This data comes from the NERC database

This workbook contains tables and figures from the Planned Outages section.
The statistics are broken down by capacity and last stage blade length, and cover only
200-1000 MW units. Where possible, units larger than 1000 MW have been shown separately.
The statistics shown here are for the most recent 3 years of the NERC reporting period, 1996-1998.
Name

Type

Description

All Events

worksheet

Weeks

chart

x
y

Cause group - all units from 200-1000 MW


Number of planned outages

Days Detail

chart

x
y

Duration (days) - 200-1000 MW units


Number of forced outages up to 100 days

Summary

worksheet

Statistics summary by size group

<25 in

worksheet

Duration statistics by day and week for units with last stage
blade length below 25 inches, 200-1000 MW capacity

<25 in (wk)

chart

Planned outages 200-1000 MW range - duration (day, week)

x
y

>35 in

worksheet

>35 in (wk)

chart

Duration statistics by day and week for units with last stage
blade length above 35 inches, 200-1000 MW capacity
x
y

200-400 MW

worksheet

10

200-400 MW (wk)

chart

400-600 MW

worksheet

12

400-600 MW (wk)

chart

600-800 MW

worksheet

14

600-800 MW (wk)

chart

Duration (week) - units with capacity 200-399 MW,


LSB length 25-35 inches
Number of planned outages by week

Duration statistics by day and week for units with last stage
blade length 25-35 inches, 400-599 MW capacity
x
y

13

Duration (week) - units with capacity 200-1000 MW,


LSB length >35 inches
Number of planned outages by week

Duration statistics by day and week for units with last stage
blade length 25-35 inches, 200-399 MW capacity

y
11

Duration (week) - units with capacity 200-1000 MW,


LSB length <25 inches
Number of planned outages by week

Duration (week) - units with capacity 400-599 MW,


LSB length 25-35 inches
Number of planned outages by week

Duration statistics by day and week for units with last stage
blade length 25-35 inches, 600-799 MW capacity
x

Duration (week) - units with capacity 600-799 MW,


LSB length 25-35 inches

y
15

800-1000 MW

worksheet

16

800-1000 MW (wk)

chart

Duration statistics by day and week for units with last stage
blade length 25-35 inches, 800-999 MW capacity
x
y

17

>1000 MW

worksheet

18

>1000 MW (wk)

chart

Number of planned outages by week

Duration (week) - units with capacity 800-999 MW,


LSB length 25-35 inches
Number of planned outages by week

Duration statistics by day and week for units with last stage
above 1000 MW
x
y

Duration (week) - units with capacity above 1000 MW


Number of planned outages by week

Planned Outages, 1996-1998


Capacity 200-1000 MW
Duration
days
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46

PO Events
46
25
29
23
46
37
53
48
52
54
25
29
27
30
45
49
48
23
23
21
37
37
61
33
23
24
26
33
35
28
25
17
22
16
16
19
15
15
10
13
10
21
18
21
13
12
13

Duration
weeks
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
27
28
31

PO Events
259
265
246
237
159
103
94
84
72
41
40
27
20
15
10
5
1
7
4
2
1
2
1
1
1
1
1
1

47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98

6
11
16
12
15
10
8
8
15
5
9
19
9
12
9
9
6
4
9
6
7
5
4
4
5
11
5
3
8
4
3
5
7
3
1
4
4
6
1
5
2
3
1
2
1
1
3
2
3
3
2
1

99
100
101
104
108
109
110
115
119
121
122
123
124
127
129
132
136
139
144
149
150
155
164
173
192
197
221

4
2
2
1
1
3
1
1
2
1
1
1
2
1
1
2
1
1
1
1
1
1
1
1
1
1
1

Planned Outages, 1996-1998


300

Number of Outages

250

200

150

100

50

0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

Duration (weeks)

Planned Outages 1996-1998 (up to 100 days)


70

60

Number of Outages

50

40

30

20

10

12

16

20

24

28

32

36

40

44

48

52

56

Duration (days)

60

64

68

72

76

80

84

88

92

96

100

Planned Outages for 1982-1998


1982-1998
LSB Length (inches)
Capacity (MW)
<25
25-35
>35
<200
3115
1055
131
200-399
173
2131
951
76
2494
194
400-599
26
1385
81
600-799
6
269
12
800-999
0
60
43
>1000

Planned Outages for 1996-1998


1996-1998
LSB Length (inches)
Capacity (MW)
<25
25-35
>35
647
224
31
<200
50
468
185
200-399
11
562
33
400-599
5
295
16
600-799
2
64
7
800-999
0
11
11
>1000

Planned Outages 1996-1998


Capacity:
LSB Length:

200-1000
<25

Duration
days
0
1
2
4
6
8
9
10
11
12
13
14
15
16
17
20
21
22
23
25
26
27
28
29
30
31
32
35
37
38
43
47
49
50
56
61
65
69
80
85
109
132
197

Events
2
5
1
1
4
1
1
1
3
3
1
4
2
2
1
1
1
2
1
2
2
4
1
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

MW
inches

Duration
weeks
0
1
2
3
4
5
6
7
8
9
11
12
15
18
28

Events
13
10
10
12
7
3
2
2
2
2
1
1
1
1
1

Planned Outages 96-98, Capacity 200-1000 MW, LSB Length <25 inches
14

12

Number of Events

10

10

11

12

13

14

15

16

Duration (weeks)

17

18

19

20

21

22

23

24

25

26

27

28

Planned Outages 1996-1998


Capacity:
LSB Length:

200-1000
>35

Duration
days
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
35
37
38
39
41
42
43
44
45
47

Events
4
1
1
3
8
3
8
8
7
14
1
4
2
1
10
10
10
7
3
2
4
5
12
1
4
6
2
1
1
2
3
4
1
2
1
2
2
3
8
2
2
4
3
1

MW
inches

Duration
weeks
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
17
18
22
23
31

Events
28
37
46
31
13
16
14
7
15
6
9
6
2
5
1
1
2
1
1
1
1

48
49
50
51
52
54
56
57
58
59
60
64
65
67
69
70
71
73
74
75
76
77
78
79
86
90
93
94
95
96
98
110
119
124
132
155
164
221

2
2
1
1
2
1
2
2
4
5
2
1
1
3
1
2
1
2
1
2
1
2
2
2
1
1
1
1
2
1
1
1
1
1
1
1
1
1

Planned Outages 96-98, Capacity 200-1000 MW, LSB Length >35 inches
50

45

40

Number of Events

35

30

25

20

15

10

10

12

14

16

Duration (weeks)

18

20

22

24

26

28

30

Planned Outages 1996-1998


Capacity:
LSB Length:

200-399
25-35

Duration
days
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
32
33
34
35
36
37
38
39
40
41
42
43
44
45

Events
19
7
8
4
8
7
17
13
12
12
10
6
10
15
9
18
17
6
5
9
12
10
16
14
8
6
11
12
7
6
8
4
6
5
4
7
1
2
1
2
6
7
8
2
3

MW
inches

Duration
weeks
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
17
18
19
21
24

Events
70
78
76
77
36
23
29
18
18
10
9
8
4
2
2
2
1
2
1
1
1

46
47
48
49
50
51
52
53
54
55
57
58
59
60
61
62
63
64
65
66
67
68
69
72
73
74
76
79
80
82
83
86
87
89
96
97
99
104
108
109
121
127
129
139
149
173

5
1
3
3
1
3
1
2
3
5
3
2
2
5
4
2
1
1
2
2
1
1
2
5
2
1
1
3
1
2
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1

Planned Outages 96-98, Capacity 200-399 MW, LSB Length 25-35 inches
90

80

70

Number of Events

60

50

40

30

20

10

10

11

12

13

Duration (weeks)

14

15

16

17

18

19

20

21

22

23

24

Planned Outages 1996-1998


Capacity:
LSB Length:

400-599
25-35

Duration
days
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43

Events
13
9
13
11
18
11
19
17
24
18
8
9
6
6
12
9
8
4
13
6
13
17
18
11
8
7
9
7
13
13
8
4
9
5
9
6
1
5
3
6
7
2
8
7

MW
inches

Duration
weeks
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
17
20
21

Events
94
88
65
77
61
30
33
33
17
15
14
9
9
6
5
1
3
1
1

44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
60
61
62
63
64
65
66
67
68
70
71
72
74
75
76
77
78
79
80
81
82
83
84
86
87
88
91
92
93
95
96
99
100
109
119
123
124

3
4
5
2
4
3
4
8
5
3
3
7
1
3
5
3
2
3
4
2
2
2
2
3
1
2
6
1
3
1
1
2
1
1
1
2
1
5
2
1
1
1
1
2
1
1
3
2
1
1
1
1

144
150

1
1

Planned Outages 96-98, Capacity 400-599 MW, LSB Length 25-35 inches
100

90

80

Number of Events

70

60

50

40

30

20

10

10

11

12

Duration (weeks)

13

14

15

16

17

18

19

20

21

Planned Outages 1996-1998


Capacity:
LSB Length:

600-799
25-35

Duration
days
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43

Events
8
2
5
5
11
13
5
9
6
9
5
7
6
7
7
9
10
2
2
4
5
4
11
6
3
2
2
7
8
3
2
4
6
3
1
5
6
4
2
2
1
5
1
3

MW
inches

Duration
weeks
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
16
17
19
27

Events
49
49
39
35
27
25
11
21
15
6
5
2
3
2
2
1
1
1
1

44
45
46
47
49
50
51
52
53
54
55
56
58
59
60
61
62
63
65
66
67
70
71
73
75
76
79
83
84
88
94
97
101
115
122
136
192

2
2
2
1
7
5
3
2
2
1
1
1
6
2
1
2
3
1
3
1
1
1
1
1
1
1
1
1
1
2
1
1
2
1
1
1
1

Planned Outages 96-98, Capacity 600-799 MW, LSB Length 25-35 inches
60

50

Number of Events

40

30

20

10

10

11

12

13

14

15

Duration (weeks)

16

17

18

19

20

21

22

23

24

25

26

27

Planned Outages 1996-1998


Capacity:
LSB Length:

800-999
25-35

Duration
days
1
2
5
7
8
14
15
16
17
20
22
25
27
28
29
30
31
34
35
36
37
39
44
46
48
53
55
57
58
60
62
66
68
71
75
78
90

Events
1
1
3
1
2
3
1
1
3
2
2
1
2
5
3
3
3
1
2
1
2
1
2
1
2
1
2
1
2
1
1
1
1
1
2
1
1

MW
inches

Duration
weeks
0
1
2
3
4
5
6
7
8
9
10
11
12

Events
5
3
10
5
15
6
5
3
5
2
3
1
1

Planned Outages 96-98, Capacity 800-999 MW, LSB Length 25-35 inches
16

14

Number of Events

12

10

6
Duration (weeks)

10

11

12

Planned Outages 1996-1998


Capacity:
LSB Length:

>=1000
>=25

Duration
days
1
13
15
17
31
32
35
41
42
49
51
62
63
65
74
84
85

Events
1
3
2
1
1
1
1
3
1
1
1
1
1
1
1
1
1

MW
inches

Duration
weeks
0
1
2
4
5
6
7
8
9
10
12

Events
1
3
3
2
4
1
2
1
2
1
2

Planned Outages 96-98, Capacity >=1000 MW, LSB Length >=25 inches
5

Number of Events

6
Duration (weeks)

10

11

12

You might also like