Professional Documents
Culture Documents
Caution
installation
Note
Caution
8
Normally, one of the following two inlet arrangements is provided:
Standard distribution basin connections: There is a circular open-
ing in the top deck of the tower near the air inlet face, drilled to accept
standard 125# flat-face flange. Remove the center inlet flume assembly
to gain access to attach inlet fasteners. (Refer to the AV Field Installation
Manual shipped with tower.)
Marley flow-control valve connection (option): The Marley flow-
control valve is designed to 1take the place of a standard elbow normally
required for inlet connection, and 2provide means of regulating flow
between individual cells. Remove the center inlet flume assembly to gain
access for attachment of valve. (Refer to the AV Field Installation Manual
shipped with tower.) The valves provides a vertical face for attachment
of your standard 125# flange.
12. Wire motor in accordance with wiring diagram on motor nameplate.
Check motor connections and power supply voltage versus motor name-
plate voltage.
For maintenance/safety purposes, SPX Cooling recommends a
lockout type disconnect switch for all mechanical equipment.
In addition to a disconnect switch, the motor should be wired to main
power supply through short circuit protection, and a magnetic starter with
overload protection.
Motor Wiring
Wire motor leads as shown on the motor nameplate matching the supply
voltage. Do not deviate from the motor nameplate wiring.
Either of following symbols may be shown on the motor nameplate
, Y, or YY. These symbols represent how the motor is constructed on the inside
and in no way have anything to do with a Delta or Wye electrical distribution
system serving the motor.
When using a starter:
Set motor overload protection to 110% of motor nameplate amps.
This setting allows the fan motor to operate during cooler weather.
During cooler weather it is common for the motor to draw 6 to 10%
Warning
installation
9
higher than nameplate amps. High amps are common during tower
commissioning when the tower is dry and the ambient air temperature
is cool.
Do not start the motor more than four to five times per hour. Short
cycling the tower will cause fuses, breakers or O.L.s to operate and
will decrease motor life.
When using a two-speed starter:
Motor rotation must be the same at slow speed and high speed.
Single winding motor requires a starter with a shorting contactor.
Two-winding motor requires a starter with out a shorting contactor.
All two-speed starters must have a 20 second time delay relay when
switching from high speed to low speed.
Do not start the motor more than four to five times per hour (each
low speed start and each high speed start count as one start).
When using a VFD:
Before beginning, ensure that the motor is rated for Inverter Duty
per NEMA MG-1, part 31.
Set the VFD solid state overload protection to 119% of motor name-
plate amps and set maximum current parameter in the VFD to motor
nameplate amps. Maximum current parameter will reduce fan speed
and limit amp draw to nameplate amps during cold weather opera-
tion. If furnished with a mechanical O.L. set this at 110% over motor
nameplate amps.
Motor rotation must be the same in both VFD mode and By-pass
mode.
If cable distance between the VFD and motor is greater than 100 feet
a DV/DT output filter is recommended to avoid damage to the motor.
100 feet distance is based on our field experience, the VFD manufac-
ture may state different distances and distance does vary depending
on the VFD manufacture.
Program the VFD for variable torque output. Flux vector and constant
torque modes may damage the gearbox.
Do not start and stop the motor using the safety switch at the motor.
If the drive is being commanded to run and the load side is cycled ON
and OFF with the safety switch this may damage the VFD.
Note
installation
Note
Note
10
Using a VFD in cooling applications has advantages over traditional single or two
speed motor control. A VFD can reduce the cost of electrical energy being used
and provide better temperature control. In addition, it reduces the mechanical and
electrical stress on the motor and mechanical equipment. Electrical savings can
be large during periods of low ambient temperature when the cooling require-
ment can be satisfied at reduced speeds. To benefit from these advantages, it
is important that the drive be installed correctly.
Marley supplies VFD and VFD controls specifically designed for our cooling
products. If you have purchased a Marley VFD and/or controls package, please
follow the instructions in the User Manual for that system. Most VFD problems
can be avoided by purchasing the Marley drive system. If you are installing a VFD
other than the Marley drive, please refer to that drives installation manual.
Improper use of a VFD may cause damage to equipment or personal
injury. Failure to correctly install the VFD drive will automatically void
all warranties associated with the motor and any equipment that is
either electrically or mechanically (directly) attached to the VFD drive
system. The length of this warranty avoidance will be contingent on
properly installing the VFD system and repairing any damage that
may have occurred during its operation. SPX Cooling Technologies
does not assume responsibility for any technical support or damages
for problems associate with non-Marley brand VFD systems.
Changing the operational fan speed from the factory settings could
cause the fan to operate in an unstable region which may result in
damage to the equipment and possible injury.
Mechanical Equipment:
Always shut off electrical power to the tower fan motor prior to
performing any maintenance on the tower. Any electrical switches
should be locked out and tagged out to prevent others from turning
the power back on.
1. Install AV61000 and AV62000 fan guard according to the installation
drawing shipped with the tower. The fan guard on other models is factory
installed.
2. Spin the fan manually to assure that all fan blades properly clear the inside
of the fan cylinder. Observe the action of the sheaves and belt(s) to be
sure that the motor is properly aligned with the fan sheave. If necessary,
Warning
Warning
Warning
installation
11
correct the alignment. See the Maintenance section for belt tensioning
and sheave alignmentpage 22.
Improper installation of the fan guard will destroy the structural in-
tegrity of the fan guard. It is essential that the fan guard be installed
in accordance with the Field Installation Manual shipped with the
tower. Do not force the fan cylinder out of round.
3. Momentarily energize (bump) the motor and observe rotation of the fan.
The fan should rotate in a counterclockwise direction when viewed from
below. If rotation is backwards, shut off the fan and reverse two of the
three primary leads supplying power to the motor.
If tower is equipped with a two-speed motor, check for proper rota-
tion at both speeds. Check also to see that starter is equipped with a
20 second time delay which prevents direct switching from high
speed to low speed. If the fan is intended to be reversed for deicing
purposes, make sure that the starter is equipped with a 2 minute
time delay between changes of direction. These delays will prevent
abnormal stress from being applied to the mechanical equipment
and the electrical circuit components.
4. Run the motor and observe the operation of the mechanical equipment.
Operation should be stable.
5. After the first 30 minute run check motor AMPS and voltage with full
water and heat load. Repitch fan, if necessarycorrect for low ambient
temperatures. Refer to motor manual.
6. After 10 to 60 hours of operation check the torque on the fan and motor
sheave bushings and check belt tension. Refer to the Maintenance section
of this manual for torque values and belt tensioning instructionspage
22.
If the water supply system is not being operatedor if there is no
heat load on the systemmotor amps read at this time may indicate
an apparent overload of as much as 1020%. This is because of the
increased density of unheated air flowing through the fan. Deter-
mination of an accurate motor load should await the application of
the design heat load.
Caution
Warning
Note
installation
12
Tower Start-Up
Among other sources, outbreaks of Legionnaires Disease have
reportedly been traced to cooling towers. Maintenance and water
treatment procedures that prevent amplification and dissemination
of Legionella and other airborne bacteria should be formulated and
implemented BEFORE systems are operated and continued regularly
thereafter to avoid the risk of sickness or death.
Water System:
1. New installations should be cleaned and treated with biocides by a water
treatment expert before startup.
2. Remove any and all accumulated debris from tower. Pay particular atten-
tion to inside areas of cold water basin, hot water basins, louvers and
drift eliminators. Make sure that cold water suction screens are clear and
properly installed.
3. Fill the water system to an approximate depth of 7
1
2" (192 mm) in the
depressed area of the cold water basin at the air inlet side of the tower.
This is the recommended operating water level. Adjust the float valve so
that it is 75% open at that level. Continue filling the system until the water
reaches a level approximately
1
8"(3 mm) below the lip of the overflow.
If tower is equipped with a standard suction connection, vent ac-
cumulated air from the top of the suction hood by removing one or
both tap screws provided at that location. Replace these tap screws
when venting is complete.
4. Completely open hot water flow control valve(s). Start your pump(s) and
observe system operation. Since the water system external to the tower
will have been filled only to the level achieved in the cold water basin, a
certain amount of pump-down of the basin water level will occur before
water completes the circuit and begins to fall from the fill. The amount
of initial pump-down may be insufficient to cause the float valve to open.
However, you can check its operation by pressing down on the operating
lever to which the stem of the float valve is attached.
Note
operation
Warning
13
Some trial-and-error adjustment of the float valve may be required to
balance the makeup water with tower operation. Ideally, the float valve
setting will be such that no water is wasted through the overflow at pump
shutdown. However, the water level after pump start-up must be deep
enough to assure positive pump suction.
5. If a multicell tower installation is equipped with flow-control valves, adjust
them to equalize hot water depth in the distribution basins after reach-
ing design water flow rate. Each basin should have from 2
3
4" to 5
1
2" (70
mm to 140 mm) water depth, with uniform depth from basin to basin. Fix
valves in this position when depth is correct. If the tower is a single cell
installation this step is not necessary.
Uniform distribution depth of 2
3
4" to 5
1
2"(70 mm to 140 mm) is essential
to efficient tower operation. Contact your Marley sales representative if
you are considering a permanent change in circulating water flow rate
that would prevent operation within these limits.
6. Continue pump operation for about 15 minutes, after which it is recom-
mended that the water system be drained, flushed, and refilled.
7. While operating the condensing water pump(s) and prior to operating the
cooling tower fan, execute one of the two alternative biocidal treatment
programs described in the following:
Resume treatment with the biocide which had been used prior to shut-
down. Utilize the services of the water treatment supplier. Maintain the
maximum recommended biocide residual (for the specific biocide) for
a sufficient period of time (residual and time will vary with the biocide)
to bring the system under good biological control
or
Treat the system with sodium hypochlorite to a level of 4 to 5 mg/L
(ppm) free chlorine residual at a pH of 7.0 to 7.6. The chlorine residual
must be held at 4 to 5 mg/L (ppm) for six hours, measurable with
standard commercial water test kits.
If the cooling tower has been in operation and then shut down for a du-
ration of time and not drained, perform one of the two previous biocidal
treatment programs directly to the cooling water storage vessel (cooling
tower sump, drain down tank, etc.) without circulating stagnant water over
the cooling tower fill or operating the cooling tower fan. After biocidal
pretreatment has been successfully completed, cooling water may be
circulated over the tower fill with the fan off.
operation
14
When biocidal treatment has been maintained at a satisfactory level for
at least six hours, the fan may be turned on and the system returned to
service. Resume the standard water treatment program, including biocidal
treatment.
Tower Operation
General:
The cold water temperature obtained from an operating cooling tower will vary
with the following influences:
1. Heat load: With the fan in full operation, if the heat load increases, the
cold water temperature will rise. If the heat load reduces, the cold water
temperature will reduce.
Note that the number of degrees (range) through which the tower cools
the water is established by the system heat load and the amount of water
being circulated, in accordance with the following formula:
operation
Range F =
Heat Load (Btu/hr)
GPM x 500
or in SI units
Range C =
Heat Load (kilowatts)
Liters/sec x 4.187
The cooling tower establishes only the cold water temperature attainable
under any operating circumstance.
2. Air wet-bulb temperature: Cold water temperature will also vary with the
wet-bulb temperature of the air entering the louvered faces of the tower.
Reduced wet-bulb temperatures will result in colder water temperatures.
However, the cold water temperature will not vary to the same extent as
the wet-bulb. For example, a 20F (11 C) reduction in wet-bulb may result
in only a 15F (8C) reduction in cold water temperature.
3. Water flow rate: Increasing the water flow rate (GPM or L/s) will cause
a slight elevation in cold water temperature, while reducing the water flow
rate will cause the cold water temperature to decrease slightly. However,
at a given heat load (see formula above), water flow reductions also cause
an increase in the incoming hot water temperature. Use care to prevent
the hot water from exceeding 125F, (52C) in order to prevent damage
to the tower components.
15
4. Air flow rate: Reducing air flow through the tower causes the cold wa-
ter temperature to rise. This is the approved method by which to control
leaving water temperature.
If your tower is equipped with a single-speed motor, the motor may be
shut off when the water temperature becomes too cold. This will cause
the water temperature to rise. When the water temperature then becomes
too warm for your process, the motor can be restarted.
Fan cycling limits:
Considering the normal fan and motor sizes utilized on AV towers,
anticipate that approximately 4 to 5 starts per hour are allowable.
If your tower is equipped with a two-speed motor, you will enjoy greater
opportunity for temperature control. When the water temperature becomes
too cold, switching the fan to half-speed will cause the cold water tem-
perature to risestabilizing at a temperature a few degrees higher than
before. With a further reduction in water temperature, the fan may be
cycled alternately from half-speed to off.
Do not start the motor more than four to five times per hour (each
low speed start and each high speed start count as one start).
If your tower consists of two or more cells, cycling of motors may be shared
between cells, increasing your steps of operation accordingly.
For greater insight on cold water temperature control, please read Cool-
ing Tower Energy and its Management, Marley Technical Report
#H-001-A, available at spxcoolling.com.
operation
Note
Note
16
Note
Wintertime Operation:
The Marley fill system used in the AV Series cooling tower has air entrance
louvers that are molded integrally as part of the fill. This feature makes these
towers very forgiving of cold weather operation, even at the low temperature
and reduced load conditions encountered in free cooling and other low tem-
perature applications. Nevertheless, during operation in subfreezing weather
the opportunity exists for ice to form in the colder regions of the tower.
Slushy, transitory ice forms routinely in the colder regions of the fill
of low temperature towers, and is visible through the tower louvers.
Such ice normally has no adverse effect on tower operation, but
its appearance should be a signal to the operator to undertake ice
control procedures.
It is the operator's responsibility to prevent the formation of destruc-
tive (hard) ice on the cooling tower fill. Certain guidelines should
be followed:
1. Do not allow the towers leaving water temperature to drop below a
minimum allowable levelsay 36F to 40F (2C to 4.5C). If such low
temperature operation is necessary or beneficial to your process, establish
the minimum allowable level as follows:
During the coldest days of the first winter of operation, observe whether
any ice is forming on the louver face, particularly near the bottom part of
the louver face. If hard ice is present on the louvers, you must increase
the allowable cold water temperature. If the coldest possible water is
beneficial to your process, ice of a mushy consistency can be tolerated
but routine periodic observation is advisable.
If the minimum allowable cold water temperature is established
at or near minimum heat load, it should be safe for all operating
conditions.
Having established the minimum allowable cold water temperature, maintain-
ing that temperature can be accomplished by fan manipulation, as outlined in
Item 4 under Tower Operation. However, in towers of more than one cell,
where fans are manipulated sequentially, please realize that the water tem-
perature will be significantly lower in the cell or cells operating at the highest
Caution
operation
17
fan speed than the net cold water temperature produced by the entire tower
would indicate. Wintertime operation of multicell towers at low cold water
temperature levels requires that the operator be especially watchful.
2. As cold air enters the louvers, it causes the water flowing over the fill to
be drawn inward toward the center of the tower. Thus, under fan opera-
tion, the louvers and lower periphery of the tower structure remain partly
dry, seeing only random splashing from within the towerplus normal
atmospheric moisture from the entering air. Such lightly wetted areas are
most subject to freezing.
Therefore, if excessive ice forms on the louvers, stop the fan for a few
minutes. With the fan off, the water flow will increase in the vicinity of the
louvers and reduce the ice buildup.
3. Under extended extreme cold conditions, it may be necessary to operate
the fan in reverse. This forces warm air out through the louvers, melting
any accumulated iceadequate heat load must be available. Reversal
of fan should only be done at half speed or less. Reverse operation of
the fan should be used sparingly and should only be used to control ice,
not to prevent it. Reverse fan operation should not need to exceed 1 or
2 minutes. Monitoring is required to determine the time required to melt
accumulated ice.
Operating the fan in reverse at half speed for prolonged periods
during subfreezing weather can cause severe damage to fans and
fan cylinders. Ice can accumulate inside fan cylinders at fan blade
plane of rotation and fan blade tips will eventually strike this ring of
ice, damaging the fan blades or cylinder. Ice can also accumulate
on fan blades and be thrown off, damaging fan cylinder or blades.
Allow a minimum of 10 minute delay between reverse operation
and forward operation during subfreezing weather to permit ice to
dissipate from fan blades and fan cylinders. See Caution note on
page 11 for fan speed change and reversing precautions.
operation
Warning
18
4. With no heat load on the circulating water, icing cannot be controlled
effectively by air control during freezing weather. Towers must not be
operated with reduced water rate and/or no heat load during
freezing weather. If the circulating water system cannot be shut down,
water returning from the process should be made to bypass the tower. If
a bypass is used, all water must be bypassed without modulation. If the
water bypass is directly into the tower's cold water basin, its design must
be approved by SPX Cooling engineers.
Intermittent Wintertime Operation:
If periods of shutdown (nights, weekends, etc.) occur during freezing weather,
measures must be taken to prevent the water in the cold water basinand
all exposed pipeworkfrom freezing. Several methods are used to combat
this, including Marley automatic basin heater systems.
Unless some means of freeze prevention is incorporated into your
system, the tower basin and exposed pipework should be drained
at the beginning of each wintertime shutdown period.
If tower basin is drained, verify that all basin heaters have been shut
off either by automatic cutoff or disconnect switch.
It is recommended that you discuss your freeze prevention options with your
local Marley sales representative.
operation
Caution
Warning
19
Tower Cleaning, Water Treatment and Blowdown
Maintaining Water Quality:
The steel used in AV Series towers has been galvanized with a heavy zinc
coating averaging 2.0 mils in thickness. AV Series towers are also available in
stainless steel, which is even more corrosion resistant than galvanized steel
in certain environments. Other materials used (PVC fill, drift eliminators, and
louvers, aluminum fans, etc.) are selected to offer maximum service life in a
normal cooling tower environment, defined as follows:
Circulating water with a pH between 6.5 and 8; a chloride content (as NaCl)
below 500 ppm; a sulfate content (SO4) below 250 ppm; total alkalinity (as
CaCO
3
) below 500 ppm; calcium hardness (as CaCO
3
) above 50 ppm; a
maximum inlet water temperature not to exceed 125F (51.7C); no significant
contamination with unusual chemicals or foreign substances; and adequate
water treatment to minimize scaling.
Startup Conditions: The water conditions during the initial tower operation
are crucial in preventing premature corrosion of galvanized steel (white
rust). For at least the first eight weeks of operation, pH should be controlled
between 6.5 and 8.0 with hardness and alkalinity levels between 100 and
300 ppm (expressed as CaCO
3
).
Chlorine (if used) shall be added intermittently, with a free residual not to
exceed 1 ppmmaintained for short periods. Excessive chlorine levels may
deteriorate sealants and other materials of construction.
An atmosphere surrounding the tower no worse than moderate industrial,
where rainfall and fog are no more than slightly acid, and they do not contain
significant chlorides or hydrogen sulfide (H2S).
Many proprietary chemicals exist for control of scale, corrosion, and biologi-
cal growth and should be used prudently. Also, combinations of chemicals
may cause reactions which reduce treatment effectiveness, and certain
chemicals such as surfactants, biodispersants and antifoams may increase
drift rate.
Unless you purchased a stainless steel AV Series the structure of
your AV Series consists primarily of galvanized steel, therefore your
water treatment program must be compatible with zinc. In working
with your water treatment supplier, it is important that you recog-
nize the potential effects on zinc of the specific treatment program
you choose.
Warning
operation
20
maintenance
Cooling Tower Cleaning:
Any evaporative-type cooling tower must be thoroughly cleaned on
a regular basis to minimize the growth of bacteria, including Legio-
nella Pneumophila, to avoid the risk of sickness or death. Service
personnel must wear proper personal protective equipment during
decontamination. Do NOT attempt any service unless the fan motor
is locked out.
Operators of evaporative cooling equipment, such as water cooling tow-
ers, should follow maintenance programs which will reduce to an absolute
minimum the opportunity for bacteriological contamination. Public Health
Service officials have recommended that good housekeeping procedures
be followed, such as: regular inspections for concentrations of dirt, scale,
and algae; periodic flushing and cleaning; and the following of a complete
water treatment program including biocidal treatment. See Tower Startup
instructions on page 12.
The visual inspection should take place at least once a week during the operat-
ing season. The periodic flushing and cleaning should be done before and after
each cooling season, but in any event at least twice a year. The louvers, drift
eliminators, and easily accessible fill surfaces should be flushed by use of a
moderate-pressure water nozzle, being careful not to cause physical damage.
A reliable water treatment program should be installed and maintained. Filtra-
tion devices may be employed to reduce the suspended solids concentrations,
thus increasing the effectiveness of the water treatment program. See Tower
Startup instructions on page 12.
Blowdown:
A cooling tower cools water by continuously causing a portion of it to evaporate.
Although the water lost by evaporation is replenished by the makeup system, it
exits the tower as pure waterleaving behind its burden of dissolved solids to
concentrate in the remaining water. Given no means of control, this increasing
concentration of contaminants can reach a very high level.
In order to achieve water quality which is acceptable to the cooling tower (as
well as the remainder of your circulating water system), the selected water treat-
ment company must work from a relatively constant level of concentrations. This
stabilization of contaminant concentrations is usually accomplished by blowdown,
which is the constant discharge of a portion of the circulating water to waste.
As a rule, acceptable levels on which to base a treatment schedule will be in the
Warning
21
range of 2-4 concentrations. The following table shows the minimum amount of
blowdown (percent of flow) required to maintain different concentrations with
various cooling ranges*:
* Range = Difference between hot water temperature coming to tower and cold water
temperature leaving tower.
EXAMPLE: 700 GPM (44.2 L/s) circulating rate, 18F (10C) cooling range.
To maintain 4 concentrations, the required blowdown is 0.458% or .00458
times 700 GPM (44.2 L/s), which is 3.2 GPM (0.2 L/s).
If tower is operated at 4 concentrations, circulating water will contain four
times as much dissolved solid as the makeup water, assuming none of the
solids form scale or are otherwise removed from the system.
When water treatment chemicals are added, they should not be in-
troduced into the circulating water system via the cold water basin
of the cooling tower. Water velocities are lowest at that point, which
results in inadequate mixing.
Belt Tensioning
The belts are adjusted by turning the jacking screw at the motor support.
Ideal tension is the lowest tension at which the belt will not slip under
peak load conditions. Check tension frequently during the first 24-48
hours of run-in operation. Overtensioning shortens belt and bearing life.
Keep belts free from foreign material which may cause slip. Never ap-
ply belt dressing as this will damage the belt and cause early failure.
A Dodge
e g n a R g n i l o o C
s n o i t a r t n e c n o C f o r e b m u N
X 5 . 1 X 0 . 2 X 5 . 2 X 0 . 3 X 0 . 4 X 0 . 5 X 0 . 6
C 8 7 . 2 7 . 8 3 . 5 2 . 8 1 . 1 1 . 8 0 . 6 0 .
) C 6 5 . 5 ( F 0 1 8 5 . 1 8 7 . 1 5 . 8 3 . 5 2 . 8 1 . 4 1 .
) C 3 3 . 8 ( F 5 1 8 3 . 2 8 1 . 1 8 7 . 8 5 . 8 3 . 8 2 . 2 2 .
) C 1 1 . 1 1 ( F 0 2 8 1 . 3 8 5 . 1 5 0 . 1 8 7 . 1 5 . 8 3 . 0 3 .
) C 9 8 . 3 1 ( F 5 2 8 9 . 3 8 9 . 1 2 3 . 1 8 9 . 4 6 . 8 4 . 8 3 .
. e t a r r e t a w g n i t a l u c r i c e h t f o % 2 0 . 0 f o t f i r d n o d e s a b e r a s r e i l p i t l u M
2.78 C
5.56 C
8.33 C
11.11 C
13.89 C
Note
22
Sheave Alignment
The motor sheave is to be positioned as close as possible to the motor
in order to minimize torque on the motor bushings.
The motor and fan sheaves may have grooves that are not used. The bot-
tom surface of the motor and fan sheaves must be aligned within
1
8" of
each other and level within
1
2 (
1
8" in 12) in order to not adversely affect
belt and sheave life.
Alignment can be achieved by placing a straight edge across the top of
the sheaves making sure that it is level and measuring down to the bottom
surface of both sheaves at four points.
The belt is to be located in the lowest set of grooves.
maintenance
g n i h s u B e z i S r e n e t s a F
e u q r o T
b l t f
m N
H S , ' 0 2 - 6 8
S D S , ' 0 2 - 6 8
D S , ' 0 2 - 6 8
K S , ' 8 1 - 3 1 8 1
F S , ` 6 1 - 2 2 0 3
E , ' 3 1 - 5 3 8 4
F , 2 1 - 5 6 8 8
Bushing Fastener Torque Values
23
maintenance
Schedule of Tower Maintenance
Some maintenance procedures may require maintenance personnel to enter
the tower. Each cased face of the tower has a door for access to the interior of
the tower. All AV Series have a 30 wide by 42 high door opening.
The purchaser or owner is responsible for providing a safe method
for entering or exiting the access door. Protective clothing to avoid
cuts from sheet metal should be worn. Wet sheet metal an/or dirt
can be slippery. Nonslip sole shoes should also be worn.
Included with this instruction packet are separate User Manuals on each major
operating component of the tower, and it is recommended that you read them
thoroughly. Where discrepancies may exist, the separate User Manuals will
take precedence.
The following is recommended as a minimum routine of scheduled mainte-
nance:
Always shut off electrical power to the tower fan motor prior to
performing any inspections that may involve physical contact with
the mechanical or electrical equipment in or on the tower. Lock out
and tag out any electrical switches to prevent others from turning
the power back on. Service personnel must wear proper personal
protective clothing and equipment.
Weekly: Inspect for bacterial growth and general operation conditions. Bacte-
rial growth should be reported to your water treatment expert for immediate
attention.
Monthly (Weekly at start up): Observe, touch, and listen to the tower.
Become accustomed to its normal appearance, sound, and level of vibration.
Abnormal aspects relating to the rotating equipment should be considered
reason to shut down the tower until the problem can be located and corrected.
Observe operation of the motor, sheaves, belt, and fan. Become familiar with
the normal operating temperature of the motor, as well as the sight and sound
of all components as a whole.
Inspect louvers, drift eliminators and basin trash screens and remove any
debris or scale which may have accumulated. Replace any damaged or worn
out components. Use of high-pressure water may damage the eliminator and
louver material.
Warning
24
maintenance
Observe operation of the float valve. Depress the operating lever to make
sure that the valve is operating freely. Inspect the suction screen for plugging.
Remove any debris that may have accumulated.
Check for any buildup of silt on the floor of the cold water basin. Mentally make
note of the amount, if any, so future inspections will enable you to determine
the rate at which it is forming.
Every 3 months: Lubricate fan shaft bearings. While rotating equipment by
hand, grease the bearings until a bead forms around the sealsa maximum
charge of 0.55 ounces is recommended. Chevron SRI-2 grease is recom-
mended.
Every 6 months: Check belt tension and condition.
Check makeup float valve sealsreplace as required.
If equipped with inlet flow control valve, grease valve stem guidefully open
and closereturn to original position and lock.
Clean and disinfect cooling tower with biocides. Systems with biofouling, high
general bacterial counts, or positive cultures of legionella may require additional
cleaning. Refer to Cooling Tower Cleaning section on page 19 Consult your
water treatment expert as to prudent biological evaluation testing.
If basin silt level is significant, drain the basin and clean it out. Refer to Cool-
ing Tower Cleaning section on page 19.
Annually: Relubricate motor. Refer to motor manufacturers recommendations.
Remove grease fill and relief plugs from front of motor and remove hardened
grease with a wire or similar item, Add grease until grease is forced out at
relief hole. Replace fill plug, run
1
2 to 1 hour and replace relief plug.
Check to see that all bolts are tight in the fan and mechanical equipment re-
gion, including the fan cylinder and fan guard. Use torque settings prescribed
in the fan manual.
Inspect the tower thoroughly, making maximum use of instructions given in the
separate service manuals. Check structural bolted connections and tighten
as required. Make preventive maintenance repairs as necessary.
25
Seasonal Shutdown Instructions
When the system is to be shut down for an extended period of time, it is
recommended that the entire system (cooling tower, system piping, heat
exchangers, etc.) be drained. Leave the basin drains open.
During shutdown, clean the tower (see Warning, page 20) and make any
necessary repairs. Pay particular attention to mechanical equipment.
Following each years shutdown and cleaning, inspect the towers metal surfaces
for evidence of the need to apply a protective coating. Do not misinterpret
grimeand transient rust from the piping systemas a need to have the tower
painted. If relatively bright metal can be exposed by cleaning, consider that the
galvanizing has remained effective. Unless there is evidence of a generalized
failure of the galvanizing, localized touch-up should be all that is required.
To the extent that the galvanizing (zinc coating) still exists, paint
will not adhere to it readily. Contact the manufacturer of the coating
you intend to use for instructions.
Tower framework: Check structural bolted connections and tighten as
required.
Fans: Check fan assembly bolting and tighten as required. Use torque set-
tings prescribed in the fan manual.
Fiberglass Components: Check all fiberglass parts for exposed glass fibers.
If found, the affected surfaces should be recoated using a two-part polyamide
epoxy primer to promote adhesion and a two-part acrylic polyurethane enamel
for the topcoat.
Fan shaft bearings: Lubricate fan shaft bearings at close of each operating
seasonsee page 24.
Electric motors: Clean and lubricate motor at close of each operating season
(refer to motor manufacturers recommendations.) Check motor anchor bolts
and tighten as required.
Do not start motor before determining that there will be no interfer-
ence with free rotation of the fan drive.
The motor should be operated for three hours at least once a month. This
serves to dry out windings and re-lubricate bearing surfacesrefer to Marley
Electric Motor User Manual 92-1475.
At start of new operating season, make sure bearings are adequately lubricated
before returning motor to service.
maintenance
26
Prolonged Shutdown
If shutdown period is longer than seasonal, contact your Marley sales repre-
sentative for additional information.
SPX Cooling Technologies Services
Our interest in your AV Series cooling tower does not end with the sale. Having
conceived, designed, and manufactured the most reliable and longest-lasting
cooling tower of its class, we want to make sure that you gain the maximum
possible benefit from its purchase.
Therefore, the following services are available which are intended to: assure
the maximum possible service life under your operating conditions; tailor the
operating characteristics to your specific needs; and maintain consistently
optimum thermal performance capability. They are available by contacting
your Marley sales representative.
Replacement parts: With the exception of the motor, drive system, and float
valve, every standard component of your tower is designed and manufactured
by SPX Cooling Technologies. We do this because commercially available
components have not proved capable of withstanding the harsh environment
of a cooling towernor do they contribute their share to the thermal capability
and operating characteristics intended.
A complete stock of all parts and components is maintained at one or more
of the various Marley plants. In cases of emergency, they can normally be
shipped within 24 hoursby air freight if necessary. However, you would
obviously benefit from anticipating your need in advance, thus avoiding the
cost of special handling.
Be sure to include your tower serial number (from the tower nameplate) when
ordering parts.
Periodic maintenance: You may wish to contract with SPX Cooling for
regularly scheduled visitsfor the purpose of inspecting and reporting your
towers conditionto make recommendations intended to prevent emergen-
cies and to perform maintenance considered outside the norm.
This service is not intended to replace the important function performed by
your maintenance staff. Their attention assures the towers routine operat-
ing performance, and is invaluable. However, we recognize that the unusual
manner in which a cooling tower performs its functionas well as the unique
forces which act upon itmay be considerations which occasionally require
the services of an expert technician.
maintenance
27
maintenance schedule
Maintenance Service Monthly Semi-annually Seasonal Startup or Annually
Inspect General Condition and Operation x x
Observe Operation of:
Mechanicalmotor, fan and drive mechanism x x
Makeup valve (if equipped) x x
Inspect for unusual noise or vibration x x
Inspect and Clean:
Air inlet x x
PVC drift eliminators x x
Distribution basin, nozzles and collection basin x x
Fan motor exterior x x
Check:
Collection water basin level x x
Blowdownadjust as required x x
Belt drive:
Fan shaft bearing lubrication (every 3 mo.) every 3 months every 3 months
Check and tighten support fasteners x
Check shaft, sheave and belt alignment x
Check belt tension and condition x x
Check sheave bushing fastener torque x
Fan:
Check and tighten blade and hub fasteners x
Check fan blade pitch and tip clearance x
Check fan cylinder for loose fasteners x
Motor:
Lubricate (grease as required) R
Check mounting bolts for tightness x
Operate at least 3 hours a month 3 hours a month 3 hours a month
Basin Heater (if equipped):
Check for proper operation of temp/low water level sensor x
Inspect/clean buildup of contaminant from sensor x x
Structure:
Inspect/tighten all fasteners x x
Inspect and touch up all metal surfaces x
R Refer to Component User Manual
Note: It is recommended at least weekly, that the general operation and condition be observed. Pay atten-
tion to any changes in sound or vibration that may signify a need for closer inspection.
28
e l b u o r T e s u a C y d e m e R
t r a t S t o N l l i W r o t o M
s l a n i m r e t r o t o m t a e l b a l i a v a t o n r e w o P
s n o i t c e n n o c d a b y n a t c e r r o C . r e t r a t s t a r e w o p k c e h C
. r o t o m e h t d n a s u t a r a p p a l o r t n o c e h t n e e w t e b
, s d a o l r e v o t e s e R . t i u c r i c l o r t n o c d n a s t c a t n o c r e t r a t s k c e h C
l o r t n o c d e l i a f e c a l p e r r o s e h c t i w s d e p p i r t t e s e r , s t c a t n o c e s o l c
. s e h c t i w s
d a o l r e v o e r u s e k a m , r e t r a t s t a s d a e l l l a n o t o n s i r e w o p f I
. n o i t i d n o c r e p o r p n i e r a s e c i v e d t i u c r i c t r o h s d n a
s n o i t c e n n o c g n o r W . s m a r g a i d g n i r i w t s n i a g a s n o i t c e n n o c l o r t n o c d n a r o t o m k c e h C
e g a t l o v w o L
k c e h C . y l p p u s r e w o p t s n i a g a e g a t l o v e t a l p e m a n k c e h C
. s l a n i m r e t r o t o m t a e g a t l o v
g n i d n i w r o t o m n i t i u c r i c n e p O . s t i u c r i c n e p o r o f s g n i d n i w r o t a t s k c e h C
k c u t s e v i r d n a f r o r o t o M
r e c u d e r a e G d n a r o t o m k c e h c d n a d a o l m o r f r o t o m t c e n n o c s i D
. m e l b o r p f o e s u a c r o f
e v t c e f e d r o t o R . s g n i r r o s r a b n e k o r b r o f k o o L
e s i o N r o t o M l a u s u n U
e s a h p - e l g n i s g n i n n u r r o t o M
- e l g n i s f i t r a t s t o n l l i w r o t o M . t i t r a t s o t t p m e t t a d n a r o t o m p o t S
. r o t o m d n a , s l o r t n o c , g n i r i w k c e h C . d e s a h p
y l t c e r r o c n i d e t c e n n o c s d a e l r o t o M . r o t o m n o m a r g a i d g n i r i w t s n i a g a s n o i t c e n n o c r o t o m k c e h C
s g n i r a e b d a B . s g n i r a e b d a b e c a l p e R . n o i t a c i r b u l k c e h C
e c n a l a b n u l a c i r t c e l E
f i t c e r r o C . s e n i l e e r h t l l a f o s t n e r r u c d n a s e g a t l o v k c e h C
. d e r i u q e r
m r o f i n u t o n p a g r i A . g n i r a e b r o s t i f t e k c a r b t c e r r o c d n a k c e h C
e c n a l a b n u r o t o R . e c n a l a b e R
d r a u g l l e b d n e g n i t t i h n a f g n i l o o C . n a f e c a l p e r r o l l a t s n i e R
t o H s n u R r o t o M
e g a t l o v d e c n a l a b n u r o e g a t l o v g n o r W
e t a l p e m a n t s n i a g a s e n i l e e r h t l l a f o t n e r r u c d n a e g a t l o v k c e h C
. s e u l a v
d a o l r e v O
r o f k c e h C . l a u n a M n a F e e S . h c t i p e d a l b n a f k c e h C
. s g n i r a e b d e g a m a d m o r f s a n i a r t e v i r d n a f n i g a r d
M P R r o t o m g n o r W . r o t o m f o M P R k c e h C . y l p p u s r e w o p t s n i a g a e t a l p e m a n k c e h C
d e s a e r g r e v o s g n i r a e B
e g r u p o t d e e p s o t p u r o t o m n u R . s f e i l e r e s a e r g e v o m e R
. e s a e r g e v i s s e c x e
s g n i r a e b n i t n a c i r b u l g n o r W
s ' r e r u t c a f u n a m r o t o m e e S . t n a c i r b u l r e p o r p o t e g n a h C
. s n o i t c u r t s n i
n e p o e s a h p e n O
- e l g n i s f i t r a t s t o n l l i w r o t o M . t i t r a t s o t t p m e t t a d n a r o t o m p o t S
. r o t o m d n a , s l o r t n o c , g n i r i w k c e h C . d e s a h p
r o t o m y t r i D . r o t o m n a e l C
t l u a f g n i d n i W . r e t e m m h O h t i w k c e h C
t f a h s r o t o m t n e B . t f a h s e c a l p e r r o n e t h g i a r t S
e s a e r g t n e i c i f f u s n I . s g n i r a e b e s a e r g e r d n a s g u l p e v o m e R
s e g n a h c d e e p s r o g n i t r a t s t n e u q e r f o o T
. r h / s d n o c e s 0 3 f o l a t o t a o t e m i t n o i t a r e l e c c a e v i t a l u m u c t i m i L
r e d i s n o C . t r a p a r e h t r a f s t n i o p t e s e g n a h c d e e p s r o f f o / n o t e S
. l o r t n o c e r u t a r e p m e t e n i f r o f e v i r d D F V y e l r a M a g n i l l a t s n i
n g i e r o f r o , e s a e r g f o n o i t a r o i r e t e D
e s a e r g n i l a i r e t a m
. e t a c i r b u l e r d n a s g n i r a e b h s u l F
d e g a m a d s g n i r a e B . s g n i r a e b e c a l p e R
p U e m o C t o N s e o D r o t o M
d e e p S o T
s l a n i m r e t r o t o m t a w o l o o t e g a t l o V
p o r d e n i l f o e s u a c e b
n o e g a t l o v r e h g i h e s U . s p a t f o g n i t t e s d n a r e m r o f s n a r t k c e h C
r o e z i s e r i w e s a e r c n I . s d a o l e c u d e r r o s l a n i m r e t r e m r o f s n a r t
. a i t r e n i e c u d e r
s r a b r o t o R n e k o r B
. d e r i u q e r e b y a m r o t o r w e n A . s g n i r e h t r a e n s k c a r c r o f k o o L
. r o t o m k c e h c n o s r e p e c i v r e s r o t o m e v a H
) r o t o M ( n o i t a t o R g n o r W s e s a h p f o e c n e u q e s g n o r W . s d a e l r o t o m e e r h t e h t f o o w t y n a h c t i w S
troubleshooting
29
troubleshooting
e l b u o r T e s u a C y d e m e R
e v i r D n a F l a u s u n U
n o i t a r b i V
s w e r c s p a c d n a s t l o b e s o o L
t n e m p i u q e l a c i n a h c e m l l a n o s w e r c s p a c d n a s t l o b l l a n e t h g i T
. s t r o p p u s d n a
n a F
y t e f a s s a n a f f o r e t n e c m o r f r a f s a e r a s e d a l b l l a n i a t r e c e k a M
e e S . e m a s e h t d e h c t i p e b t s u m s e d a l b l l A . t i m r e p s e c i v e d
. s e d a l b n o p u - d l i u b t i s o p e d f f o n a e l C . l a u n a M r e s U n a F
s g n i r a e b t f a h s n a f n r o W . y r a s s e c e n s a s g n i r a e b e c a l p e R . y a l p d n e t f a h s n a f k c e h C
r o t o m d e c n a l a b n U
, s e t a r b i v l l i t s r o t o m f I . r o t o m e t a r e p o d n a d a o l t c e n n o c s i D
. r o t o r e c n a l a b e r
e s i o N n a F
r e d n i l y c n a f f o e d i s n i g n i b b u r e d a l B . e c n a r a e l c p i t e d a l b e d i v o r p o t r e d n i l y c t s u j d A
s p m a l c e d a l b n i s t l o b e s o o L . y r a s s e c e n f i n e t h g i t d n a k c e h C
s g n i r a e b t f a h s n a F . s g n i r a e b e s a e r G
e c n a t s b u s n g i e r o f r o e l a c S
m e t s y s r e t a w g n i t a l u c r i c n i
n w o d w o l b t n e i c i f f u s n I l a u n a m s i h t f o n o i t c e s " t n e m t a e r T r e t a W " e e S
y c n e i c i f e d t n e m t a e r t r e t a W
r e t a W " e e S . t s i l a i c e p s g n i t a e r t r e t a w t n e t e p m o c t l u s n o C
l a u n a m s i h t f o n o i t c e s " t n e m t a e r T
e r u t a r e p m e T r e t a W d l o C
m r a W o o T
) " n o i t a r e p O r e w o T " e e S (
n g i s e d e v o b a s i . p m e t b l u b t e w g n i r e t n E
f i e e S . r e w o t g n i t c e f f a e r a s e c r u o s t a e h l a c o l f i e e s o t k c e h C
r e w o t f o n o i t a l u c r i c e r g n i s u a c e r a s e r u t c u r t s g n i d n u o r r u s
. e v i t a t n e s e r p e r y e l r a M h t i w y d e m e r s s u c s i D . r i a e g r a h c s i d
w o l o o t s a w . p m e t b l u b t e w n g i s e D
y e l r a M h t i w y d e m e r s s u c s i D . e z i s r e w o t e s a e r c n i o t e v a h y a M
. e v i t a t n e s e r p e r
n g i s e d n a h t r e t a e r g d a o l s s e c o r p l a u t c A
y e l r a M h t i w y d e m e r s s u c s i D . e z i s r e w o t e s a e r c n i o t e v a h y a M
. e v i t a t n e s e r p e r
g n i p m u p r e v O . s n o i t i d n o c n g i s e d o t r e w o t r e v o e t a r w o l f r e t a w e c u d e R
r i a r o f d e v r a t s r e w o T
t c a r t n o c t c e r r o c f o e r u s e b o t e g a t l o v d n a t n e r r u c r o t o m k c e h C
, s r e v u o l n a e l C . y r a s s e c e n f i s e d a l b n a f h c t i p - e R . r e w o p e s r o h
r o s e r u t c u r t s y b r a e n f i e e s o t k c e h C . s r o t a n i m i l e d n a l l i f
. r e w o t o t w o l f r i a l a m r o n g n i t c u r t s b o e r a s l l a w g n i s o l c n e
. e v i t a t n e s e r p e r y e l r a M h t i w y d e m e r s s u c s i D
g n i t i x E t f i r D e v i s s e c x E
r e w o T
g n i w o l f r e v o s n i s a b n o i t u b i r t s i D
e B . s n o i t i d n o c n g i s e d o t r e w o t r e v o e t a r w o l f r e t a w e c u d e R
. d e g g u l p t o n d n a e c a l p n i e r a s e l z z o n n i s a b r e t a w t o h e r u s
n o i t a n i m i l e t f i r d y t l u a F
e r a s r o t a n i m i l e d n a , s r e v u o l , l l i f l a r g e t n i t a h t e e s o t k c e h C
s r o t a n i m i l e t f i r d f I . y l t c e r r o c d e l l a t s n i d n a , s i r b e d f o e e r f , n a e l c
n i d e l l a t s n i y l t c e r r o c e r a y e h t e r u s e k a m , l l i f m o r f e t a r a p e s e r a
t u o n r o w r o d e g a m a d e c a l p e R . y r a s s e c e n f i n a e l C . e c a l p
. s t n e n o p m o c
30
additional information
Increased load requirements: AV Series towers are designed such that
cells of either equal or unequal capacity can be added in the future. This al-
lows you to compensate for the load increases that normally occur with the
replacement or addition of production equipmentand still retain continuity
with respect to your cooling tower system.
Tower rebuilding: SPX Cooling Technologies routinely rebuilds and upgrades
cooling towers of all materials and manufacture. If your tower ever reaches the
limit of its service life, we recommend that you investigate the cost of rebuild-
ing before you routinely order a new replacement tower.
Each AV tower includes a document package containing general
orientation drawings, a Field Installation Manual, and tower component user
manuals. These documents contain important information relating to
safe installation and operation of the cooling tower. Field installation
is always required for piping inlets and piping outlets. The fan guard on larger
models an some optional accessories, such as valves, handrails, ladders and
safety cages may also require field installation. If installation details are not
covered in the Field Installation Manual a separate installation drawing for each
purchased option is included in the document package. If you have purchased
an option and cant find the appropriate installation drawing, contact your local
Marley sales representative before proceeding.
For complete parts and service assistance, contact the Marley sales repre-
sentative in your area. If you need help locating the office nearest you, please
phone 913 664 7400 or check the internet at spxcooling.com.
SPX COOLI NG TECHNOLOGI ES, I NC.
7401 W 129 STREET
OVERLAND PARK, KANSAS 66213 USA
P: 913 664 7400
F: 913 664 7439
spxcooling@spx.com
In the interest of technological progress, all products are subject to design
and/or material change without notice
ISSUED 09/2012 M98-1514G
COPYRIGHT 2012 SPX Corporation
AV cooling tower
user manual