Standby Police Battalion Headquarters Water Supply Calculation Sheet

Date:28-11-2007 Project # SP00 Sheet # 1 of 7


Project:
Site/Type
Site Checked By Approved By
Average Daily Demand 50 gaped
Design Population 500 People
Average Flow 25000 gpd
Peaking factor 5
Peak Flow 125000 gpd
Storage Tanks Capacity 25000 Gallons
94.635 m3
Take it 100 m3
Deep well pump
12.5 m3 /hr
208.33 lit / min
Selected pump discharge 210 lit / min
Delivery pipe diameter 65 mm
Pipe Cross section Area 0.0033 m2
velocity 1.0553 m/sec
Booster pump 5208.3 gph
328.59 lit / min
Selected pump discharge 350 lit / min
Delivery pipe diameter 90 mm
Pipe Cross section Area 0.0064 m2
velocity 0.9174 m/sec
Specified Data Specified Data
C 150 C 150
Q = volume flow 64 (gal/min) Q = volume flow 4 (gal/min)
di = inside diameter 2.5 (inches) di = inside diameter 1 (inches)
Calculated Pressure Loss Calculated Pressure Loss
f = friction head loss in feet of
water per 100 feet of pipe 2.520208 ft/100ft
f = friction head loss
in feet of water per
100 feet of pipe 1.281100976 ft/100ft
Calculated Flow Velocity Calculated Flow Velocity
v = flow velocity 4.104704 (ft/s) v = flow velocity 1.6034 (ft/s)
1.366866 (m/s) 0.5339322 (m/s)
Total length + equivalent length of
fittings of 75mm
165 m
Total length + equivalent
length of fittings of 25mm
24 m
549.45 ft 79.92 ft
Total Head loss through the 75mm
pipe
13.84729 ft
Total Head loss through
the 25mm pipe
1.0238559 ft
Total Head loss through the 75mm
pipe & 25mm
14.87114 ft
Total Head 68.061 ft
22.664 m
Mazin Sadiq
Deep well and booster pumps and Water tank Design Calculation Sheet
500 persons
UIProjects Afghanistan
Afghan National Police(ANP) Program\Standby Police Battalion Headquarters
Lashkar Gah, Afghanistan
Designed By
Deep well and booster
pumps and Water tank
Noorullah M.E.amiryar
United Infrastructure Projects
Standby Police Battalion Headquarters Water Supply Calculation Sheet
Date:28-11-2007 Project # SP00 Sheet # 2 of 7
Project:
Site/Type
Site Checked By Approved By
BOOSTER PUMP HEAD M.E.amiryar
TOTAL DISCHARGE AT 64 GPM
SIZE OF SERVICE MAIN 2.5 INCH
VELOCITY AT MAIN 4.104704 FT/SEC
WATER PRESSURE AT MAIN 32 P.S.I
ELEVATION AT WATER MAIN 0 FT
ELEVATION OF HIGHEST FIXTURE 10 FT
LOSS THRU METER 5 P.S.I
LOSS THRU REDUCE PRESSURE BACK FLOW PREVENTER 10 P.S.I
PRESSURE AT FIXTURE OUTLET (P.S.I ) 20 P.S.I
STATIC HEAD (FROM MAIN TO HIGHEST FIXTURE) 4.33 P.S.I
LOSS THRU FILTERS 0 P.S.I
LOSS THRU WATER SOFTNER 0 P.S.I
PRESSURE LOSS IN MAIN PIPE 6.916928901 P.S.I
TOTAL PRESSURE LOSS 46.2469289 P.S.I
HEAD OF PUMPE EQUALS 106.8058404 FT
35.56634486 M
Lashkar Gah, Afghanistan
Designed By
Noorullah Mazin Sadiq
PRESSURE LOSSES
TOTAL LENGTH OF PIPE FROM THE BOOSTR STATION TO FURTHEST
FIXTURE+(EQULENT LENGTH DUE TO FITTINGS)
629.37
FT
Water Supply Design Calculation Sheet
UIProjects Afghanistan
Afghan National Police(ANP) Program\Standby Police Battalion Headquarters United Infrastructure Projects
Standby Police Battalion Headquarters Water Supply Calculation Sheet
Date:28-11-2007 Project # SP00 Sheet # 3 of 7
Project:
Site/Type
Site Checked By Approved By
Working Graph for
Booster Pump
M.E.amiryar
UIProjects Afghanistan
Afghan National Police(ANP) Program\Standby Police Battalion Headquarters
Lashkar Gah, Afghanistan
Designed By
Noorullah
Working Graph for Booster Pump Design Calculation Sheet
Mazin Sadiq
United Infrastructure Projects
Standby Police Battalion Headquarters Water Supply Calculation Sheet
Date:28-11-2007 Project # SP00 Sheet # 4 of 7
Project:
Site/Type
Site Checked By Approved By
Power plan M.E.amiryar
P= {6.819 *L(V/C)^1.852 * (1/D)^1.167 * * g}/1000
Where:
P=
C = Roughness factor,150 for PVC pipes
L= Length of pipe in feet
V= Avrage velocity ,m/s
D=
According to Equation 5, chapter 35, ASHREA hand bock 2001
LOCATION
Working
Pressure
(Kpa)
Remain Pressure
in node
Gravity
Acceleration
Roughness
factor
Pipe Diameter
(m)
Velocity(m/sec) Density (kg/m3)
Network E.
length(meter)
Pressure drop in ( KPas)
over the length of the
tube/pipe
P1 311.3 308.1897956 9.81 150 0.09 1 1000 30 3.110204406
P2 311.3 303.524489 9.81 150 0.09 1 1000 75 7.775511015
P3 311.3 295.748978 9.81 150 0.09 1 1000 150 15.55102203
P4 311.3 294.1938758 9.81 150 0.09 1 1000 165 17.10612423
P5 311.3 282.9971399 9.81 150 0.09 1 1000 273 28.30286009
P6 311.3 279.1093844 9.81 150 0.09 1 1000 310.5 32.1906156
P7 311.3 285.174283 9.81 150 0.09 1 1000 252 26.12571701
P8 311.3 268.2555524 9.81 150 0.065 1 1000 284 43.04444761
P9 311.3 274.0812206 9.81 150 0.09 1 1000 359 37.21877939
P10 311.3 281.2865275 9.81 150 0.09 1 1000 289.5 30.01347252
P11 311.3 295.748978 9.81 150 0.09 1 1000 150 15.55102203
P12 311.3 288.7510181 9.81 150 0.09 1 1000 217.5 22.54898194
P13 311.3 305.0795912 9.81 150 0.09 1 1000 60 6.220408812
P14 311.3 300.8808152 9.81 150 0.09 1 1000 100.5 10.41918476
P15 311.3 290.4616305 9.81 150 0.09 1 1000 201 20.83836952
Pressure drop in ( KPas) over the length of the tube/pipe
Internal Daimeter of pipe,m
Pressure drop Design Calculation Sheet
Calculaton of pressure drop
UIProjects Afghanistan
Afghan National Police(ANP) Program\Standby Police Battalion Headquarters
Lashkar Gah, Afghanistan
Designed By
Noorullah Mazin Sadiq
United Infrastructure Projects
United Infrastructure Projects
United Infrastructure Projects
United Infrastructure Projects
United Infrastructure Projects
Standby Police Battalion Headquarters Water Supply Calculation Sheet
Date:28-11-2007 Project # SP00 Sheet # 5 of 7
Project:
Site/Type
Site Checked By Approved By
Power plan M.E.amiryar
Working graph for pressure drop Design Calculation Sheet
UIProjects Afghanistan
Afghan National Police(ANP) Program\Standby Police Battalion Headquarters
Lashkar Gah, Afghanistan
Designed By
Noorullah Mazin Sadiq
United Infrastructure Projects
United Infrastructure Projects
United Infrastructure Projects
United Infrastructure Projects
United Infrastructure Projects
Standby Police Battalion Headquarters Water Supply Calculation Sheet
Date:28-11-2007 Sheet # 6 of 7
Project:
Site/Type
Site
Septic Tank
Lashkar Gah, Afghanistan
Designed By Checked By Approved By
189 500 226.8 2(95(m3),1(40m3)
Noorullah M.E.amiryar
Septic tank size for Three days (m3) Taket it
Note: According the spicefication Average daily sewer water flow for residential and office facility based on capital flow of 189
liters.
Mazin Sadiq
Septic Tank Calculation Sheet
Septic Tank Size
Average daily sewer water flow for capita
(liter/day)
No of capita
UIProjects Afghanistan
Project # SP00
Afghan National Police(ANP) Program\Standby Police Battalion Headquarters
United Infrastructure Projects
United Infrastructure Projects
United Infrastructure Projects United Infrastructure Projects United Infrastructure Projects United Infrastructure Projects United Infrastructure Projects United Infrastructure Projects United Infrastructure Projects United Infrastructure Projects United Infrastructure Projects United Infrastructure Projects United Infrastructure Projects United Infrastructure Projects United Infrastructure Projects United Infrastructure Projects United Infrastructure Projects United Infrastructure Projects United Infrastructure Projects United Infrastructure Projects United Infrastructure Projects
Standby Police Battalion Headquarters Water Supply Calculation Sheet
Date:28-11-2007 Sheet # 7 of 7
Project:
Site/Type
Site
Seepage Tank
step (1) step (2) step (3) step (4)
Total
(m2)
1.00 SP00 Lashkar Gah 500 55.8 0.4 139.5 19.68 44.16 80.76 0 144.6 13.95
No. Volume (m3) Diameter (m) Depth (m)
1.00 13.95 2.3 3.35930069 36
NOTE:
Munimum Storage
Volume
Storage size
Percolation
Rate (min/cm)
According to the ufc_3_240_02n
Table 9 page 99 we have
Mazin Sadiq
Seepage Tank Calculation Sheet
Seepage Tank Size
No. Project Location Population
Waste Water
m3/day
Infiltration
record m/day
Needed
Surface for
Infiltration
(m2)
UIProjects Afghanistan
Project #
Noorullah
Absorption Surface Area (m2)
M.E.Amiryar
SP00
Afghan National Police(ANP) Program\Standby Police Battalion Headquarters
Lashkar Gah, Afghanistan
Designed By Checked By Approved By