Multi Sectoral Development Plan ::: Goalpara District
2 MULTI-SECTORAL DISTRICT DEVELOPMENT PLAN GOALPARA INDEX PARTICULARS PAGE NO Chapter-1 Synopsis 4 Chapter-2 Critical Gaps And Development Deficits (Baseline Survey) 5 - 9 Chapter-3 Planning Process and plan 10 Chapter-4 Interventions 11 - 22 Chapter-5 Summary of plan allocation (under each category) proposed under MSDP(Table-I). Financial and physical phasing for next three years under MSDP( Table-II) 26 - 27
28 - 30 Chapter-6 Beneficiary Selection and Asset Management 31 Chapter-7 Monitoring and Evaluation
32 Annexure-1 Unit cost of Home Solar lighting systems 33 - 34 Annexure-2 Unit cost of IAY houses 35 - 36 Annexures- 3A, 3B, 3C Health Sector Development Unit cost for a) Design of Health sub-centres b) Design of 24 X 7 labour rooms c) Design of Female wards
37 - 38 39 - 41 42 - 43 Annexures- 4A, 4B, 4C Safe drinking water i) Chemical analysis report ii) Piped water supply scheme (PWSS) at Nayapara, Goalpara. ii) Piped water supply scheme (PWSS) at Lakhipur.
44 45 - 47
48 - 50
Multi Sectoral Development Plan ::: Goalpara District
3 Annexures- 5A, 5B
Employment generating activities a) Handloom & Textiles sector Unit cost for i) Establishment of Common facility centres (CFC). ii) Skill up gradation training on weaving. iii) Skill up gradation training on dyeing. iv) Skill up gradation training on designing.
51 55
56 - 57
Annexures 6A, 6B, 6C, 6D, 6E, 6F, 6G
b) Animal Husbandary &Veterinary sector Unit cost for i) Broiler farming ii) Goatery farming iii) Dairy farming iv) Piggery farming v) Training vi) Pig breading farm. vii) Mini cattle breading farm ( Dairy farm) 58 -61 62 64 65 - 68 69 71 72 73-75 76-78 Annexures- 7 & 8 c) Organised marketing sector (forward linkages establishment) i) Establishment of 16 nos.rural SHG-Haats ii) Construction of market comprising 190 nos of room for vendors at Haseela-beel.
79 81 82 - 83 Annexure-9 d) Infrastructure Development of ITI building at Goalpara. i) Electrical trade. ii) Mechanical trade.
84 - 89 Annexure- 10 Education sector development. Unit cost for Construction of additional class rooms for high schools, high Madrassa and higher secondary school in minority concentrated areas.
90 - 93 Annexure- 11 Reply of Para wise clarification / information on MSDP as sought by Govt.of India. 94- 95 Annexure-12 A brief profile of Goalpara District 96-101
Multi Sectoral Development Plan ::: Goalpara District
4
CHAPTER 1 The Synopsis The District Goalpara District is one of 90 Minority concentration districts in the country and classified in category A i.e. the district is having both Socio-Economic and Basic amenities parameters below national average. The Survey Based on the guidelines of Ministry of Minority Affairs, Government of India, base line survey of the district was carried out by Omeo Kumar Das Institute of Social Changes, Guwahati, Assam. On the basis of the survey the Multi Sectoral Development Plan for Minorities has been drafted for the district. The Gaps & Priorities Plan schemes covering prioritized critical gaps and development indicators are proposed under this programme. Priorities have been given on pucca housing, better infrastructure of schools, basic health, critical infrastructure linkages that are required for optimizing services, skill development, marketing facilities which are required for improving living conditions besides beneficiary oriented schemes for creating income generating activities especially for the female. Partners in the process While preparing the schemes, views of the members of the District Level Committee on PMs New 15 pt. programme have been obtained along with the PRIS. The Plan/Project has been approved by the District Level Committee. The MSDP, which will change the socio-economic scenario of the minority people of Goalpara District, may be implemented successfully only through joint effort and responsibility of the Govt. functionaries as well as PRIS. Evaluation & Monitoring Proper evaluation and external monitoring will be carried out at the time of implementation. There is no doubt that inclusive growth, accelerated development and improvement in the quality of life of the people will be arrived at in the District of Goalpara with the help of all.
Gaon Panchayats having more than 25% Minority Population in the District
Multi Sectoral Development Plan ::: Goalpara District
5
CHAPTER 2
CRITICAL GAPS & DEVELOPMENT DEFICITS (THE BASELINE SURVEY)
At the time of preparation of the plan following aspects have been considered:
1. Goalpara district has been selected in Multi Sectoral Development Plan for the economic & educational upliftment of Minority Concentrated Districts and was classified in A category. Under A category, the district was found to be below national average in socio-economic & infrastructural parameters. As per the guidelines, the emphasis has been given to poverty alleviation, generation of employment, literacy & infrastructure. 2. The plan size is as per the outlay of Rs. 57.60 crore prescribed for the district. 3. The scheme predominantly focuses on rural areas. 4. Socio-economic and infrastructural development of the district has been considered for improving the quality of life of the people and reducing the imbalances during the 11th five-year plan. While this has been the principal objective, it has been kept in mind that at the time of making interventions under the MSDP, the minority concentrated areas are given preference. Although no location specific details in few sectors have been indicated in the plan, at the time of implementation of the schemes, minority dominated areas will be chosen for the implementation of the scheme. In sectors where achieving 100% saturation will not be possible during this plan period, it is proposed to address intervention only in the areas with substantial minority population under MSDP. 5. The baseline survey by Omeo Kumar Das Institute of Social Changes, Guwahati, Assam has identified priority areas for the multi-sectoral development for the district. The findings of the survey formed critical input for the formulation of MSDP.
Multi Sectoral Development Plan ::: Goalpara District
6
Ranking of deficits in order of priority as per baseline survey
Sl no
Indicators
Survey results India (NSS 2004-05) Gap between all India and District Priority 1 2 3=1-2 4 I) Socio-economic indicators 1 Rate of literacy 70.00 67.30 2.70 7 2 Rate of female literacy 64.84 57.10 7.74 9 3 Work participation rate 53.68 38.00 15.68 10 4 Female work participation rate 14.52 21.50 -6.98 6 II) Basic amenities indicators 5 Percentage of pucca houses 21.89 59.40 -37.51 2 6 Percentage of households with access to safe drinking water 70.22 87.90 -17.68 5 7 Percentage of households with sanitation facilities. 16.33 39.20 -22.87 4 8 Percentage of electrified households 15.11 67.90 -52.79 1 III)Health indicators 9 Percentage of fully vaccinated children 50.30
43.50 6.80
8 10 Percentage of institutional delivery. 15.02
38.70
-23.68
3
Most important facilities lacking in the villages: In the Goalpara district the transport & communication, drinking water supply and health facilities are the most important facilities lacking in the villages. However, the households across all religious groups placed road communication and drinking water supply ahead of health facilities as shown in the household database.
Other Findings of Survey: *The Assam Human Development (AHDR), 2003 states that Goalpara is one of the lowest ranked districts of Assam. The district ranks 18 in respect of HDI with an index value of 0.308 which is below the state average of 0.407. In terms of income, education and health this district occupies 14 th , 18 th and 16 th places respectively.
*Taking cognizance of the development deficits pointed out above, the first priority of multisector development plan for rural Goalpara should be expansion of rural electrification. As the present survey has clearly pointed out, nearly one third of the villages in the district are yet to be provided with electricity connection. In addition, poverty is a factor to restrict a large section of the households from availingthe facility in the villages having electricity connection.
Multi Sectoral Development Plan ::: Goalpara District
7 *Compared to the national scenario, the second priority area for an effective development intervention in the district should be rural housing, making provision for pucca houses for rural poor of the district under the existing centrally sponsored housing programme. As pointed out in the table above, the different between the existing scenario of the district and the national average is quite prominent.
*The present sample survey has reflected that majority of the rural households have access to the Govt. health service providers, although the access is not always easy primarily because of poor road connectivity, the issue of child delivery deserves adequate attention on priority basis.This issue, besides access to the services, involves behavioral change , specially of the predominant religious minority community of the district. Therefore, multi sector development plan forr the district must address this sensitive dimension in a gradual process.
* Safe drinking water is still one major problem in the Goalpara Municipal Board & Lakhipur Town, and therefore, the multisector development plan of the district may adequately emphasize on this one important issue.
* Although the literacy rate in the district is found a little above the national average,the present baseline survey has reflected that the rural areas are highly deprived of required education infrastructure leading to a relatively poor rate of illiteracy . The requirements are better education infrastructure, scholarship etc.In addition to incentives, the religious minority along side the ST & SC population should be sensitized . While aiming at promotion of literacy in the district, special emphasis shoul be on girl in order to address the issue of female literacy.
* The immunization status of the surveyed population shows that only about 50% of the children in the age group of 0-5 years have been fully immunized which needs to be addressed with serious concern. The quality service delivery and immunization of vaccination is found poor. In most of the cases the parents are not aware of the secod and third doses of vaccines. Immunization therefore, should be adequate emphasized through existing programme of NRHM.
* The survey indicates that more than 87% of the families are reported to be BPL but only a little more than 55% of them have BPL ration card.
* Preference for self- employment among the underemployed is more prevalent than salaried jobs in the sample villages. This means that Govt. needs to create more facilities for skill development training and make provisions of real services to keep the enthusiasm level high for the people in self employment endeavour, which is grossly missing in most of the State departments in the State.
a) percentage distribution of workforce by main industry Main industry Hindu Muslim Christian Male Femal e Total Male Femal e Total Male Femal e Total Cultivation 26.6 2.2 28.8 23.4 1.7 25.0 23.3 3.9 27.1 Livestock 0.6 0.6 0.9 0.3 0.3 1.2 0.8 Horticulture 1.1 1.1 .8 .8 1.6 .8 2.3 Fishing 1.0 1.0 Forestry 0.4 0.4 Poultry 0.4 0.4 0.1 0.1 0.8 0.8 Mining & quarrying 3.9 0.7 4.6 5.8 0.4 6.2 9.3 0.8 10.1
Multi Sectoral Development Plan ::: Goalpara District
8 Agricultural based manufacturing 1.3 0.7 2.0 0.3 0.3 0.5 Non- agricultural based manufacturing 3.7 2.8 6.5 1.8 0.3 2.1 6.2 1.6 7.8 Electricity, gas & water supply 0.2 0.2 0.4 0.4
b) Percentage distribution of sample households by own land . Hindu Muslim Christian SC ST OBC General Total General Total ST Total Land less 0.3 0.3 1.5 1.5 Marginal 20.9 24.3 14.9 17.1 77.1 87.2 87.2 87.7 87.7 Small 2.0 8.9 2.3 3.7 16.9 6.7 6.7 12.3 12.3 c) percentage distribution of sample households by own cultivated land. Hindu Muslim Christian SC ST OBC General Total General Total ST Total Land less 17.1 14.3 10.6 13.7 55.7 54.7 54.7 45.2 45.2 Marginal 4.6 15.1 6.6 6.3 32.6 37.1 37.1 47.9 47.9 Small 1.7 4.6 .9 1.1 8.3 6.1 6.1 6.8 6.8
d) Distribution of households across religion and caste who own livestock. livestock Hindu Muslim Christian All total SC ST OBC General Total General Total ST Total Milch animal 7.46 16.45 7.97 10.03 41.90 52.70 52.70 5.40 5.40 100.00 Graught animal 2.37 23.70 9.00 6.16 41.23 55.45 55.45 3.32 3.32 100.00 Young cattle 7.92 19.06 5.28 10.26 42.52 53.67 53.67 3.81 3.81 100.00 Goats 12.02 19.58 7.65 8.20 46.45 50.82 50.82 2.73 2.73 100.00 Sheep 4.76 4.76 - - 9.52 90.48 90.48 - - 100.00 Cock/Hen/Duck 5.62 17.71 5.62 5.40 34.34 57.88 57.88 7.78 7.78 100.00 Pigs 7.69 56.04 9.89 1.10 74.73 1.10 1.10 24.18 24.18 100.00 Others - - - - - 100.00 100.00 - - 100.00
e) Percentage distribution of the sample population by level of literacy Educational Level Hindu Muslim Christian Male Female Total Male Female Total Male Female Total Illiterate 13.9 25.7 19.9 33.7 43.8 38.4 19.9 30.5 25.0 Below primary 8.6 8.9 8.8 16.2 15.9 16.0 15.3 17.1 16.2 Primary 16.8 14.5 15.6 18.1 13.1 15.7 18.2 17.7 17.9 Middle 21.8 22.3 22.0 18.6 16.3 17.5 17.6 18.3 17.9 Management / Com. School course (vocational) 0.4 0.2 0.2 0.1 0.1
Multi Sectoral Development Plan ::: Goalpara District
f) Distribution of households(%) by housing status Hindu Muslim Christian SC ST OBC General Total General Total ST Total Own 16.3 23.7 15.4 17.1 72.6 89.5 89.5 74.0 74.0 Indira Awas / Govt. Provided 7.1 12.3 3.4 4.3 27.1 9.6 9.6 26.0 26.0 Rented 0.3 0.3 0.8 0.8 Total 23.4 36.0 18.9 21.7 100.0 100.0 100.0 100.0 100.0 g) Distribution of households with Electricity connection Religion Caste House electrified Yes No Total Hindu SC 5.1 18.3 23.4 ST 8.6 27.4 36.0 OBC 6.0 12.9 18.9 General 7.7 14.0 21.7 Total 27.4 72.6 100.0 Muslim General 5.2 94.8 100.0 Total 5.2 94.8 100.0 Christian ST 20.5 79.5 100.0 Total 20.5 79.5 100.0 h) Distribution of non electrified households by source of light Religion Caste Source of light Oil lamp Lantern Lamp + others Oil lamp + others Lantern + others Total Hindu SC 18.5 6.7 25.2 ST 26.8 .4 9.8 .4 .4 37.8 OBC 11.0 5.9 .8 17.7 General 14.2 5.1 19.3 Total 70.5 .4 27.6 1.2 .4 100.0 Muslim General 61.3 .4 37.6 .7 100.0 Total 61.3 .4 37.6 .7 100.0 Christian ST 60.3 3.4 36.2 100.0 Total 60.0 3.4 36.2 100.0
Multi Sectoral Development Plan ::: Goalpara District
10 CHAPTER 3 PLANNING PROCESS AND PLAN Based on the base line survey by the Omeo Kumar Das Institute of Social Changes and Development the following points are verified at the time of preparation of proposal by the various departments and development deficits and critical gaps identified concerned.
They have not been sanctioned or proposed under any other scheme/programme.
There is no duplication with other public funded schemes being implemented in the district with similar objectives.
That these do not involve any recurring cost and do not include maintenance liabilities.
Guidelines and norms fixed by the Government of India and various central assistance schemes are being followed strictly with respect to the cost estimate, plan formulation and implementation strategies, etc
Synergy and topping up of various existing programmes, etc followed strictly
Guidelines & Norms followed
Critical Gaps & Development Deficits.. Plan Guidelines & Norms followed.. 1. Electrified Households (Priority rank-1) Solar Energy System for rural household in remote areas as per Guidelines of Assam Energy Development Agency under MNES 2. Houses with Pucca Walls (Priority rank- 2) IAY Guidelines and Norms with BPL waitlist on the identified minority concentrated Gaon Panchayats based on base line survey 3. Health & Immunization (Priority rank- 3 & 8) NRHM guidelines & norms in the identified minority concentrated Gaon Panchayats based on base line survey 4. Safe Drinking Water & Sanitaion (Priority rank-4 & 5) Norms on the basis of APWD(B) for 2004-05 and rates earmarked by the CPHE/ACE(LAZ). Safe drinking water is still one major problem in the Goalpara (Nayapara) & Lakhipur. 5. Work Participation a. Animal Husbandary & Veterinery b. Handloom & Textile c. Organized & Market Development (Priority rank-6 & 10) a. Unit Cost rates on the basis of NABARD guidelines for more employment opportunity in rural areas through SHGs. b. Unit Cost rates on the basis of Ministry of textile, Govt.of India guidelines for more employment opportunity in rural areas through SHG. c. Norms on the basis of APWD(B) schedule rates for 2004-05 for more employment opportunity in rural & urban areas. 6. Literacy: (Priority rank 7 & 9) SSA guidelines and identified minority concentrated Gaon Panchayats based on base line survey.
Multi Sectoral Development Plan ::: Goalpara District
11 CHAPTER- 4 INTERVENTIONS
* INTERVENTIONS AS PER FINDINGS OF THE BASE LINE (BL) SURVEY: As per the BL survey, the following have been identified as priority areas and each priority area as identified has been attempted to be addressed in the following manner:
a) Electricity in houses (Priority rank-1): Under various rural electrification programmes, all the villages in the district are being electrified in a phased manner. The emphasis now is on giving connection to maximum number of households. No additional funds are needed, hence no allocation is proposed under MSDP. However, it is proposed to make provision for solar energy systems for rural households in remote areas like chars and along foothills of Meghalaya. The details and the unit cost of the scheme are enclosed at Annexure -1.
b) Houses with Pucca walls (Priority rank-2): The district lags far behind the national average in terms of the number of people having houses with puccca walls by 37.51%. As per the requirement of houseless people who are to be provided with houses under IAY at the present rate of fund allocation by the rural development department, all the houseless people can not be provided with Pucca Houses under IAY before the completion of the 11 th five year plan. Thus there will be substantial gap. Accordingly top priority has been accorded for fund allocation for housing by topping up the centrally sponsored scheme of Indira Awas Yojana (IAY).
The statement showing priority wise IAY wait list with Bharat Nirman block wise & GP wise in Goalpara district.
Rongjuli Development T.D Block:
Sl no Name of GP Total nos of IAY wait list with Bharat Nuirman beneficiaries Total nos of minority beneficiaries % minority IAY beneficiaries 1 Ambari 2012 nos 1421 nos 70.62% 2 Tiplai 1698 nos 1185 nos 69.75% 3 Simlitola 2108 nos 1066 nos 50.56% 4 Dhupdhara 870 nos 385 nos 44.25% 5 Khutabari 1485 nos 597 nos 40.20% 6 Kothakuthi 800 nos 310 nos 38.75% 7 Dhanubhanga 869 nos 322 nos 37.05% 8 Kahibari 617 nos 214 nos 34.68% 9 Rongjuli 982 nos 174 nos 17.82% Total 11441 nos 5656 nos 49.43%
Multi Sectoral Development Plan ::: Goalpara District
12 Kushdhowa Development T.D. block: Sl no Name of GP Total nos of IAY wait list with Bharat Nirman beneficiaries Total nos of minority beneficiaries % minority IAY beneficiaries 1 Baguan Kathalbari 402 nos 252 nos 62.68% 2 Damra 1547 nos 660 nos 42.66% 3 Puranibhita 1376 nos 484 nos 35.17% 4 Darranggirri 1376 nos 389 nos 17.05% 5 Lela 981 nos 189 nos 19.26% 6 Kushdhowa 632 nos 105 nos 16.61% 7 Majjakhili 1011 nos 107 nos 10.58% 8 Dudhnoi 1080 nos 19 nos 1.75% Total 8405 nos 2205 nos 26.04% Matia Development Block: Sl no Name of GP Total nos of IAY wait list with Bharat Nirman beneficiaries Total nos of minority beneficiaries % minority IAY beneficiaries 1 N/Simlitola 2732 nos 2616 nos 95.75% 2 Buduchar 2110 nos 1966 nos 93.17% 3 Baladmari Char 2056 nos 1735 nos 84.38% 4 Sidhabari 2441 nos 1969 nos 80.66% 5 Surjyagiri 2544 nos 1993 nos 78.34% 6 Karipara 834 nos 503 nos 60.31% 7 Mornoi 1055 nos 580 nos 54.97% 8 Harimura 1642 nos 713 nos 43.42% 9 Matia 823 nos 319 nos 38.76% 10 Dolgoma - Kadamtola 683 nos 71 nos 10.39% 11 Bakaitary 626 nos 53 nos 8.46% Total 17546 nos 12518 nos 71.34% Krishnai Development Block: Sl no Name of GP Total nos of IAY wait list with Bharat Nirman beneficiaries Total nos of minority beneficiaries % minority IAY beneficiaries 1 Manikpur Bhelakhamar 1363 nos 1246 nos 91.41% 2 Molandibi 2415 nos 1976 nos 81.82% 3 Krishnai 2202 nos 1657 nos 75.24% 4 Fofonga 1458 nos 1055 nos 72.35% 5 Tukura Bormohara 1125 nos 719 nos 63.91% 6 Meselkhowa 1236 nos 774 nos 62.62% 7 Jira 1330 nos 665 nos 50% 8 Dhaigoan 1110 nos 401 nos 36.12% 9 Dirmajakhili Salpara 1785 nos 92 nos 5.15% Total 14024 nos 8585 nos 61.21%
Multi Sectoral Development Plan ::: Goalpara District
13 Lakhipur Development Block: Sl no Name of GP Total nos of IAY wait list with Bharat Nirman beneficiaries Total nos of minority beneficiaries % minority IAY beneficiaries 1 Saktola 1376 nos 1351 nos 98.11% 2 Kholsabhanga 750 nos 727 nos 96.93% 3 Rowkhowa 887 nos 846 nos 95.37% 4 Aolatoli 1039 nos 1133 nos 91.70% 5 Foringapara 834 nos 759 nos 91% 6 Bapurbhita Jurigoan 1670 nos 1476 nos 88.38% 7 Chunari 1163 nos 1022 nos 87.87% 8 Dhamar 1641nos 577 nos 35.16% 9 Dodan 689 nos 105 nos 15.23% 10 Joyramkuchi 947 nos 129 nos 13.62% 11 Pukhuripara 736 nos 73 nos 9.91% Total 11732 nos 8198 nos 69.87% Balijana Development Block: Sl no Name of GP Total nos of IAY wait list with Bharat Nirman beneficiaries Total nos of minority beneficiaries % minority IAY beneficiaries 1 Kalpani Chandamari 650 nos 580 nos 89.23% 2 Kumri 38 nos 31 nos 81.54% 3 Baladmari 794 nos 641 nos 80.73% 4 Badahpur 165 nos 114 nos 69.09% 5 Kalyanpur 1298 nos 741 nos 57.08% 6 Agai 222 nos 97 nos 43.69% 7 Bordamal 167 nos 68 nos 40.71% 8 Balijana 237 nos 75 nos 31.64% 9 Dwarka 108 nos 24 nos 22.22% 10 Dariduri 683 nos 33 nos 4.83% Total 4362 nos 2404 nos 55.11% Kharmuza Development Block: Sl no Name of GP Total nos of IAY wait list with Bharat Nirman beneficiaries Total nos of minority beneficiaries % minority IAY beneficiaries 1 Khankhowa 1129 nos 1129 nos 100% 2 Ramharir Char 1107 nos 1107 nos 100% 3 Ambari 2233 nos 2233 nos 100% 4 Bashbari 1673 nos 1673 nos 100% 5 Rowmari 2029 nos 2029 nos 100% 6 Nolonga 2696 nos 2690 nos 99.77% 7 Kharmuza 1984 nos 1978 nos 99.69% 8 Markula 1887 nos 1835 nos 97.24% 9 Baguan 1138 nos 712 nos 62.56% Total 15876 nos 15386 nos 96.91%
Multi Sectoral Development Plan ::: Goalpara District
14 Jaleswar Development Block:
Sl no Name of GP Total nos of IAY wait list with Bharat Nirman beneficiaries Total nos of minority beneficiaries % minority IAY beneficiaries 1 Haguripara 1316 nos 1316 nos 100% 2 Katarihara 1872 nos 1872 nos 100% 3 Kathuri 1319 nos 1319 nos 100% 4 Monkola Saildhara 608 nos 608 nos 100% 5 Rajmita 3031 nos 3020 nos 99.63% 6 Simlabari 3124 nos 3100 nos 99.23% 7 Tarangapur 2543 nos 2521 nos 99.13% 8 Jaleswar 2092 nos 2070 nos 98.94% 9 Gaurnagar 2171 nos 2140 nos 98.57% 10 Gosaidubi 1523 nos 1500 nos 98.48% 11 Takimari 1241 nos 1220 98.30% 12 Guriadhap 976 nos 950 nos 97.33% 13 Khalisavita 2419 nos 2315 nos 95.70% 14 Hasdoba 1616 nos 1400 nos 86.63% Total 25,851 nos 25,351nos 98.06% Block wise total IAY wait list with increasing order and percentage: Sl no Name of block Total nos of IAY wait list with Bharat Nirman beneficiaries Total nos of minority beneficiaries % minority IAY beneficiaries with increasing order. 1 Jaleswar 25,851 nos 25,351nos 98.06% 2 Kharmuza 15,876 nos 15,386 nos 96.91% 3 Matia 17,546 nos 12,518 nos 71.34% 4 Lakhipur 11,732 nos 8198 nos 69.87% 5 Krishnai 14,024 nos 8585 nos 61.21% 6 Balijana 4362 nos 2404 nos 55.11% 7 Rongjuli 11441 nos 5656 nos 49.43% 8 Kushdhowa 8405 nos 2205 nos 26.04% Total 1,09,237 nos 80,303 nos 73.47%
Multi Sectoral Development Plan ::: Goalpara District
15
The present source of fund allocation under this sector as indicated by the table below shows that under the existing fund sources only 24158 households out of the IAY waitlist with Bharat Nirman of 1,09,237 numbers will get IAY houses by the year 2011-2012.
Total No. of houseless families requiring house as per Bharat Nirman beneficiaries. Financial year Year wise coverage of families under IAY. 1,09,237 2007-2008 4802 2008-2009 4839 2009-2010 4839 2010-2011 4839 2011-2012 4839 Total 24158
Thus remaining wait list will not be covered by the end of 11 th five year plan. Out of the gap, 7500 households are proposed to be benefited from identified villages having substantial minority population wherein the minority beneficiaries shall be limited to around 60% and the remaining from other communities in minority concentrated Gaon Panchayats. Provision has been made at the unit cost Rs.38, 500.00 as approved by GOI under IAY (Annexure-2)
c) Health Indicators: (Priority rank 3 and 8) One of the most important areas of concern as per the BL survey is institutional delivery and percentage of fully vaccinated children where the district lags behind the national average by 23.68%. The actual situation in respect of the vaccination in the district is quite good and the district fares better than the State and national average.The single most important reason for the poor institutional delivery is lack of proper labour rooms, female wards and sub-centres to conduct deliveries.
Multi Sectoral Development Plan ::: Goalpara District
16
Multi Sectoral Development Plan ::: Goalpara District
17 There are 69 numbers of Sub-Centres which are functioning in rented houses in Goalpara which are often inadequate in space and other facilites. Out of those Sub-Centres, 34 numbers of Sub- Centres are under construction under 12 th Finance Commission Award and another 13 shall be started shortly. At the present rate of work, it will not be possible to achieve 100% saturation within 11 th five year plan period and therefore, it is proposed to construct buildings for 22 sub- centres which are buildingless, through MSDP fund. The construction is proposed at the design and unit cost of 7.5 lakhs approved by the State Govt. under NRHM. The design and the costing are as detailed in Annexure 3(A). The Sub-Centres which are proposed for construction of building are as follows:- Sl.No Name of Sub Centre Population Availability of land 1 Khagrabari SC 7600 Available 2 Titapara SC 5200 Available 3 Bangaljhar SC 3700 Available 4 Lempara SC 1549 Available 5 Tiapara Char SC 5200 Available 6 Chotipara SC 3660 Available 7 Ketkibari SC 2735 Available 8 Rokhapara SC 3254 Available 9 Darighopa SC 4215 Available 10 Bhetaipara SC 2968 Available 11 Garuchatka SC 5026 Available 12 Barpathar SC 4750 Available 13 Checapani SC 2005 Available 14 Salpara SC 4417 Available 15 Kaliashastra SC 3875 Available 16 Khamari SC 2008 Available 17 Jaybhum SC 6856 Available 18 Daikhowa SC 5672 Available 19 Sonamoyee SC 5299 Available 20 Polashkandi SC 2516 Available 21 Meservita SC 4299 Available 22 Pub-Kathuri SC 7897 Available In Goalpara, there are 36 (Thirty Six) numbers of Health Institutions where the delivery should be performed. Out of these 36 institutions, 5 nos. are BPHC, 14 nos. are SD, 12 nos. are MPHC, 2 nos. are SHC, 1 is FRU, 1 is M.C.H, 1 is Civil Hospital & 151 nos. of Sub-Centre. The data of total expected birth & actual institutional delivery is given below: Total Population : 9,69,363 (projected) Birth Rate (Assam) : 2.46% Total expected birth : 23,846 Nos. of Institutional Delivery (2007-08) : 9,728 The above-mentioned data indicates that less than 50% of total delivery occurs in health institutions. This problem may be eradicated by developing the infrastructure of health institutions by providing 35 number of wards to each of the 35 numbers of Health Institutions (excluding 200 Bedded Civil Hospital, Goalpara) and additional Labour Rooms in identified 15 institutions. The institutions where addl. Labour room is required are:
Multi Sectoral Development Plan ::: Goalpara District
18 Sl. No. Name of the Health Institution Average Delivery/Month Justification 1 Matia BPHC 15 Poor infrastructure for conducting delivery 2 Agia BPHC 40 3 Mornai BPHC 25 4 Maternal & Child Health Centre,Goalpara 16 5 Lakhipur BPHC 140 An additional Labour Room is required as delivery load is high 6 Dudhnoi FRU 85 7 Joleswar SHC 75 8 Krishnai MPHC 60 9 Khutabari MPHC 0 Insufficient infrastructure for conducting delivery. 10 Dohela Majjakhili SD 0 11 Bardamol SD 0 12 Daranggiri SD 3 13 Kushdhowa SD 0 14 Badahpur SD 3 15 Dhumerghat SD 0
Further, List of 35 Health Institutions where addl. female ward is required for better ante- natal, natal and post-natal care is as follows: NAME OF HEALTH INSTITUTIONS Maternal & Child Health Centre , Goalpara Dilmajakhili SD Rongjuli BPHC Agia BPHC Dohela Majjakhili SD Dudhnoi FRU Badahpur SD Harimura SD Bikali SD Bardamal SD Lakhipur BPHC Ambari SD Baguan SD Baida SHC Damra MPHC Ambari Bazar SD Jaleswar SHC Khutabari MPHC Joypur MPHC Chaibari MPHC Simlitola MPHC Kharmuza MPHC Chunari SD Darrangiri MPHC Messelkhowa MPHC Dhumerghat SD Tiplai MPHC Mornoi BPHC Matia BPHC Thabalpara MPHC Krishnai MPHC Bahati MPHC Kushdhowa SD Khardang MPHC Dolgoma SD
The construction of the labour room @ Rs 6.00 lakhs and the female ward @ Rs 7.00 lakhs is proposed at the design and unit cost approved by the State Govt. under NRHM. The design and the costing are as detailed in Annexure 3(B) and 3(C). d) Sanitation facilities: ( Priority rank-4) The district lags behind the national average by 22.87% as per BL survey, which means that a substantial number of households are without W/C toilets. However, the district is under total
Multi Sectoral Development Plan ::: Goalpara District
19 sanitation campaign and there are adequate funds to cover all the left out families, hence no allocation is proposed under MSDP. e) Safe drinking water (Priority rank-5) The District lags behind the national average by 17.68 % as per baseline survey report. The district is being covered under RGDWM programme and all rural areas are likely to be covered with 2012 as per population norms for safe drinking water source. However, there are large areas adjoining and outside Goalpara and Lakhipur towns with substantial minority concentration and without any safe drinking water source. Further, due to heavy iron content in the water in these areas ( Chemical Analysis report at Annexure 4(A)) , it is proposed to provide two PWSS in these areas along with the Iron filteration plant; One at Nayapara ( Goalpara ) and other at Lakhipur, both areas with substantial minority population. The details of the schemes are given in Annexure 4(B) and 4(C). The schemes are very essential for providing safe drinking water source to the people in these areas. f) Work participation rate including female work participation rate (priority rank 6 & 10).
The district lags behind the national average by 6.98% as per BL survey. The important recommendations of the survey report on this sector are as follows: * Enhancement of female work participation rate in the district is to be fourth priority of the multi-sector development plan for Goalpara. The present baseline survey provides sufficient insinghts for effective planning for greater female work participation in the district. For instance, besides highlighting the problems of self-employed people in the district, the baseline survey has clearly pointed out the kind of skill sought by the people. * Preference for self employment among the underemployed or unemployed is more prevalent than salaried jobs in the sample villages. This means that Govt. needs to create more facilites for skill development training and make provisions of real services to keep the enthusiasm level high for the people in self employment endeavour, which isgrassly missing in most of the State department in the State. The employment potential of land based activities is limited. With the increase in population and limited land resources, it is imperative to find alternative employment opportunities. In this context, the rural Non-Farm Sector (RNFS) assumes great significance. A substantial portion of surplus rural labour can be absorbed in this sector. This will also facilitate provision of effective source of income generation to women who constitute nearly 50% of the rural population and are unable to move to distant places for a job. The cottage and village industries are important
Multi Sectoral Development Plan ::: Goalpara District
20 activities for village economy and provide gainful employment to unemployed population of rural areas. Keeping above observations in mind, the following interventions are proposed in the minority concentrated areas. It is proposed to create more opportunities of employment through the following interventions: i) HANDLOOM SECTOR DEVELOPMENT: The handloom weavers are active in 345 villages and 9 small towns. There are 9 (nine ) major pockets in the district, (i) Bausiatari, (ii) Gojapara, (iii) Godharbori (Muslim Para), (iv) Shakumari, (v) Bhalukdubhi, (vi) Bagdoba , (vii) Rongsai (viii) Baguan & (ix) Simlitola. For the Development of the sector, a two pronged approached is proposed:- Development of common infrastructure:- The main problem of this sector is lack of adequate dyeing and allied facilities in the district. For the development of this sector, a provision for establishing a Common Facility Centre and Handloom Dyeing Unit at each of the nine Pockets is made under MSDP as detailed in Annexure - 5 (A). Skill up Gradation Cum Construction of Workshed to the weavers:- Training and retraining are critical inputs for handloom weavers to produce diversified products with improve quality to meet changing market trends and requirements. The training is proposed in disciplines of weaving, dyeing and designing alongwith construction of workshed for each weavers as detailed in Annexure 5 (B) The proposals for the development of Common Facility Centre and skill up gradation Cum Construction of Workshed are prepared as per the norms prescribed under the guidelines of Integrated Handloom Development Scheme of Ministry of Textiles, Govt. of India. ii) ANIMAL HUSBANDARY SECTOR DEVELOPMENT: There are 220 numbers of SHGs in Goalpara district in A.H & Veterinary sector out of which 200 nos of SHGs will be involved in MSDP. These groups mainly belong to minority community out of which Muslim prefer Poultry, Goatery and Dairy farming while Christians (Garos) prefer Dairy & Piggery farming. To increase meat, milk and egg production in the district and the income generating level of the SHGs, four types of Animal Husbandary activities are proposed for farming with skill upgradation (capacity building). Proposed activities are: a) Dairy farming b) Goatery farming c) Broiler farming and d) Piggery farming
Multi Sectoral Development Plan ::: Goalpara District
21 In addition to the above activities two breading farms proposed to establish at Govt. Fodder farm Rakhyasini ( Matia ) and Kuchdhowa ( Govt. piggery farm campus) in Piggery sector and two mini dairy farms are proposed to establish at State Vety. Dispensary campus Ambari and State Vety. Dispensary Campus , Joyramkuchi ( Jaleswar ) in dairy sector, both these breading farms will be run by the SHGs of the respective locality and total numbers of SHG involve is 4(four).The breading farms are as follows: a)Pig Breeding farm. b)Mini cattle Breeding farm ( Dairy Farm). For each of the above sub - sectors, a total of 50 SHGs comprising of 500 members are proposed to be benefited in the minority concentrated areas. The unit costs based on NABARD guidelines are enclosed at Annexure 6(A), 6(B), 6(C), 6(D), 6(F) & 6(G). Further, the training is proposed for skill upgradation of these 200 SHGs. The details are at Annexure 6(E). iii) ORGANIZED MARKET SECTOR (FORWARD LINKAGE DEVELOPMENT: A) SHG HAATS: There are 5644 number of SHGs in the rural areas of our district. However, there is a difficulty in getting a remunerative price due to lack of organized markets and consequent bargaining power of SHGs. To overcome this and to increase rural incomes, it is proposed to construct SHG Haats at 16(sixteen) identified minority concentrated locations for providing organized markets to the SHGs and a large numbers of SHGs will be benefited directly on rotation basis. The SHG Haats are proposed at Chunari Bazaar, Nidanpur, Rangapani Bazaar, Krishnai, Bashbari Bazaar, Kaljani Bazzar, Makri Bazaar, Agia, Dudhnoi Bazaar, Darrangiri, Nabagata Simlitola, in front of Matia Block office, Milanpur, Borpathar, Gaurnagar Bazaar and Jaleswar. The details of the scheme are at Annexure-7. The unit cost for a 12outlet Haat is proposed @ Rs.12.50 lakhs based on APWD schedule. B) MARKET AT HASILA BEEL: Goalpara town is the Dist. Head Quarter of Goalpara District of Assam. The mighty river Brahmaputra following areas the north and west boundary blessed Goalpara to be a fertile agricultural land meeting the demand of its boundary district. But due to lack of proper Market Place, the venders are running their business in road side spaces of the town. About 250 retail venders of vegetable, Fish, Mutton & Chicken are running their business in the road side of the town and create traffic snarls, accidents, garbage problem etc, leading to closed drains unhygienic working conditions and open to exploitation by both police and Municipal tax
Multi Sectoral Development Plan ::: Goalpara District
22 collectors .The venders have no permanent settlement to setup there shopping houses because they are mainly BPL people. So, the provision of proper market place outside the town area would help the venders of vegetable, chicken, Mutton etc. who are mainly from minority community and BPL families. This scheme would upgrade their skills and also settle their business to progress their livelihood. 10 Bigha, 2 katha and 6 lessa land is available for market at Hasila beel.
The people from all communities including minorities shall be benefited in the proposed Hasila Market. The minority population to be benefited is expected to be with in 60% to 70%. To provide organized hygenic market to these vendors, it is proposed to construct Hasila Beel Market with 190 outets and a lot of open space at a total cost of Rs 194.833 lakhs as per APWD schedule. Out of total cost of this, 95% is proposed from MSDP and 5% is proposed to be provided by beneficiaries. The details are at Annexure 8. v) Upgradation of ITI: A very large proportion of the population of minority communities is engaged in low level technical work and earns its livelihood as artisans and labourers. Provision of technical training to such people would upgrade their skills and earning capacity. The ITI situated in the district does not have sufficient building of its own and is being run with a lot of constraints. To provide better training and self employment generation skills to the minorities, it is proposed to establish two workshops at a cost of Rs. 101.13 lakhs only as per APWD schedule. Presently, the students have to go to ITI, Boangaigoan and to private Workshops for training. The details are at Annexure-9. g) Literacy (Priority 7 & 9) The lower primary (LP)/Elementary schools of the district are being covered for additional class room under SSA. So, no proposal is made for additional class room for Elementary schools. However, the high and the higher secondary schools are not covered and there is a high rate of dropout due to lack of classrooms at high and higher secondary school level. This has resulted in poor overall literacy level including female litracy. It is proposed to construct 258 additional class rooms keeping in view the 1:40 norms for classrooms for students. The size of the room is proposed to be 8m X 6.24 m as per SEBA (Secondary Education Board of Assam) norms. The unit cost has been worked out to be Rs.2.55 lakhs based on SSA rates. The details of the estimate are enclosed at Annexure 10.
Multi Sectoral Development Plan ::: Goalpara District
23 LIST OF SCHOOLS REQUIRING ADDL. CLASSROOM Sl.No. Name of School Total No. of Students Total No. of Minority Students Minority P/C No. of Existing Classroom No. of Classroom required as per rule No. of Addl. Class room, required 1 2 3 4 5 6 7 8 1 Dupdhara H.S. 835 139 16.65% 19 21 2 2 Dupdhara Girls H.S. 530 225 45% 8 13 5 3 Dudhnoi Girls High School 740 22 2.97% 15 19 4 4 Derek H.S. 400 400 100% 5 10 5 5 Bagun Girls H.S. 280 146 52% 3 7 4 6 Bakaitari High School 285 25 9% 9 7 - 7 Dhaundhanga H.S. 310 30 9.50% 5 8 3 8 Nehru Vidyapith H.S 279 15 5.37% 5 7 2 9 Baladmari High School 815 371 45.52% 18 20 2 10 Amjonga High School 650 Nil Nil 14 16 2 11 Maj-Jakhili H.S. 408 18 4.60% 12 10 - 12 Ambari Bazar H.S. 453 453 100% 5 11 6 13 Indira High School 324 Nil Nil 4 8 4 14 Gossaidubi High School 265 260 98.11% 3 7 4 15 Foringapara H.S. 240 240 100% 3 6 3 16 Nishangram H.S. 380 350 97% 5 10 5 17 Simlitola High School 658 51 8% 12 16 4 18 Bapuji H.S. 260 128 49.80% 4 7 3 19 Padupara Anchalik Mad. H.S 320 320 100% 7 8 1 20 Agia Balijana Girls H.S. 421 3 0.70% 7 10 3 21 Fatengapara H.S. 282 282 100% 3 8 5 22 Batabari High School 195 195 100% 3 5 2 23 Takimari H.S. 256 241 87% 4 6 2 24 Lower Chotipara H.S. 210 210 100% 3 5 2 25 Dirmajakhili High School 250 Nil Nil 5 6 1 26 Bardamal High School 250 Nil Nil 7 6 -
Multi Sectoral Development Plan ::: Goalpara District
Multi Sectoral Development Plan ::: Goalpara District
25 59 Balbala High School. 353 122 35% 7 9 2 60 Dalgoma H.S.School 810 346 42.72% 16 20 4 61 P.R.Govt. H.S. & M.P. School 836 543 65% 15 21 6 62 J. N. Memo. H.S.School 1238 248 20% 21 31 10 63 Chunari H.S. School 752 660 88% 12 19 7 64 Kharmuza H.S. School 495 437 88% 7 12 5 65 Rajmita High Madrassa 222 222 100% 4 6 2 66 RakhaldubiHigh Madrassa 749 749 100% 11 18 7 67 Katarihara Giris H/Mad 195 195 100% 3 5 2 68 Pud-Kathuri H.Mad. 260 260 100% 3 6 3 69 Nayapara High Mad. 205 205 100% 3 5 2 70 Aolatoli High Madrassa 250 250 100% 3 6 3 71 Katarihara Title Madrassa 150 150 100% 2 4 2 72 Katarihara Sr. Madrassa 525 525 100% 10 13 3 73 Meserbhita Nasiria Arabic College. 560 560 100% 10 14 4 G. Total 32439 17488 571 814 258 In respect of above High schools , Higher Secondary schools and high Madrassa these are functioning under Govt . of Assam and the Principals , Head Masters and Superientendents with staff of the schools are drawing salary from the Govt. of Assam.
Multi Sectoral Development Plan ::: Goalpara District
26
TABLE-I MULTI- SECTORAL DISTRICT DEVELOPMENT PLAN- GOALPARA ( Rs. In lakhs) Sl no Activity Output Quantity Unit cost Financial allocation (A) SATURATION OF PRIME MINISTERS NEW 15 POINT PROGRAMME 1 Upgradation of existing ITI Creation additional class room of two trades 1 101.13 101.13 ( B) TOPPING UP OF CENTRALLY SPONSERED SCHEMES . 2 IAY Construction of houses for families living below poverty line. 7500 0.385 2887.50 3 Accelerated water supply programme. a) Construction of new pipe water supply scheme at Nayapara 1 135.00 135.00 b) Construction of new pipe water supply scheme at Lakhipur 1 66.90 66.90 (C) BRIDGING CRITICAL INFRASTRUCTURE GAP 4 a) Construction of subcentres Construction of subcentres which are not having Govt. building. 22 7.5 165.00 b) labour room An additional labour room is required as delivery load is high. 15 6.00 90.00 c)Female wards for MPHC/S.H.C/S.D/BPHC/P HCs To provide Health care facilities to the areas where such facilities are still lacking. 35 7.00 245.00 5 Assistance to handloom weavers Looms & Accessories, Construction of workshed & skill upgradation training in weaving, design development and in dying. looms 50 nos, Jacquard 50 nos ,Warping drum 5 nos , workshed 180 nos with training. - 62.98 Construction of common facilily centre for 1) CFC , (i) Bausiatari, (ii) Gojapara, (iii) Godharbori (Muslim Para), (iv) CFC 9, Loom 90 nos, J. machine 90 nos, W . drum 18 nos , 17.42 156.78
Multi Sectoral Development Plan ::: Goalpara District
27 upliftment of handloom weavers at eight pokets. Shakumari, (v) Bhalukdubhi, (vi) Bagdoba , (vii) Rongsai (viii) Baguan & (ix) Simlitola Looms ,Jacquard machine, Warping drump , Dyeng equipments etc. Winding charkha 90 nos 6 Dairy scheme Goatery scheme Broiler scheme and Piggery scheme for self employment. Pig breeding farm Mini cattle breeding farm (dairy farm) Assistance for setting of Dairy unit , Goatery unit , Broiler unit and Piggery unit including training. .
2) to gear up SHG.( Kuchdhowa and Rakhyashini) 3) to gear up SHG ( Ambari State Vety Dispensary, Joyramkuchi State Vety. Dispensary. 1) Dairy 50 unit , 2) Goatery 50 unit , 3) Boiler 50 unit and piggery 50 unit including training
4) 2 units 5) 2 units 1) 3.70 lacs , 2) 3.00 lacs , 3) 2.97 lacs ,4) 3.10 lacs 5) training Rs.1.00 lacs for each scheme.
6) 19.515 X 2 7)19.515 X 2 578.65
39.03 39.03 7 Organized market Development a) Construction of Market at Hasila Beel 1 185.10 185.10 b) Construction of SHGs Haats in rural areas. 16 12.50 200.00 8 Upgradation & strengthening of High and Higher Secondary schools Construction of additional class rooms 258 2.55 657.90 9 Installation of solar lights Solar energy systems for rural households in remote areas like chars and along foothills of Meghalaya 2400 1450.00 34.80 10 Sub total 5644.80 11 Contingency @2% 115.20 12 Grand total 5760.00
Multi Sectoral Development Plan ::: Goalpara District
28
TABLE-II MULTI SECTORAL DISTRICT DEVELOPMENT PLAN- GOALPARA ( Rs. In lakhs) Sl no Activity Output Quantity Unit cost Financial allocation Total 2008-09 2009-10 2010-11 Phy Fin Phy Fin phy fin (A) SATURATION OF PRIME MINISTERS NEW 15 POINT PROGRAMME 1 Upgradation of existing ITI Creation additional class room of two trades 1 101.13 101.13 1
5 0 . 5 6 5
3 0 . 3 3 9
2 0 . 2 2 6
(B) TOPPING UP OF CENTRALLY SPONSORED SCHEMES . 2 IAY Construction of houses for families living below poverty line. 7500 0.385 2887.50 4 0 0 0
1 5 4 0
2 5 0 0
9 6 2 . 5 0
1 0 0 0
3 8 5
(C) BRIDGING CRITICAL INFRASTRUCTURE GAP. 3 Accelerated Pipe water supply programme. a) Construction of new pipe water supply scheme at Nayapara , Goalpara . 1 135.00 135.00
6 7 . 5
4 0 . 5
2 7
b) Construction of new pipe water supply scheme at Lakhipur 1 66.90 66.90
3 3 . 4 5
2 0 . 0 7
1 3 . 3 8
4 a) Construction of subcentres Construction of subcentres which are not run in Govt. building . 22 7.5 165.00 1 1
8 2 . 5
7
5 2 . 5
4
3 0
b) labour room An additional labour room is required as delivery load is high .( institutional delivery) 15 6.00 90.00 8
4 8
5
3 0
2
1 2
Multi Sectoral Development Plan ::: Goalpara District
29 c)Female wards for MPHC/S.H.C/S.D /BPHC/PHCs To provide Health care facilities to the areas where such facilities are still lacking .( percentage of fully vaccinated children) 35 7.00 245.00 1 8
1 2 6
1 0
7 0
7
4 9
5 Assistance to handloom weavers Looms & Accessories, Construction of workshed & skill upgradation training in weaving, design development and in dying. looms 50 nos, Jacquard 50 nos ,Warping drum 5 nos , workshed 180 nos with training. - 62.98
3 1 . 4 9
1 8 . 8 9 4
1 2 . 5 9 6
Construction of common facilily centre for upliftment of handloom weavers at eight pokets. 1) CFC , (i) Bausiatari, (ii) Gojapara, (iii) Godharbori (Muslim Para), (iv) Shakumari, (v) Bhalukdubhi, (vi) Bagdoba , (vii) Rongsai (viii) Baguan & (ix) Simlitola, Looms ,Jacquard machine, Warping drump , Dyeng equipments etc. CFC 9, Loom 90 nos, J. machine 90 nos, W . drump 18 nos , Winding charkha 90 nos 17.42 156.78 5
8 7 . 1 0
2
3 4 . 8 4
2
3 4 . 8 4
6 Dairy scheme Goatery scheme Broiler scheme and Piggery scheme for self
employment. Assistance for setting of Dairy unit , Goatery unit , Broiler unit and Piggery unit including training. .
1) Dairy 50 unit , 2) Goatery 50 unit , 3) Boiler 50 unit and piggery 50 unit including training 1) 3.70 lacs , 2) 3.00 lacs , 3) 2.97 lacs ,4) 3.10 lacs 5) training Rs.1.00 lacs for each scheme. 578.65
2 9 0 . 0 0
1 8 8 . 6 5
1 0 0 . 0 0
Pig breeding farm Mini cattle breeding farm ( dairy farm
2) to gear up SHG.( Kuchdhowa and Rakhyashini) 3) to gear up SHG ( Ambari State Vety Dispensary, Joyramkuchi State Vety. Dispensary.
4) 2 units
5) 2 units
6) 19.515 X 2
7) 19.515 X 2
39.03
39.03
1
1
1 9 . 5 1 5
1 9 . 5 1 5
1
1 1 1 . 7 0 9
1 1 . 7 0 9
7 . 8 0 6
7 . 8 0 6
Multi Sectoral Development Plan ::: Goalpara District
30 7 Organized market Development. a) Construction of Market at Hasila Beel 1 185.10 185.10
9 2 . 5 5
5 0 . 5 5
4 2 . 0 0
b) Construction of SHGs Haats in rural areas. 16 12.50 200.00 8
1 0 0
4
5 0
4
5 0
8 Upgradation & strengthening of High and Higher Secondary schools Construction of additional class rooms 258 2.55 657.90 1 2 9
3 2 8 . 9 5
7 7
1 9 7 . 3 7
5 2
1 3 1 . 5 8
9 Installation of solar lights Solar energy systems for rural households in remote areas like chars and along foothills of Meghalaya 2400 1450.00 34.80 1 2 0 0
1 7 . 4 0
7 2 0
1 0 . 4 4
4 8 0
6 . 9 6
10 Sub total 5644.80
2 9 3 4 . 5 3 5
1 7 8 0 . 0 7 1
9 3 0 . 1 9 4
11 Contingency @2% 115.20
5 7 . 6
3 4 . 6
2 3 . 0
12 Grand Total 5760.00
2 9 9 2 . 1 3 5
1 8 1 4 . 6 7 1
9 5 3 . 1 9 4
Multi Sectoral Development Plan ::: Goalpara District
Any kind of assets/infrastructure to be developed or created under the MSDP will be constructed as per the laid out Government norms and procedures wherein the PRI like ZP, AP and Gaon Panchayat will be involved for the selection of individual beneficiaries, distribution and monitoring, etc as per GoI norms and procedures. For IAY, the allotment shall be strictly based on BPL waitlist in identified minority concentrated Gaon Panchayats. The PRI institutions will monitor and supervise the construction, etc. Major benefit to women SHGs in minority concentrated areas. Line departments like Fishery, Animal Husbandry, Agriculture, Handloom etc will be associated. Financial institutions like the banks and NABARD shall be involved. Training is to be provided by reputed Govt training institutes or approved NGOs. All existing rules, specifications and regulation by GoI and the Govt of Assam shall be followed.
Assets maintenance
All the assets/building/infrastructure etc will be at the disposal of individual or department concerned as the case may be. All these assets will be registered and handed over to the concerned individual beneficiary or department for proper up keeping and further maintenance. Assets register will be maintained centrally from the office of the Deputy Commissioner and by the department concerned. The PRIs, line departments, SHGs, NGOs etc shall be taken into confidence while handing over the assets.
Multi Sectoral Development Plan ::: Goalpara District
32
CHAPTER-7
MONITORING & EVALUATION
There is a committee to oversee the implementation of MSDP in the district with Deputy Commissioner as the Chairman as District Level Committee for implementation of the Prime Ministers New 15 Point Programme for the Welfare of Minorities as constituted by the State as per direction of Ministry of Minority Affairs. There is a District Vigilance & Monitoring Committee to review the progress of the scheme. District Vigilance Council headed by the Commissioner of the Division to take care of the progress. Moreover, following external agencies will be involved for the monitoring and evaluation of the same:- 1. Directorate of Monitoring & Evaluation, Government of Assam 2. National Institute of Rural Development, Guwahati 3. State Institute of Rural Development, Guwahati 4. Assam Agricultural University, Jorhat 5. Indian Institute of Entrepreneurship, Guwahati 6. Weavers Service & Training Center, Guwahati 7. Krishi Vigyan Kendra, Dudhnoi Transparency and Publicity IT enabled monitoring cell with direct NIC network. Transparency and publicity of information and extensive use of ICT enabled uses.
Multi Sectoral Development Plan ::: Goalpara District
33 ANNEXURE -1
INSTALLATION OF SOLAR LIGHT BY AEDA UNDER MNES
i) Proposed for Solar photovoitaic systems to be executed by AEDA (Assam Energy Development Agency) under MNES. After a very detailed and in depth deliberation with local community and local authorities , it has emerged that the Solar Home lighting Systems with two lights is the most effective and efficient systems to address the particular need of lighting problems in the villages in the char areas and foothill areas of Goalpara . It was decided to install individual Solar Home lighting Systems at 2400 nos of households. It was concluded that Solar Home lighting Systems with 9W CFL luminary will be the most suitable for each household. ii) Brief description of two point solar home systems: Sunlight is directly converted into DC electricity by the SPV module mounted on the metal support structure . The generated electricity charges a better through an electronic charge controller in the day time and two of burning the CFL daily is 4-5 hours and the system will be designed to have three days autonomy. The light output of a 9W CFL is equivalent to that of a 60W incandescent lamp.
System Specifications:
Sl no Item Qnty. Specification. 1 SPV Module ( with support structure) 1 12V, 37Wp 2 Storage Battery 1 12V,40AH Low maintenance Tubular Plate Batteries 3 Charge Controller ( Battery over charge and deep discharge controller) 1 10 amps 4 Luminaries 2 9W DC CFL 5 Cables and accessories 1 set
System Cost:
1 Item Price(Rs.) 1 12V,37Wp Solar Module 12V,40AH Tubular Plate Battery 2 nos of 9W CFL Luminaries 1 No of charge Controller Cables and Accessories with 2 years Warranty Rs.12,500.00
Multi Sectoral Development Plan ::: Goalpara District
34
Project Cost:
Sl no Item Amount (Rs.) 1 Project cost for 2400 nos of SPV Home Lighting systems including supply , installation and commissioning at site @ Rs.12,500.00 per system Rs.3,00,00,000.00 2 Service charge to AEDA @Rs.200.00 per system for 2400 systems Rs.4,80,000.00 Total project cost Rs.3,04,80,000.00
Project funding : MNES= 90%, MSDP= 10% plus service charge
Sl no Item Contribution per system (Rs.) Total contribution for 274 nos of systems(Rs.) 1 MNES share a)System cost Rs.11,250.00 Rs.2,70,00,000.00 Total MNES share Rs.2,70,00,000.00 2 (A) MSDP share i) system cost ii) Administrative charge to AEDA
Rs.1,250.00
Rs.200.00 Rs.30,00,000.00
Rs.4,80,000.00 3 Total MSDP share (B) Rs.34,80,000.00
4 Total project cost (A+ B) Rs.3,04,80,000.00
Fund requirement from MSDP= Rs.34,80,000.00
Multi Sectoral Development Plan ::: Goalpara District
35 ANNEXURE -2
UNIT COST OF IAY HOUSE
Multi Sectoral Development Plan ::: Goalpara District
36
Multi Sectoral Development Plan ::: Goalpara District
37 ANNEXURE -3(A)
UNIT COST OF SUB-CENTRE
Multi Sectoral Development Plan ::: Goalpara District
38
DESIGN OF SUB-CENTRE
Multi Sectoral Development Plan ::: Goalpara District
39
ANNEXURE -3(B)
UNIT COST OF LABOUR ROOM
Multi Sectoral Development Plan ::: Goalpara District
40
DESIGN OF LABOUR ROOM
Multi Sectoral Development Plan ::: Goalpara District
41
Multi Sectoral Development Plan ::: Goalpara District
42 ANNEXURE -3(C) UNIT COST OF FEMALE WARD
Multi Sectoral Development Plan ::: Goalpara District
43
DESIGN OF FEMALE WARD
Multi Sectoral Development Plan ::: Goalpara District
44
ANNEXURE -4(A)
CHEMICAL ANALYSIS REPORT
Multi Sectoral Development Plan ::: Goalpara District
45 ANNEXURE -4(B) NAYAPARA PWSS REPORT
Name of proposed PWSS : Nayapara PWSS Proposed Cost : Rs. 135.00 Lakh Programme : Multi-Sectoral Development Programme for Minority Concentrated District. INTRODUCTION: Nayapara & adjoining area outside the Goalpara Town which are not included in Rajib Gandhi National Rural Drinking Water Mission is a water scared one & even in some cases ordinary HTW does not work. The area is a thickly populated one and does not have any organised water supply scheme for the people. There is a long standing demand of the people for good quality drinking. Source Proposed : Considering the plain topography of the area, there is no likelihood to met with rocky , hence boring of a deep tube well with ordinary rig may be feasible. Quality of Ground Water : The ground water contains excess iron, hence this ground water can be used as source of the scheme after proper treatment by filtration process. Land & Electricity : A land plot measuring 4 Katha is available to set up various components of the scheme. So, land will not be a problem for the proposed scheme. Moreover, power required to run the scheme can be obtained from nearby power line running nearby the proposed scheme. The proposal for an amount of Rs.135.00 Lakh (Rupees One Crore, Thirty Five Lakh) Only for Nayapara PWSS under Multi Sectoral Development Programme for Minority Concreted District, is submitted for according necessary Administrative Approval.
Multi Sectoral Development Plan ::: Goalpara District
46
PROFORMA
1. Name of Scheme : : Nayapara PWSS
Multi Sectoral Development Plan ::: Goalpara District
47 CALCULATION OF COST DETAILS OF NAYAPARA PWSS
(Estimate prepared as per APHE SOR 2008-09 & APWD(B) SOR 2004-05 & Addl. CE (PHE Approved Rates. )
Sl. No. Item of Work Amount ( Rs.) 1 Deep Tube Well (By DTH /Rotary Rotary Rig) Size 200 mm x 200 mm 750,000.00 2 Raw Water Pumping Main- 150 mm dia GI 78,675.00 3 Raw Water Pump Set: ( Submersible Pump Set) HP- 15.00 HP 200,000.00 4 Raw cum Clear water Pump House. Size: 25.00 Sqm. 150,000.00 5 Installation of Clear water Pump set -40 H.P. Centrifugal Pump Set. - 250,000.00 6 Rapid Sand Filter - Size : 20.00sqm 800,000.00 7 Clear Water Reservoir- Size : 5,00,000 Litre. 3,250,000.00 8 Clear Water Pumping Main- LS 100,000.00 9 Distribution System. Total Length : 12.00 KM 4,200,000.00 10 Overhead RCC Reservoir. 2,00,000 litres 3,400,000.00 11 Internal Electrification. - Raw Cum ClearWaterPump House 10,000.00 12 T & P Materials 20,000.00 13 Detail Survey 5,000.00 14 Trial Run of the scheme. 10,000.00 15 Chemical Dosing arrangement 30,000.00 Total = Rs. 13,253,675.00 Add 2% Contingency = Rs. 265,073.50 Grand Total = Rs. 13,518,748.50 Say, = Rs. 13,500,000.00 ( Rupees One crore & Thirty Five Lakh ) Only (Estimate prepared as per APHE SOR 2008-09 & APWD(B) SOR 2004-05 & Addl. CE (PHE Approved Rates. )
Multi Sectoral Development Plan ::: Goalpara District
48
ANNEXURE -4(C) LAKHIPUR PWSS REPORT
Name of proposed PWSS : Lakhipur PWSS. Name of Dev. of Block : Lakhipur Proposed Cost : Rs. 66.90 Lakh Programme : Multi-Sectoral Development Programme for Minority Concentrated District. Location: Proposed Lakhipur PWSS is situated in Lakhipur Development Block under 38 Goalpara West L.A.C. The proposed scheme is about 50 Km away towards West direction from Goalpara District Head Quarter. Ward No.1(One) complete and Ward No.2(Two) in Partly is considered in the proposal to cover with the scheme.
Need of the project: The area isadjoining and outside Lakhipur Town and is not come in purview to cover the population with Drinking water Facility under Rajib Gandhi National Drinking Water Mission. Drinking water facility is the main problem of the locality as there is no organised water supply arrangement in the area. The two wards of the proposed PWSS are contiguous in nature and can easily be covered with piped water supply scheme. Source Proposed : Considering the plain topography of the area, there is no likelihood to met with rocky , hence boring of a deep tube well with ordinary rig may be feasible. Quality of Ground Water : The ground water contains excess iron, hence this ground water can be used as source of the scheme after proper treatment by filtration process. Land & Electricity : A land plot measuring 2 Katha 10 Lessa is available to set up various components of the scheme. So, land will not be a problem for the proposed scheme. Moreover, power required to run the scheme can be obtained from nearby power line running nearby the proposed scheme.
The proposal for an amount of Rs.66.90 Lakh (Rupees Sixty Six Lakh & Ninety Thousand) Only for Lakhipur PWSS under Multi Sectoral Development Programme for Minority Concreted District, is submitted for according necessary Administrative Approval..
Multi Sectoral Development Plan ::: Goalpara District
51
ANNEXURE - 5 (A)
COMMON FACILITY CENTRE FOR MINORITY HANDLOOM WEAVERS UNDER MULTISECTORAL DEVELOPMENT PROJECT
Handloom weaving is a traditional cottage industry in Assam. In spite of mill made products the handloom product have their own special attraction. To work together common facilitiy centres are proposed for the minority weavers. In the common facility centre the weavers can do the works of weaving preparatory, weaving, dyeing and finishing. There will be 9 (nine) nos. of common facility centres in the Goalpara district in the villages (i) Bausiatari, (ii) Gojapara, (iii) Godharbori (Muslim Para), (iv) Shakumari, (v) Bhalukdubhi, (vi) Bagdoba , (vii) Rongsai (viii) Baguan & (ix) Simlitola respectively. The common facility centre will be maintained by a consortium formed on the pattern of Integrated Handloom Development Scheme. It is proposed to provide the facilities to all weavers on user charges basis.
Sl. no. Components Space Reqd. Name of equipments & others Qnty Rate in Rs. Total Amount 1.
Weaving workshop 90 sq. mtr Fly Shuttle frame looms a) Accessories like bobbin, pirn, heald frame, healdwires, and reed of different count. b) Jacquards of different capacity with harness, card, card punching machin etc. c) Charkha d) Warping drum with creel stand & accessories. e) Misc. Expenses including documentation 10 nos
10 sets
10 nos
10 nos
02 nos
8000/-
2000/-
7000/-
2000/-
16000/- 80,000/-
20,000/-
70,000/-
20,000/-
32,000/-
50,000/-
Multi Sectoral Development Plan ::: Goalpara District
52 2. Dyeing shed 21.90 Sq. mtr Dyeing tubs, stirring rod, gas cylinder and burner, bucket, mug, measuring cylinder, measuring beaker, watch glass, Dyestuff and chemical etc. 1,00,000/- 1,00,000/ -
3. Office room 9.36 sq.mtr Furniture, showcase, product display stand etc. 1,00,000/- 1,00,000/ - 4. Working capital Yarn (cotton, silk, acrylic etc.) 1,00,000/- 1,00,000/ - 5. Training for 10 nos of weavers for 2 months Stipend, honorarium to master trainer, raw material etc. 1,20,000/- 1,20,000/ - Total cost for construction of building Rs. 10.50 lacs Total cost for equipments and others (sl. no 1 to 5) Rs 6.92 lacs Total cost for 1 Common Facility Centre of Rs. 17.42 lacs Total cost for 9 nos. of Common Facility Centre is 9 x Rs.17.42 lacs = Rs, 156.78 lacs N.B: 1. Unit cost as per guideline of I ntegrated Handloom Development Scheme of Ministry of Textile, Govt. of I ndia. 2. The cost of Building materials as per APWD schedule of rate for 2004-05.
SPECIFICATION
1. Plinth foundation : - 75 mm thick c.c. prop. 1:4:8 over 1st class brick flat. 2. Plinth wall : - 250 mm thick 1st class brick/stone masonry/c.c. works.
a) Outer wall : - Works in cement mortar prop. 1:5 and 12 mm cement plaster 1:5 and by exposed faces over plate as per first direction of the Deptt.
b) Inner wall : -125 mm thick 1st class brick work/stone masonry work/ c.c work as per marginal sketch in cement mortar in prop.1:5.
3. Post : - 130 mm x 130 mm R.C. post with 4 nos. 12 mm main Rods and 6 mm stirrup @ 15cm c/c prop. 1:2:4 complete with all necessary shuttering, curing.
4. Lintel/ Beam : - 130 mm x 130 mm R.C. lintel with 4 nos. 10 mm main Rods and 6 mm stirrup @ 15 cm c/c prop.l:2:4 complete with all necessary
Multi Sectoral Development Plan ::: Goalpara District
53 shuttering, curing etc. foundation tie 800 mm x 150 mm size with 4 nos. 12 mm M.S. rod.
5. Floor : - 65 mm thick c.c. floor in prop. 1:3:6 with stone aggregates Up to 32 mm size over one 1st class brick flat soling and 12 mm thick cement plastering in prop. 1:2 on top including trawl finishing with neat cement watering, curing etc. complete as per direction.
6. Wall : - 125 mm thick 1st class brick nogged wall in cement mortar Prop. 1:5 from plinth up to post plate with cement plaster 12 mm thick on both faces in prop. 1:5 including colour/white washing with or more coats complete as directed. OR 100 mm thick c.c. wall in cement mortar in prop. 1:3 with 13 mm thick cement plaster on both faces in prop. 1:5 up to window grill and rest white wall and cement plaster in prop. 1:8 complete as directed. 7. Doors and Windows : 38 mm thick 1st. class local wood doors and windows as per design and drawing with Iron Gratings in the windows.
8. Roofing : - 0.63 mm lst thickness (in mm}C.I/A.C sheet roofing over out of MS black iron tubes of ISI approved make.
9. Ceiling : - 4 mm A.C. building board with painting! Hessian cloth Ceiling with two coats approved paints.
10. Miscellaneous : - C. C. apron and drain, cupboard socket doors and windows leaves to be painted with one coat of primer two coats of enamel paints of approved shed
11. Height of plinth : - 600mm
12. Height of building : - 3650 mm from the plinth up to top post plate
Multi Sectoral Development Plan ::: Goalpara District
54
Preliminary Estimate of Common Facility Centre
General Abstract of Cost as per APWD schedule SL NO. ITEM OF WORKS AMOUNT Rs. P. 1. TOTAL PLINTH AREA OF THE BUILDING : 156.24 SQ.M. RATE AS PER APWD (B) SCHEDULE FOR 2004-05 @ RS 5990.00/SQ.M. 9,35,878 00 2. NORMAL PREPARATION OF SITE @ 1% OF CIVIL WORK NIL 3. SANITARY INSTALLATION @ 5% OF CIVIL WORK 46,794 00 4. WATER SUPPLY @ 2% OF CIVIL WORK 18,718 00 5. INTERNAL ELECTRIFICATION @ 5% OF CIVIL WORK 46,794 00 6. FOR EXTERNAL ELECTRIFICATION @ 2% OF CIVIL WORK 18,718 00 GRAND TOTAL : RS. 10,66,902 . 00 Or Say .. RS. 10,50,000 . 00 (Rupees ten Lakhs fifty thousand) Only
Multi Sectoral Development Plan ::: Goalpara District
55
Multi Sectoral Development Plan ::: Goalpara District
56 ANNEXTURE 5(B)
SKILL UP GRADATION CUM CONSTRUCTION OF WORKSHED TO MINORITY WEAVERS UNDER MULTI SECTORAL DEVELOPMENT PROJECT
The minority weavers will be provided training for up gradating their skill in weaving, design development and dyeing so as to enable them to produce a diversified range of products as per latest market demands .Training will be given batch wise in groups of 20 for a period of 2 months in weaving, 15 days in design development and 15 days in dyeing. It is proposed to provide work shed to all weavers in order to protect the weavers and loom from rain and sunlight so that the weavers can engage themselves in weaving all seasons. So that the average running time of loom may increase resulting the increase of quality of production. Average cost of work shed for 20 sq. mt shed will be Rs 25,000.
a) TRAINING IN WEAVING CUM CONSTRUCTION OF WORKSHED`` Batch size for each programme : 20 trainees Duration of training : 2 months Sl. No Component Provision of fund (in Rupees) 1. Stipend for 20 weavers 90,000 @ Rs. 75/- as per day for 60 days 2. Honorarium to Master Trainer for 2 months 9,000/- @ Rs 45,00/- per month for 2 months 3. Stipend of Master Trainer for refresher course 2,250 @ Rs. 150/- per day for 15 days 4. Cost of warping drum 16,000/-
5. Cost of looms & attachment (Dobby/ Jacquard/ accessories) @ Rs. 8,000+4,000 for 10 looms for 20 trainees 1,20,000/- 6. Raw material 24,000 (for cotton) 7. Loom setting charges, subject to maximum of 10 looms provided under basic inputs 2,000/- 8. Documentation and sample 3,000/- Total 2,66,250/- 9. Admn. & Misc. expenditure 5% of the total cost 13,000/- Total Tool Kit 2,79,250/- Plus 21,000/- 3,00,250/-
10. Construction of Work shed (area 20 sqm. Per unit) 20 x Rs. 25,000 =5,00,000/- Total Amount = 8, 00,250/- Say Rs. 8, 00,000/- per batch
Multi Sectoral Development Plan ::: Goalpara District
57 b) TRAINING IN DESIGN DEVELOPMENT CUM CONSTRUCTI ON OF WORKSHED Batch size for each programme : 20 trainees Duration of Training : 15 days Sl. no Component Provision of funds ( in Rupees) 1. Stipend for 20 weavers Rs. 22,500/- (@ Rs. 75/day for 15 days) 2. Honorarium to Master Trainer for 15 days Rs. 2,250/- (@ Rs. 4500/month for 15 days) 3. Raw material Rs. 18,000/- (@ Rs. 4500/per 5 trainees for 20 trainees) 4. Documentation of Design Rs. 3000/- 5. Hiring sheds electricity and water charges Rs. 2000/- 6. Administrative and Misc expenditure (5% of the total cost.) Rs.2388/- 7. Construction of Work shed (area 20 sqm. Per unit) 20 x Rs. 25,000 =5,00,000/- Total Rs. 5,50,138/- Say Total Rs. 5,50,000/- per batch
C) TRAI NI NG I N DYEI NG CUM CONSTRUCTI ON OF WORKSHED Batch size for each programme: 20 trainees Duration of training: 15 days Sl no Component Provision of funds (in Rupees) 1. Stipend for 20 weavers Rs. 22,500/- (@ Rs. 75/day for 15 days) 2. Honorarium to Master Trainer for 15 days Rs. 2,250/- (@ Rs. 4500/month for 15 days) 3. Stipend of master trainer for refresher course Rs. 750/- (@ Rs 150/- per day for 15 days) 4. Raw material Rs. 64,000/- (@ Rs. 3200/-for 20 trainees) 5. Documentation of dyeing Rs. 3000/- 6. Hiring sheds, Electricity, Water charges Rs. 2000/- 7. Administrative and misc expenditure ( 5% of the total cost) Rs. 4725/- 8. Construction of Work shed (area 20 sqm. Per unit) 20 x Rs. 25,000 =5,00,000/- Total Rs. 5,99,225/- Say Total Rs. 5, 99,000/- per batch
Sl. No Type of Training No of beneficiaries No of batch Unit cost per batch in lacs Total amount in lacs 1. Training in Weaving 100 5 Rs 8.00 Rs. 40.00 2. Training in Design Development 40 2 Rs. 5.50 Rs.11.00 3. Training in Dyeing 40 2 Rs. 5.99 Rs. 11.98 Total Rs. 62.98 TOTAL PROJECT COST RS. 62.98 Lacs (Rupees Sixty Two Lacs Ninety Eight Thousand Only)
N.B: Unit cost as per guideline of Integrated Handloom Development Scheme of Ministry of Textile, Govt. of India.
Multi Sectoral Development Plan ::: Goalpara District
58
ANNEXURE 6(A)
Multi Sectoral Development Project Sector :- A.H& Veterinary Deptt., Goalpara.
Scheme :- Broiler Farming Prepared allocation
( Rs. In Lakh ) Unit cost
Total No. of unit Total Cost Beneficiar y share (10%) Govt. Share (90%) (A) Addl. Cost of Training (B) Total Govt. Share Including Training (A+B) 2.97 50 148.50 14.85 133.65 1.00 134.65
FEASIBILITY :- Agro-climatic condition favours poultry farming specially Broiler Farming in the district. As electrification is presently covering the rural areas of the district which became new era for rural unemployed youth for establishing broiler farm in the same. Popularity of broiler meat increasing day by day in the District. Market demand is tremendous in the District particularly for neighboring state. Transportation facilities touches every corner of the district which helps in transportation of poultry and poultry product. So, the commercial broiler farming may be considered as technically feasible and economically viable in normal condition.
JUSTIFICATION :- Top most priority of the broiler farming is to solve unenployement problem as it is clean farm practice in comparison to other livestock farming. Through this farming transfer of new technology from expert to rural people. It is the way of motivation of rural people towards commercial poultry farming. Succesful inplementation of the project will incraese the district economy.
Multi Sectoral Development Plan ::: Goalpara District
59 UNIT COST ( BROILER FARMING) Scheme) Scheme for setting up of a Broiler farm under deeep litter system of rearing in SGSY group finance (in ten individual sheds of the Swarojgaries)
Introduction : Farming of hybrid bird under deep litter system of rearing is found to be a very profitable bussiness if managed under proper technical guidance. If broiler farm is started with efficiency mangemental practices with proper veterinary care good return may expected after Fifty days od reariong. however, Rearing in a suitable shed in high land area, electriciry, Power supply and maintenance of lygienc, vaccination and health coverage, potential of market , and transport Facilities should be given top most priority .
Systematic Rearing : All in all out system. Six bateches in a year will be reared.
Schematic presentation.
A. Capital Expenditure :- i) Poultry Pan and other accessories : Shed should constructed with concrete floor, bamboo netting at Wall and with good ventilation. Ten Units sheds having the Capacity of rearing 2000 birdswill , be reared in ten small sheds. One small shed may be divided into two with the capacity of Rearing 100 birds each semi Permanent shed with locally avaibale materials . Cost of constructiotn is considered at rate of Rs. 50/Sq.ft.
ii) Waterer 60 nos @ Rs. 75.00 each considering 60x75 ............................................................ = Rs. 4,500.00
iii) Feeder (two longitudinal, one hanging /100 birds ) @ Rs. 100.00 each considered 900xRs. 100.00......................................................... = Rs. 9,000.00
iv) Single pan balance at the Rs. 200.00 each at the present market rate Rs. 200.00x10 ..........................................................= Rs. 2,000.00
v) Bucket, Mug 60 nos. @ Rs.80.00/- each considered Rs. 80.00x60 ............................................................= Rs. 4,800.00
i) Cost of 2000 birds @ 20.00 each Rs. 20,x2000.................................................................. = Rs. 40,000.00
ii) Transportation of birds 1000.................... L/S ........ .= Rs. 2,000.00
iii) Ration upto the age of 42 days @ 4.5 Kg/head/days at the Purchase price of Rs. 11.50 Kg. Rs. 11.50x4.5x2000........................................... = Rs. 1,03,500.00
iv) Medicine /Vaccine and health coverage @ Rs. 4.00/- bird Rs. 4x2000........................................................ = Rs. 8,000.00
vi) Electricity bill/Expenditure for power supply @ 300.00/-shed Rs. 300.00x10.................................................... = Rs. 3,000.00 _________________________________ Sub Total = Rs. 1,59,400.00
Multi Sectoral Development Plan ::: Goalpara District
61 D. Total cost of the secheme :-
A) Capital Expenditue ............................................................= Rs. 1,12,000.00
B) Equipments.......................................................................= Rs. 25,300.00
C) Operational Cost for two months......................................= Rs. 1,59,400.00 __________________________________ Total = Rs. 2,96,700.00 Say, = Rs. 2,97,000.00
Fund Requirement under multi sectoral developmental project
= 50 x @ Rs. 2.673 Lakhs
= 133.65 Lakhs
N.B. : Unit Cost rates are calculated on the basis of NABARD guide line
Multi Sectoral Development Plan ::: Goalpara District
62 ANNEXURE-6(B)
Multi Sectoral Development Project Sector :- A.H & Veterinary Deptt., Goalpara.
Scheme :- Goatery Farming.
Prepared allocation
( Rs. In Lakh ) Unit cost
Total No. of unit Total Cost Beneficiary share (10%) Govt. Share (90%) (A) Addl. Cost of Training (B) Total Govt. Share Including Training (A+B) 3.00 50 150.00 15.00 135.00 1.00 136.00
Feasibility :- Agro-climatic condition of Goalpara district is favourable for Goat husbandry. Demand of goat meat and milk in increasing day by day. Rather than the cultivable land there are abundant hilly areas where goat can be reared during summer season. District has goat well communication facilities and well equipped veterinary services both in public and private Sector. More over market demand is much more higher in the border areas of the district adjacent to Meghalaya. So, the Goatery scheme may be considered technically feasible and economically viable in normal education.
Justification :- Main idea of the project is to increase meat and milk production of the district. Per capita meat production is lower in the district in comparison to demand. As goat is a very docile animal women S.H.G.s can be involved in the scheme. Successful implementation of the project will help in enhancing the district economy as well as partially solve the unemployment problem. This will influence the unemployed youth to come forward for self employment with veterinary project.
Multi Sectoral Development Plan ::: Goalpara District
63 UNIT COST ( GOATERY FARMING)
SCHEME FOR REARING OF 80 Nos. OF SHE GOAT FOR A GROUP OF 10 MEMBERS IN INDIVIDUAL UNITS UNDER THE SGSY SCHEME.
INTRODUCTION :- 80 nonbers of local does and 4 nos. of improved of buck like Beetal or Black Bengal Goat will be introduced at the sheds constructed at the individual house hold premises of the system of rearing : semi-intensive system. UNIT COST : A) Capital Cost :
I) Rearing Shed :- Semi-permanent in nature. The sheds are to be constructed with locally available materials like bamboo thatch, wood, etc. The floor should be elevated & 3 above the ground level.
i) Cost of construction of Machang type of shed @ Rs. 45/ Sq. ft.
a) Doc : 10 Sq.ft. each : 10x 8 x45......................................................... Rs. 3,600.00
b) Kid : 4 Sq.ft. each 4x22x45 ......................................................... Rs. 3,960.00
2) Neccessary Appliances like bucket, mug, spade, sickle, rope etc. & Misc. Expenditure Rs. 500/- per unit...................................................................... Rs. 500.00
3) Water source: Own of the Swarojgaries Nil ---------------------------------------- Total Rs. 8,060.00
Cost for 10 shed = 8060x10...................................................................... Rs. 80,600.00
b) Cost of construction of shed for 4 Bucks (each needs 20 Sq.ft. ) 20x4x45 = Rs. 3,600.00
c) Plantation Cost, Fodder management (Approx 3/4 bigha) Rs. 800/-per unit = 800x10........................................................ Rs. 8,000.00 -------------------- Sub Total Rs. 11,600.00
Multi Sectoral Development Plan ::: Goalpara District
64 Total Fixed Capital ............................................. Rs.92,200..00
II) Foundation Stock : a) Cost of purchase of 4 matured bucks @ Rs. 2400/- each ................................................. Rs. 9,600.00 b) Cost of matured 80 does @ Rs. 1400 each ....................... Rs.1,12,000.00 c) Cost of Transporation (L/S) .......................................... Rs. 8,000.00 d) Insurance 7% ................................................... Rs. 8,512.00 _______________________________ Sub- Total Rs.1,38,112.00
Total capital Investment : (I+II) = Rs. (92,200.00 +1,38,112.00) Rs. 2,30,312.00
B) Working Capital for 1 year rearing : (Recurring Expenditure )
a) Grazing field management @ Rs. 500/-unit /season 500x2x10........... Rs.10,000.00 b) Feed cost (Concentrate) @ Rs. 9/- Kg.
i) Adult dose (One month before breeding and one month after kidding i,e. per kidding 6.75/- month 6.75x8x10x6x9 ......................... Rs.29,160.00
ii) Bucks (two month per breeding season ) 7.5Kg. /month 7.5x4x4x9 Rs. 1,080.00
iii) Kids (for 30 days ) 3.75 Kid/month 3.75x2x55x9................ Rs. 3,713.00 c) Vety aid, vaccine, medicine, health cover age including feed additives & @ Rs. 150/month/unit............................................................... Rs. 21,000.00
C) Misc. Expenditure :- @ Rs. 500/unit/year ............................................... Rs. 5,000.00 ----------------------------------- Sub- total Rs.69,953.00 D) Total Cost of the Scheme : A+B Rs. (2,30,312+69,953.00) Rs.3,00,265.00 Say Rs.3,00,000.00 (Rupees three Lakhs only)
Fund Requirement under multi sectoral development project
=50 x 2.70 Lakhs =135.00 Lakhs.
N.B. : Unit Cost rates are calculated on the basis of NABARD guide line
Multi Sectoral Development Plan ::: Goalpara District
65 ANNEXURE-6(C)
Multi Sectoral Development Project Sector :- A.H & Veterinary Deptt., Goalpara.
Scheme :- Dairy Farming, Implemented through S.H.G.
Prepared allocation
( Rs. In Lakh ) Unit cost
Total No. of unit Total Cost Beneficiary share (10%) Govt. Share (90%) (A) Addl. Cost of Training (B) Total Govt. Share Including Training (A+B) 3.70 50 185.00 18.50 166.50 1.00 167.50
Feasibility :- Agro-climatic condition of Goalpara is favourable for dairy Farming. There is tremendous demand of milk & milk product in the district. There are abundant unused land including P.G.R. in the District where green fodder hybrid & local grass can be cultivated. More over S.H.G's will produce green fodder in his own land. District is well communicated and have good market facilities . District has got both govt. and private sector veterinary service. These informations make it clear that the Dairy Farming is highly adaptable in Goalpara District. So, the scheme will be technically feasible and economically viable under normal condition. Justification :- Main idea of Dairy Farming is to increase milk production of the district which is very low compared to others. It is an employment generating scheme which will encourage young generations for self employment. Successful implementation of the scheme will attract the general people towards veterinary sector specially dairy husbandry and fodder production.
UNIT COST ( DAIRY FARMING)
Multi Sectoral Development Plan ::: Goalpara District
66 Unit of 10 C.B cow yielding 9 liters of milk per day . A. BUILDING & OTHER ACCESSORIES:- a) 1. Cost of construction of semi-permanent type of cow shed ( only concrete floor) with average space requirement 40 Sqft. per cow with necessary fittings to accommodate 10 cows ( local materials like bamboo, thatch, etc. to be used.) Considering Rs. 75/- sqft. at present rate. = Rs. 30,000.00
2. Calves and growing heifers shed each requiring average 20 sqft. at the above rate = Rs. 15,000.00 3. Office room ( presumed existing) = nil ......... ........ 4. Store room for feed and medicine ( L/S) = Rs. 6,000.00 5. Hay room ( L/S ) by local materials. = Rs. 3,000.00 6. Isolation shed. = nil 7. Extension of electricity from the existing line / misc. ( L/S) = Rs. 2,500.00 __________________________________ Sub-Total = Rs. 56,500.00 b. Equipments :- 1. Cost of equipments, such as milk pails, buckets, ropes/cow chains, weighing balance, milk measuring can and other equipments may be required etc. ( L/S), Rs. 300/ cow. = Rs. 3,000.00 2. Cost of trolley / by-cycle, etc. = Rs. 4,000.00 3. Chaff cutter, spade, sickles etc. (L/S) = Rs. 1,000.00 4. Bullock cart ( own of the Swarojgaries ) = Rs. NIL Sub-Total = Rs.8,000.00
C. Water source, fodder cultivation and fencing of the premises:- 1. Farm and Own of the Swa-rojgaries. = Rs. ..................
2. Cost of installation Wells / tube Wells / ( 2 Nos. ) = Rs. 7,000.00 3. Expenditure incurred for fertilizer and procurement of roots / seeds, preparation of land and also fencing of the premises with locally available of materials, like woods, bamboo etc. by self labour ( L/S) Rs. 6000/ acre = Rs. 12,000.00
Multi Sectoral Development Plan ::: Goalpara District
67 B. BREEDING STOCK ( Milch Cow)
( Purchased from recognised farms / breeder ) 1. Purchase cost of 10 Nos. cross breed Jersy cows/ Holstein Friesian Rs. 24,500.00 ( F1 or F2 generation ) having milk yielding potency average 9 litters daily, preferably in their 1 st or 2 nd lactation after one month of calving. 5 cows will be purchased with calves in them after one month of calving at the first instance. While the 2nd batch will be purchased after six months. = Rs. 2,45,000.00
2. Cost of transportation of cows ( L/S ) .............. = Rs. 10,000.00
3. Insurance coverage for 1 Year @ 7% = Rs. 17,150.00
OPERATIONAL COST : ( Recurring expenditure ) for one month.
1. Cost of feed for 1 st batch of cows for initial one month . @ Rs. 4.50 Kg/cow/day at the cost of rs. 9/kg feed including transportation = Rs. 6,075.00
2. Cost of fodder for 1 st batch as the processing for fodder cultivation has already been started prior to entry of cows in the farm. 25 Kg. / cow/day. Considering @ Rs. 1.00 / kg at the present market rate. = Rs. 3,750.00
3. Cost of dry fodder. ---- = Rs. 900.00
4. Medicine, vaccine & health coverage considering Rs. 200/ each = Rs. 1000.00
5. Misc. and unforeseen expenditure ( L/S ) as starting administrative expenditure. = Rs. 1,000.00
6. Labour charge. = Self. _____________________________ Sub-Total = Rs.12,725.00
Multi Sectoral Development Plan ::: Goalpara District
Fund Requirement under multi sectoral developmental project
= 50 x @ Rs. 3.33 Lakhs
= 166.50 Lakhs
N.B. : Unit Cost rates are calculated on the basis of NABARD guide line
ANNEXURE-6(D)
Multi Sectoral Development Plan ::: Goalpara District
69 Multi Sectoral Development Project Sector :- A.H & Veterinary Deptt., Goalpara. Scheme:- Piggery Farming. Prepared allocation
( Rs. In Lakh ) Unit cost
Total No. of unit Total Cost Beneficiary share (10%) Govt. Share (90%) (A) Addl. Cost of Training (B) Total Govt. Share Including Training (A+B) 3.10 50 155.00 15.50 139.50 1.00 140.50
Feasibility :- Agro-climatic condition for piggery farming is favourable in Goalpara district. There is high demand of pork in the district particularly in the tribal dominant areas. District has got govt. pig breeding Farm which will be able to solve partially the supply of parent stock. Other than intensive farming, scavenging also may be practised as there are lots of hector of unused land in the district. Both public and private sector veterinary service is well equipped in the district. Marketing and transportation facilitation also very satisfactory in the district. So, the piggery farming is technically feasible and economically viable in the district in normal condition. Justification :- i) Implementation of piggery farming will partially solve unemployment problem ii) Pork production will be increased which enhance the meat production of the district. iii) Transfer of technology from expert to common people by practisingcross breeding of pigs. iv) This scheme will attract the unemployed youth towards self employment. v) More H.S.G.S. can be involved in other allied sector of this farming such as establishment of feed mill, establishment of pork processing plant in the district etc.
UNIT COST PIGGERY
Multi Sectoral Development Plan ::: Goalpara District
70
Scheme for a piggery unit with 10 cross bred Male weaner 50 Female weaner 10 castrated Male weaner in semi intensive system.
A. CAPITAL INVESTMENT (FIXED)
1. Shed :Economic pigshed will be constructed by the beneficiary on his own land with locally available material having semi concrete floor 12' x 12' x 10 rooms Rs. 30 / Sqtf Rs. 43,200.00 2. i) 10 Cross Bred male weaner of 6 months of age @ Rs. 12000/Pig. Rs. 12,000.00 ii) 50 up graded female weaner of 4 months Rs.1000/pig. Rs. 50,000.00 iii) 10 castrated male weaner @ Rs. 1200 / pig Rs. 12,000.00 Sub Total Rs. 1,17,200.00
OPERATIONAL EXPENDITURE FOR INITIAL 18 MONTHS 1. Supplementary feeding - Beside scavenging pigs require stall feeding. Beneficiary will supply normal feed from his own source. Moreover supplementary feeding is done.
i) Breeders feed 15 Kg / pig / month for 50 sow 10 boar 60 x 15 x 18 = 16,200 Kg. ii) Falteners feed 15 kg / pig / months for 1 month. 10 x 15 x 6 = 900 kg. iii) Weaners feed 6 kg / pig / months for 1 month. 300 weaners of 1 st batch 300 x 1 x 6 = 1800 kg. iv) Falteners feed 15 kg / pig / months for 150 male falteners of 1 st batch 150 x15 x 5 = 11,250 kg.
Total feed required = 30,150 kg x Rs.6 / kg . Rs.1,80,900.00
2. Medicines, vaccines etc. L . S Rs. 6,911.00
Multi Sectoral Development Plan ::: Goalpara District
Fund Requirement under multi sectoral development project
=50 x 2.79 Lakhs
=139.50 Lakhs.
N.B. : Unit Cost rates are calculated on the basis of NABARD guide line.
ANNEXURE-6(E)
Multi Sectoral Development Plan ::: Goalpara District
72
Multi Sectoral Development Project A.H & Veterinary Deptt.Goalpara.
Cost of Training of S.H.G. Member for each scheme
(Number of S.H.G. involved 50)
1. Pen and Khata @ Rs. 40/-member for 250 member Rs. 10,000.00 2. Honorarium of Resource person @ Rs. 250/- each for 4 resource person per day for 5 days Rs. 5,000.00 3. Cost of Food (Launch & Tea) @ Rs. 65/- each for 250 members for 5 days Rs. 75,000.00 4. Fare of sound system @ Rs. 400/-day Rs. 2,000.00 5. Fare of 300 nos. of plastic chairs@ Rs. 5/-day/chair and 5 nos. tables @ Rs. 20/-day for 5 days Rs. 8,000.00 ------------------------------------------ Total Cost Rs. 1,00,000.00
S.H.Gs are selected from every corner of the Minority Concentrate areas of Goalpara district covering concerned Gaon Panchayat. Each scheme involves 50 (fifty) numbers of S.H.G.s and each S.H.G. comprises 10 members, total 500 members. Five members from each SHG are selected for training (total 250). Total number of S.H.G selected for 4 (four) schemes (Dairy, Goatery, Piggery, Broiler) is 200.
Multi Sectoral Development Plan ::: Goalpara District
73 ANNEXURE-6(F)
MULTI SECTORAL DEVELOPMENT PLAN : SECTOR : ANIMAL HUSBANDRY & VETERINARY DEPARTMENT ,GOALPARA
Multi Sectoral Development Plan ::: Goalpara District
74
Multi Sectoral Development Plan ::: Goalpara District
75
N.B. : Unit Cost rates are calculated on the basis of NABARD guide line.
Multi Sectoral Development Plan ::: Goalpara District
76
ANNEXURE-6(G)
Multi Sectoral Development Plan ::: Goalpara District
77
Multi Sectoral Development Plan ::: Goalpara District
78
N.B. : Unit Cost rates are calculated on the basis of NABARD guide line.
Multi Sectoral Development Plan ::: Goalpara District
79
ANNEXURE-7
CONSTRUCTION OF SHG HAATS
(A) Plinth area estimate (Specification A : Assam Type Building) AS PER APWD SCHEDULE
1. Plinth foundation 77 mm thick C.C. prop 1 : 4 : 8 2. Plinth wall a) Outer wall b) Inner wall 225 mm thick 1st class brick/stone masonry works in cement mortar prop 1 : 5 and 10 mm cement plaster prop 1 : 6 on exposed faces. 112 mm thick 1st class brick works in cement mortar prop 1 : 5 over two layer of 225 mm thick brick work below ground level in cement motor prop 1 : 5, stone masonry wall over 75 mm thick C.C. work prop 1: 4: 8 3. Post 130 mm X 130 mm RCC as per design. 4. Floor 65 mm thick cement concrete flooring with 50 mm under layer of cement concert prop 1 : 3 : 6 and 15 mm C.C. topping 1 : 1 : 2 over one flat brick soling / 150 mm thick stone soling. 5. Wall 112 mm thick 1st class brick nagged wall in cement mortar prop 1 : 5, from plinth upto plate with cement plaster 15 mm thick on outside face, 10 mm thick on inside face prop 1 : 6 including clour / white washing. 6. Door & windows 1st class local wood / steel doors and windows as per desing with iron gratings on the windows. 7. Roofing 0.63 I.S. thickness (in mm) C.L. / A.C. sheet roofing over 1st class timber frame/tubular truss. 8. Ceiling 4 mm thick A.C. building board with painting. 9. Miscellaneous C.C. apron with drain, cupboard, rolling shutter door and to be painted with one coat of primer and two coats of enamel paints of approved shade. 10. Height of plinth ii) 600 mm for functional building. 11. Height of building iv) 3200 mm for residential building.
Total plinth area = 20.10 x 8.20 = 164.82 M 2
@ Rs. 5990.00/M 2 (As per APWD schedule of rate 2004-05) Rs. 9,87,272.00 a) For Electrification i) for internal :- 11% Rs. 1,08,599.00 ii) External :- 4% Rs. 39,491.00 b) Extra 4% for providing tubular truss Rs. 39,491.00 c) For Sanitation (Latrine & Urinal) Rs. 30,000.00 d) For D/Water (installation Tara Pump 1 No.) Rs. 25,000.00 Total = Rs. 12,29,853.00 Add. Contingency Rs. 20,147.00 Total Rs. 12,50,000.00 (Rupees twelve lakhs fifty thousand) only.
Multi Sectoral Development Plan ::: Goalpara District
80
REPORT
This estimate amount to Rs. 12,50,000.00 (Rupees twelve lakhs fifty thousand) only has been framed to show the probable cost of Construction of SHG Hat under MSDP. The following provision have been made.
1. Plinth foundation : C.C. work 7.5 cm./15 cm thick with cement concrete in Proportion 1 : 3 : 6 2. Plinth wall : 25 cm/12.5 cm 1st class brick work (Proportion 1 : 5) upto P.L. 3. Post : 20 cm X 20 cm R.C.C. Post with 4 Nos. 12 mm longitudinal and 6 mm 20 cm c/c lateral r/f over R.C.C Trap ezoidal base footing as per design. 4. Wall : Brick nogged wall 11.20 cm (Propn) 5. Roofing : 063 mm GCI sheet roofing over Timber/Tubular truss as per design. 6. Doors / Windows : 1st class local braced and battened/Panell door and window as per design/Rolling Shutters door. 7. Ht. Of Plinth : 60 cm 8. Ht. Of Bldg. : 3.20 m The estimate is prepared as per APWD Schedule rates for 2004-05 (Building), and analysis rates on the prevailing market price as on when necessary. All works will be carried out in accordance with general APWD specifications and also I.S. code of practice unless otherwise mentioned.,
Multi Sectoral Development Plan ::: Goalpara District
81
Multi Sectoral Development Plan ::: Goalpara District
82 ANNEXURE-8
CONSTRUCTION OF HASILA BEEL MARKET
Name of Work: Estimate for construction of RCC Two Storied Building of vegetable market, Mutton & Fish market shed at Hasila Beel adjacent with Hasila Beel Bus terminus, Goalpara under Multi sectoral development plan for 2008 - 09.
ABSTRACT OF COST
1. Const. of RCC two storied building for Market shed incl. road foot path at Hasila, Goalpara. Plinth area - (a) Ground floor 2 Nos block = ( 632.44 + 634.39)m 2
= 1266.83 m 2
@ Rs. 7150.00 m 2 = Rs. 9057834.00 (b) 1 st floor 634.39 m 2
@
Rs. 5950.00 m 2 = Rs. 3774620.00 2. Deeper foundation for depth of 2m. for ground floor area 1266.83 m 2
@ Rs. 600.00 /m 3 = Rs. 760098.00 3. White anti treatment for ground floor area 1266.83 m 2
@ Rs. 230.00 / m 2 = Rs. 291371.00 4. For Super roof and parapet wall area 1266.83 m 2
@ Rs. 400.00 /m2 = Rs. 506732.00 5. For normal preparation of side @ 1% of the cost of civil works = Rs. 128325.00 6. For sanitary installation @ 9% of the cost of civil works = Rs. 1154921.00 7. For internal water supply @ 5% of the cost of civil works = Rs. 631623.00 8. For internal road, Path fencing etc. @ 2.5% of the cost of civil works = Rs. 320811.00 9. For internal electrification @ 11% of the cost of civil works = Rs. 1411570.00 10. For external electrification @ 4% of the cost of civil works = Rs. 513298.00 Total = Rs. 18561203.00 Add 1% for contingency = Rs. 185612.00 Add 4% for VAT = Rs. 742448.00 = Rs. 19489263.00 Say = Rs. 19483300.00
(Rupees One Crore Ninty Four Lakhs Eighty Three Thousand Three hundred) only. Fund required from MSDP 95% Rs. 1,85.09,135.00 only.
N.B.- Estimate has been prepared all the basis of APWD (B) (Plinth area basis Civil, Sanitary & Water supply works for the year 2004-05
Multi Sectoral Development Plan ::: Goalpara District
83
Multi Sectoral Development Plan ::: Goalpara District
84 ANNEXURE-9 Name of work:- Cost apprisal for Up-Gradation of New ITI at Goalpara (Construction of Practical Class Workshop for Petrol Wheeler Vehicle, Trade and Electrical trade for Industiral Training Institute at Goalpara under Multisectoral Development Plan.
Multi Sectoral Development Plan ::: Goalpara District
85
Multi Sectoral Development Plan ::: Goalpara District
86
Multi Sectoral Development Plan ::: Goalpara District
87
Multi Sectoral Development Plan ::: Goalpara District
88
Multi Sectoral Development Plan ::: Goalpara District
89
Multi Sectoral Development Plan ::: Goalpara District
90 Note : This estimate has been prepared as per ITI specification. ANNEXURE-10 Estimate for Additional Class Room ( 8.00 M x 6.24 M with 1.88 M wide verandah and ramp) ( As per SSA Rates )
Sl.No Description of Item Unit Quantit y Rate (Rs.) Amount (Rs.) 1 Earth Work in excavation for foundation trenches of walls retaining walls, footings of columns steps and septic tank etc. including refilling (return filling) the quantity as necessary after completion of work etc complete.
Cu.m 16.93 53.40 904.00 2 Earth/sand filling in plinth inlayer not more than 150mm thick including necessary carriage, watering, ramming etc. complete as directed and specified including payment of land compensation, forest royalty , sales tax and other duties and taxes as may be necessary Cu.m 35.74 260.50 9310.00 3 Plain cement concrete works with coarse aggregate of size 13mm to 32 mm in foundation bed for footing steps, walls, brick works etc as directed and specified including dewatering if necessary and curing complete. a) In Prop 1:4:8 Cu.m 1.05 2284.00 2398.00 4 Providing brick soling in foundation and under floor with stone/best quality picked jhama brick, sand packed and laid to level and in panel after preparing the sub grade as directed including all labour and materials and if necessary dewatering complete
Sq.m 85.24 157.00 13383.00 5 Brick work in cement mortar with 1 st class brick including racking out joints and dewatering if necessary and curing completed as directed in substructure up to plinth level. In prop 1:5
Cu.m 6.56 2414.35 15838.00 6 112 mm thick 1 st class brick nogged wall in cement mortar including racking out joints and curing complete as directed in super structure above plinth (Providing rod will be measured and paid for separately under) Sq.m 81.40 275.55 22430.00 7 Providing and laying plain/reinforced cement concrete works in prop 1:2:4 including dewatering if necessary and curing complete excluding the cost of form work and reinforcement for RCC work.
a) Below plinth level Cu.m 5.13 3165.64 16240.00 b) Above Plinth Cu.m 3.14 3312.75 10402.00 8 Supplying fitting and fixing in position reinforcement bars conforming to relevant I.S.
Multi Sectoral Development Plan ::: Goalpara District
91 code for R.C.C. work/R.B. walling including straightening, cleaning, cutting and bending to proper shapes and length as per details, binding 20 20G annealed black etc a) High yield strength deformed bar Kg 5.19 3500.00 18165.00 b) Mild steel bar Kg 3.26 3700.00 12062.00 9 Providing formwork of ordinary timber planking so as to give a rough finish including centering stuttering and preparing etc. up to 4.00 m height and removal of the same for
a) Below plinth level Sq.m 11.50 137.54 1582.00 b) Above Plinth Sq.m 14.86 164.40 2443.00 10 Providing and laying 25mm thick damp proof course with cement concrete in prop 1:2:4 with graded stone aggregate of 10mm down nominal size including providing approved damp proof admixture in proportion as recommended by the manufacturer Sq.m 8.03 114.39 919.00 11 10 mm thick cement plaster in single coat on fair side of brick. concrete walls for interior plastering upto 1 st floor level including arises or rounded angles not exceeding 80mm girth and finished even and smooth including curing complete as directed Sq.m 185.23 54.35 10067.00 12 40mm thick cement concrete floor consisting of 63 mm under layer of cement concrete in prop 1:3:6 and 12mm thick wearing layer in cement concrete in prop 1:2 finished with a floating coat of neat cement finish using cement slurry for including curing etc complete as directed Sq.m 60.56 220.58 13358.00 13 Applying and coat of cement primer of approved brand and manufacture on. And papered smooth Sq.m 92.50 23.96 2216.00 14 Finishing wall with water proofing cement paint to give an even shade after thoroughly booming the surface to remove all dirt, dust mortar drops and other foreign matters (outside) Sq.m 92.50 33.31 3081.00 15 Colour wash with lime on wall surface (two coats) over and including a priming coat of white washing to give an even shade after thoroughly brooming the surface drops and other foreign matter, Sq.m 85.65 17.09 1464.00 16 Supplying, fitting & fixing M.S. angles, M.S. flat M.S. bolt and nuts including painting with lead paint one coat completed as directed kg 112 58.40 6541.00 17 Providing fitting and fixing steel door/window shutters with provision to be fitted M.S. angle including painting with lead paint one coat complete as directed (100 mm x 58mm x1.90 mm) with 6 nos necessary screws. Sq.m 12.12 1120.00 13574.00 a) 25mm thick frame with 12 mm thick plain sheet 18 Applying primary coat over new steel based surfaces over 100 mm in width /grith after and Sq.m 24.24 17.44 423.00
Multi Sectoral Development Plan ::: Goalpara District
92 including preparing the surface by thoroughly cleaning oil, grases, dirt and other foreign matter, sand papering and knoling with ready mixed paint , wood printer. 19 Painting two coats with Apeolite (Luxol/ Brolac/Emotile brand glossy enamel paint on new wood and wood/steel based surfaces with enamel paint to give an even shade including cleaning the surfaces of dirt , dust and other foreign materials sand papering Sq.m 24.24 32.74 794.00 20 Providing fitting , hoisting and fixing of roof truss including purlins fabricating out of M.S. black tube conforming to relevant I.S. code as per approved design and drawing including M.S. clears base plalve bolts and nuts and . As directed. MT 0.81 48993.50 39685.00 21 Providing fitting and fixing E-board in curing with necessary nails , wood , screw including 1 st class local wood 50mm x 12 mm beading including painting (a) 4 mm thick
Sq.m 49.92 212.50 10608.00 22 Providing corrugated sheet roofing 0.55mm thick fixed with G.I. coach screws square head 6mm dia and 115 mm long /galvd J hooks or L hocks , bolts etc. Sq.m 99.68 318.32 31730.00 23 Providing G.I.C. ridging including supplying and fixing necessary Galvd Screws/washer etc complete as directed 150 mm lapping RM 9.20 102.27 941.00 24 Supplying , fitting and fixing black annealed iron fitting of approved make, reasonable smooth, free from sharp edges and corners, flus and other defects and with countersunk holes for wood , screws including necessary screws etc complete.
a) Sliding foor boil (300 mm x16 mm) Each 2 131.91 264.00 b) Tower bolt (250mmx 10mm) Each 16 73.88 1182.00 c) Door handle 150 mm Each 8 25.27 202.00 25 Providing barge board of size 200 mm x 200 mm with 1 st class local hillock/bonsum/sundi timber including fitting and fixing RM 49.26 150.28 7403.00 26 Cement plaster skirting upto 30 cm height with cement mortar 1:3 with a coat of nest cement Sq.m 10.34 119.88 1240.00 27 Providing digressed woodwork in ceiling & fixed in position in contact with brick masonry walls . In contact with 1 st class timber Cub.m 0.38 23623.44 898.00 28 Supplying fitting and fixing P.C.C. /R.C.C. ready made ventilator of size 600mm x 450 mm Sq.m 4.86 279.76 1360.00 Total: 2,73,107.00 Less 10% Contractor Profit (-) 27311.00 Total after Deduction 245796.00 Add for Signboard, Chalkboard 2000.00 Add for Ramp with Railing 7000.00 Total 254796.00 Say, Rs. 2,55,000.00 (Rupees Two lakhs sixty five thousand ) only.
Multi Sectoral Development Plan ::: Goalpara District
93
Layout for Additional Class Room ( 8.00 M x 6.24 M with 1.88 M wide verandah)
W W D D W W W W 1.83 M WIDE VERANDAH CLASS ROOM 8.00 M X 6.24 M Ramp with Rail (1:12)
Multi Sectoral Development Plan ::: Goalpara District
94
ANNEXURE-11
Para wise clarification / information of MSDP as sought by the Govt.of India as per Agenda note of Meeting of Empowered Committee held on 19 th
Dec.2008
a) EDUCATION:
i) In respect of above High schools , Higher Secondary schools and high Madrassa , these are functioning under Govt . of Assam and the Principals , Head Masters and Superientendents with staff of the schools are drawing their salary from the Govt. of Assam. It may be mentioned herewith that Rashtriya Madhyamik Shiksha Abhijan has not yet implemented in the district Goalpara and hence the above mentioned High schools , Higher Secondary schools , High madrassa & Sr. Madrassa are included in this project report for construction of Additional Class room.
ii) Total 416 nos of ACRs / Schools (LP ,ME) constructed last year under SSA.
iii) Rs.2.30 lakhs ( Rupees two lakhs thirty thousand) only per ACRs/ Schools approved by the State PWD under SSA for the State.But estimate of Rs.2.55 lakhs ( Rupees two lakhs fifty five lakhs) only is also as per SSA because of bigger Class room size for High School / Higher Secondary school.
iv) All Schools are existing schools. No new school set up. Only ACRs are proposed Minority student percentage is given in the main project report.
v)Land is available for ACRs.
vi)The Proposed schemes are as per guidelines of SSA.
b)INSTALLATION OF TARA HAND PUMPS:-
All the habitations of this district are categorized as not covered ( NC) , partially covered ( PC) and fully covered ( FC) on the basis of present water supply facilities available to the rural population . Now all thses habitations are targeted to the covered as per Govt. norms under Bharat Nirman Programme through centrally sponsored normal programme / State programme by 2012. However, the habitations of urban areas are not included in the departmental programme of PHED, as this department is dealing with drinking water supply of rural population only. Further , the sources like Hand Pumps , Ring Wells etc. proposed in the earlier MSDP are located in rural areas only which are likely to be covered by 2012 , under Bharat Nirman programme through centrally sponsored / State programme as informed by the Executive Engineer , PHE, Goalpara division , Goalpara . In this respect a full revised proposal of MSDP is being submitted vide letter No. GDCP/121/2008/ dated /2009 and request to drop the earlier ARWSP scheme from MSDP in respect of Goalpara district.
Multi Sectoral Development Plan ::: Goalpara District
95
B. Proposal requiring modification , more details , justification for consideration by the empowered committee:
1)Infrastructure development of civil hospital including procurement of equipments:
The Scheme Infrastructure development of civil hospital including procurement of equipments which was proposed for Rs.50.00 lakhs ( Rupees fifty lakhs) only has been dropped as it will be covered under NRHM in due course.
2) VOCATIONAL TRAINING CENTRE :
The Scheme upgradation of existing ITI building has been framed with the financial involvement of Rs.101.13 lakhs as per norms of DG, E&T , Govt of India , Ministry of Labour, in the revised project report .
3) INSFRASTRURE DEVELOPMENT IN MADRASSAS:
In the project report 6 nos High Madrassa and 3 nos Sr. Madrassa was proposed for construction of additional class room only. It may be mentioned herewith that the schools are purely Govt. and teaching & non teaching staff are drawing salary regularly. These Madrassas are as per with Govt. High / Higher Secondary school and not the private Madrassas.
4) ANIMAL HUSBANDRY :
The schemes have been submitted in the revised plan as per NABARD guidelines and on SGSY pattern.
5) SOLAR STREET LIGHTS:
The schemes have been submitted in the revised plan as per the guidelines and funding pattern MNES= 90% , MSDP=10% plus service charge under Non- Renewable Energy.
Multi Sectoral Development Plan ::: Goalpara District
96
ANNEXURE-12
DISTRICT PROFILE 1.Background The district of Goalpara is situated entirely on the south bank of river Brahmaputra . The district covers an area 1911 sq. K.M and is bounded by West and East Garo Hills districts of the State of Meghalaya on the South and Kamrup district on the east , Dhubri district on the West and the mighty river Brahmaputra all along the North. 2.Administrative Division In 1983 Goalpara Civil sub-division was separated from original Goalpara district and the present Goalpara district was formed.The district thus consist of only one sub-division namely Goalpara Sadar Sub- Division with five ( 5) revenue circles : Lakhipur , Balijana , Matia , Rongjuli and Dudhnoi , and eight (8) Development blocks namely Jaleswar , Lakhipur , Kharmuza , Matia ., Balijana , Rongjuli, Khushdhowa and Krishnai . There are two towns viz. Goalpara ( Municipal Board), Lakhipur ( Town Committee) in the district. The total number of villages in the district is 837 of which 761 are inhabited . There are 81 Goan Panchayats in the district.An Autonomous Council has been constituted under the style Rabha Hasong Autonomous Council with its head quarter at Dudhnoi town. The autonomous council has been created to fulfill the longstanding demands of the Rabha people of the area . However , as the council is constituted only for the Rabha, the Tribals like the Bodos, the Garos , the Koches , the Rajbongsis and others who constitute more than haft of the population of Hasong area have been left out from the benefit of the council. As a result of this , there is a growing demand for autonomous district council comprising of all tribal groups of these areas. Goalpara contains 4 ( four) Legislative Assembly Constituencies . These are 36 Dudhnoi S.T LAC , 37 Goalpara East LAC, 38 Goalpara West LAC and 39 Jaleswar LAC. 36 Dudhnoi (ST) LAC is a segment of 7 Guwahati HPC and other 3 LACs are segments 4 Dhubri HPC. It may be mentioned that Khankhowa GP under Kharmuza Development Block of Goalpara district falls in the Abhayapuri ( South) LAC which is a segment of Barpeta HPC.
Multi Sectoral Development Plan ::: Goalpara District
97
3. Demographic profile of the district ( As per 2001 census) 1 Area 1911/sq.k.m 2 Population Density 451/ sq.k.m 3 Total Population Total 822305 Male 420251 Female 401784 Rural Total 755133 Male 385706 Female 369427 Urban Total 66902 Male 34535 Female 32357 4 Sex Ratio Total 956 Rural 755133 Urban 66902 5 Literacy Rate (%) Total 56.25 Male 64.86 Female 50.85 Rural Total 76.65 Male 63.15 Female 49.01 Urban Total 76.65 Male 82.44 Female 70.42
4. Religion wise Population Religion wise percentage of population,( 2001) Sl no Religion Proportion to total population Goalpara Assam 1 Hindu 38.22 64.89 2 Muslim 53.71 30.92 3 Christian 7.87 3.70 4 Sikh 0.01 0.08 5 Buddhist 0.02 0.19 6 Jain 0.05 0.09
5. Status of Economic infrastructure: The district is industrially backward and there is no industry worth the name . It was a land locked district with poor transport and communication facilities till the opening of rail cum road bridge, the Naranarayan Setu over the river Brahmaputra . It is expected , however , that the
Multi Sectoral Development Plan ::: Goalpara District
98 proposed Industrial Growth Centre of Matia ( near Sainik School, Goalpara) will give a boost to the development of Industries in the district. The district is primarily an agrarian district as 90% of the population depend their livelihood on agriculture . The Principal agriculture produce are paddy , Jute , Green and Black Gram and Potato etc. The district has a lot of potential for the precious Assam Silk Muga . The district is also known for its production of areca nut and banana A big are of banana production has come up at Daranggiri to which businessmen from all over India have been attracted . There is also scope for rubber production and the rubber produced in the district commands a good demand from the rubber buyers across the country . Recently , a new development in respect of cultivation of Boro paddy has been witnessed in the district and there is a bumper production of paddy of that variety. This is perhaps due to large scale distribution of STWs along with diesel water pump sets by the agriculture department in the district.
a) Livestock and veterinary facilities: In the essential agrarian economy of Assam ,livestock is an essential and important contribution to the NSDP. Dairy and poultry farming can augment incomes and increase purchasing power . The economy of Goalpara district is basically agrarian and as such the economic development of the district is highly dependable on agriculture and allied activities. Traditionally , dairy farming is a subsidiary occupation of the farmers of the district . Despite the large poputation of live stock, the milk production in the district is low mainly due to predominance of local cows with a poor genetic make-up.
Multi Sectoral Development Plan ::: Goalpara District
99 b) Power and energy. Transport and Communication power is the other basic infrastructure which is essential for economic growth . Of the total villages in the district 90% are reported to have power supply (Census of India ,2001) with domestic connection for lighting available in all the villages with electric connection . However , consumption of electricity for commercial and industrial purpose is not available while only 0.1% of the villages have electricity connection for agricultural use. Percentage of households in sample villages with electricity connection. Sl no Type of connection Hindu Muslim Christian Total 1 Domestic 27.4 5.2 20.5 15.1 2 Agricultural 0 0 0 3 Commercial 8.0 4.2 0 5.3 4 Others 0 0 0 0 Source: sample village survey,2008. c) Banking Access to credit and banking facilities is an important indicator for socio- economic development . As on December 2005,the total number of reporting offices of Scheduled Commercial Banks in the district stands at 35. The population coverage of banking services is estimated to be 23,487 persons per bank office as per the number of offices in 2005. The credit deposit ratio in the district which stands at about 52% is lower than the stipulated norm of 60% . The existing situation of rural credit in the district reflects further ramifications on credit availability for productive purposes on stragic commitments . Commercial banking is quite poor in the rural areas of Goalpara . Besides , a sizeable amount of fund is transferred from the rural areas for low credit worthiness of the rural people.
d) Basic Amenities Besides housing standard of the rural people , the standard of living is also based on the availability of certain basic community institutions in the rural locality along with easy assess to these. Safe drinking water , facilities for basic education and health and social security are some of the important elements of these basic requirements.In respect of amenities in rural areas,there are facility wise variations. With a total household of 146826, Goalpara has 761 inhabited villages. No. of villages with various basic facilities are shown in the following table.
Multi Sectoral Development Plan ::: Goalpara District
100 i) Distribution of Amenities in inhabited villages in Golapara district. Sl no Amenities Numbers ( percentage) 1 Total inhabited villages 761 2 Total households 146826 3 Safe drinking water facilities 759( 99.7%) 4 Electricity ( Power supply) 689( 90.4%) 5 Electricity ( domestic) 688(90.4%) 6 Electricity( Agriculture) 1( o.13%) 7 Primary school 723( 95.0%) 8 Middle schools 311( 40.9%) 9 Secondary / Sr. Secondary schools 130(17.1%) 10 College 13(1.7%) 11 Medical facility 243(31.9%) 12 Primary Health Centre 18(2.4%) 13 Primary Health sub-centre 46(6.0%) 14 Post, telegraph and telephone facility 134(17.6%) 15 Bus services 209(27.5%) 16 Paved approach road 165(21.7%) 17 Un-paved approach road 720(94.6%) Source: Statistical Handbook, Assam 2006, cencus of India, 2001.
ii) Percentage of beneficiaries by religion & caste under major programmes Religion Programmes SGSY NREGA PMGSY IAY Hindu 30.0 27.4 16.7 40.3 Muslim 33.3 53.0 83.3 35.2 Christian 3.3 2.8 - 2.2 SC 25.6 4.7 - 9.1 ST 7.8 12.1 - 13.2 Total 100.0 100.0 100.0 100.0 Source: Sample Village survey,2008.
iii) Land holding & cultivated land
Size of land holding No. of land holding P.C. Land under possession P.C. Landless 10067 9.79 176 0.16 Less than 1 Hectare 13904 13.53 6952 6.16 1-2 Hectare 66067 64.28 76205 67.57 2-4 Hectare 11426 11.12 24137 21.41 Above 4 Hectare 1310 1.28 5298 4.70 Total. 102774 100.00 112768 100.00
Multi Sectoral Development Plan ::: Goalpara District
101 iv)Production and Quantity per Hectare
Name of crop Status of State Status of District Goalpara Area (Lakh Ha) Production (Lakh MT) Productivity (Kg per Ha) Area (Ha) Production (MT) Productivity (Kg per Ha) Wheat 0.72 0.83 1151 4191 6915 1650 Rice 24.43 36.49 1480 81004 129600 1609 Pulses 1.23 0.68 550 5277 3238 613 Jute 0.60 6.57 1979 4832 8214 1700 Oil seeds 3.08 1.59 515 5216 2794 535 Maize 0.19 0.14 737 172 115 669 Hort. Fruits 1.16 14.02 12142 4094 85368 20851 Hort. Spices 0.88 2.18 2478 1043 25845 2478 Hort. Vegetables 2.38 39.16 16482 61118 976928 15984
v)Production Status of Cereals, Pulses in total Foodgrains Name of Crop Status of State Status of Goalpara District Production (in lakh MT) Production (in lakh MT) P.C. against State Total Cereals 37.46 1.3663 3.647 Total Pulses 0.68 0.032 0.047 Total Food grains 38.14 1.3983 3.666
Goalpara District is one of 90 Minority concentration districts in the country and classified in category A i.e. the district is having both Socio- Economic and basic amenities parameters below national average.