CURRICULUM VITAE

NAME
DATE OF BIRTH
ADDRESS

MARITAL STATUS
RELIGION
SEX
PASSPORT NO.
LANGUAGES

: PAULUS SUYANTA.
: KLATEN, 17th JULY 1959.
: PERAK KOTABARU NO.52, TEGALYOSO,
KLATEN, CENTRAL JAVA, INDONESIA.
POST CODE 57424.
MOBILE PHONE No. +62 81328888446
E-mail: <paulus_adyt@yahoo.com>
: MARRIED
: CATHOLIC
: MALE
: S 324923
: ENGLISH AND BAHASA INDONESIA.

EDUCATION,
Bachelor of Engineering degree, majoring in Mechanical.
INSTITUTE SAINS AND TECHNOLOGY AKPRIND , YOGYAKARTA 1983.
Bachelor of Engineering degree ( S-1 ) majoring in Energy Conversion,
INSTITUTE SAINS AND TECHNOLOGY AKPRIND , YOGYAKARTA 1999.
QUALIFICATION,
Senior Mechanical Engineer has reached the post of manager and hard work.
Having almost 27 years of experience and good relationship with all level.
Good experience in Oil and Gas project, Power Plant project and machining work.
HISTORY OF EMPLOYMENT,
Period
Client
Project
Position Held

:
:
:
:

August 2013 to now.


BEIJING HUAFU ENGINEERING Co. Ltd.
Nickel Ore Smelter Plant, PT. TITAN MINERAL UTAMA.
Construction Manager, PT. PROSYST BANGUN PERSADA,
Project Management Consultant.

Job Function,
Assist PMC project manager to control project execution concerning to the
schedule, material delivery and construction works.
To prepare necessary document and procedure related with standard and
code.
Sub-contractor monitoring and advising for any discrepancy of quality,
schedule and other problem.
Liaison with owner, main contractor and sub-contractor for all matter
related with schedule, procedure, quality, safety and environment.
Collect all necessary data related with quality assurance and quality
control.
Advising and suggest to main contractor for all matter related with
government regulation for construction works.
Assist and advising the main contractor to get local material resources

and supply.
Period
: July 2012 to May 2013.
Client
: BARRY CALEBOUT COMEXTRA INDONESIA, MAKASSAR.
Project
: Cacao Factory Expansion.
Position Held
: Site Manager, PT. GRAMA BAZITA.
Job Function,
Responsible to carry out the mechanical works, include boiler and piping.
Progress billing preparation for client approval.
Responsible to control erection schedule and budget.
Coordination with project control to prepare monthly report.
Coordination with HRD officer to plan and control man power recruitment.
Liaison to client and owner related with all matters of mechanical works.
Period
Client
Project
Position Held

:
:
:
:

January 2010 to April 2012.


CHEVRON NIGERIA LIMITED, NIGERIA, WEST AFRICA.
Escravos Gas To Liquid ( EGTL), Nigeria.
Mechanical Superintendent of Static Equipment,
TECHINT CIMIMONTUBI, NIGERIA.
Under contract with PT. TRILINK INDONESIA.

Job Function,
Responsible for 5 unit boilers erection, including all of auxiliaries.
Responsible to control man power, equipment and tools to achieve
working progress as per planning.
Liaison with client and all departments in connection with boiler erection.
Period
: October 2008 to October 2009.
Client
: KOBE STEEL CORPORATION, JAPAN.
Project
: GIIC, Pellet Plant 2, BAHRAIN, MIDDLE EAST.
Position Held
: Construction Manager, PT.TRUBA JAYA ENGINEERING.
Job Function,
Mechanical works execution, monitoring and control.
Responsible for the progress achievement and target schedule as per
contract agreement.
Liaison with client for working procedure and progress approval.
To coordinate all of supporting section to get better efficiency.
Period
Client
Project
Position Held

: January 2007 to September 2008.


: JAPAN GAS CORPORATION, JAPAN.
: TANGGUH LNG Project, West Papua Indonesia.
: Site Coordinator of Mechanical works,
PT. TRUBA JAYA ENGINEERING.

Job Function,
Responsible to carry out the works assigned by Site Manager.
Coordination with project control department to prepare progress report
before submit to client for approval.
Coordination with all staff and supervisors to achieve working target.
Coordination with client for problem solving of the works.

Monitoring and controlling heavy equipment operation and utilization.


Responsible of equipments preservation, include static equipment and
rotating equipment.

Period
: May 2005 to December 2006.
Client
: PT.PERUSAHAAN LISTRIK NEGARA, INDONESIA.
Project
: TANJUNG JATI B, 2 X 600 MW, Coal Fired Steam Power Plant.
Position Held
: Senior Mechanical Engineer, PT.JAYA CM.
Job Function,
Monitoring and control the balance of plant, boiler and auxiliary erection.
Monitoring material arrival and availability to avoid any erection delay.
Responsible to control preservation activity, including rotating equipments,
static and package equipments.
Period
: September 1997 to February 2005.
Client
: AUTOMOTIVE INDUSTRIES.
Product
: Automotive component manufacture.
Position Held
: Shop Manager, CV. SANJAYA.
Job Function,
Responsible to the Director for production activity, man power planning and
production cost.
To control sub-contractor for casting and machining works.
To check necessaries document related with the production processes and
delivery.
Period
: September 1994 to September 1996.
Client
: MITSUBISHI HEAVY INDUSTRY, JAPAN.
Project
: 800 MW, GRATI Combined Cycle Power Plant.
Position Held
: Shop Manager, PT. TRUBA JURONG ENGINEERING.
Job Function,
Responsible to the General Manager for all technical matters and financial
of the fabrication works.
Coordination with client to solve any problem encountered related with
design, material supply and fabrication of boiler parts.
To coordinate all supporting section to get good work efficiency.
Invoice issuing to client base on monthly fabrication progress approved.
Coordination with HRD officer to plan and control man power recruitment.
Period
Client
Project

: January 1993 to August 1994.


: SUMITOMO CORPORATION, JAPAN.
: Gas Firing Modification of Boiler, 2 x 200 MW,
Gresik Steam Power Plant.
: Site Manager, PT.TRUBA JURONG ENGINEERING.

Position Held
Job Function,
Responsible to General Manager for all technical matters, approval budget,
material purchasing and progress billing.
Responsible for firing system modification of 2(two) unit boilers from fuel oil
firing to oil and gas firing.

Coordination with client and owner for any problems related with boiler
modification work.
To coordinate all supporting section to get the good work and efficiency.
Assist commissioning team to conduct solo run test, no load test and steam
blowing to get the acceptance criteria of the boiler unit.
Period
: September 1991 to December 1992.
Client
: MITSUBISHI HEAVY INDUSTRY, JAPAN.
Project
: 1500 MW GGRESIK Combined Cycle Power Plant.
Position Held
: Chief Engineer, PT. TRUBA JURONG ENGINEERNG.
Job Function,
Responsible to carry out the erection works of 9 units gas turbine
and auxiliaries.
Coordination with supervisors, field engineer and other supporting staff to
achieved target schedule.
Monitoring material arrival and availability to avoid any erection delay.
Responsible to Site Manager for equipment schedule and utilization to keep
the work efficiency.

Period
: September 1989 to August 1991.
Client
: PT. PERKEBUNAN XXII, Surabaya.
Project
: Boiler Erection for CUKIR SUGER FACTORY.
Position Held
: Project Engineer, PT.DWIKA, ( Gunanusa group Companies).
Job Function,
Responsible to control fabrication processes of the boiler part and
auxiliaries.
To coordinate the 40 ton steam capacity boiler erection and auxiliaries.
To control man power force, equipment utilization and material delivery.
Assist to site manager for preparation of monthly progress report.
Period
Client
Project
Position Held

: September 1987 to 1989.


: CHIYODA Co, Ltd, Japan.
: Train D & E, PT. BADAK L N G Project, East Kalimantan.
: Fabrication Engineer, PT.CILEGON FABRICATORS,
( Truba group Companies ).

Job Function,
Responsible of material requisition, fabrication processes and product
delivery schedule.
Coordination with material control department to avoid any delay of
delivery.
Liaison with client to solve any problem related with fabrication drawing
and design.