provide sustainable solutions for natural resources management through the
use of multi-disciplinary teams able to take a holistic approach of natural resource
management encompassing technical, financial, economic, and social factors. We deal in
following sectors of Natural Resource Management:

Land & Soil Management
Sustainable Agricultural Practices
Forestry & Silvi-culture
Natural Resource Management


VI- GIS & MAPPING:
HNBC deals in Geospatial Solutions with turn-key solutions for the Survey works, Remote
Sensing & GIS, LIDAR Data Processing & Mapping, and GIS Software
Customization. Our vast experience and innovations have allowed us to expand into a new
era by offering leading- edge technological services in serving our customers. We offer GIS
related services in following fields:

Map digitizing & analysis
Digital elevation models
Spatial & hazard analysis
Classification, spatial & spectral enhancement
Field operation
Company Profile



11

VII- SOCIAL:
Information, Education and Communication play a pivotal role in awareness building,
mobilizing people and promote development participatory through advocacy and by
transferring knowledge, skills and techniques to the people and stakeholders under various
projects. It is also critical for bringing about transparency in implementation of the
programmes at the field level and for promoting the concept of accountability and social
audit. With our experts and experienced team, HNBC offers a wide array of services in social
sector which include academic studies to implementation of projects in the field.
Information, Education and Communication (IEC) development
Socio-economic Study
Social Impact Assessment
Rural Development
Training & Capacity Building
Institutional Development and capacity Building


Our Associates for Environmental Monitoring & Engineering Survey:


Environmental Monitoring:
In any environmental project, qualitative and quantitative
assessment of various physico-chemical and biological
parameters are significant for characterization of ecological
health and to assess the changes and alterations caused by
unsustainable development processes. Thus, HNBC is taking
services of their associates M/S. Analitika Eco Lab Pvt. Ltd.,
an approved laboratory by Ministry of Environment &
Forests (MoEF), GoI, under EPA 1986 offering services in the
field of environment monitoring and assessment. This
laboratory is well equipped and having wide range of essential
instruments such as AAS, GC, Spectro-photometer, HVS and
RDS etc. for the characterization and quantification of
pollutants generally present in the environment.



Topographical & Engineering Survey:

Our associates GLOBAL SURVEYOR is a recognized and experienced survey company
and provide survey data and information as may be required for engineering, and scientific
planning. The firm is well equipped with modern and sophisticated equipment, instrument s
which are necessary for carry our desired field survey. Global Survey has also expertized
in costal and specialized for bathymetric survey. Authenticity of data and accuracy in survey
and interpretation of data for proper planning is credibility of the Global Survey.





Company Profile



12


SERVICES WE OFFER:

HNBC provides consultancy services in various sectors of environment and infrastructure
as per demands of the client, which includes management of various sectors namely, Water
Resources, Environmental & Natural Resources, Infrastructure Development, Energy, GIS
& Mapping along with Social sector. Besides we provide techno-economically feasible
technological intervention for total solution of problem as suitable to site and conditions. We
deal with the various components under the above sectors as summarized under:


E
















Feasibility And Pre-feasibility Reports
Detailed Project Reports
Management Plan
Project Management Consultancy
Design And Construction Supervision
Project And Proposal Appraisal
Technology Advisory Services
Company Profile



13





















KEY TECHNICAL STRENGTH


Company Profile


14
KEY TECHNICAL STRENGTH

S.N
o
Discipline Qualification Experiences Area Of Expertise
1. Principal Water
Resource Expert
Ph.D 30 Years Watershed
Management
Water Resource
Conservation &
Management
Sustainable Eco-
Technology For
Environment
Conservation
2. Principal Advisor Ph.D 35 Years Watershed
Management
Soil Contamination
& Mitigation
Hazardous Waste
Management
Environmental
Policy &
Legislation
3. Urban Sanitation
Expert
M.E
(Environmental
Engineer)
35 Years Sewerage &
Sanitation
4. Hydrological
Geotechnical
Expert
M.E (Soil
Dynamics)
30+ Years Hydrology & Geo-
Technology
5. Urban Planner Masters In
Town &
Country
Planning
25 Years Urban Planning
/Landscape Architect
6. Water Supply &
Sewage Expert
M.E (Structural
Engineer)
35 Years Water Supply &
Sewage
7. Senior City
Sanitation Expert
Ph.D 35 Years Sewerage & Sewage
Treatment
8. Senior
Environmental
Experts
Ph.D 15 Years Lake & River
Conservation
Aquaculture
Bio-Manipulation &
Bioremediation
Aeration Of
Limnetic
Ecosystem
Pollution
Prevention

9. Hydro-Geologist Ph.D 15 Years Hydrology & Geology
10. GIS & Remote
Sensing Expert
Ph.D 10 Years Gis & Remote
Sensing
Watershed Planning
11. Senior Biologist Ph.D 15 Years Terrestrial & Aquatic
Biodiversity
Company Profile


15
12. Wild Life Expert Ph.D 10 Years Wild Life
Conservation
13. Senior
Environmentalist
Ph.D 10 Years Environment
Conservation
Lake Conservation
14. Senior Limno-
Chemist
Ph.D 10 Years Limno-Chemistry,
Water Quality
15. Financial Expert C.A 15 Years Institutional & Project
Finance
16. Social &
Institutional
Expert
Masters 25 Years IEC & Capacity
Building
17. Landfill Design
Expert
M.E
(Environment)
10 Years Landfill Design Expert
18. Tourism Expert Ph.D 10 Years Tourism & Eco-
Tourism





























Company Profile


16








DETAIL EXPERIENCE OF HNBC
INCLUDING THAT OF PARENT
COMPANY




17

DETAILED EXPERIENCE OF HNBC INCLUDING THAT OF PARENT COMPANY


S.No. Name of work/project and location, with Work order/LOI No.
and Date.
Name/ Address of
Clients
Value of
Work
(Rs. in Cr)
1 Pollution Abatement Of Rivers Diphu And Dhanseri And Solid
Waste Management At Dimapur, Nagaland - Completed And
Submitted To MoEF For Financial Assistance
PHED, Govt. of
Nagaland
3.22
2 Rejuvenation & Management Of Raj Pukhuri, Dimapur,
Nagaland Under NLCP Guidelines - Completed And Submitted
To MoEF For Financial Assistance
PHED, Govt. of
Nagaland
0.80
3 Rejuvenation & Management Of Padam Pukhuri, Dimapur,
Nagaland Under NLCP Guidelines - Completed And Submitted
To MoEF For Financial Assistance
PHED, Govt. of
Nagaland
0.80
4 Rejuvenation & Management Of Govt. Fisheries Pond, Dimapur,
Nagaland Under NLCP Guidelines - Ongoing
PHED, Govt. of
Nagaland
0.70
5 Rejuvenation & Management Of Jor Pukhuri, Dimapur,
Nagaland Under NLCP Guidelines - Ongoing
PHED, Govt. of
Nagaland
0.70
6 Sustainable Conservation And Management Of Diphu River As
Per NRCP, MoEF Guidelines - Ongoing
PHED, Govt. of
Nagaland
3.50
7
Construction of 100 Bedded Urban Hospital at Chumukedima
under Dimapur District. PWD (Housing)
10.56
8
Housing for Urban Poor at Dimapur under ISHDP. PWD (Housing)
26.34
9 Construction of Border Fencing along Indo-Bangladesh Border
in Meghalaya State under Phase II, (Jaliakhola to Hengaria,
BP No. 1299 to BP No. 1304) - Package No. I.
N.P.C.C Ltd.,
Shillong
16.13
10 Construction of fencing alongwith Border Road for certain
stretches of Meghalaya Sector along Indo-Bangladesh Border
(IBB) from Baghmara to Phanda near (BP No. 1158/7S) to
near (BP No. 1162/6S) - Package III.
N.P.C.C Ltd.,
Shillong
7.98
11 Strengthening the existing two lane pavement for the portion
from km 235.800 to km 263.000 in the state of Manipur.
PWD, Manipur
33.89
12 Pollution abatement of Rivers Dhansiri and Diphu at Dimapur
Town.
PHE Nagaland
44.60
13 Construction of 24 Nos Type II Qtrs in G+II in 4 blocks and 3
Nos SM Barrack in G+II in 1 Blocks with allied services and
development works for Assam Rifles at Shokhuvi (Package
XII).
N.P.C.C Ltd.,
Shillong
1.87
14 Construction of 12 Nos Type II Qtrs in G+II in 2 blocks, 12 Nos
Type III Qtrs. In G+II in 2 blocks and 3 Nos SM Barrack in G+II
in 1 Blocks with allied services and development works for
Assam Rifles at Shokhuvi (Package XIII) Phase II.
N.P.C.C Ltd.,
Shillong
1.97
15 Construction of Casualty Ward at Dimapur under Referral
Hospital
PWD (Housing)
Kohima
3.67
16 Construction of Road from NH-39 to Referral Hospital at
Dimapur
PWD (Housing)
Kohima
2.35
17 Construction of Treatment Block, Dimapur under Referral
Hospital Project.
PWD (Housing)
Kohima
2.29
18 Contruction of Boundary Wall for Referral Hospital Projects
Dimapur
PWD (Housing)
Kohima
0.52
19 Airconditioning work for Referral Hospital Project at Dimapur PWD (Housing)
Kohima
4.12
20 Construction of 1.5 KV T.E Building (PH-I) and 1 No. Type-II
S/Qtrs. at Aghunato, Nagaland.
B.S.N.L Civil Division
Dimapur. Nagaland
0.21



18

21 OFC Laying on route Naharlagan-Yupia Section in Arunachal
Pradesh.
T.C.I. Ltd.
(A Govt. of India
Enterprise)
0.23
22 Construction of OFC Laying on Route Tuensang-Lonkhim-I
(Tuensang to 11 Km point towards Longkhim) under Nagaland
Telecom District, Dimapur

T.C.I. Ltd. 0.23
23 OFC Laying on Route Mokokchung-Chare-II (19 km point of
Mokokchung/ Chare to 22 Km point)
T.C.I. Ltd. 0.08
24 OFC Laying on Route Mokokchung-Chare-II (Mokokchung 11
km point to 19 Km point)
T.C.I. Ltd. 0.17
25 U.G Cable Laying & Associated work; (a) Secondary cable
from Nagarjan Cabinet to Pillar 81 & 82, (b) Distribution of
Pillar 81 & 82.for OCB Exchange expansion work at Dimapur
work at Diampur under GMT. Nagaland
T.C.I. Ltd. 0.07
26 Construction of cable duct 12 ways (11+4 OFC) from T.E to
MH-5 and 4 ways from MH-5 to MH-11 to T.E Chumukedima.
Nagaland
B.S.N.L, Civil
Division, Dimapur
0.51
27 Partition work for office of DET (O.C.B) and ladies Dormitory in
T.E Building at Dimapur.
B.S.N.L Civil
Division, Dimapur.
0.05
28 Partition and furnishing work for C.G.Ms chamber along with
PA and visitors room in T.E Building Dimapur Nagaland.
B.S.N.L Civil
Division, Dimapur.
0.02
29 Construction of 8 Nos. Type-III for Assam Rifles at
Mokokchung, Nagaland.
N.P.C.C Ltd.,
Shillong (A Govt. of
India Enterprise)
0.90
30 Construction of OFC laying work on route Wokha Town to
Doyang Hydro Project. 25.85 km. PO.
D.G.M (ES & P) I.T.I
Ltd. Kolkata.
0.67
31 Construction & Improvement of 7.1km road from Khopanallah
to Assam Riffle Pump House Sukhovi ARTC& S, Nagaland
N.P.C.C Ltd. Shillong
(A Govt. of India
Enterprise)
1.94
32 Laying OF Cable from Kohima T.E to T.E Phek, Nagaland
Part-III
B.S.N.L, Dimapur 1.01
33 Construction of OFC laying work on route Wokha T.E to
Mokokchung T.E 82.30 km.
D.G.M (ES & P) I.T.I
Ltd. Kolkata.
2.08
34 Construction of Garrage I.B and Type IV Qtrs. at T.E
Compound Dimapur.
E.E (C) B.S.N.L Civil
Division, Dimapur.
0.28
35 Construction of 8 Nos. Single JCOS Qtrs. for Assam Riffles at
Sukhovi.
N.P.C.C Ltd.,
Shillong.
0.22
36 Construction of 12 Nos. Type-II Qtrs. at Kashiram Basti. N.P.C.C Ltd.,
Shillong
0.47
37 Construction of 1 No. Single Men Barrack for 4 NCOS and 40
ORS for Assam Riffles at Sukhovi, Nagaland
N.P.C.C Ltd.,
Shillong
0.33
38 Construction of 2 Nos. S.M. Barrack accommodation for 8 Nos.
NCOS and 80 ORS for Assam Riffles at Zunheboto.
N.P.C.C Ltd.,
Shillong
0.85
39 Construction of 12 Nos. Type-II Qtrs. for Assam Riffles at
Zunheboto, Nagaland
N.P.C.C Ltd.,
Shillong
0.96
40 Construction of 100 bedded Hospital Building Complex for
Assam Riffles at Sukhovi.
N.P.C.C Ltd.,
Shillong
0.95
41 Strengthening & Improvement of Dimapur Halflong Road.
Under CRF (Group A Road Works) Nagaland
Chief Engineer PWD
(R&B) Nagaland,
Kohima.
1.83
42 Construction of protection work from erosion of Dhansiri river
(ph-II) at Bridge Point 0-120 mtrs. Left Bank.
Irrigation and Flood
Control, Dimapur.
0.33
43 Construction of Cable Duct 6 Ways (4+8) OFC from MH 36
(EX) to MH-48 (INC) in Tenyiphe Village to Sugar Mill colony at
Chumukedima. Nagaland.
B.S.N.L, Dimapur 0.47
44 Construction of Cable Duct 6 ways (4+8) OFC from PC48 (EX)
to Nuiland road crossing MH.59 (INC) at Chumukedima.
Nagaland
B.S.N.L, Dimapur 0.26



19

45 Construction of 1 Nos. S.M Barrack(G+I) for Assam Riffles at
Kashiram Basti, Nagaland.
N.P.C.C Ltd.,
Shillong
0.70
46 Construction of 8 Nos Type-III Qtrs with Allied Services and
Development works for Assam Rifles at Jalukie.
N.P.C.C Ltd.,
Shillong
0.65
47 Supplying Fabrication & Laying P.S over head water tank for 2
Nos. S.M Barrack at Sukhovi.
N.P.C.C Ltd.,
Shillong
0.04
48 Strengthening & Improvement of Dimapur-Dhansiripar Ganesh
Nagar Road. (35 Km), Nagaland
Chief Engineer PWD
(R&B) Nagaland,
Kohima
5.39
49 Construction of 24 Nos. S.M. Barrack and 48 Nos. Type-II Qtrs.
(G+II) in 8 blocks for Assam Riffles at Zunheboto, Nagaland.
N.P.C.C Ltd.,
Shillong
9.32
50 Supply of Equipment for Trauma Centre Dimapur. Directorate of
Medical Service
Nagaland, Kohima
0.90
51 Construction of Hill Type Building for Accident and Trauma
Center at Dimapur Civil Hospital,
Medical Engineering,
Govt. of Nagaland
0.37
52 Construction of Hill Type building for Accident and Trauma
Center at Mokokchung Civil Hospital,
Medical Engineering,
Govt. of Nagaland
0.39
53 Up- gradation of District Civil Hospital at Phek (PMSP) Medical Engineering
Division: Govt. of
Nagaland
0.45
54 Construction of 1 Nos. S.M Barrack(G+I) in 1 blocks and 60
Nos. Type-II Qtrs. (G+II) in 1 blocks with Allied Services and
Development works for Assam Riffles at Sukhovi, Nagaland.
N.P.C.C Ltd.,
Shillong
0.33
55 Construction of 30 Nos. S.M Barrack (G+II) in 10 blocks and 60
Nos. Type-II Qtrs.(G+II) in 10 blocks with Allied Services and
Development works for Assam Riffles at Sukhovi, Nagaland.
N.P.C.C Ltd.,
Shillong
10.31
56 Construction of 30 Nos. S.M Barrack (G+II) in 10 blocks and 60
Nos. Type-III Qtrs.(G+II) in 10 blocks for Assam Riffles at
Kashiram Basti, Nagaland.
N.P.C.C Ltd.,
Shillong
11.83
57 Construction of Vertical Extension of newly Constructed
Garage, IB & Type IV Qtrs. in T.E compound Dimapur.
E.E (C) B.S.N.L Civil
Division, Dimapur.
0.08
58 Under Ground OFC laying work under Nagaland SSA in NE-II
Telecom Circle " Zunheboto Exchange to Kilomi Village 46 Km"
ITI Ltd. (Govt. of
India Enterprise)
0.78
59 Construction of Road for N.E Agri Expo including construction
of Retaining wall Culvert and Steel Gate etc. at 4th Mile
Dimapur.
Director Agriculture,
Kohima: Nagaland
0.95
60 Construction of Anti- Erosion measure to Protect Mao Colony,
Kuki Village and Assam Rifles Transit Camp at Dimapur from
flood and erosion of River Dhansiri (s)
Chief Engineer
(I & W) Bramaputra
Board Basistha:
Guwahati -29,
Assam
1.60















20






















COMPANY REGISTRATION &
FINANCIAL DETAILS



21









22














23















24

You might also like