You are on page 1of 12

Lectures Notes (Steel III- CT225) by Dr.

Essam Abdelaty Mohamed Amoush

Example:The shown figure illustrated


a simple span deck bridge. it is required
to :1) Draw a general layout
2) Calculate dead and live loads for
for each element
3) Design the stringer
4) Design the cross-girder
5) Design the main girder
6) Calculate wind loads
7) Ccalculate the internal forces in the
bracing system
8) Design the bearing
Given steel used is St.52

Solution
1) General layout of Deck Bridge
2

1,4

14

2,6

Cross-Section
(1)

Lectures Notes (Steel III- CT225) by Dr. Essam Abdelaty Mohamed Amoush

1,4

14

Sec. Elevation

36

Floor system

(2)

Lectures Notes (Steel III- CT225) by Dr. Essam Abdelaty Mohamed Amoush
14

14

Upper bracing

Lower Bracing

36

41

(3)

Lectures Notes (Steel III- CT225) by Dr. Essam Abdelaty Mohamed Amoush

2) Loads
2-1) loads on stringer
Dead loads
WDL= o.w.t of stringer + o.w.t of R.c slab+ o.w.t
of asphalt
= 0.05+0.1x2.5x2+0.05x2.2x2=0.77 t/m
2

WdL=0.77 t/m

Cross-Section

(4)

Lectures Notes (Steel III- CT225) by Dr. Essam Abdelaty Mohamed Amoush

For New Loads ECP2008


I

II

0.25 t/m2

5
10

0.9 t/m2

15
1.2

0.25 t/m2

0.5

15

60

15

15

10

40

10

0.25 t/m2

5
10

0.25 t/m2
0.9 t/m2

20

0.25 t/m2

0.25 t/m2

If sidewalk width<1.5 LL= 0.25 t/m2


If not LL=0.5 t/m2

If sidewalk width<1.5 LL = 0.25 t/m2


If not LL= 0.5 t/m2

II

For median live load is 0.5 t/m2


(5)

Lectures Notes (Steel III- CT225) by Dr. Essam Abdelaty Mohamed Amoush

Transverse direction
2

14
3

15t

15t

10t

0.5 t/m

10t 5 t

5t
0.5 t/m

0.25 t/m

Path I-I
0.5 t/m

0.9 t/m

0.5 t/m

0.25 t/m

Path II-II
Path I-I
I= 0.4-0.008x6=0.352
15t

0.50

0.50
2.00

15t

15t

0.9 t/m

(6)

0.50

1.0
2.00

1.0
2.00

1.0

Wa=(0.9x2x 12
+0.9x1x1.5/2)x1.352
+0.25x1.0x0.5/2=2.192 t/m

10t

0.2 5 t/m

0.25

0.9 t/m

0.75

Path II-II

0.75

1.0

0.25

0.50
2.00

10t

0.25

Ra=15x0.5/2+15x1.5/2)x1.352
10x0.5/2=22.78 t

15t

15t
10t

0.25

15t

Lectures Notes (Steel III- CT225) by Dr. Essam Abdelaty Mohamed Amoush

Longitudnal direction
For maximum moment
22.78 t 22.78 t

ML+I=54.34 t.m

2.192t/m

2.192 t/m
0.9

4.2

0.9

21.27
55.44

55.44

21.27

B.M.D

For maximum shear


M@b=0.0
Ra=(22.78x6+22.78x4.8+
2.192x3.3x1.65)/6=42.99 t

22.78 t 22.78 t

QL+I=42.99 t.m

(7)

2.192 t/m

6.00

Lectures Notes (Steel III- CT225) by Dr. Essam Abdelaty Mohamed Amoush

Design of Stringer
Procedure to design the stringer:1) Determine the straining actions MD+L+I, QD+L+I
2) Assume section of stringer {I.P.E, S.I.B, HEA, HEB}
3) Check bending stress. Pages (16-21) code ECP2001
4) Check shear stress. Pages (13-15)
5) Check fatigue stress Pages (35-50)
6) Check deflection. Page (132)
Given MD=0.77x6^2/8=3.465 t.m
ML+I=54.34 t.m
QD=0.77x6/2=2.31 t
QD+L+I= 42.74 t
assume : the depth of section= span/10=600/10= 60 cm
choose HEA 600
h=590 mm bf =300 mm tf =25 mm
dw=486 mm tw=13 mm
r=27 mm
Ix=141208 cm^4
Sx=4787 cm^3
i) classification of section
bf /2tf = 300/(2x25)=6 < 16.9/v3.6=8.9 compact flange
dw/tw=486/13=37.38 < 127/v3.6=66.93 compact web
section is compact section
ii) check the laterally supported
300 mm

90 mm

25 mm

Lc = smaller from {20bf /vFy or 1380 Af . cb/(dFy)}


= smallre from {316.23 cm or 487.3 cm)= 316.23 cm
Lu = larger from {1380 Af . cb/(dFy) or 84r v(cb/Fy)}
= Larger from { 487.3 or 356.83}= 487.3 cm
Luns = 600 cm > Lu
I =2.5x(30)^3/12
+9x(1.3^3)/12
Fltb1=800Af. cb/(Luns.d)=
= 5626.65 cm^4
800x30x2.5x1/(600x59)=1.67 t/cm^2<2.08 t/cm^2
A =30x2.5+9x1.3
=86.7 cm^2
Luns/rt=600/8.06=74.44
r = v(5626.65/86.7)
13 mm

cf

cf

(8)

=8.06 cm

Lectures Notes (Steel III- CT225) by Dr. Essam Abdelaty Mohamed Amoush

F ltb2 = [0.64-(Luns/r )^2 F y /117600. cb] F y


= [0.64-(74.44^2)x 3.6/117600 x 1)x 3.6=1.69 t/cm^2
= 2.08 t/cm^2
F ltb =v(Fltb1^2+Fltb2 ^2)=v(1.69^2+1.69^2)=2.39 t/cm^2
= 2.08 t/cm^2
Check bending
f act= MD+L+I/Sx=57.8x 100/4787=1.21 t/cm^2 = 2.08 t/cm^2
O.K
Check shear
For unstiffened web
dw/tw=486/13=37.38 < 105/v3.6=55.34
qb=0.35Fy=1.26 t/cm^2
q act= 45.05 /(48.6x1.3)=0.713 t/cm^2 < 1.26 t/cm^2 O.K
Check Fatigue
Detail Category is Detail A, N=2000,000
Fsr=1.68 t/cm^2
Fmax= (M D+0.6M L+I)/Sx= 36.07 x 100/ 4787=0.753 t/cm^2
Fmin = M D/Sx= 3.465x100/4787=0.072 t/cm^2
Fmax-Fmin= 0.753-0.072=0.68 t/cm^2 < Fsr = 1.68 t/cm^2
O.K
Check Deflection
dmax = dall= span/600=600/600= 1.0 cm
dmax=d1+d2
22.78 t 22.78 t
d1=(PL^3)[3a/4L-(a/L)^3]/6EI
= 22.78x600^3x
[3x90/4x600-(90/600)^3]
/(6x2100x141208)= 0.3 cm
d2= 2wa(3L^2-2a^2)/96EI
2.192 t/m
2.192 t/m
= (2x2.192/100)x90x(3x600^2-2x90^2)
/96x2100x141208=0.000147
dmax=0.3+0.000127=0.300147 cm
< span/600=1.0 cm
T

(9)

0.9

4.2

0.9

0.9

4.2

0.9

Lectures Notes (Steel III- CT225) by Dr. Essam Abdelaty Mohamed Amoush

Cross Girder
1- Dead Loads

2.31

4.62

4.62

4.62

4.62

4.62

4.62

2.31

0.1 t/m
A
17.07 t

17.07 t

M@mid-span
M+ve=17.07x7-2.31x9-0.1x9x4.5-4.62x7-4.62x5-4.62x3
-4.62x1=20.73 t.m

Max Shear
QD=17.07-2.31-0.1x2=14.56 t

(10)

Lectures Notes (Steel III- CT225) by Dr. Essam Abdelaty Mohamed Amoush

2 Live Loads
Transverse Direction
14
V

IV

III

II

2
Path V

0.25 t/m

0.25 t/m

2
15

1.2

15

10

15

10

60

10

10

40

20
5

0.25 t/m2
0.9 t /m2

0.25 t/m2

0.25 t/m2

0.25 t/ m2

5t

5t

0.25 t/m2

0.25 t/m

0.25 t/m

0.25 t/m

0.25 t/m

15 t

15t

0.9 t/m

3.9

1.50

0.65

0.9 t /m

0.60

0.9

0.9

IV

III

II

I=0.4-0.008X 2X 6=0.304
RI =2X15X0.9X(1+0.304)=35.21 t
RII=2X10X0.9
= 18 t
RIII =2X5X0.9
=9t
WI = 2X0.9X(0.5X3.9X0.65)X (1+0.304)=2.98 t/m
WII =WIII = 2X0.25X (0.5 X3.9X0.65) = 0.634 t/m
WIV =2X0.25X(0.5X6X1)=1.5 t/m
WV=2X0.5X(0.5X6X1)=3 t/m
(11)

Path III

10 t

10 t
6

0.5

0.25 t/ m2

If sidewal k width<1.5 LL= 0.25 t/m2


If not LL=0.5 t/m2

If sidewal k wi dth<1.5 LL = 0.25 t/m2


If not LL= 0.5 t/ m2

0.9 t /m2

PathIV

0.65

Path II

Path I

Lectures Notes (Steel III- CT225) by Dr. Essam Abdelaty Mohamed Amoush

Longitudinal Direction

124.4 t
35.2

35.2 18

18 9

5,63

2,74

R=35.2 x 2+18x2+2x9=124.4 t
X=(35.2x2+18x3+18x5+9x6+9x8)/124.4=2.736 m
For max.+ve Moment
124.4 t
35.2 35.2 18
18 9
2.98 t/m
0.634 t/m

1.50 t/m
A

9
1.5 t/m

0,37
4,13

0,87

2,74

6,63

0.098
0.062

0.276

0.312

0.526
0.491
0.455

0.705
0.669

I.L.RA

RA =1.5x[0.5x(1+0.705)x4.13]+2.98x[0.5x(0.705+0.491)x3]
+ 0.634x[0.5x(0.491+0.062)x6]+1.5x(0.5x0.87x0.062) +
+ 35.2x0.669+35.2x0.526 +18x0.455+18x0.312
+ 9x0.276+9x0.098=70.96 t
M@ zero shear
M+ve=70.96x6.63-1.5x4.13x(4.13/2+2.5)-2.98x2.5x1.25
-35.2x2=362.47 t.m
For M-ve
M-ve = (3x2^2)/2 = 6 m.t
3 t/m

35.2 35.2 18
18 9
2.98 t/m
0.634 t/m

1.5 t/m
5
5,5

7,5
8,5

10,5
11
11,5
13,5
2

14

0.393
0.357

0.607
0.536

0.821
0.786
0.75

1
0.964

1.143

I.L.RA

For max shear Qmax


Qmax=RA= 3x{0.5x(1.143+1)x2}+2.98x{0.5x(1+0.786)x3}
+0.634x {0.5x(0.786+0.357)x6}+1.5x(0.5x5x0.357)
+ 35.2x0.964+35.2x0.821+18x0.75+18x0.607
+ 9x0.536 + 9x0.393=113.544 t
(12)

You might also like