Classical Advance Grade Method #5 : Isopach Cross-Contour Mapping GRV (Pyramidal Rule) SUBSURFACE OIL & GAS RESOURCE VOLUME DETERMINATION METHODS Fundamentals of Gross Rock Volume Derivation Md Yazid Mansor UTP FGPE IE Petroleum Basin Studies If Data Available is restricted to Area & Thickness information ONLY, the Calculation of STOIIP or GIIP formula is :
oSTOIIP (stb) = 7758 x A x h x G C x N/G x phi x So x 1/Boi
oGIIP (scf) = 43560 x A x h x GC x N/G x phi x Sg x Bgi
Where, o STOIIP [stock tank barrels] o GIIP [standard cubic feet] o 7758 = Conversion factor (acre-ft * 7758 = barrels) o 43560 = Conversion factor (acre-ft * 43560 = scf) o A = Area [acres] o h = Gross pay thickness (feet) o GC = Geometric Correction Factor (decimal) o N/G = Net Reservoir Pay to Gross Reservoir Pay thickness proportion (decimal) o phi = Porosity of net reservoir rock (decimal) o So = Oil saturation , oil-filled portion of this porosity (decimal) o Sg = Gas saturation , gas-filled portion of this porosity (decimal) o 1/Boi = Oil Formation Volume Factor (decimal). Expresses the change in oil volume between reservoir and standard conditions at surface (unit in reservoir barrels / stock tank barrels) o Bgi = Gas Formation Volume Factor (decimal). Expresses the change in gas volume between reservoir and standard conditions at surface (unit in standard cubic feet / reservoir cubic feet)
If the metric system is being used, a conversion factor of 6.289808 can be used to convert cubic metres to stock tank barrels. 1 cubic metre container would hold 6.289808 barrels of oil. For gas, 1 cubic metre container would hold 35.315 cubic feet of gas. SUBSURFACE OIL & GAS RESOURCE VOLUME DETERMINATION METHODS Fundamentals of Method #1 : Area-Thickness (Geometric Corrected Tank Model GRV) Md Yazid Mansor UTP FGPE IE Petroleum Basin Studies Exercise #A (40 mins): You will each receive an A4 size Base Map, observe the information on the map. You are also provided a Seismic Marker Horizon TWT Isochron Map of the same scale, and a Seismic Stacking Velocity Data, tabulation & x-y plot. Using the above information, generate a Horizon Marker Depth Structure Map and draw these depth contours onto an A4 tracing paper with a carbon pencil. Label the Depth Contours appropriately.
Exercise #B (5 mins): How would you describe this trap style? What is the crestal depth value? What is the possible spill-points and its values? What is the Structural Relief of the trap?
Exercise #C (15 mins): This trap is undrilled, what is the Prospective Resource (STOIIP) volume in this trap? You may elect to do either a Minimum Case, Most Like Case or Maximum Case. o Area = Measure your choice of Trap Closure, use the horizontal map scale. o Gross pay thickness = Assume a thickness range of 25 75 m tvt (true vertical thickness) o Estimate of Geometric Correction factor = 0.6 0.9 o Net Reservoir to Gross Reservoir proportion = 50 - 90% o Porosity of net reservoir rock = 15 - 25% o Water Saturation = 35 65% o Oil Formation Volume Factor , 1/Boi = 0.72 stb/rb
given STOIIP (stb) = 7758 x A x h x G C x N/G x phi x So x 1/Boi
This is your Pre-Drill Prospective Resource STOIIP value. SUBSURFACE OIL & GAS RESOURCE VOLUME DETERMINATION METHODS Fundamentals of Method #1 : Area-Thickness (Geometric Corrected Tank Model GRV) Md Yazid Mansor UTP FGPE IE Petroleum Basin Studies MYM UTP BASEMAP NOV 2013 202000 201000 203000 204000 205000 206000 701000 702000 703000 704000 705000 COMPANY : PROSPECT/FIELD : RESERVOIR : MAP :
Datum : Mean sea-level Contour Interval : Scale
AUTHOR: DATE: REPORT NO: ENCL NO: 0 kilometer 2 Base Map 202000 201000 203000 204000 205000 206000 701000 702000 703000 704000 705000 0 kilometer 2 MYM UTP BASEMAP NOV 2013 COMPANY : UTP PG Undergrads PROSPECT/FIELD : UTP - XA RESERVOIR : Mid-Mio S1 Marker Horizon MAP : TWT Isochron
Datum : Mean sea-level Contour Interval : 100 msec TWT Scale
AUTHOR: MYM Consulting DATE: Nov 2013 REPORT NO: ENCL NO: 0 kilometer 2 1800 ms 2400 ms 2200 ms 2000 ms 1800 ms 2400 ms 2600 ms Given Isochron Map 202000 201000 203000 204000 205000 206000 701000 702000 703000 704000 705000 0 kilometer 2 MYM UTP BASEMAP NOV 2013 1800 ms 2400 ms 2200 ms 2000 ms COMPANY : UTP PG Undergrads PROSPECT/FIELD : UTP - XA RESERVOIR : Mid-Mio S1 Marker Horizon MAP : TWT Ishochron & Well Sites
Datum : Mean sea-level Contour Interval : 100 msec TWT Scale
AUTHOR: MYM Consulting DATE: Nov 2013 REPORT NO: ENCL NO: 0 kilometer 2 1800 ms 2400 ms 2600 ms Where would you site the first wildcat well? Drillers do not understand TWT Isochron Map.. UTP FGPE Geophysical Interpretation & Volumetrics Md Yazid / Luluan Nov-13 UTP Prospect Stacking Velocity data TWT Depth Incident time Avg Vel mSec mss mSec m/sec 0 0 0.0 0.0 200 -150 100.0 -1500.0 500 -420 250.0 -1680.0 750 -640 375.0 -1706.7 1000 -865 500.0 -1730.0 1150 -998 575.0 -1735.7 1300 -1130 650.0 -1738.5 1440 -1280 720.0 -1777.8 1610 -1450 805.0 -1801.2 1800 -1665 900.0 -1850.0 1915 -1785 957.5 -1864.2 1990 -1860 995.0 -1869.3 2060 -1940 1030.0 -1883.5 2130 -2020 1065.0 -1896.7 2220 -2140 1110.0 -1927.9 2300 -2260 1150.0 -1965.2 2340 -2340 1170.0 -2000.0 2410 -2490 1205.0 -2066.4 2500 -2660 1250.0 -2128.0 2650 -2885 1325.0 -2177.4 2800 -3115 1400.0 -2225.0 3000 -3450 1500.0 -2300.0 -4000 -3500 -3000 -2500 -2000 -1500 -1000 -500 0 0 500 1000 1500 2000 2500 3000 3500 D e p t h
Henry Stevens - Hitler's Flying Saucers - A Guide To German Flying Discs of The Second World War New Edition (2013, Adventures Unlimited Press) - Libgen - lc-116-120