1. What do you understand by PLC? Where is it used? 10

2. (a) What is single line diagram? What is the significance of single line diagram? 5
(b) What is symmetrical & unsymmetrical fault? Which type is commonly occured? 5

3. (a) What is coherent machine? 5
(b) What is rectifier circuit? Describe half wave rectifier & Full wave rectifier circuit. 5

4. (a) Explain the operation & Skech the characterstics of a diode. 5
(b) What is Lightning arrester in power system? 5

5. (a) What is the principle difference between synchronous M/C and an induction M/C? 6
(b) What is single line to ground fault? 4

6. (a) A 480 V, 60Hz, Delta connected, 4 Pole synchronous Generator has the OCC shown. This
Generator has a synchronous Resistance of 1ohm and an armature resistance of 1.5 ohm. At full
load the M/C supplies 1200 A at .8 PF lagging under full load conditions, the friction & Windage
Losses are 40 KW and core losses are 10 KW. What is the speed of a rotation of this generator? 5

(b) A 2 Pole, 50 Hz induction motor supplying 15 KW to a load at a speed of 2950 r/min. What is the
motor slip? 5

7. (a) What is PU system? 5
(b) What is power system stability? 5

8. Suppose you have been appointed Production Engineer PRAN-RFL Group. Now describe your
responsibilities. 10

9. Make a sentence using the following words: 10

(a) Installation, Generator, power plant
(b) Factory, Production, Emergency
(c) PRAN, profit, Engineer
(d) India, Bangladesh, China
(e) Engineering, China, Bangladesh