You are on page 1of 2

Talisman Malaysia Limited

HS&E Section
Job Safety Analysis
Doc. No: PM3-HSE-GEN-PR-F-00!
Re"ision: 0
Date: J#ne $00%
Pa&e: A''en(i) 3
JOB SAFETY ANALYSIS WORKSHEETS
JOB SAFETY ANALYSIS DATE PERMIT NO:
JOB Topping-up into diesel operated engines of mobile Equipment using Filler hose
WORK TEAM Welder/Rigger
SEQUENCE OF BASIC JOB STEPS POTENTIAL ACCIDENTS OR HAZARDS RECOMMENDED SAFE JOB PROCEDURES
1. Raise Flammable Release Work Permit for the
job.
onfli!t "ith others a!ti#ities.
$. Pull the fuel hose to the mobile equipment. Trip/%lip/Fall Walk steadil&.
'. (pen fuel !ap and insert hose end to the tank
opening.
)iesel spills. *nflammable +fire, -ake sure the engine has stopped. .et hot engine
!ool do"n. %tandb& fire e/tinguisher.
0. (pen hose suppl& #al#e. )iesel spill. )iesel splash. oordinate "ith produ!tion to open #al#e slo"l&.
1se "alkie-talkie. )o not o#er fill. lean the floor if
there is spillage.
2. Repla!e fuel !ap. 3ot !apping properl& +!ap drop off, Ensure that fuel tank !ap has been put properl&.
4. oil hose ba!k to original storage pla!e. Trip/%lip/Fall 5e a"are of tripping ha6ard.
WHAT TO CHECK AND NOT LIMITED TO WITH REFERENCE TO APPENDIX 1 & 2 OF THE JOB SAFETY ANALYSIS SECTION OF MOGP MANUAL
EXPERIENCE YES NO YES NO
7a#e &ou done this job before8 /
9re &ou kno"ledgeable "ith the job to be
performed8
/
7a#e &ou referred to te!hni!al dra"ing/#endor
pro!edure/%%P8
/ *s super#ision/e/perien!ed assistan!e required8 /
PPE YES NO YES NO
7ard hat8 / Work #est8 /
%afet& :lasses8 / 9pron8 /
%afet& shoes8 / :oggle8 /
Ear plugs8 / Fa!e shield8 /
Right t&pe of glo#es8 / Respirator& prote!tion8 /
%afet& harness8 /
POTENTIAL HAZARDS YES NO YES NO
%lipper& floor8 / Trapped pressure8 /
ongested area8 / Pressuri6ed equipment/#essel ha6ard8 /
Tripping8 / Fire/e/plosion ha6ards8 /
(#erhead "ork8 / Es!ape route8 /
Working at height8 / %ho!k/ele!tri!it&/stati!8 /
TML MANAGING OPERATIONS WITH GENERAL PROCEDURES Rev. 0
Talisman Malaysia Limited
HS&E Section
Job Safety Analysis
Doc. No: PM3-HSE-GEN-PR-F-00!
Re"ision: 0
Date: J#ne $00%
Pa&e: A''en(i) 3
%!affolding8 / 5reaker ra!k out8 /
%e!ure ladder8 / ;al#e isolation8 /
7ea#& load8 / :uard rotating equipment8 /
7ammer strikes8 / Po"er tools ha6ards8 /
Pin!h/trap finger< hand8 / 7igh noise area< double ear prote!tion8 /
5a!k injur& ha6ard8 / %park/hot slag8 /
%"inging obje!t8 / 5urn +heat/!hemi!al,8 /
Falling obje!t8 / 3ear radioa!ti#e materials/sour!es8 /
(thers !loseb&8 / En#ironmental spill8 /
%harp obje!t8 / 7ose !onne!tion8 /
E&e injur&8 / Wind&8 /
:rating/de!k opening8 / )ust&8 /
5lo!ked drains8 /
Prepared b&=>......................... >> Re#ie"ed b&= >>>>>>>>>>.. losed out= ?????????????????????????
TML MANAGING OPERATIONS WITH GENERAL PROCEDURES Rev. 0

You might also like