Accroding to an article entitled "Avoiding waste in the production process" by
Ecodesign online Pilot, Minimizing the reject rate is an important goal if only with a view to cost reduction, and it is also a key factor in quality management and quality assurance. Rejects could be defined as product without any direct benefit attributable to the input of resources used up in the manufacture of the product; this means that resource efficiency is absolutely zero. If consumption of resources is set off against the other products the overall resource efficiency decreases with the reject rate. A further problem of rejects, especially if they are rejected at a late stage in the production process, consists in the fact that the components have to be disassembled before they can be recycled on the production site. Table 23: . According to "The effects of job characteristics and working conditions on job performance" by Emin Kahya. Shikdar and Sawaqed (2003) investigated ergonomic factors which lead to low worker productivity in six different industries by applying questionnaires to 50 production managers. In this study, measures related to performance were productivity, quality, and absenteeism, and environmental factors including heat, humidity, noise, light, dust, and pollution. From the statistical analysis, they concluded that there was a signicant correlation(r= 0.234) between performance indicators and environmental factors. It indicates that companies with higher environmental problems had more performance related problems such as low productivity, high absenteeism. In the ergonomic literature, no research has examined the relationship between job characteristics, working conditions and employee job performance. Table 24: According to an article entitled "Operations Scheduling" by myomlab, the scheduler needs to know the job's current status: its location (waiting in line for a workstation or being processed at a workstation), how much of the operation has been completed, the actual arrival and departure times at each operating or waiting line, and the actual processing and setup times. The scheduler or software uses the priority sequencing rules to determine the processing sequence of jobs in workstation and the remaining information for estimating job arrival times at the next workstation, as well as determining whether an alternative workstation should be used when the primary one is busy. Because this information may change throughout the day, computers are needed to track the data need to maintain valid priorities. myomlab (n.d), Operations Scheduling Retrieved from http://wps.prenhall.com/wps/media/objects/7117/7288732/krm9e_SuppJ.pdf Table 27: According to "The effects of job characteristics and working conditions on job performance" by Emin Kahya Task performance involves patterns of behaviors that are directly involved in producing goods or service or activities that provide indirect support for the organizations core technical processes. Such criteria including quantity of output were widely used task performance criteria to measure employee job performance in the ergonomic studies. International Journal of Industrial Ergonomics (2007), The effects of job characteristics and working conditions on job performance Retrieved from http://www.theergonomicscenter.com/pdfs/job_satisfaction.pdf Ecodesign online Pilot (n.d), Avoiding waste in the production process Retrieved from http://www.ecodesign.at/pilot/ONLINE/ENGLISH/PDS/DETAILS/705.HTM