You are on page 1of 8

Project

Spreadsheets to BS 8110

Client
Location

Advisory Group
Level 2 - Beam on Grid 7

Made by

POST-TENSIONED ANALYSIS & DESIGN to BS 8110:1997

Checked

REINFORCED CONCRETE COUNCIL


Date

RMW

Originated from RCC42.xls on CD

Revision

chg

1999 RCC

Page

23-Jul-2014

66
Job No

R68

POST-TENSIONED ANALYSIS & DESIGN to BS 8110:1997 - GENERAL DATA


LOAD COMBINATIONS

NOTES
Initial prestress + OW + construction load on all spans
INPUT IS UNDERLINED.
FRAMES ARE ASSUMED
Initial prestress + OW + construction load on odd spans
TO BE BRACED
Initial prestress + OW + construction load on even spans
Final prestress + dead + imposed load on all spans
Final prestress + dead + imposed load on odd spans
Final prestress + dead + imposed load on even spans
Final prestress + factored dead and imposed load on all spans
Final prestress + factored dead + factored imposed load on odd spans
Final prestress + factored dead + factored imposed load on even spans
Final prestress + dead + 30% imposed load on odd spans

SLS 1
SLS 2
SLS 3

INITIAL

SLS 4
SLS 5
SLS 6
ULS 1

FINAL

ULTIMATE

ULS 2
ULS 3

DEFLECTION

SLS 7

LOAD FACTORS
DEAD
IMPOSED
OPTIONS

min

max

1
0

1.4
1.6

VIBRATION
Limiting reponse factor = 8

Stressing Ends

B
(L, R, B) Prestress system
U
(U, B)
Assume 20% max redistribution
0.7
BS 8110 Class
3
(Clause 4.1.3)
.
Slab or beam
B
(B or S)Limiting crack width
0.2
mm
.
In slabs, nominal top bonded reinforcement in span?
Y
(Y or N; use Y for dissimilar spans)
Slab type
S
(S)olid, (R)ibbed or (W)affle, supported by beam Damping, z (2% to 8%) 5%

Jacking F/strength

MATERIALSCONCRETE
fcu = 40
At days 4.80
fci = 25.04
Cement content 330
Ave ambient during curing = 15C
STRAND

fpu = 1860
Ep = 195

REBAR

fy = 460
gm = 1.05

sc = 13.20
st =
Ec28 = 28
sic = 10.02
sit =
Eci = 21.72
W/C ratio 0.55
OPC or RHPC ?
gm =
Longterm R/H % 50
Ap, mm = 100
Rel % = 2

COVERS

to links

LOADING SEQUENCE Permanent loads for assessment

Own weight
Applied dead
Quasi-Permanent Imposed
COMBINED

= 0.140
Draw in= 6

5.00
3.20
OPC
1.50

unmodified
unmodified
.

K = 0.0010
Depth to strand centre = 40
Top
25

Bottom
25

Sides
25

60
5.1

80
7.5

30% of Imposed is permanent

Load

@ Age

fcut

Et

Ec

kN/m

days

N/mm

kN/mm

Creep

kN/mm

13.81
42.00
9.60
65.41

4.80
60
-=-

25.04
43.50

21.72
29.47

3.64
2.14

4.68
9.39

26.76

2.45

7.75

NOTES on MATERIALS
BRITISH LOW RELAXATION STRAND
Type

Dia

Area

Standard

15.2
12.5
15.7
12.9
15.2
12.7

139
93
150
100
165
112

Super
Compact

Breaking Weight

1670
1770
1770
1860
1820
1860

1.090
0.730
1.180
0.785
1.295
0.890

RELAXATION at 0.7fpu
Ambient C
20
Relaxation
1.8

40
3.5

100
10.7

Project

Spreadsheets to BS 8110

Client
Location

Advisory Group
Level 2 - Beam on Grid 7

REINFORCED CONCRETE COUNCIL


Made by

POST-TENSIONED ANALYSIS & DESIGN to BS 8110:1997


Originated from RCC42.xls on CD

SUMMARY iv
(e) SHEAR

Date

RMW

Page

23-Jul-2014

Checked

Revision

Job No

chg

1999 RCC

70

R68

Link = 10
Span 1

Left
V
636.0
cracked?
N
Vc
1396.8
No of legs
8
Link spacing
375

Span 2

Right
882.1
Y
736.8
8
375

Left
919.3
Y
757.3
8
375

Span 3

Right
677.9
N
1396.8
8
375

Left
0.0
N
0.0
8
0

Right
0.0
N
0.0
8
0

ULS SHEAR ENVELOPE

1500
1000
500

938.7

650.5

0.0

-500

-677.9

-901.4

-1000
-1500
(f) VIBRATION
Response factor

Span 1

Span 2

Span 3

0.62
OK

0.70
OK

0.00
OK

(g) DEFLECTION
MAX DEFLECTIONS

15
10
5
0
-5
-10
-15
-20

9.20

7.90

0.00
0.0
-9.4
Transfer

Span 1 = 9.6mm < 48

Final

OK

Col centres

-15.4

Zero axis

Span 2 = 15.8mm < 50

OK
-

SUPPORT REACTIONS
ULS 4
ULS 5
ULS 6
DEAD
IMPOSED

Supt 1

Supt 2

Supt 3

Supt 4

650.5
655.4
199.1
274.4
147.0

1840.2
1362.1
1409.3
803.8
484.4

677.9
232.0
677.9
289.0
152.6

0.0
0.0
0.0
0.0
0.0

COLUMN MOMENTS
Above
ULS 4

Supt 1

Supt 2

Supt 3

Supt 4

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

Below

ULS 5

Above
Below

ULS 6

Above
Below

kN
kN
kN
kN
kN

kNm
kNm
kNm
kNm
kNm
kNm

Project

Spreadsheets to BS 8110

REINFORCED CONCRETE COUNCIL

Client
Advisory Group
Location Level 2 - Beam on Grid 7

Made by

RMW

POST-TENSIONED ANALYSIS & DESIGN to BS 8110:1997


Originated from RCC42.xls on CD

Date

Page

Revision

chg

1999 RCC

TYPICAL CALCULATION
for Span 1 at 3.60 m from C/L of LH support
Class 3 Tee section,

h = 525 mm, bw = 1800 mm

71

23-Jul-14

Checked

Job No

R68
BS 8110
Reference

hf = 200 mm, bf =3000 mm.

Ac = 1185000mm2, Z top = 120.0E6 mm, and Z bottom = 93.3E6 mm


Tendons are unbonded, Ap = 100mm2, fpu = 1,860 N/mm2 and 75.9 mm from soffite
There are 24 tendons, jacked to 1,302 N/mm or 70.0% fpu
Prestress losses at this section are -2,500.7 kN at transfer and -2,237.1 kN longterm
(b) Stresses at transfer
M = 394.4 kNm hogging, and prestressing force = 2,761.1 kN

4.3.5

Max compression (bottom) = M/Z + P/A = 394.4E3 / 93.3 + 2,761.1 / 1185 = 6.56 N/mm
< 10.02 N/mm allowed

Max tension (bottom) = M/Z - P/A = -158.3E3 / 93.3 - 2,761.1 / 1185 = 0.96 N/mm
< 3.00 N/mm allowed

(c) Stresses in service

4.3.4

M = 400.5 kNm sagging, and prestressing force = 2,497.5 kN


Max compression (top) = 400.46E6 / 120.0E6 + 2,497.5E3 / 1185E3 = 5.44 N/mm
< 13.33 N/mm allowed

Max tension (bottom) = 400.46 / 93.3 - 2,497.5 / 1185 = 2.18 N/mm


< 4.73 N/mm allowed

(d) MOR at ultimate limit state

4.3.7

M = 1,382.7 kNm sagging, and prestressing force = 2,497.5 kN


fpe = 1000 x 2,497.5 / 24 / 100 = 1,040.6 N/mm
Reinforcement d = 480 mm
Rp = 1860 x 100 x 24 / 40 / 3000 / (525 - 75.86) = 0.083
fpe/fpu = 1,040.6 / 1860 x 1.05 = 0.587
Lte = 12,250 mm
fpb (unbonded)
= 1,040.6 + 7000 x (525 - 75.86) / 12,250 (1 - 1.7 x 0.083) = 1,261.1 N/mm

Eq 52

Tendon force = 1,261.1 x 24 x 100 / 1000 = 3,026.7 kN


Rebar force = 460 / 1.05 x 6,283 / 1000 = 2,752.6 kN
Total tensile force = 3,026.7 + 2,752.6 = 5,779.4 kN
Compression block depth, dn = 1000 / 5,779.4 / 0.45 / 40 / 3000 = 107.03 mm
MOR = (3,026.7 ( 525 - 75.9 - 107.03 / 2) + 2,752.6 x (480 - 107.03 / 2)) / 1000
= 2,371.4 kNm > 1,382.7 ok

Eq 51

Project

REINFORCED CONCRETE COUNCIL

Spreadsheets to BS 8110

Client
Advisory Group
Location Level 2 - Beam on Grid 7

Made by

POST-TENSIONED ANALYSIS & DESIGN TO BS 8110


Originated from RCC42.xls on CD

DETAILED CALCULATIONS ix
(d) ULS MOMENT CHECKS
Supt 1

DESIGN MOMENT
TENDON HEIGHT
fpe
Hinges
Lt
Lte
dt
300.0
dr
482.0
Rp
0.207
fpe/fpu
0.588
TABLE 4.4 1a
0.90
1b
0.92
2a
0.86
2b
0.88
fpb bonded
1616
fpb unbonded
1153
TENDON FORCE 2768
As
4021
REBAR FORCE 1761.7
TOTAL TENSION
4530
dn
139.8
Steel stress
438
Zt
230.1
Zr
412.1
MOR
1362.9

1522.1
40.7
1040
2
24.50
12250
484.3
480.0
0.077
0.587
1.00
1.00
1.00
1.00
1771
1281
3073
6283
2752.6
5826
107.9
438
430.3
426.1
2495.4

(e) SHEAR
V
Mu
M0
Cracked ?
UNCRACKED

Span 1

fcp
Vco
CRACKED
Aps
As
d
As%
fpe/fpu
vc
Vcr
Vc
Asv/Sv
Sv

(f) VIBRATION
ny : ly
Ix : Iy
lx : ly
kx : ky
w
dx : dy
f'x : f'y
fbx : fby
fx : fy
Nx : Ny
Cx : Cy
Rx : Ry
R

Checked

Left
636.0
42.7
211.9
N
2.111
1396.8
2300
6321
415.8
0.845
0.411
0.555
3479.3
1396.8
1.643
375

Right
882.1
1531.7
570.2
Y
2.104
1395.7
2300
8583
480.0
0.993
0.350
0.585
736.8
736.8
1.643
375

Supt 2

Left
1531.7
480.0
1039

Span 2

Right
1502.2
480.0
1039

1765.2
40.7
1040
2
24.50
12250
484.3
484.0
0.077
0.587
1.00
1.00
1.00
1.00
1771
1281
3074
2262
990.9
4065
75.3
438
446.7
446.4
1815.1

480.0
480.0
480.0
480.0
0.129
0.129
0.586
0.586
1.00
1.00
1
1
0.97
0.97
0.99
0.99
1758
1758
1253
1253
3007
3007
6283
2752.6 2752.6
5760
5760
177.8
177.8
438
438
391.1
391.1
391.1
391.1
2252.7 2252.7

Right
677.9
11.5
211.9
N
2.111
1396.8
2500
8783
209.0
2.335
0.363
0.915
12816.1
1396.8
1.643
375

Right
0.0
0.0
0

300.0
0.0
480.0
0.0
0.207
0.000
0.588
0.000
0.90
0.00
0.92
0
0.86
0
0.88
0
1616
0
1153
0
2768
0
6283
2752.6 2752.6
5521
2753
170.4
0.0
438
0
214.8
0.0
394.8
0.0
1681.3
0.0

R68
0

0.0
0.0
0
0
0.00
0
0.0
0.0
0.000
0.000
0.00
0.00
0.00
0.00
0
0
0
0
0.0
0
0.0
0
0.0
0.0
0.0

Left
0.0
0.0
0

0.0
0.0
0.000
0.000
0.00
0
0
0
0
0
0
0
0.0
0
0.0
0
0.0
0.0
0.0
ft = 1.518

Left
0.0
0.0
0.0
N
0.000
0.0
0
0
0.0
0.000
0.000
0.000
0.0
0.0
0.000
0

80
Job No

Date

Supt 3

Left
11.5
300.0
1042

Span 2

Left
919.3
1502.2
570.2
Y
2.104
1395.7
2500
8783
480.0
1.017
0.362
0.590
757.3
757.3
1.643
375

Page

23-Jul-2014
Revision

chg

1999 RCC

Span 1

Right
42.7
300.0
1042

Date

RMW

Right
0.0
0.0
0.0
N
0.000
0.0
0
0
0.0
0.000
0.000
0.000
0.0
0.0
0.000
0

Links required

nx = 2
Span 1

Span 2

5
6.000
2.8E+10 1.5E+09
1.934
5.170
1.267
1.037
65.41
54.51
9.62
15.75
5.69
5.96
5.69
5.96
5.69
5.96
1.388
2.036
253.2
249.0
0.37
0.25
0.62

5
6.000
2.8E+10 1.5E+09
2.015
4.963
1.246
1.041
65.41
54.51
15.78
15.75
5.60
4.67
5.60
4.67
5.60
4.67
1.404
1.995
254.7
356.5
0.36
0.34
0.70

0
0.000
0
0
0.000
0.000
0.000
0.000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.000
1.000
0.0
0.0
0.00
0.00
0.00

Khan/Williams Ref
(Concrete Society Method)
(9.8)
(9.9, 9.10)

(9.11)
(9.12, 9.13)
(9.14)
(9.17, 9.18)
(9.19)
(9.20)
(9.21)

Project

Spreadsheets to BS 8110

Client
Location

Advisory Group
Level 2 - Beam on Grid 7

REINFORCED CONCRETE COUNCIL


Made by

DEFLECTION CALCULATIONS (ii)

POST-TENSIONED ANALYSIS & DESIGN to BS 8110:1997


Originated from RCC42.xls on CD

SPAN 2
Distance
Element b
d'
As(t)

d = 484
0
1725
2350
275
625
625
45
45
45
6283
6283
6283
TRANFORMED SECTION PROPERTIES at TRANSFER
E=
A
1255151 1255151 1255151 1255151 1255151
S A.Yt
2.8E+08 2.8E+08 2.8E+08 2.8E+08 2.8E+08
Yt
225.767 225.767 225.767 225.767 225.767
Yb
299.233 299.233 299.233 299.233 299.233
Ixx
3.1E+10 3.1E+10 3.1E+10 3.1E+10 3.1E+10
TRANFORMED SECTION PROPERTIES - LONGTERM
E=
A
1397045 1397045 1397045 1397045 1397045
S A.Yt
3.1E+08 3.1E+08 3.1E+08 3.1E+08 3.1E+08
Yt
219.209 219.209 219.209 219.209 219.209
Yb
305.791 305.791 305.791 305.791 305.791
Ixx
3.6E+10 3.6E+10 3.6E+10 3.6E+10 3.6E+10
TRANFORMED SECTION PROPERTIES - IMPOSED
E=
A
1234447 1234447 1234447 1234447 1234447
S A.Yt
2.8E+08 2.8E+08 2.8E+08 2.8E+08 2.8E+08
Yt
226.849 226.849 226.849 226.849 226.849
Yb
298.151 298.151 298.151 298.151 298.151
Ixx
3E+10 3E+10 3E+10 3E+10 3E+10

Revision

chg
h=
2975
625
45
6283
21.72
1255151
2.8E+08
225.767
299.233
3.1E+10
7.75
1397045
3.1E+08
219.209
305.791
3.6E+10
29.47
1234447
2.8E+08
226.849
298.151
3E+10

525
3600
625
45
6283.19
m=
1255151
2.8E+08
225.767
299.233
3.1E+10
m=
1397045
3.1E+08
219.209
305.791
3.6E+10
m=
1234447
2.8E+08
226.849
298.151
3E+10

bw =
4225
625
45
6283.19
9.21
1255151
2.8E+08
225.767
299.233
3.1E+10
25.81
1397045
3.1E+08
219.209
305.791
3.6E+10
6.79
1234447
2.8E+08
226.849
298.151
3E+10

1800
4850
625
45
6283.19
m-1=
1255151
2.8E+08
225.767
299.233
3.1E+10
m-1=
1397045
3.1E+08
219.209
305.791
3.6E+10
m-1=
1234447
2.8E+08
226.849
298.151
3E+10

bf =
5475
625
45
6283.19
8.21
1255151
2.8E+08
225.767
299.233
3.1E+10
24.81
1397045
3.1E+08
219.209
305.791
3.6E+10
5.79
1234447
2.8E+08
226.849
298.151
3E+10

3000
hf = 200
bd3/12 = 2.3E+10
6100
6725
7350
7975
8600
625
625
625
625
625
45
45
45
45
45
6283.19 6283.19 6283.19 6283.19 6283.19

Page

23-Jul-2014

Checked

1999 RCC

As(b) = 2262
550
1100
550
588
45
45
6283
6283

Date

RMW

82
Job No

R68

9225
625
45
6283

9850
625
45
6283

10475
625
45
6283

11100
625
45
6283

11725
625
45
6283

12350
313
45
6283

1255151
2.8E+08
225.767
299.233
3.1E+10

1255151
2.8E+08
225.767
299.233
3.1E+10

1255151
2.8E+08
225.767
299.233
3.1E+10

1255151
2.8E+08
225.767
299.233
3.1E+10

1255151
2.8E+08
225.767
299.233
3.1E+10

1255151
2.8E+08
225.767
299.233
3.1E+10

1255151
2.8E+08
225.767
299.233
3.1E+10

1255151
2.8E+08
225.767
299.233
3.1E+10

1255151
2.8E+08
225.767
299.233
3.1E+10

1255151
2.8E+08
225.767
299.233
3.1E+10

1255151
2.8E+08
225.767
299.233
3.1E+10

1397045
3.1E+08
219.209
305.791
3.6E+10

1397045
3.1E+08
219.209
305.791
3.6E+10

1397045
3.1E+08
219.209
305.791
3.6E+10

1397045
3.1E+08
219.209
305.791
3.6E+10

1397045
3.1E+08
219.209
305.791
3.6E+10

1397045
3.1E+08
219.209
305.791
3.6E+10

1397045
3.1E+08
219.209
305.791
3.6E+10

1397045
3.1E+08
219.209
305.791
3.6E+10

1397045
3.1E+08
219.209
305.791
3.6E+10

1397045
3.1E+08
219.209
305.791
3.6E+10

1397045
3.1E+08
219.209
305.791
3.6E+10

1234447
2.8E+08
226.849
298.151
3E+10

1234447
2.8E+08
226.849
298.151
3E+10

1234447
2.8E+08
226.849
298.151
3E+10

1234447
2.8E+08
226.849
298.151
3E+10

1234447
2.8E+08
226.849
298.151
3E+10

1234447
2.8E+08
226.849
298.151
3E+10

1234447
2.8E+08
226.849
298.151
3E+10

1234447
2.8E+08
226.849
298.151
3E+10

1234447
2.8E+08
226.849
298.151
3E+10

1234447
2.8E+08
226.849
298.151
3E+10

1234447
2.8E+08
226.849
298.151
3E+10

DEFLECTIONS at TRANSFER

M (SLS 2)
435.9
434.7
331.9
166.7
20.2
-107.7
-216.9
-307.5
-379.5
-432.8
-467.5
-483.5
-480.9
-459.6
-419.7
-361.1
-283.9
-188.1
-73.6
6.7
0.0
1/R
6.6E-07 6.6E-07 5E-07 2.5E-07 3.1E-08 -2E-07 -3E-07 -5E-07 -6E-07 -7E-07 -7E-07 -7E-07 -7E-07 -7E-07 -6E-07 -5E-07 -4E-07 -3E-07 -1E-07
1E-08 7.4E-21
Load
0.00018 0.00036 0.00029 0.00016 1.9E-05 -0.0001 -0.0002 -0.0003 -0.0004 -0.0004 -0.0004 -0.0005 -0.0005 -0.0004 -0.0004 -0.0003 -0.0003 -0.0002 -7E-05 6.3E-06 2.3E-18
Load x dist 0.02488 0.19852 0.32384 0.27141 0.04482 -0.3023 -0.7368 -1.226 -1.7366 -2.2358 -2.6906 -3.0679 -3.3349 -3.4584 -3.4056 -3.1434 -2.6389 -1.8591 -0.7709 0.07415 2.8E-14
End slope -0.001
-0.0024
Span d
0
-0.61
-1.45
-2.58
-3.81
-5.06
-6.24
-7.29
-8.16
-8.81
-9.20
-9.32
-9.15
-8.70
-7.97
-7.00
-5.82
-4.47
-3.01
-1.50
0
Cant d
0
-28.96
-28.48
-28.11
-27.84
-27.58
-27.26
-26.81
-26.18
-25.33
-24.22
-22.83
-21.16
-19.21
-16.98
-14.51
-11.83
-8.97
-6.01
-3.00
0
d
0
-0.61
-1.45
-2.58
-3.81
-5.06
-6.24
-7.29
-8.16
-8.81
-9.20
-9.32
-9.15
-8.70
-7.97
-7.00
-5.82
-4.47
-3.01
-1.50
0
DEFLECTIONS - LONGTERM

M (SLS 7) -332.7
-129.7
-34.6
10.3
51.4
88.7
122.2
151.9
177.7
199.8
218.0
232.5
243.1
249.9
253.0
252.2
247.6
239.2
227.0
163.2
0.0
1/R
-1E-06 -5E-07 -1E-07 3.7E-08 1.8E-07 3.1E-07 4.3E-07 5.4E-07 6.3E-07 7.1E-07 7.7E-07 8.3E-07 8.6E-07 8.9E-07 9E-07
9E-07 8.8E-07 8.5E-07 8.1E-07 5.8E-07 1.3E-20
Load
-0.0003 -0.0003 -7E-05 2.3E-05 0.00011 0.0002 0.00027 0.00034 0.00039 0.00044 0.00048 0.00052 0.00054 0.00055 0.00056 0.00056 0.00055 0.00053 0.0005 0.00036 4.1E-18
Load x dist -0.0447 -0.1393 -0.0794 0.03948 0.26808 0.58554 0.97601 1.42365 1.91261 2.42707 2.95118 3.46909 3.96496 4.42296 4.82724 5.16196 5.41128 5.55936 5.59035 4.24526 4.9E-14
End slope
0.002
0.00429
Span d
0
1.23
2.65
4.31
5.95
7.52
8.97
10.25
11.32
12.14
12.68
12.92
12.84
12.43
11.66
10.55
9.08
7.28
5.14
2.68
0
Cant d
0
51.85
50.91
49.88
48.84
47.73
46.50
45.10
43.49
41.63
39.49
37.05
34.29
31.19
27.75
23.95
19.81
15.32
10.50
5.36
0
d
0.0
1.2
2.7
4.3
6.0
7.5
9.0
10.2
11.3
12.1
12.7
12.9
12.8
12.4
11.7
10.5
9.1
7.3
5.1
2.7
0.0
DEFLECTIONS - IMPOSED

M(SLS 4-7)
1/R
Load
Load x dist
End slope
Span d
Cant d
d

-460.7
-367.5
-281.0
-191.1
-109.8
-37.3
26.4
81.4
127.6
165.1
193.9
213.9
225.1
227.6
221.3
206.3
182.5
150.0
108.8
58.8
0.0
-5E-07 -4E-07 -3E-07 -2E-07 -1E-07 -4E-08
3E-08 9.3E-08 1.5E-07 1.9E-07 2.2E-07 2.4E-07 2.6E-07 2.6E-07 2.5E-07 2.4E-07 2.1E-07 1.7E-07 1.2E-07 6.7E-08 1E-21
-0.0001 -0.0002 -0.0002 -0.0001 -8E-05 -3E-05 1.9E-05 5.8E-05 9.1E-05 0.00012 0.00014 0.00015 0.00016 0.00016 0.00016 0.00015 0.00013 0.00011 7.8E-05 4.2E-05 3.3E-19
-0.0199 -0.1273 -0.208 -0.2358 -0.1847 -0.0795 0.06804 0.24611 0.443 0.64696 0.84627 1.02917 1.18393 1.2988 1.36206 1.36194 1.28673 1.12466 0.86402 0.49304 3.9E-15
-0.0002
0.00092
0
-0.03
0.09
0.34
0.67
1.06
1.46
1.85
2.20
2.50
2.72
2.86
2.90
2.84
2.68
2.42
2.06
1.63
1.13
0.58
0
0
10.86
10.47
10.14
9.90
9.71
9.54
9.35
9.13
8.85
8.49
8.05
7.52
6.88
6.14
5.30
4.37
3.36
2.28
1.15
0
0

-0.03

0.09

0.34

0.67

1.06

1.46

1.85

2.20

2.50

2.72

2.86

2.90

2.84

2.68

2.42

2.06

1.63

1.13

0.58

Spreadsheets to BS 8110

Project

Level 2 - Beam on Grid 7

Location

GRAPH DATA I

Made by RMW Job No R68


Date
23-Jul-14
REINFORCED CONCRETE COUNCIL

POST-TENSIONED ANALYSIS & DESIGN to BS 8110:1997


Originated from RCC42.xls on CD

1999 RCC

GEOMETRY
0
-1395
0
500
-150
-1895
4500
-1500

BEAM X
BEAM Y
C SECa X
C SECa Y
C SECb X
C SECb Y
B SEC X
B SEC Y

LOADING
UDL X
DEAD
IMPOSED
PUD X
PUD D
PUD L
PL X
PLs D
PLs L

0
0
0
500
150
-1895
7500
-1500

0
0
0
500
150
-2495
7500
-1700

12000
0
0
500
-150
-2495.2
6900
-1700

12000
-1395.2
0
500
-150
-1895.2
6900
-2025

scaling factor 8.54


0
0
12000
0
476.67 476.67
476.67
750
750
0
0
0
750
750
750
750
750
750
0
0
750
750
750
750

12000
0
476.67
0
750
750
0
750
750

12000
0
476.67

-1395.15
12000
12000
0
0
12000
500
11850
-1895.2
5100
5100
-2025
-1700

12000
476.67
750
12000
750
750

0
750
750

STRESS DIAGRAMS
Balance scaling =
Vl

Vr

W1

166.09 215.58 278.03


278.03
278.03
251.48
251.48
247.74 421.94 251.48
1 326.55 458.32 251.48
650.49 901.45 251.48
655.44 896.51 251.48
199.10 470.57 251.48

S 181.12 200.56
P 68.38
97.29
A 421.45 632.23
N 448.15 605.52

SPAN 1
X

profile X
PROFILE
BALANCE
Beam

-0.15
300.0
0.00
0
0
0
0
0
0
0
0
0
0
0

M-SLS 1
M-SLS 2
M-SLS 3
M-SLS 4
M-SLS 5
M-SLS 6
M-SLS 7
M-ULS 1
M-ULS 2
M-ULS 3
Pi
Pf
C top @ trans
0
C btm @ trans
0
T top @ trans
0
T btm @ trans
0
C top, final
0
C btm, final
0
T top, final
0
T btm, final
0
C top, ULS
0
C btm, ULS
0
T top, ULS
0
T btm, ULS
0
sc final
16.00

-0.15

0.15

300.0 300.0
0.00
0.00
0
0
-52.28 -52.28
-41.01 -41.01
-77.42 -77.42
-1.751 -1.751
18.275 18.275
-46.46 -46.46
-13.02 -13.02
31.219 31.219
30.477 30.477
-67.78 -67.78

2.978
1.894
0.000
0.000
2.498
2.306
0.000
0.000
2.675
2.445
0.000
0.000
16.00

2.978
1.894
0.000
0.000
2.498
2.306
0.000
0.000
2.675
2.445
0.000
0.000
16.00

x profile

we

-67.64
-67.64
-67.64
-61.18
-61.18
-61.18
-61.18
-61.18
-61.18
-61.18
0.6
0.15
0
300.0
239.51
0
-52.275
-41.01
-77.422
-1.7512
18.2752
-46.457
-13.019
31.219
30.4774
-67.78
2764.9
2501.1
2.978
1.894
0.000
0.000
2.498
2.306
0.000
0.000
2.675
2.445
0.000
0.000
16.00

24500
0
12000
500
12150
-1895.2
4500
-1700

24500
-1395.2
12000
500
12150
-2495.2
4500
-1500

24500
0
12000
500
11850
-2495.2

24500
476.67
750
12000
750
750
12000
750
750

24500
0
476.67
12000
750
750
12000
750
750

24500
0
0
12000
750
750

24500
0
0

X
Top
n/a

-0.30
525
295.41

12.00
525
295.41

Vl

Vr

W1

we

220.58
92.25
209.73
655.99
427.85
636.72
477.01
938.71
465.56
938.71

177.00
80.33
187.84
441.58
269.73
460.86
340.56
677.89
232.01
677.89

354.19
354.19
354.19
320.36
320.36
320.36
320.36
320.36
320.36
320.36

-61.54
-61.54
-61.54
-55.66
-55.66
-55.66
-55.66
-55.66
-55.66
-55.66

Btm
0.675
1.2
1.2
0.525
1.05
1.05
286.8
247.1
247.1
239.51 239.51 -61.18
0
0
0
-96.095 -58.166 -58.166
-92.716 -62.673 -62.673
-73.842 6.52665 6.52665
-170.99 -250.01 -250.01
-164.98 -258.02 -258.02
-131.43
-135
-135
-137.29 -177.52 -177.52
-249.27 -428.11 -428.11
-252.61 -434.04 -434.04
-127.22 -105.26 -105.26
2764.3 2763.8 2763.8
2500.5 2500.0 2500.0
3.133
2.854
2.854
1.541
2.402
2.402
0.000
0.000
0.000
0.000
0.000
0.000
3.535
4.259
4.259
0.701
0.663
0.663
0.000
0.000
0.000
0.000
2.624
2.624
4.215
5.726
5.726
0.746
0.981
0.981
0.000
0.000
0.000
2.390
10.171 10.171
13.20
13.20
13.20

0
1.8
1.65
191.1
-61.18
0
25.4469
11.9274
132.566
-283.98
-308.01
-93.542
-174.71
-562.13
-571.03
-34.622
2763.1
2499.4
2.232
3.753
0.000
0.000
4.675
1.106
0.000
4.770
6.866
1.738
0.000
16.047
13.20

0
2.4
2.25
143.8
-61.18
0
96.1596
73.6277
239.225
-308.36
-348.41
-54.017
-170.38
-671.62
-683.49
34.0815
2762.4
2498.7
1.718
4.895
0.000
0.000
5.011
1.530
0.000
6.504
7.803
2.474
0.000
20.871
13.20

S
P
A
N
2

24500
0
12000
500
11850
-1895.2
16750
-1500

24500
0

24500
0
0
24500
0
0

12000
750
750

24500
0
0
24500
0
0
12000
750
750

12.00
525
295.41

24.50
525
295.41

24.50
525
0.00

S
P
A
N
3

0
3
2.85
105.4
-61.18
0
153.973
122.428
326.505
-323.15
-379.23
-16.427
-164.52
-756.58
-771.41
100.851
2761.8
2498.1
1.311
5.830
1.558
0.000
5.267
1.932
0.000
7.828
8.534
3.189
0.000
24.643
13.20

19750
-1500

24500
-1395.2
24500
500
24500
-1895.2
19750
-1700

24500
0
24500
500
24500
-1895.2
19150
-1700

24500
0
0
24500
0
0

24500
0
0
24500
0
0

24.50
525
0.00

24.50
525
0.00

Vl

Vr

W1

we

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TypiCalc!
0
3.60
3.45
75.9
-61.18
0
198.886
158.329
394.405
-328.36
-400.46
19.2287
-157.15
-817
-834.8
165.686
2761.1
2497.5
1.011
6.558
3.822
0.000
5.444
2.314
0.000
8.740
9.062
3.884
0.000
27.363
13.20

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0
4.2
4.05
55.1
-61.18
0
230.899
181.33
442.925
-323.99
-412.11
52.95
-148.25
-852.89
-873.65
228.587
2760.4
2496.9
0.819
7.077
5.442
0.000
5.540
2.675
0.000
9.241
9.385
4.557
0.000
29.031
13.20

0
4.8
4.65
43.2
-61.18
0
250.013
191.431
472.066
-310.02
-414.17
84.7369
-137.84
-864.24
-887.97
289.553
2759.8
2496.2
0.734
7.389
6.415
0.000
5.557
3.015
0.000
9.332
9.504
5.210
1.223
29.647
13.20

0
5.4
5.25
40.1
-61.18
0
256.227
188.632
481.827
-286.48
-406.64
114.589
-125.9
-851.07
-877.76
348.584
2759.2
2495.7
0.757
7.493
6.742
0.000
5.494
3.334
0.000
9.011
9.418
5.843
3.192
29.211
13.20

24500
500
24500
-1895.2
19150
-2025

24500
500
24500
-1895.2
17350
-2025

24500
500
24500
-1895.2
17350
-1700

24500
0
0

24500
0
0

0
577.50
16
351.835

0
-52.5
0
-93.16

16750
-1700

24500
500
24500
-1895.2
16750
-1500

24500
500
24500
-1895.2

24500
500
24500
-1895.2
24500
-1500

12
12
577.5
-52.5
16
0
351.835 -93.165

24500
500
24500
-1895.2
24500
-1500

24500
500
24500
-1895.2
24500
-1500

24500
-1500

24.5
24.5
577.5
-52.5
16
0
351.835 -93.165

24500
-1500

24500
-1500

24500
-1500

24500
-1500

24500
-1500

24.5
24.5
577.5
-52.5
16
0
351.835 -93.165

LOAD COMBINATIONS
INITIAL

FINAL

6
5.85
45.8
-61.18
0
249.541
172.934
472.207
-253.34
-389.53
142.507
-112.44
-813.35
-843.02
405.682
2758.9
2495.5
0.888
7.390
6.422
0.000
5.351
3.633
0.000
8.278
9.129
6.454
5.095
27.722
13.20

20
6.6
6.45
60.4
-61.18
0
229.955
144.336
443.209
-210.63
-362.84
168.491
-97.456
-751.11
-783.74
460.845
2758.7
2495.2
1.126
7.079
5.457
0.000
5.128
3.912
0.000
7.134
8.635
7.046
6.934
25.181
13.20

SLS 1
SLS 2
SLS 3
SLS 4
SLS 5
SLS 6

0
7.2
7.05
83.8
-61.18
0
197.47
102.838
394.83
-158.32
-326.56
192.54
-80.953
-664.33
-699.92
514.073
2758.5
2495.0
1.471
6.560
3.846
0.000
4.826
4.169
0.000
5.580
7.936
7.616
8.708
21.588
13.20

7.8
7.65
116.0
-61.18
0
152.085
48.4406
327.072
-96.433
-280.69
214.655
-62.928
-553.02
-591.58
565.367
2758.2
2494.8
1.924
5.834
1.588
0.000
4.444
4.406
0.000
3.614
7.034
8.166
10.418
16.943
13.20

Initial prestress + OW + construction load on all spans


Initial prestress + OW + construction load on odd spans
Initial prestress + OW + construction load on even spans
Final prestress + dead + imposed load on all spans
Final prestress + dead + imposed load on odd spans
Final prestress + dead + imposed load on even spans

20
8.4
8.25
157.0
-61.18
0
93.7997
-18.857
239.934
-24.958
-225.24
234.835
-43.381
-417.17
-458.7
614.726
2758.0
2494.6
2.484
4.899
0.000
0.000
3.981
4.622
0.000
1.237
5.926
8.694
12.064
11.247
13.20

0
9
8.85
206.8
-61.18
0
22.6151
-99.054
133.416
56.1018
-160.2
253.081
-22.314
-256.79
-301.28
662.151
2757.7
2494.3
3.152
3.757
0.000
0.000
3.439
4.818
0.014
0.000
4.615
9.203
13.645
4.498
13.20

9.6
9.45
265.5
-61.18
0
-61.469
-192.15
7.51797
146.748
-85.575
269.392
0.27594
-71.876
-119.34
707.642
2757.5
2494.1
3.928
2.408
0.000
0.000
2.818
4.992
0.558
0.000
3.099
9.690
15.162
0.000
13.20

20
10.2
10.05
333.0
-61.18
0
-158.45
-298.15
-137.76
246.979
-1.3657
283.769
24.387
137.571
87.1437
751.198
2757.2
2493.9
4.811
0.850
0.000
3.476
2.116
5.146
1.038
0.000
1.379
10.157
16.614
0.000
16.00

0
10.8
10.65
409.4
-61.18
0
-268.34
-417.04
-302.42
356.796
92.4291
296.211
50.0196
371.552
318.158
792.819
2757.0
2493.6
5.801
0.000
0.000
8.575
1.334
5.929
3.472
0.000
0.000
10.603
18.001
0.000
16.00

10.8
10.65
409.4
319.85
0
-268.34
-417.04
-302.42
356.796
92.4291
296.211
50.0196
371.552
318.158
792.819
2757.0
2493.6
5.801
0.000
0.000
8.575
1.334
5.929
3.472
0.000
0.000
10.603
18.001
0.000
16.00

ULTIMATE
DEFLECTION

20
11.325
11.175
462.3
319.85
0
-317.01
-473.61
-404.33
513.26
234.873
358.022
126.207
648.921
592.932
880.162
2756.8
2493.5
6.272
0.000
0.000
11.001
0.148
7.606
8.686
0.000
0.000
11.539
20.913
0.000
16.00

0
11.85
11.7
480.0
319.85
0
-259.46
-423.93
-404.98
782.084
489.678
523.373
308.58
1050.1
991.51
1071.04
2756.6
2493.3
5.858
0.000
0.000
8.872
0.000
10.487
17.645
0.000
0.000
13.585
27.274
0.000
16.00

11.85
11.7
480.0
0.00
0

ULS 1
ULS 2
ULS 3
SLS 7

Final prestress + factored dead and imposed load on all spans


Final prestress + factored dead + factored imp load on odd spans
Final prestress + factored dead + factored imp load on even spans
Final prestress + dead + 30% imposed load on odd spans

-27.72
-14.20
-67.32
60.48
84.51
-9.92
35.23
127.34
127.34
-38.54

12

5.694
5.544
41.8

4.953
4.803
41.6

5.104
4.954
40.5

4.439
4.289
49.3

5.068
4.918
40.7

3.568
3.418
77.2

-227.48 254.558 252.825


-394.21 182.542 191.943
-390.54 479.529 476.399
875.93
-299.3 -319.57
579.52
-411.56 -414.08
586.04
100.097 65.8571
376.59
1183.86
-861.39 -814.38
1124.53
-886.45 -832.02
1141.00
316.158 162.256
2759.1 2759.6 2759.4 2760.2 2759.5 2761.1
2495.6 2496.1 2495.9 2496.6 2496.0 2497.5
0.808
0.730
7.468
7.435
1.666
1.640
0.000
0.000
5.535
5.556
3.179
2.813
0.000
0.000
2.305
2.332
9.491
9.039
5.495
3.847
0.528
0.000
7.396
6.811

Disclaimer
All advice or information from the British Cement Association and/or Reinforced Concrete Council is
intended for those who will evaluate the significance and limitations of its contents and take responsibility
for its use and application. No liability (including that for negligence) for any loss resulting from such
advice or information is accepted by the BCA, RCC or their subcontractors, suppliers or advisors. Users
should note that all BCA software and publications are subject to revision from time to time and should
therefore ensure that they are in possession of the latest version.
This spreadsheet should be used in compliance with the accompanying publication 'Spreadsheets for
concrete design to BS 8110 & EC2' available from British Cement Association, Telford Avenue,
Crowthorne, Berkshire RG45 6YS.

Status of spreadsheet
Public release version.
Revision history RCC42 Post tensioned Analysis & Design

Date
06-Aug-99

Version

Action

RCC42 v1.0

First public release.


Includes b version comments

Reinforced Concrete Council is


contents and take responsibility
or any loss resulting from such
rs, suppliers or advisors. Users
n from time to time and should

g publication 'Spreadsheets for


Association, Telford Avenue,

Size (kB)
1647