No Rate Unit of measure ment 1 2 3 4 5 6 I Road Part 1 37863.00 Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201 MORD . including contractors profit & Over head charges, VAT. 201 MORD 2.10 Sqm 2 40398.22 Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain (not exceeding 0.6 m depth) and foundation of other structures including breaking clods, ramming, spreading, sectioning, grading compacting with vibratory roller 80-100KN to OMC compaction including to a top width of 7.5m and raising to required height complete etc.as per requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 MORD/ 305 MORTH including contractors profit & Over head charges, VAT and Seigneorage. etc. complete. 301.5 MORD 109.00 Cum 3 6721.60 Construction of improved subgrade/ Shoulders by providing selected earth having minimum CBR of 10%, MDD not less than 1.85 g/cc with LL & PI not more than 40% and 20 respectively and spreading in uniform layers with tractor grader on prepared surface, and compacted at OMC with vibratory roller 80-100 kN to meet requirement of Table 300.2 with as per Technical Specification Clause 303 MORD / 305 MORTH, by using machinery including contractors profit & Over head charges, VAT and Seigneorage etc. complete. 303 MORD 286.00 Cum 4 3390.85 Construction of granular sub-base by providing well graded material(Table 400.1) with Grading III Material(HBG M/C +Stone dust) CBR Value not less than 20 and PI Value less than 6 spreading in uniform layers with Tractor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with Vibratory Roller to achieve the desired density, complete as per Technical Specification Clause 401 MORD including contractors profit & Over head charges, VAT and Seigneorage etc. complete. 401 MORD 1392.10 Cum Schedule-A T01- Vinukonda-Karempudi R&B Road to Pedakancherla of Vinukonda (M) Package . No. AP061413 S.No Quantity Description Specification No Rate Unit of measure ment 5 5128.97 Construction of Shoulders by providing selected earth having MDD not less than 1.85 g/cc with LL & PI not more than 40% and 20 respectively. and, spreading in uniform layers with tractor grader on prepared surface, and compacted at OMC with vibratory roller 80-100 kN to achieve the desired density, complete as per Technical Specification Clause 407 MORD and clause 305 & 305.4.4 MORTH including contractors profit & Over head charges, VAT and Seigneorage etc. complete. 303, 407 MORD and clause 305 & 305.4.4 MORTH 286.00 Cum 6 3158.32 Providing, laying, spreading and compacting stone aggregates of specific sizes for Grading 2 material to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with Vibratory roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405 MORD / 404 MORTH. For compacted thickness of 75 mm. including contractors profit & Over head charges, VAT and Seigneorage etc., complete for Grade II 405 MORD 2238.20 Cum 7 3158.32 Providing, laying, spreading and compacting stone aggregates of specific sizes HBG Machine Crushed metal to water bound macadam Grade III specification including spreading in uniform thickness, hand packing, rolling with Vibratory roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405 MORD/ 404 MORTH. For compacted thickness of 75 mm. including contractors profit & Over head charges, VAT and Seigneorage etc., complete 405 MORD 2524.70 Cum 8 42367.64 Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 MORD (for use on Wet mix macadam & WBM) ,including contractors profit & Over head charges, VAT etc., complete for Prime Coat 502 MORD 40.70 Sqm 9 44911.51 Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 MORD, including contractors profit & Over head charges, VAT etc., complete for Tack Coat 503 MORD 14.80 Sqm S.No Quantity Description Specification No Rate Unit of measure ment 10 44911.51 Providing, laying and rolling of close-graded premix surfacing (Mix seal surfacing) material of 20 mm thickness composed of 13.2 mm to 0.9 mm (Type-B) aggregates as per Table 500.15 of MORD using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable Hot Mix plant (By mechanical means), laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 MORD, including contractors profit & Over head charges, VAT and Seigneorage 512 MORTH 198.10 Sqm 11 78.90 Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD including contractors profit & Over head charges, VAT and Seigneorage etc., complete 1501 MORD 6176.30 Cum Total II Road Furniture 12 12 Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 MORD / 804 MORTH including contractors profit & Over head charges, VAT and Seigneorage Ordinary KM Stone MORD 1703 2001.70 Nos 13 54 Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 MORD / 804 MORTH including contractors profit & Over head charges, VAT and Seigneorage 200M Stone MORD 1703 571.40 Nos S.No Quantity Description Specification No Rate Unit of measure ment 14 2 Providing & fixing of typical PMGSY informatory sign board with LOGO as per MORD secifications and drawing. Three MS plates of 1.6mm thick, top and middle plate duly welded with MS flat iron 25mmx5mm size on black on edges. The lower plate will be welded with MS angle iron frame of lower most plate and flate iron frame of middle plate will be welded to 2 nos 75mmx75mm of 12 SWG sheet tubes posts duly embedded in CC M15 grade blocks of 450mmx450mmx600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mmx47mm of 12 SWG sheet plate tube. All MS will be stove enmeled on both sides. Lettering and paining of superior quality in required shede and colour. All sections of framed posts and sheet tube will be painted with primer and two coats of epoxy paint as per drawing clause 1701 and annexure 1700.1 if MORD including contractors profit & Over head charges, VAT and Seigneorage MORD 1701 9510.40 Nos 15 4 Providing and erecting direction and place identifications of semi reflective sign boards up to 0.9 sqm size board as per IRC:67 made of 2 mm thick M.S. Sheet duly stove enameled paint in white colour in front and grey colour on back with red reflective border of 70 mm width and required message, letters, figures with reflective engineering grade tape as per MORD specifications of required shade and colour. supported and welded on 47 mm x 47 mm of 12 SWG Square tube of 3050 mm height duly strengthened by 25 mm x 5 mm M/s flat iron on edges on back firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 1701 MORD including contractors profit & Over head charges, VAT and Seigneorage up to 0.9 sqm size board MORD 1701 2254.40 Nos 16 25 Providing and fixing of semi-reflective cautionery, mandatory and informatory boards as per IRC:67 made of 1.5mm thick MS sheet duly stove enamelled paint in white colour in front and grey colour on back with red reflective boarder of 65mm width and required letters and figures with reflective engineering grade tape as per clause 1701.3.9 of MORD for rural roads specification of required shade and colour supported and welded on 47x47mm of 12 SWG square tube of 3050mm height duly strenthened by 25x5mm MS flat iron on edges on back firmly fixed to ground by means of properly designed foundations with M-15 grade CC 450x450x600 mm , 600mm below ground level as per approved drawings and technical specification Clause 1701.2.2 of MORD including contractors profit & Over head charges, VAT and Seigneorage with 600X 600 mm size MS sheet Clause 1701 MORD 1726.50 Nos Total III 1v 1mt slab culvert at 2/350,2/810,3/812,4/350,4/650, 5/100,5/300, 5/630, 7/410, 8/940, 9/060, 9/455, 10/150, 10/650, 10/920, 11/440, 11/910, 12/460 S.No Quantity Description Specification No Rate Unit of measure ment 17 1074.06 Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage - For Foundations 305 MORD 95.20 Cum 18 380.70 Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size Graded hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage For levelling course 802, 803, 1202 & 1203 MORD 4175.10 Cum 19 473.94 Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage etc. complete. 802, 804, 805, 806, 807, 1202 and 1204 MORD 4600.80 Cum 20 32.40 Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage (upto 5m height) Bed blocks Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD 6318.80 Cum 21 51.12 Providing and laying reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 MORD / Sections 1500, 1600 & 1700 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage upto 5m height. - For Super Structure (Deck slab) Clauses 800, 1205.4 and 1205.5 MORD 6874.60 Cum 22 10.80 Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 MORD / Sections 1600 & 2200 MORTH for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, VAT - For Sub Structures Clauses 1002, 1005, 1010 & 1202 MORD 58691.90 MT Total IV) 6V 3M submersible vented causeway at 4/775-4/875 S.No Quantity Description Specification No Rate Unit of measure ment 23 476.43 Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage - For Foundations 305 MORD 95.20 Cum 24 126.46 Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size Graded hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage For levelling course 802, 803, 1202 & 1203 MORD 4175.10 Cum 25 323.67 Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage etc. complete. 802, 804, 805, 806, 807, 1202 and 1204 MORD 4600.80 Cum 26 39.65 Providing concrete for reinforced concrete M20 grade (Design mix) in open foundations using 20 & 10mm nominal size Graded hard stone aggregate, Mechanically mixed placed in foundation and compacted by vibration including curing for 14 days completed as per drawings and tech. specifications clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH including over head charges & contractor profit VAT & Seignorage charges- for Raft foundation 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH 5671.42 Cum 27 6.73 Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage (upto 5m height) Bed Blocks Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD 6318.80 Cum 28 52.88 Providing and laying reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 MORD / Sections 1500, 1600 & 1700 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage upto 5m height. - For Super Structure (Deck slab) Clauses 800, 1205.4 and 1205.5 MORD 6874.60 Cum 29 10.84 Providing and laying cement concrete wearing course M 30 (Design Mix) grade using 20 & 10mm metal (HBG) mechanically mixed excluding reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3 MORD and 2702 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage - 800, 1206.3 MORD 5999.50 Cum S.No Quantity Description Specification No Rate Unit of measure ment 30 4.50 Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 MORD & 1100, 1600 MORTH for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, VAT - For Foundation Clauses 1000, 1002 MORD 58517.30 MT 31 481.84 Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8 MORD / 710.14 of IRC, 78 & 2200 MORTH, including contractors profit & Over head charges, VAT and Seigneorage 78& 2200 MORTH 1354.50 Cum 32 2.00 Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 MORD / Sections 1600 & 2200 MORTH for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, VAT - For Sub StructuresBed blocks Clauses 1002, 1005, 1010 & 1202 MORD 58691.90 MT 33 5.50 Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, VAT - For Super Structures Clauses 1002, 1010 and 1202 MORD 59945.90 MT 34 103.09 Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD including contractors profit & Over head charges, VAT and Seigneorage etc., complete 1501 MORD 6176.30 Cum S.No Quantity Description Specification No Rate Unit of measure ment Total 5) 6m slab culvert at 7/790km 35 161.19 Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage - For Foundations 305 MORD 95.20 Cum 36 27.84 Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size Graded hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage For levelling course 802, 803, 1202 & 1203 MORD 4175.10 Cum 37 105.61 Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage etc. complete.Footings 802, 804, 805, 806, 807, 1202 and 1204 MORD 4600.80 Cum 38 79.30 Providing and laying reinforced cement concrete M20 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in Substructure as per drawing and technical specifications Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including overhead charges & Contractors profit but excluding VAT and seigniorage charges upto 5m height. 802, 804, 805, 806, 807, 1202 and 1204 MORD 5998.62 Cum 39 6.53 Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage (upto 5m height) Bed blocks Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD 6318.80 Cum 40 28.29 Providing and laying reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 MORD / Sections 1500, 1600 & 1700 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage upto 5m height. - For Super Structure (Deck slab) Clauses 800, 1205.4 and 1205.5 MORD 6874.60 Cum 41 3.83 Providing and laying cement concrete wearing course M 30 (Design Mix) grade using 20 & 10mm metal (HBG) mechanically mixed excluding reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3 MORD and 2702 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage - Clauses 800 and 1206.3 5999.50 Cum S.No Quantity Description Specification No Rate Unit of measure ment 42 51.00 Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 MORD / 2706 & 2200 MORTH including contractors profit & Over head charges, VAT and Seigneorage etc. complete. - Clauses 614, 709, 1204.3.7 MORD 364.40 Nos. 43 2.00 Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 MORD / Sections 1600 & 2200 MORTH for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, VAT - For Sub Structures Bed blocks Clauses 1002, 1005, 1010 & 1202 MORD 58691.90 MT 44 6.00 Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, VAT - For Super Structures Deck slab Clauses 1002, 1010 and 1202 MORD 59945.90 MT 45 94.07 Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 MORD / 710.14 of IRC, 78 & 2200 MORTH, including contractors profit & Over head charges, VAT and Seigneorage Clause 1204.3.8 MORD 616.30 Cum 46 97.50 Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain (not exceeding 0.6 m depth) and foundation of other structures including breaking clods, ramming, spreading, sectioning, grading compacting with vibratory roller 80-100KN to OMC compaction including to a top width of 7.5m and raising to required height complete etc.as per requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 MORD/ 305 MORTH including contractors profit & Over head charges, VAT and Seigneorage. etc. complete. 301.5 MORD 109.00 Cum 47 10.13 P.C.C. M 15 ordinary grade (1:2.5:5) using 40,20 & 10mm metal (HBG) mechanically mixed leveling course below approach slab complete as per drawing and technical specifications Clauses 800 and 1211 MORD & 2700 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage 800 and 1211 MORD 4945.00 Cum 48 6.75 Reinforced Cement Concrete M 25 grade approach slab using 20 & 10mm metal (HBG) mechanically mixed excluding reinforcement complete as per drawing and technical specifications Clauses 800 and 1211 MORD / 1500, 1600, 1700 & 2704 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage 800 and 1211 MORD 5489.90 Cum S.No Quantity Description Specification No Rate Unit of measure ment 49 13.60 Construction of R.C.C. railing of M 25 grade (excluding cost of reinforcement) in cast-in-situ with 20 & 10 mm nominal size aggregate (HBG), true to line and grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre spacing between vertical posts not to exceed 2000 mm as per drawing and technical specifications Clauses 800, 900 and 1208.3 MORD ,including contractors profit & Over head charges, VAT and Seigneorage 1208 MORD 824.90 Rmt 50 11.74 Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8 MORD / 710.14 of IRC, 78 & 2200 MORTH, including contractors profit & Over head charges, VAT and Seigneorage 78& 2200 MORTH 1354.50 Cum Total VI Road dam8/868-8/892 51 108.00 Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage - For Foundations 305 MORD 95.20 Cum 52 25.92 Filling in foundation trenches with Sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH ,including overhead charges & Contractors profit but excluding VAT and seigniorage charges etc.,complete for foundations. 305.3.9 MORD 542.30 Cum 53 21.12 Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size Graded hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage For levelling course 802, 803, 1202 & 1203 MORD 4175.10 Cum 54 63.64 Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage etc. complete. 802, 804, 805, 806, 807, 1202 and 1204 MORD 4600.80 Cum S.No Quantity Description Specification No Rate Unit of measure ment 55 104.85 Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8 MORD / 710.14 of IRC, 78 & 2200 MORTH, including contractors profit & Over head charges, VAT and Seigneorage 78& 2200 MORTH 1354.50 Cum 56 36.48 Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD including contractors profit & Over head charges, VAT and Seigneorage etc., complete 1501 MORD 6176.30 Cum 57 22.50 Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause 1106 MORD ,including contractors profit & Over head charges, VAT and Seigneorage - For Pipe Culverts600 mm dia 1106 MORD 3526.40 RM 6) 9V 3M submersible vented causeway at 10/3-10/4 58 706.86 Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage - For Foundations 305 MORD 95.20 Cum S.No Quantity Description Specification No Rate Unit of measure ment 59 137.63 Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size Graded hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage For levelling course 802, 803, 1202 & 1203 MORD 4175.10 Cum 60 366.92 Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage etc. complete. 802, 804, 805, 806, 807, 1202 and 1204 MORD 4600.80 Cum 61 57.44 Providing concrete for reinforced concrete M20 grade (Design mix) in open foundations using 20 & 10mm nominal size Graded hard stone aggregate, Mechanically mixed placed in foundation and compacted by vibration including curing for 14 days completed as per drawings and tech. specifications clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH including over head charges & contractor profit VAT & Seignorage charges- for Raft foundation 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH 5671.42 Cum 62 1043.89 Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8 MORD / 710.14 of IRC, 78 & 2200 MORTH, including contractors profit & Over head charges, VAT and Seigneorage 78& 2200 MORTH 1354.50 Cum 63 9.83 Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage (upto 5m height) Bed blocks Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD 6318.80 Cum 64 78.80 Providing and laying reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 MORD / Sections 1500, 1600 & 1700 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage upto 5m height. - For Super Structure (Deck slab) Clauses 800, 1205.4 and 1205.5 MORD 6874.60 Cum S.No Quantity Description Specification No Rate Unit of measure ment 65 4.00 Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 MORD / Sections 1600 & 2200 MORTH for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, VAT - For Sub StructuresBed blocks Clauses 1002, 1005, 1010 & 1202 MORD 58691.90 MT 66 16.19 Providing and laying cement concrete wearing course M 30 (Design Mix) grade using 20 & 10mm metal (HBG) mechanically mixed excluding reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3 MORD and 2702 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage - Clauses 800 and 1206.3 5999.50 Cum 67 6.00 Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 MORD & 1100, 1600 MORTH for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, VAT - For Foundation Clauses 1000, 1002 MORD 58517.30 MT 68 8.00 Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, VAT - For Super StructuresDeck Slab Clauses 1002, 1010 and 1202 MORD 59945.90 MT 69 88.83 Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD including contractors profit & Over head charges, VAT and Seigneorage etc., complete 1501 MORD 6176.30 Cum Total 7) 15V 3M submersible vented causeway at 12/975-13/100 S.No Quantity Description Specification No Rate Unit of measure ment 70 1042.34 Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage - For Foundations 305 MORD 95.20 Cum 71 202.41 Filling in foundation trenches / Pipe bedding with Sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage. 305.3.9 MORD 542.30 Cum 72 202.41 Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size Graded hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage For levelling course 802, 803, 1202 & 1203 MORD 4175.10 Cum 73 93.29 Providing concrete for reinforced concrete M20 grade (Design mix) in open foundations using 20 & 10mm nominal size Graded hard stone aggregate, Mechanically mixed placed in foundation and compacted by vibration including curing for 14 days completed as per drawings and tech. specifications clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH including over head charges & contractor profit VAT & Seignorage charges- for Raft foundation 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH 5671.42 Cum 74 559.58 Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage etc. complete. 802, 804, 805, 806, 807, 1202 and 1204 MORD 4600.80 Cum 75 554.05 Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8 MORD / 710.14 of IRC, 78 & 2200 MORTH, including contractors profit & Over head charges, VAT and Seigneorage 78& 2200 MORTH 1354.50 Cum 76 16.04 Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage (upto 5m height) Bed Blocks Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD 6318.80 Cum S.No Quantity Description Specification No Rate Unit of measure ment 77 130.71 Providing and laying reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 MORD / Sections 1500, 1600 & 1700 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage upto 5m height. - For Super Structure (Deck slab) Clauses 800, 1205.4 and 1205.5 MORD 6874.60 Cum 78 7.00 Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 MORD / Sections 1600 & 2200 MORTH for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, VAT - For Sub StructuresBed Blocks Clauses 1002, 1005, 1010 & 1202 MORD 58691.90 MT 79 26.88 Providing and laying cement concrete wearing course M 30 (Design Mix) grade using 20 & 10mm metal (HBG) mechanically mixed excluding reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3 MORD and 2702 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage - Clauses 800 and 1206.3 5999.50 Cum 80 10.00 Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 MORD & 1100, 1600 MORTH for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, VAT - For Foundation Clauses 1000, 1002 MORD 58517.30 MT 81 13.00 Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, VAT - For Super Structures For Deck Slab Clauses 1002, 1010 and 1202 MORD 59945.90 MT S.No Quantity Description Specification No Rate Unit of measure ment 82 93.32 Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD including contractors profit & Over head charges, VAT and Seigneorage etc., complete 1501 MORD 6176.30 Cum Total S.No Quantity Description Specification No Rate Unit of measure ment Routine maintenance 83 11.99 Routine maintenance cost for 1st Year 1900 MORD 43841.00 km 84 11.99 Routine maintenance cost for 2nd Year 1900 MORD 54036.00 km 85 11.99 Routine maintenance cost for 3rd Year 1900 MORD 64971.00 km 86 11.99 Routine maintenance cost for 4th Year 1900 MORD 75344.00 km 87 11.99 Routine maintenance cost for 5th Year 1900 MORD 85716.00 km Grand Total Grand Total Total no. of Items 87 only (Rupees Seven Crores Nine Lakhs Twenty Seven Thousand sixty and paise thirty four only)) 21.2.2014 Engineer - In - Chief P.R, PMGSY, Hyderabad Amount 7 79512.30 4403405.98 1922377.60 4720402.29 Schedule-A T01- Vinukonda-Karempudi R&B Road to Pedakancherla of Vinukonda (M) Package . No. AP061413 Amount 1466885.42 7068951.82 7973810.50 1724362.95 664690.35 Amount 8896970.13 487310.07 39408679.41 24020.40 30855.60 Amount 19020.80 9017.60 43162.50 126076.90 Amount 102250.51 1589460.57 2180503.15 204729.12 351429.55 633872.52 5062245.42 Amount 45356.14 527983.15 1489140.94 224871.80 42525.52 363528.85 65034.58 Amount 263327.85 652652.28 117383.80 329702.45 636714.77 Amount 4758222.13 15345.29 116234.78 485890.49 475690.57 41261.76 194482.43 22948.09 Amount 18584.40 117383.80 359675.40 57975.34 10627.50 50092.85 37056.83 Amount 11218.64 15901.83 2030370.00 10281.60 14056.42 88178.11 292794.91 Amount 142019.33 225311.42 79344.00 851985.79 67293.07 Amount 574619.01 1688125.54 325766.36 1413949.01 62113.80 541718.48 Amount 234767.60 97131.91 351103.80 479567.20 548640.73 6384796.51 Amount 99230.77 109766.94 845081.99 529086.77 2574515.66 750460.73 101353.55 Amount 898578.97 410843.30 161266.56 585173.00 779296.70 Amount 576372.32 8421027.26 Amount 525653.59 647891.64 779002.29 903374.56 1027734.84 3883656.92 70927060.34 Rs: 728.00 Lakhs S.No. Description km/ No. Amount 1 Road portion a) Road Portion 11.99 km 39408679 b) Road furniture 126078 2 1v 1mt slab culvert 18 Nos 5062248 3 6m slab culvert 1 Nos 2030370 4 6V 3M submersible vented causeway 1 Nos 4758223 5 9V 3M submersible vented causeway 1 Nos 6384797 6 15V 3M submersible vented causeway 1 Nos 8421029 7 Road dam 1 Nos 851985 8 Provision for DPR Charges 11.99 10000 119900 9 Unforeseen items LS 36691 PART - A Construction Total 67200000 10 Maintenance cost for 5 Years 3883658 11 Emergency repairs 1576342 5460000 PART - (A+B) Total 72660000 21.2.2014 Engineer - In - Chief P.R, PMGSY, Hyderabad T01- Vinukonda-Karempudi R&B Road to Pedakancherla of Vinukonda (M) Package . No. AP061413 Estimate amount: The road work is administratively sanctioned for Rs.728 lakhs for construction vide GO Rt No 33 of PR & RD (Progs-II)Dept. dated 15.02.2014. The part - A estimate is technically Sanctioned for Rs.672 Lakhs (Rupees Six Crores Seventy Two Lakhs only) Vide T.S.R No. /2013-14, Dt. -02-2014. PART - A PMGSY - II PART - B PART - B Routine Maintenance Total The part - B estimate is technically Approved for Rs.54.6 Lakhs. General Abstract