You are on page 1of 13

SUBSURFACE OIL & GAS MAPPING

RESOURCE VOLUME DETERMINATION METHODS


3 hours Lab
Md Yazid Mansor
UTP FGPE IE Petroleum Basin Studies
Beginners Grade / Sparse Data
Method #1 : Area-Thickness (Geometric Corrected Tank Model GRV)

Intermediate Grade / Few Data
Method #2 : Area-Depth Plot (Gross Rock Volume)

Advance Grade / Some Data
Method #3 : Isopach Cross-Contour Mapping GRV (Area Thickness Plot)

Classical Advance Grade
Method #4 : Isopach Cross-Contour Mapping GRV (Trapezoidal Rule)

Classical Advance Grade
Method #5 : Isopach Cross-Contour Mapping GRV (Pyramidal Rule)
SUBSURFACE OIL & GAS
RESOURCE VOLUME DETERMINATION METHODS
Fundamentals of Gross Rock Volume Derivation
Md Yazid Mansor UTP FGPE IE Petroleum Basin Studies
If Data Available is restricted to Area & Thickness information ONLY, the
Calculation of STOIIP or GIIP formula is :

oSTOIIP (stb) = 7758 x A x h x G C x N/G x phi x So x 1/Boi

oGIIP (scf) = 43560 x A x h x GC x N/G x phi x Sg x Bgi

Where,
o STOIIP [stock tank barrels]
o GIIP [standard cubic feet]
o 7758 = Conversion factor (acre-ft * 7758 = barrels)
o 43560 = Conversion factor (acre-ft * 43560 = scf)
o A = Area [acres]
o h = Gross pay thickness (feet)
o GC = Geometric Correction Factor (decimal)
o N/G = Net Reservoir Pay to Gross Reservoir Pay thickness proportion (decimal)
o phi = Porosity of net reservoir rock (decimal)
o So = Oil saturation , oil-filled portion of this porosity (decimal)
o Sg = Gas saturation , gas-filled portion of this porosity (decimal)
o 1/Boi = Oil Formation Volume Factor (decimal). Expresses the change in oil volume between reservoir and
standard conditions at surface (unit in reservoir barrels / stock tank barrels)
o Bgi = Gas Formation Volume Factor (decimal). Expresses the change in gas volume between reservoir and standard
conditions at surface (unit in standard cubic feet / reservoir cubic feet)

If the metric system is being used, a conversion factor of 6.289808 can be used to convert cubic metres to
stock tank barrels.
1 cubic metre container would hold 6.289808 barrels of oil.
For gas, 1 cubic metre container would hold 35.315 cubic feet of gas.
SUBSURFACE OIL & GAS
RESOURCE VOLUME DETERMINATION METHODS
Fundamentals of Method #1 : Area-Thickness (Geometric Corrected Tank Model GRV)
Md Yazid Mansor UTP FGPE IE Petroleum Basin Studies
Exercise #A (40 mins):
You will each receive an A4 size Base Map, observe the information on the map.
You are also provided a Seismic Marker Horizon TWT Isochron Map of the same scale, and a
Seismic Stacking Velocity Data, tabulation & x-y plot.
Using the above information, generate a Horizon Marker Depth Structure Map and draw these
depth contours onto an A4 tracing paper with a carbon pencil.
Label the Depth Contours appropriately.

Exercise #B (5 mins):
How would you describe this trap style?
What is the crestal depth value? What is the possible spill-points and its values?
What is the Structural Relief of the trap?

Exercise #C (15 mins):
This trap is undrilled, what is the Prospective Resource (STOIIP) volume in this trap?
You may elect to do either a Minimum Case, Most Like Case or Maximum Case.
o Area = Measure your choice of Trap Closure, use the horizontal map scale.
o Gross pay thickness = Assume a thickness range of 25 75 m tvt (true vertical thickness)
o Estimate of Geometric Correction factor = 0.6 0.9
o Net Reservoir to Gross Reservoir proportion = 50 - 90%
o Porosity of net reservoir rock = 15 - 25%
o Water Saturation = 35 65%
o Oil Formation Volume Factor , 1/Boi = 0.72 stb/rb

given STOIIP (stb) = 7758 x A x h x G C x N/G x phi x So x 1/Boi

This is your Pre-Drill Prospective Resource STOIIP value.
SUBSURFACE OIL & GAS
RESOURCE VOLUME DETERMINATION METHODS
Fundamentals of Method #1 : Area-Thickness (Geometric Corrected Tank Model GRV)
Md Yazid Mansor UTP FGPE IE Petroleum Basin Studies
MYM UTP BASEMAP NOV 2013
202000 201000 203000 204000 205000 206000
701000
702000
703000
704000
705000
COMPANY :
PROSPECT/FIELD :
RESERVOIR :
MAP :

Datum : Mean sea-level
Contour Interval :
Scale


AUTHOR: DATE:
REPORT NO: ENCL NO:
0 kilometer 2
Base Map
202000 201000 203000 204000 205000 206000
701000
702000
703000
704000
705000
0 kilometer 2
MYM UTP BASEMAP NOV 2013
COMPANY : UTP PG Undergrads
PROSPECT/FIELD : UTP - XA
RESERVOIR : Mid-Mio S1 Marker Horizon
MAP : TWT Isochron

Datum : Mean sea-level
Contour Interval : 100 msec TWT
Scale


AUTHOR: MYM Consulting DATE: Nov 2013
REPORT NO: ENCL NO:
0 kilometer 2
1800 ms
2400 ms
2200 ms
2000 ms
1800 ms
2400 ms
2600 ms
Given Isochron Map
202000 201000 203000 204000 205000 206000
701000
702000
703000
704000
705000
0 kilometer 2
MYM UTP BASEMAP NOV 2013
1800 ms
2400 ms
2200 ms
2000 ms
COMPANY : UTP PG Undergrads
PROSPECT/FIELD : UTP - XA
RESERVOIR : Mid-Mio S1 Marker Horizon
MAP : TWT Ishochron & Well Sites

Datum : Mean sea-level
Contour Interval : 100 msec TWT
Scale


AUTHOR: MYM Consulting DATE: Nov 2013
REPORT NO: ENCL NO:
0 kilometer 2
1800 ms
2400 ms
2600 ms
Where would you site the first wildcat well?
Drillers do not understand TWT Isochron Map..
UTP FGPE Geophysical Interpretation & Volumetrics
Md Yazid / Luluan
Nov-13
UTP Prospect Stacking Velocity data
TWT Depth Incident time Avg Vel
mSec mss mSec m/sec
0 0 0.0 0.0
200 -150 100.0 -1500.0
500 -420 250.0 -1680.0
750 -640 375.0 -1706.7
1000 -865 500.0 -1730.0
1150 -998 575.0 -1735.7
1300 -1130 650.0 -1738.5
1440 -1280 720.0 -1777.8
1610 -1450 805.0 -1801.2
1800 -1665 900.0 -1850.0
1915 -1785 957.5 -1864.2
1990 -1860 995.0 -1869.3
2060 -1940 1030.0 -1883.5
2130 -2020 1065.0 -1896.7
2220 -2140 1110.0 -1927.9
2300 -2260 1150.0 -1965.2
2340 -2340 1170.0 -2000.0
2410 -2490 1205.0 -2066.4
2500 -2660 1250.0 -2128.0
2650 -2885 1325.0 -2177.4
2800 -3115 1400.0 -2225.0
3000 -3450 1500.0 -2300.0
-4000
-3500
-3000
-2500
-2000
-1500
-1000
-500
0
0 500 1000 1500 2000 2500 3000 3500
D
e
p
t
h

(
m
s
s
)
TWT (mSec)
FGPE UTP Prospect Mapping Exercise
Seismic Stacking Velocitymym
202000 201000 203000 204000 205000 206000
701000
702000
703000
704000
705000
0 kilometer 2
MYM UTP BASEMAP NOV 2013
UTP-XA
UTP-XC
UTP-XD
UTP-XE
UTP-XB
UTP-XF
UTP-XH
UTP-XG
-1700 mss
-2400 mss
-2000 mss
-1900 mss
-1700 mss
-2300 mss
-2700 mss
-1800 mss
-2100 mss
-2300 mss
-2200 mss
-2500 mss
-2500 mss
-2600 mss
-3000 mss
COMPANY : UTP PG Undergrads
PROSPECT/FIELD : UTP - XA
RESERVOIR : Mid-Mio S1 Marker Horizon
MAP : Top Depth Structure/ Wellsites

Datum : Mean sea-level
Contour Interval : 100 m
Scale


AUTHOR: MYM Consulting DATE: Nov 2013
REPORT NO: ENCL NO:
0 kilometer 2
Drillers need Depth Structure Map
202000 201000 203000 204000 205000 206000
701000
702000
703000
704000
705000
0 kilometer 2
MYM UTP BASEMAP NOV 2013
UTP-X
UTP-X
UTP-X
UTP-X
UTP-X
UTP-X
UTP-X
UTP-X
-1700 mss
-2400 mss
-2000 mss
-1900 mss
-1700 mss
-2300 mss
-2700 mss
-1800 mss
-2100 mss
-2300 mss
-2200 mss
-2500 mss
-2500 mss
-2600 mss
-3000 mss
0 kilometer 2
COMPANY : UTP PG Undergrads
PROSPECT/FIELD : UTP - XA
RESERVOIR : Mid-Mio S1 Marker Horizon
MAP : Top Depth Structure/ Wellsites

Datum : Mean sea-level
Contour Interval : 100 m
Scale


AUTHOR: MYM Consulting DATE: Nov 2013
REPORT NO: ENCL NO:
0 kilometer 2
Minimum Case Closure
202000 201000 203000 204000 205000 206000
701000
702000
703000
704000
705000
0 kilometer 2
MYM UTP BASEMAP NOV 2013
UTP-X
UTP-X
UTP-X
UTP-X
UTP-X
UTP-X
UTP-X
UTP-X
-1700 mss
-2400 mss
-2000 mss
-1900 mss
-1700 mss
-2300 mss
-2700 mss
-1800 mss
-2100 mss
-2300 mss
-2200 mss
-2500 mss
-2500 mss
-2600 mss
-3000 mss
0 kilometer 2
COMPANY : UTP PG Undergrads
PROSPECT/FIELD : UTP - XA
RESERVOIR : Mid-Mio S1 Marker Horizon
MAP : Top Depth Structure/ Wellsites

Datum : Mean sea-level
Contour Interval : 100 m
Scale


AUTHOR: MYM Consulting DATE: Nov 2013
REPORT NO: ENCL NO:
0 kilometer 2
Maximum Case Closure
202000 201000 203000 204000 205000 206000
701000
702000
703000
704000
705000
0 kilometer 2
MYM UTP BASEMAP NOV 2013
UTP-X
UTP-X
UTP-X
UTP-X
UTP-X
UTP-X
UTP-X
UTP-X
-1700 mss
-2400 mss
-2000 mss
-1900 mss
-1700 mss
-2300 mss
-2700 mss
-1800 mss
-2100 mss
-2300 mss
-2200 mss
-2500 mss
-2500 mss
-2600 mss
-3000 mss
0 kilometer 2
COMPANY : UTP PG Undergrads
PROSPECT/FIELD : UTP - XA
RESERVOIR : Mid-Mio S1 Marker Horizon
MAP : Top Depth Structure/ Wellsites

Datum : Mean sea-level
Contour Interval : 100 m
Scale


AUTHOR: MYM Consulting DATE: Nov 2013
REPORT NO: ENCL NO:
0 kilometer 2
Most Likely Case Closure
202000 201000 203000 204000 205000 206000
701000
702000
703000
704000
705000
0 kilometer 2
MYM UTP BASEMAP NOV 2013
UTP-XA
UTP-XC
UTP-XD
UTP-XB
UTP-XF
UTP-XH
UTP-XG
UTP-XE
-1700 mss
-2400 mss
-2000 mss
-1900 mss
-1700 mss
-2300 mss
-2700 mss
-1800 mss
-2100 mss
-2300 mss
-2200 mss
-2500 mss
-2500 mss
-2600 mss
-3000 mss
0 kilometer 2
COMPANY : UTP PG Undergrads
PROSPECT/FIELD : UTP - XA
RESERVOIR : Mid-Mio S1 Marker Horizon
MAP : Top Depth Structure/ Wellsites

Datum : Mean sea-level
Contour Interval : 100 m
Scale


AUTHOR: MYM Consulting DATE: Nov 2013
REPORT NO: ENCL NO:
0 kilometer 2
Min, ML, Max Closures