You are on page 1of 36

S.

No Quantity Description Specification


No
Rate Unit of
measure
ment
1 2 3 4 5 6
I Road Part
1 37863.00 Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs,
saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and
disposal of unserviceable materials and stacking of serviceable material to be used or
auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not
exceeding 150 mm in thickness as per Technical Specification Clause 201 MORD .
including contractors profit & Over head charges, VAT.
201 MORD 2.10 Sqm
2 40398.22 Construction of embankment with approved materials deposited at site from roadway
cutting and excavation from drain (not exceeding 0.6 m depth) and foundation of other
structures including breaking clods, ramming, spreading, sectioning, grading compacting
with vibratory roller 80-100KN to OMC compaction including to a top width of 7.5m and
raising to required height complete etc.as per requirement of Tables 300.1 and 300.2 as
per Technical Specification Clause 301.5 MORD/ 305 MORTH including contractors profit
& Over head charges, VAT and Seigneorage. etc. complete.
301.5 MORD 109.00 Cum
3 6721.60 Construction of improved subgrade/ Shoulders by providing selected earth having minimum
CBR of 10%, MDD not less than 1.85 g/cc with LL & PI not more than 40% and 20
respectively and spreading in uniform layers with tractor grader on prepared surface, and
compacted at OMC with vibratory roller 80-100 kN to meet requirement of Table 300.2 with
as per Technical Specification Clause 303 MORD / 305 MORTH, by using machinery
including contractors profit & Over head charges, VAT and Seigneorage etc. complete.
303 MORD 286.00 Cum
4 3390.85 Construction of granular sub-base by providing well graded material(Table 400.1) with
Grading III Material(HBG M/C +Stone dust) CBR Value not less than 20 and PI Value
less than 6 spreading in uniform layers with Tractor grader on prepared surface, mixing by
mix in place method with rotavator at OMC, and compacting with Vibratory Roller to
achieve the desired density, complete as per Technical Specification Clause 401 MORD
including contractors profit & Over head charges, VAT and Seigneorage etc. complete.
401 MORD 1392.10 Cum
Schedule-A
T01- Vinukonda-Karempudi R&B Road to Pedakancherla of Vinukonda (M) Package . No. AP061413
S.No Quantity Description Specification
No
Rate Unit of
measure
ment
5 5128.97 Construction of Shoulders by providing selected earth having MDD not less than 1.85 g/cc
with LL & PI not more than 40% and 20 respectively. and, spreading in uniform layers with
tractor grader on prepared surface, and compacted at OMC with vibratory roller 80-100 kN
to achieve the desired density, complete as per Technical Specification Clause 407 MORD
and clause 305 & 305.4.4 MORTH including contractors profit & Over head charges, VAT
and Seigneorage etc. complete.
303, 407
MORD and
clause 305 &
305.4.4
MORTH
286.00 Cum
6 3158.32 Providing, laying, spreading and compacting stone aggregates of specific sizes for Grading
2 material to water bound macadam specification including spreading in uniform thickness,
hand packing, rolling with Vibratory roller 80-100 kN in stages to proper grade and camber,
applying and brooming, stone screening/binding materials to fill-up the interstices of coarse
aggregate, watering and compacting to the required density grading 2 as per Technical
Specification Clause 405 MORD / 404 MORTH. For compacted thickness of 75 mm.
including contractors profit & Over head charges, VAT and Seigneorage etc., complete for
Grade II
405 MORD 2238.20 Cum
7 3158.32 Providing, laying, spreading and compacting stone aggregates of specific sizes HBG
Machine Crushed metal to water bound macadam Grade III specification including
spreading in uniform thickness, hand packing, rolling with Vibratory roller 80-100 kN in
stages to proper grade and camber, applying and brooming, stone screening to fill-up the
interstices of coarse aggregate, watering and compacting to the required density Grading 3
as per Technical Specification Clause 405 MORD/ 404 MORTH. For compacted thickness
of 75 mm. including contractors profit & Over head charges, VAT and Seigneorage etc.,
complete
405 MORD 2524.70 Cum
8 42367.64 Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of
granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0
kg/sqm using mechanical means as per Technical Specification Clause 502 MORD (for use
on Wet mix macadam & WBM) ,including contractors profit & Over head charges, VAT etc.,
complete for Prime Coat
502 MORD 40.70 Sqm
9 44911.51 Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor
at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer
& cleaned with Hydraulic broom as per Technical Specification Clause 503 MORD,
including contractors profit & Over head charges, VAT etc., complete for Tack Coat
503 MORD 14.80 Sqm
S.No Quantity Description Specification
No
Rate Unit of
measure
ment
10 44911.51 Providing, laying and rolling of close-graded premix surfacing (Mix seal surfacing) material
of 20 mm thickness composed of 13.2 mm to 0.9 mm (Type-B) aggregates as per Table
500.15 of MORD using penetration grade bitumen to required line, grade and level to serve
as wearing course on a previously prepared base, including mixing in a suitable Hot Mix
plant (By mechanical means), laying and rolling with a three wheel 8-10 kN static roller and
finishing to required level and grades as per Technical Specification Clause 509 MORD,
including contractors profit & Over head charges, VAT and Seigneorage
512 MORTH 198.10 Sqm
11 78.90 Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain
cement concrete pavement, thickness as per design, over a prepared sub base, with 43
grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine
aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum
capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed
side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges,
steel plates including levelling the formwork as per drawing), spreading the concrete with
sholvels, rakes, compacted using needle, screed and plate vibrators and finished in
continuous operation including provision of contraction and expansion, construction joints,
applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert
and construction joints, admixtures as approved, curing of concrete slabs for 14- days,
curing compound (where specified) and water finishing to lines and grade as per drawing
and Technical Specification Clause 1501 MORD including contractors
profit & Over head charges, VAT and Seigneorage etc., complete
1501 MORD 6176.30 Cum
Total
II Road Furniture
12 12 Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as
per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical
Specification Clause 1703 MORD / 804 MORTH including contractors profit & Over head
charges, VAT and Seigneorage Ordinary KM Stone
MORD 1703 2001.70 Nos
13 54 Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as
per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical
Specification Clause 1703 MORD / 804 MORTH including contractors profit & Over head
charges, VAT and Seigneorage 200M Stone
MORD 1703 571.40 Nos
S.No Quantity Description Specification
No
Rate Unit of
measure
ment
14 2 Providing & fixing of typical PMGSY informatory sign board with LOGO as per MORD
secifications and drawing. Three MS plates of 1.6mm thick, top and middle plate duly
welded with MS flat iron 25mmx5mm size on black on edges. The lower plate will be
welded with MS angle iron frame of lower most plate and flate iron frame of middle plate will
be welded to 2 nos 75mmx75mm of 12 SWG sheet tubes posts duly embedded in CC M15
grade blocks of 450mmx450mmx600mm, 600mm below ground level. The top most
diamond plate will be welded to middle plate by 47mmx47mm of 12 SWG sheet plate tube.
All MS will be stove enmeled on both sides. Lettering and paining of superior quality in
required shede and colour. All sections of framed posts and sheet tube will be painted with
primer and two coats of epoxy paint as per drawing clause 1701 and annexure 1700.1 if
MORD including contractors profit & Over head charges, VAT and Seigneorage
MORD 1701 9510.40 Nos
15 4 Providing and erecting direction and place identifications of semi reflective sign boards up to
0.9 sqm size board as per IRC:67 made of 2 mm thick M.S. Sheet duly stove enameled
paint in white colour in front and grey colour on back with red reflective border of 70 mm
width and required message, letters, figures with reflective engineering grade tape as per
MORD specifications of required shade and colour. supported and welded on 47 mm x 47
mm of 12 SWG Square tube of 3050 mm height duly strengthened by 25 mm x 5 mm M/s
flat iron on edges on back firmly fixed to the ground by means of properly designed
foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below
ground level as per drawings and Technical Specification Clause 1701 MORD including
contractors profit & Over head charges, VAT and Seigneorage up to 0.9 sqm size board
MORD 1701 2254.40 Nos
16 25 Providing and fixing of semi-reflective cautionery, mandatory and informatory boards as per
IRC:67 made of 1.5mm thick MS sheet duly stove enamelled paint in white colour in front
and grey colour on back with red reflective boarder of 65mm width and required letters and
figures with reflective engineering grade tape as per clause 1701.3.9 of MORD for rural
roads specification of required shade and colour supported and welded on 47x47mm of 12
SWG square tube of 3050mm height duly strenthened by 25x5mm MS flat iron on edges on
back firmly fixed to ground by means of properly designed foundations with M-15 grade CC
450x450x600 mm , 600mm below ground level as per approved drawings and technical
specification Clause 1701.2.2 of MORD including contractors profit & Over head charges,
VAT and Seigneorage with 600X 600 mm size MS sheet
Clause 1701
MORD
1726.50 Nos
Total
III 1v 1mt slab culvert at 2/350,2/810,3/812,4/350,4/650, 5/100,5/300, 5/630, 7/410, 8/940,
9/060, 9/455, 10/150, 10/650, 10/920, 11/440, 11/910, 12/460
S.No Quantity Description Specification
No
Rate Unit of
measure
ment
17 1074.06 Earthwork in excavation for structures as per drawing and technical specifications Clause
305.1 including setting out, construction of shoring and bracing, removal of stumps and
other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom
and backfilling in trenches with excavated suitable material as per Technical Specification
305 MORD / 304 MORTH ,including contractors profit & Over head charges, VAT and
Seigneorage - For Foundations
305 MORD 95.20 Cum
18 380.70 Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal
size Graded hard stone aggregate (HBG), mechanically mixed, placed in foundation and
compacted by vibration including curing for 14 days complete as per drawings and technical
specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH
,including contractors profit & Over head charges, VAT and Seigneorage For levelling
course
802, 803, 1202
& 1203 MORD
4175.10 Cum
19 473.94 Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in
foundation complete as per drawings and technical specification Clauses 802, 804, 805,
806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors
profit & Over head charges, VAT and Seigneorage etc. complete.
802, 804, 805,
806, 807, 1202
and 1204
MORD
4600.80 Cum
20 32.40 Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG)
mechanically mixed in substructure complete as per drawings and technical specification
Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH
,including contractors profit & Over head charges, VAT and Seigneorage (upto 5m height)
Bed blocks
Clauses 802,
804, 805, 806,
807, 1202 and
1204 MORD
6318.80 Cum
21 51.12 Providing and laying reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm
metal (HBG) mechanically mixed in superstructure as per drawing and technical
specifications Clauses 800, 1205.4 and 1205.5 MORD / Sections 1500, 1600 & 1700
MORTH ,including contractors profit & Over head charges, VAT and Seigneorage upto 5m
height. - For Super Structure (Deck slab)
Clauses 800,
1205.4 and
1205.5 MORD
6874.60 Cum
22 10.80 Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructure complete as
per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 MORD /
Sections 1600 & 2200 MORTH for Bars below 36 mm dia including over laps and wastage,
where they are not welded ,including contractors profit & Over head charges, VAT - For Sub
Structures
Clauses 1002,
1005, 1010 &
1202 MORD
58691.90 MT
Total
IV) 6V 3M submersible vented causeway at 4/775-4/875
S.No Quantity Description Specification
No
Rate Unit of
measure
ment
23 476.43 Earthwork in excavation for structures as per drawing and technical specifications Clause
305.1 including setting out, construction of shoring and bracing, removal of stumps and
other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom
and backfilling in trenches with excavated suitable material as per Technical Specification
305 MORD / 304 MORTH ,including contractors profit & Over head charges, VAT and
Seigneorage - For Foundations
305 MORD 95.20 Cum
24 126.46 Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal
size Graded hard stone aggregate (HBG), mechanically mixed, placed in foundation and
compacted by vibration including curing for 14 days complete as per drawings and technical
specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH
,including contractors profit & Over head charges, VAT and Seigneorage For levelling
course
802, 803, 1202
& 1203 MORD
4175.10 Cum
25 323.67 Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in
foundation complete as per drawings and technical specification Clauses 802, 804, 805,
806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors
profit & Over head charges, VAT and Seigneorage etc. complete.
802, 804, 805,
806, 807, 1202
and 1204
MORD
4600.80 Cum
26 39.65 Providing concrete for reinforced concrete M20 grade (Design mix) in open foundations
using 20 & 10mm nominal size Graded hard stone aggregate, Mechanically mixed placed in
foundation and compacted by vibration including curing for 14 days completed as per
drawings and tech. specifications clause 802, 803, 1202 & 1203 MORD and 1500, 1700 &
2100 MORTH including over head charges & contractor profit VAT & Seignorage charges-
for Raft foundation
802, 803, 1202
& 1203 MORD
and 1500, 1700
& 2100 MORTH
5671.42 Cum
27 6.73 Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG)
mechanically mixed in substructure complete as per drawings and technical specification
Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH
,including contractors profit & Over head charges, VAT and Seigneorage (upto 5m height)
Bed Blocks
Clauses 802,
804, 805, 806,
807, 1202 and
1204 MORD
6318.80 Cum
28 52.88 Providing and laying reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm
metal (HBG) mechanically mixed in superstructure as per drawing and technical
specifications Clauses 800, 1205.4 and 1205.5 MORD / Sections 1500, 1600 & 1700
MORTH ,including contractors profit & Over head charges, VAT and Seigneorage upto 5m
height. - For Super Structure (Deck slab)
Clauses 800,
1205.4 and
1205.5 MORD
6874.60 Cum
29 10.84 Providing and laying cement concrete wearing course M 30 (Design Mix) grade using 20 &
10mm metal (HBG) mechanically mixed excluding reinforcement complete as per drawing
and technical specifications Clauses 800 and 1206.3 MORD and 2702 MORTH ,including
contractors profit & Over head charges, VAT and Seigneorage -
800, 1206.3
MORD
5999.50 Cum
S.No Quantity Description Specification
No
Rate Unit of
measure
ment
30 4.50 Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per
drawings and technical specifications Clauses 1000 and 1202 MORD & 1100, 1600
MORTH for Bars below 36 mm dia including over laps and wastage, where they are not
welded ,including contractors profit & Over head charges, VAT - For Foundation
Clauses 1000,
1002 MORD
58517.30 MT
31 481.84 Providing and laying filter media with granular crushed aggregates as per specification to a
thickness of not less than 600 mm with smaller size towards the soil and bigger size
towards the wall and providing over the entire surface behind abutment, wing wall, return
wall to the full height, compacted to firm condition complete as per drawing and technical
specification Clause 1204.3.8 MORD / 710.14 of IRC, 78 & 2200 MORTH, including
contractors profit & Over head charges, VAT and Seigneorage
78& 2200
MORTH
1354.50 Cum
32 2.00 Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructure complete as
per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 MORD /
Sections 1600 & 2200 MORTH for Bars below 36 mm dia including over laps and wastage,
where they are not welded ,including contractors profit & Over head charges, VAT - For Sub
StructuresBed blocks
Clauses 1002,
1005, 1010 &
1202 MORD
58691.90 MT
33 5.50 Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per
drawing and technical specifications Clauses 1002, 1010 and 1202 MORD / 1600 MORTH,
for Bars below 36 mm dia including over laps and wastage, where they are not welded
,including contractors profit & Over head charges, VAT - For Super Structures
Clauses 1002,
1010 and 1202
MORD
59945.90 MT
34 103.09 Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain
cement concrete pavement, thickness as per design, over a prepared sub base, with 43
grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine
aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum
capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed
side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges,
steel plates including levelling the formwork as per drawing), spreading the concrete with
sholvels, rakes, compacted using needle, screed and plate vibrators and finished in
continuous operation including provision of contraction and expansion, construction joints,
applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert
and construction joints, admixtures as approved, curing of concrete slabs for 14- days,
curing compound (where specified) and water finishing to lines and grade as per drawing
and Technical Specification Clause 1501 MORD including contractors
profit & Over head charges, VAT and Seigneorage etc., complete
1501 MORD 6176.30 Cum
S.No Quantity Description Specification
No
Rate Unit of
measure
ment
Total
5) 6m slab culvert at 7/790km
35 161.19 Earthwork in excavation for structures as per drawing and technical specifications Clause
305.1 including setting out, construction of shoring and bracing, removal of stumps and
other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom
and backfilling in trenches with excavated suitable material as per Technical Specification
305 MORD / 304 MORTH ,including contractors profit & Over head charges, VAT and
Seigneorage - For Foundations
305 MORD 95.20 Cum
36 27.84 Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal
size Graded hard stone aggregate (HBG), mechanically mixed, placed in foundation and
compacted by vibration including curing for 14 days complete as per drawings and technical
specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH
,including contractors profit & Over head charges, VAT and Seigneorage For levelling
course
802, 803, 1202
& 1203 MORD
4175.10 Cum
37 105.61 Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in
foundation complete as per drawings and technical specification Clauses 802, 804, 805,
806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors
profit & Over head charges, VAT and Seigneorage etc. complete.Footings
802, 804, 805,
806, 807, 1202
and 1204
MORD
4600.80 Cum
38 79.30 Providing and laying reinforced cement concrete M20 grade (Design Mix) using 20 & 10mm
metal (HBG) mechanically mixed in Substructure as per drawing and technical
specifications Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 &
2200 MORTH ,including overhead charges & Contractors profit but excluding VAT and
seigniorage charges upto 5m height.
802, 804, 805,
806, 807, 1202
and 1204
MORD
5998.62 Cum
39 6.53 Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG)
mechanically mixed in substructure complete as per drawings and technical specification
Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH
,including contractors profit & Over head charges, VAT and Seigneorage (upto 5m height)
Bed blocks
Clauses 802,
804, 805, 806,
807, 1202 and
1204 MORD
6318.80 Cum
40 28.29 Providing and laying reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm
metal (HBG) mechanically mixed in superstructure as per drawing and technical
specifications Clauses 800, 1205.4 and 1205.5 MORD / Sections 1500, 1600 & 1700
MORTH ,including contractors profit & Over head charges, VAT and Seigneorage upto 5m
height. - For Super Structure (Deck slab)
Clauses 800,
1205.4 and
1205.5 MORD
6874.60 Cum
41 3.83 Providing and laying cement concrete wearing course M 30 (Design Mix) grade using 20 &
10mm metal (HBG) mechanically mixed excluding reinforcement complete as per drawing
and technical specifications Clauses 800 and 1206.3 MORD and 2702 MORTH ,including
contractors profit & Over head charges, VAT and Seigneorage -
Clauses 800
and 1206.3
5999.50 Cum
S.No Quantity Description Specification
No
Rate Unit of
measure
ment
42 51.00 Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment,
wing wall, return wall with 100 mm dia AC pipe extending through the full width of the
structures with slope of 1(V):20(H) towards drawing face complete as per drawing and
technical specification Clauses 614, 709, 1204.3.7 MORD / 2706 & 2200 MORTH including
contractors profit & Over head charges, VAT and Seigneorage etc. complete. -
Clauses 614,
709, 1204.3.7
MORD
364.40 Nos.
43 2.00 Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructure complete as
per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 MORD /
Sections 1600 & 2200 MORTH for Bars below 36 mm dia including over laps and wastage,
where they are not welded ,including contractors profit & Over head charges, VAT - For Sub
Structures Bed blocks
Clauses 1002,
1005, 1010 &
1202 MORD
58691.90 MT
44 6.00 Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per
drawing and technical specifications Clauses 1002, 1010 and 1202 MORD / 1600 MORTH,
for Bars below 36 mm dia including over laps and wastage, where they are not welded
,including contractors profit & Over head charges, VAT - For Super Structures Deck slab
Clauses 1002,
1010 and 1202
MORD
59945.90 MT
45 94.07 Backfilling behind abutment, wing wall and return wall complete as per drawings & technical
specification Clause 1204.3.8 MORD / 710.14 of IRC, 78 & 2200 MORTH, including
contractors profit & Over head charges, VAT and Seigneorage
Clause
1204.3.8
MORD
616.30 Cum
46 97.50 Construction of embankment with approved materials deposited at site from roadway
cutting and excavation from drain (not exceeding 0.6 m depth) and foundation of other
structures including breaking clods, ramming, spreading, sectioning, grading compacting
with vibratory roller 80-100KN to OMC compaction including to a top width of 7.5m and
raising to required height complete etc.as per requirement of Tables 300.1 and 300.2 as
per Technical Specification Clause 301.5 MORD/ 305 MORTH including contractors profit
& Over head charges, VAT and Seigneorage. etc. complete.
301.5 MORD 109.00 Cum
47 10.13 P.C.C. M 15 ordinary grade (1:2.5:5) using 40,20 & 10mm metal (HBG) mechanically mixed
leveling course below approach slab complete as per drawing and technical specifications
Clauses 800 and 1211 MORD & 2700 MORTH ,including contractors profit & Over head
charges, VAT and Seigneorage
800 and 1211
MORD
4945.00 Cum
48 6.75 Reinforced Cement Concrete M 25 grade approach slab using 20 & 10mm metal (HBG)
mechanically mixed excluding reinforcement complete as per drawing and technical
specifications Clauses 800 and 1211 MORD / 1500, 1600, 1700 & 2704 MORTH ,including
contractors profit & Over head charges, VAT and Seigneorage
800 and 1211
MORD
5489.90 Cum
S.No Quantity Description Specification
No
Rate Unit of
measure
ment
49 13.60 Construction of R.C.C. railing of M 25 grade (excluding cost of reinforcement) in cast-in-situ
with 20 & 10 mm nominal size aggregate (HBG), true to line and grade, tolerance of vertical
railing post not to exceed 1 in 500, centre-to-centre spacing between vertical posts not to
exceed 2000 mm as per drawing and technical specifications Clauses 800, 900 and 1208.3
MORD ,including contractors profit & Over head charges, VAT and Seigneorage
1208 MORD 824.90 Rmt
50 11.74 Providing and laying filter media with granular crushed aggregates as per specification to a
thickness of not less than 600 mm with smaller size towards the soil and bigger size
towards the wall and providing over the entire surface behind abutment, wing wall, return
wall to the full height, compacted to firm condition complete as per drawing and technical
specification Clause 1204.3.8 MORD / 710.14 of IRC, 78 & 2200 MORTH, including
contractors profit & Over head charges, VAT and Seigneorage
78& 2200
MORTH
1354.50 Cum
Total
VI Road dam8/868-8/892
51 108.00 Earthwork in excavation for structures as per drawing and technical specifications Clause
305.1 including setting out, construction of shoring and bracing, removal of stumps and
other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom
and backfilling in trenches with excavated suitable material as per Technical Specification
305 MORD / 304 MORTH ,including contractors profit & Over head charges, VAT and
Seigneorage - For Foundations
305 MORD 95.20 Cum
52 25.92 Filling in foundation trenches with Sand as per drawing and technical specification Clause
305.3.9 MORD & 304 MORTH ,including overhead charges & Contractors profit but
excluding VAT and seigniorage charges etc.,complete for foundations.
305.3.9 MORD 542.30 Cum
53 21.12 Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal
size Graded hard stone aggregate (HBG), mechanically mixed, placed in foundation and
compacted by vibration including curing for 14 days complete as per drawings and technical
specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH
,including contractors profit & Over head charges, VAT and Seigneorage For levelling
course
802, 803, 1202
& 1203 MORD
4175.10 Cum
54 63.64 Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in
foundation complete as per drawings and technical specification Clauses 802, 804, 805,
806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors
profit & Over head charges, VAT and Seigneorage etc. complete.
802, 804, 805,
806, 807, 1202
and 1204
MORD
4600.80 Cum
S.No Quantity Description Specification
No
Rate Unit of
measure
ment
55 104.85 Providing and laying filter media with granular crushed aggregates as per specification to a
thickness of not less than 600 mm with smaller size towards the soil and bigger size
towards the wall and providing over the entire surface behind abutment, wing wall, return
wall to the full height, compacted to firm condition complete as per drawing and technical
specification Clause 1204.3.8 MORD / 710.14 of IRC, 78 & 2200 MORTH, including
contractors profit & Over head charges, VAT and Seigneorage
78& 2200
MORTH
1354.50 Cum
56 36.48 Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain
cement concrete pavement, thickness as per design, over a prepared sub base, with 43
grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine
aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum
capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed
side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges,
steel plates including levelling the formwork as per drawing), spreading the concrete with
sholvels, rakes, compacted using needle, screed and plate vibrators and finished in
continuous operation including provision of contraction and expansion, construction joints,
applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert
and construction joints, admixtures as approved, curing of concrete slabs for 14- days,
curing compound (where specified) and water finishing to lines and grade as per drawing
and Technical Specification Clause 1501 MORD including contractors
profit & Over head charges, VAT and Seigneorage etc., complete
1501 MORD 6176.30 Cum
57 22.50 Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding
of granular material including fixing collar with cement mortar 1:2 but excluding excavation,
protection works, backfilling, concrete and masonry works in head wall and parapets. Tech
Specification Clause 1106 MORD ,including contractors profit & Over head charges, VAT
and Seigneorage - For Pipe Culverts600 mm dia
1106 MORD 3526.40 RM
6) 9V 3M submersible vented causeway at 10/3-10/4
58 706.86 Earthwork in excavation for structures as per drawing and technical specifications Clause
305.1 including setting out, construction of shoring and bracing, removal of stumps and
other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom
and backfilling in trenches with excavated suitable material as per Technical Specification
305 MORD / 304 MORTH ,including contractors profit & Over head charges, VAT and
Seigneorage - For Foundations
305 MORD 95.20 Cum
S.No Quantity Description Specification
No
Rate Unit of
measure
ment
59 137.63 Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal
size Graded hard stone aggregate (HBG), mechanically mixed, placed in foundation and
compacted by vibration including curing for 14 days complete as per drawings and technical
specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH
,including contractors profit & Over head charges, VAT and Seigneorage For levelling
course
802, 803, 1202
& 1203 MORD
4175.10 Cum
60 366.92 Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in
foundation complete as per drawings and technical specification Clauses 802, 804, 805,
806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors
profit & Over head charges, VAT and Seigneorage etc. complete.
802, 804, 805,
806, 807, 1202
and 1204
MORD
4600.80 Cum
61 57.44 Providing concrete for reinforced concrete M20 grade (Design mix) in open foundations
using 20 & 10mm nominal size Graded hard stone aggregate, Mechanically mixed placed in
foundation and compacted by vibration including curing for 14 days completed as per
drawings and tech. specifications clause 802, 803, 1202 & 1203 MORD and 1500, 1700 &
2100 MORTH including over head charges & contractor profit VAT & Seignorage charges-
for Raft foundation
802, 803, 1202
& 1203 MORD
and 1500, 1700
& 2100 MORTH
5671.42 Cum
62 1043.89 Providing and laying filter media with granular crushed aggregates as per specification to a
thickness of not less than 600 mm with smaller size towards the soil and bigger size
towards the wall and providing over the entire surface behind abutment, wing wall, return
wall to the full height, compacted to firm condition complete as per drawing and technical
specification Clause 1204.3.8 MORD / 710.14 of IRC, 78 & 2200 MORTH, including
contractors profit & Over head charges, VAT and Seigneorage
78& 2200
MORTH
1354.50 Cum
63 9.83 Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG)
mechanically mixed in substructure complete as per drawings and technical specification
Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH
,including contractors profit & Over head charges, VAT and Seigneorage (upto 5m height)
Bed blocks
Clauses 802,
804, 805, 806,
807, 1202 and
1204 MORD
6318.80 Cum
64 78.80 Providing and laying reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm
metal (HBG) mechanically mixed in superstructure as per drawing and technical
specifications Clauses 800, 1205.4 and 1205.5 MORD / Sections 1500, 1600 & 1700
MORTH ,including contractors profit & Over head charges, VAT and Seigneorage upto 5m
height. - For Super Structure (Deck slab)
Clauses 800,
1205.4 and
1205.5 MORD
6874.60 Cum
S.No Quantity Description Specification
No
Rate Unit of
measure
ment
65 4.00 Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructure complete as
per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 MORD /
Sections 1600 & 2200 MORTH for Bars below 36 mm dia including over laps and wastage,
where they are not welded ,including contractors profit & Over head charges, VAT - For Sub
StructuresBed blocks
Clauses 1002,
1005, 1010 &
1202 MORD
58691.90 MT
66 16.19 Providing and laying cement concrete wearing course M 30 (Design Mix) grade using 20 &
10mm metal (HBG) mechanically mixed excluding reinforcement complete as per drawing
and technical specifications Clauses 800 and 1206.3 MORD and 2702 MORTH ,including
contractors profit & Over head charges, VAT and Seigneorage -
Clauses 800
and 1206.3
5999.50 Cum
67 6.00 Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per
drawings and technical specifications Clauses 1000 and 1202 MORD & 1100, 1600
MORTH for Bars below 36 mm dia including over laps and wastage, where they are not
welded ,including contractors profit & Over head charges, VAT - For Foundation
Clauses 1000,
1002 MORD
58517.30 MT
68 8.00 Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per
drawing and technical specifications Clauses 1002, 1010 and 1202 MORD / 1600 MORTH,
for Bars below 36 mm dia including over laps and wastage, where they are not welded
,including contractors profit & Over head charges, VAT - For Super StructuresDeck Slab
Clauses 1002,
1010 and 1202
MORD
59945.90 MT
69 88.83 Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain
cement concrete pavement, thickness as per design, over a prepared sub base, with 43
grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine
aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum
capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed
side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges,
steel plates including levelling the formwork as per drawing), spreading the concrete with
sholvels, rakes, compacted using needle, screed and plate vibrators and finished in
continuous operation including provision of contraction and expansion, construction joints,
applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert
and construction joints, admixtures as approved, curing of concrete slabs for 14- days,
curing compound (where specified) and water finishing to lines and grade as per drawing
and Technical Specification Clause 1501 MORD including contractors
profit & Over head charges, VAT and Seigneorage etc., complete
1501 MORD 6176.30 Cum
Total
7) 15V 3M submersible vented causeway at 12/975-13/100
S.No Quantity Description Specification
No
Rate Unit of
measure
ment
70 1042.34 Earthwork in excavation for structures as per drawing and technical specifications Clause
305.1 including setting out, construction of shoring and bracing, removal of stumps and
other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom
and backfilling in trenches with excavated suitable material as per Technical Specification
305 MORD / 304 MORTH ,including contractors profit & Over head charges, VAT and
Seigneorage - For Foundations
305 MORD 95.20 Cum
71 202.41 Filling in foundation trenches / Pipe bedding with Sand as per drawing and technical
specification Clause 305.3.9 MORD & 304 MORTH ,including contractors profit & Over
head charges, VAT and Seigneorage.
305.3.9 MORD 542.30 Cum
72 202.41 Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal
size Graded hard stone aggregate (HBG), mechanically mixed, placed in foundation and
compacted by vibration including curing for 14 days complete as per drawings and technical
specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH
,including contractors profit & Over head charges, VAT and Seigneorage For levelling
course
802, 803, 1202
& 1203 MORD
4175.10 Cum
73 93.29 Providing concrete for reinforced concrete M20 grade (Design mix) in open foundations
using 20 & 10mm nominal size Graded hard stone aggregate, Mechanically mixed placed in
foundation and compacted by vibration including curing for 14 days completed as per
drawings and tech. specifications clause 802, 803, 1202 & 1203 MORD and 1500, 1700 &
2100 MORTH including over head charges & contractor profit VAT & Seignorage charges-
for Raft foundation
802, 803, 1202
& 1203 MORD
and 1500, 1700
& 2100 MORTH
5671.42 Cum
74 559.58 Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in
foundation complete as per drawings and technical specification Clauses 802, 804, 805,
806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors
profit & Over head charges, VAT and Seigneorage etc. complete.
802, 804, 805,
806, 807, 1202
and 1204
MORD
4600.80 Cum
75 554.05 Providing and laying filter media with granular crushed aggregates as per specification to a
thickness of not less than 600 mm with smaller size towards the soil and bigger size
towards the wall and providing over the entire surface behind abutment, wing wall, return
wall to the full height, compacted to firm condition complete as per drawing and technical
specification Clause 1204.3.8 MORD / 710.14 of IRC, 78 & 2200 MORTH, including
contractors profit & Over head charges, VAT and Seigneorage
78& 2200
MORTH
1354.50 Cum
76 16.04 Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG)
mechanically mixed in substructure complete as per drawings and technical specification
Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH
,including contractors profit & Over head charges, VAT and Seigneorage (upto 5m height)
Bed Blocks
Clauses 802,
804, 805, 806,
807, 1202 and
1204 MORD
6318.80 Cum
S.No Quantity Description Specification
No
Rate Unit of
measure
ment
77 130.71 Providing and laying reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm
metal (HBG) mechanically mixed in superstructure as per drawing and technical
specifications Clauses 800, 1205.4 and 1205.5 MORD / Sections 1500, 1600 & 1700
MORTH ,including contractors profit & Over head charges, VAT and Seigneorage upto 5m
height. - For Super Structure (Deck slab)
Clauses 800,
1205.4 and
1205.5 MORD
6874.60 Cum
78 7.00 Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructure complete as
per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 MORD /
Sections 1600 & 2200 MORTH for Bars below 36 mm dia including over laps and wastage,
where they are not welded ,including contractors profit & Over head charges, VAT - For Sub
StructuresBed Blocks
Clauses 1002,
1005, 1010 &
1202 MORD
58691.90 MT
79 26.88 Providing and laying cement concrete wearing course M 30 (Design Mix) grade using 20 &
10mm metal (HBG) mechanically mixed excluding reinforcement complete as per drawing
and technical specifications Clauses 800 and 1206.3 MORD and 2702 MORTH ,including
contractors profit & Over head charges, VAT and Seigneorage -
Clauses 800
and 1206.3
5999.50 Cum
80 10.00 Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per
drawings and technical specifications Clauses 1000 and 1202 MORD & 1100, 1600
MORTH for Bars below 36 mm dia including over laps and wastage, where they are not
welded ,including contractors profit & Over head charges, VAT - For Foundation
Clauses 1000,
1002 MORD
58517.30 MT
81 13.00 Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per
drawing and technical specifications Clauses 1002, 1010 and 1202 MORD / 1600 MORTH,
for Bars below 36 mm dia including over laps and wastage, where they are not welded
,including contractors profit & Over head charges, VAT - For Super Structures For Deck
Slab
Clauses 1002,
1010 and 1202
MORD
59945.90 MT
S.No Quantity Description Specification
No
Rate Unit of
measure
ment
82 93.32 Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain
cement concrete pavement, thickness as per design, over a prepared sub base, with 43
grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine
aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum
capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed
side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges,
steel plates including levelling the formwork as per drawing), spreading the concrete with
sholvels, rakes, compacted using needle, screed and plate vibrators and finished in
continuous operation including provision of contraction and expansion, construction joints,
applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert
and construction joints, admixtures as approved, curing of concrete slabs for 14- days,
curing compound (where specified) and water finishing to lines and grade as per drawing
and Technical Specification Clause 1501 MORD including contractors
profit & Over head charges, VAT and Seigneorage etc., complete
1501 MORD 6176.30 Cum
Total
S.No Quantity Description Specification
No
Rate Unit of
measure
ment
Routine maintenance
83 11.99 Routine maintenance cost for 1st Year 1900 MORD 43841.00 km
84 11.99 Routine maintenance cost for 2nd Year 1900 MORD 54036.00 km
85 11.99 Routine maintenance cost for 3rd Year 1900 MORD 64971.00 km
86 11.99 Routine maintenance cost for 4th Year 1900 MORD 75344.00 km
87 11.99 Routine maintenance cost for 5th Year 1900 MORD 85716.00 km
Grand Total
Grand Total
Total no. of Items 87 only
(Rupees Seven Crores Nine Lakhs Twenty Seven Thousand sixty and paise thirty
four only))
21.2.2014
Engineer - In - Chief
P.R, PMGSY, Hyderabad
Amount
7
79512.30
4403405.98
1922377.60
4720402.29
Schedule-A
T01- Vinukonda-Karempudi R&B Road to Pedakancherla of Vinukonda (M) Package . No. AP061413
Amount
1466885.42
7068951.82
7973810.50
1724362.95
664690.35
Amount
8896970.13
487310.07
39408679.41
24020.40
30855.60
Amount
19020.80
9017.60
43162.50
126076.90
Amount
102250.51
1589460.57
2180503.15
204729.12
351429.55
633872.52
5062245.42
Amount
45356.14
527983.15
1489140.94
224871.80
42525.52
363528.85
65034.58
Amount
263327.85
652652.28
117383.80
329702.45
636714.77
Amount
4758222.13
15345.29
116234.78
485890.49
475690.57
41261.76
194482.43
22948.09
Amount
18584.40
117383.80
359675.40
57975.34
10627.50
50092.85
37056.83
Amount
11218.64
15901.83
2030370.00
10281.60
14056.42
88178.11
292794.91
Amount
142019.33
225311.42
79344.00
851985.79
67293.07
Amount
574619.01
1688125.54
325766.36
1413949.01
62113.80
541718.48
Amount
234767.60
97131.91
351103.80
479567.20
548640.73
6384796.51
Amount
99230.77
109766.94
845081.99
529086.77
2574515.66
750460.73
101353.55
Amount
898578.97
410843.30
161266.56
585173.00
779296.70
Amount
576372.32
8421027.26
Amount
525653.59
647891.64
779002.29
903374.56
1027734.84
3883656.92
70927060.34
Rs: 728.00 Lakhs
S.No. Description km/ No. Amount
1 Road portion
a) Road Portion 11.99 km 39408679
b) Road furniture 126078
2 1v 1mt slab culvert 18 Nos 5062248
3 6m slab culvert 1 Nos 2030370
4 6V 3M submersible vented causeway 1 Nos 4758223
5 9V 3M submersible vented causeway 1 Nos 6384797
6
15V 3M submersible vented
causeway
1 Nos 8421029
7 Road dam 1 Nos 851985
8 Provision for DPR Charges 11.99 10000 119900
9 Unforeseen items LS 36691
PART - A Construction Total 67200000
10 Maintenance cost for 5 Years 3883658
11 Emergency repairs 1576342
5460000
PART - (A+B) Total 72660000
21.2.2014
Engineer - In - Chief
P.R, PMGSY, Hyderabad
T01- Vinukonda-Karempudi R&B Road to Pedakancherla of Vinukonda (M)
Package . No. AP061413
Estimate amount:
The road work is administratively sanctioned for Rs.728 lakhs for construction
vide GO Rt No 33 of PR & RD (Progs-II)Dept. dated 15.02.2014.
The part - A estimate is technically Sanctioned for Rs.672 Lakhs (Rupees Six
Crores Seventy Two Lakhs only) Vide T.S.R No. /2013-14, Dt. -02-2014.
PART - A
PMGSY - II
PART - B
PART - B Routine Maintenance Total
The part - B estimate is technically Approved for Rs.54.6 Lakhs.
General Abstract