Serial Saloon Goods Total

Description of item Unit Other


number PF Qty PF Qty Quantity
1 BW Cum 27.83 58.5 4 90
2 EW Filling Cum 400 1040 60 1500
3 Sand filling Cum 90 400 60 550
4 PCC Cum 50 0 15 65
5 M-25 Cum 30 70 3 103
6 Jalley Rm 139 0 7 146
7 Painting Sqm 460 0 500 960
8 Paver Block Sqm 260 0 2700 2960
9 40 mm GI Pipe Rm 200 0 0 200
10 Shuttering Sqm 70 200 20 290
11 Reinforcement Kg 2030 1300 390 3720
Name of Work: Construction of balance work at Anantnag Station on Qazigund Baramulla section of New BG
Rail Line Project, J.

Refference
Description of Item Quantity Unit Rate Amount
DSR-07

Brick work with FPS brick of CD-


75 in superstructure above plinth
level upto floor V level in all shape 90 cum 2357.40 212,166.00 6.4.2
and sizes in cement morter 1:6 (1
cement : 6 coarse sand)

Sand filling 550 cum 250 137,500.00 ?? Apx

Jalley 219 m 359.2 78,664.80 ??? 5.18.1

Jalley Painting 960 sqm 50.4 48,384.00 13.46.1

Paver block 2960 sqm 345.45 1,022,532.00 16.68

40 mm NB GI Pipe 200 m 219.60 43,920.00 18.12.5

Providing and laying in position cement


concrete of specified grade excluding
the cost of centring and shuttering - All
work upto plinth level

1:4:8 (1 Cement : 4 coarse sand : 8


graded stone aggregate 40 mm nominal 103.00 cum 2449.00 252,247.00 4.1.8
size)

BOQ OF CIRCULATING AREA.xls Page 2 of 4


Name of Work: Construction of balance work at Anantnag Station on Qazigund Baramulla section of New BG
Rail Line Project, J.

Refference
Description of Item Quantity Unit Rate Amount
DSR-07

Providing and laying in position


machine batched, machine mixed and
machine vibrated design mix cement
concrete of specified grade for
reinforced cement concrete structural
elements, excluding the cost of centring,
shuttering, finishing and
reinforcement.includingAdmixtures in
recommended proportions.(as per IS
9103) to accelerate, retard setting of
concrete improve workability without
imparing strength and durability as per
direction of Engineer-in -charge-M-25
grade reinforced cement concrete

All work upto plinth level 103.000 cum 4147.40 427,182.20 5.33
Add or deduct for providig richer or
leaner mixes respectively at all floor
levels.
Centring and shuttering including
strutting, propping etc. and removal of
form for

Foundations, footings, bases of columns


290.00 sqm 119.25 34,582.50 5.9.1
etc. for mass concrete.

BOQ OF CIRCULATING AREA.xls Page 3 of 4


Name of Work: Construction of balance work at Anantnag Station on Qazigund Baramulla section of New BG
Rail Line Project, J.

Refference
Description of Item Quantity Unit Rate Amount
DSR-07

SUB HEAD NO-4: MISCELLANEOUS


TOTAL OF SCHEDULE A : 2,257,178.50

Reinforcement for RCC work


including cutting, straightening,
bending, placing in position and
binding all complete.
Thermo mechanicalley treated
3,720.00 kg 42.70 158,844.00 5.22.6
bars.
TOTAL OF SCHEDULE B : 158,844.00
GRAND TOTAL : 2,416,022.50

BOQ OF CIRCULATING AREA.xls Page 4 of 4