5 5 M Me eg ga aw wa at tt t U Ut ti il li it ty y S Sc ca al le e S So ol la ar r P PV V G Ge en ne er ra at ti io on n U Un ni it t 5 5 M Me eg ga aw wa at tt t U Ut ti il li it ty y S Sc ca al le e S So ol la ar r P PV V G Ge en ne er ra at ti io on n U Un ni it t

Standardized 5 MW Solar PV Generation Unit Designed & Engineered for Large Utility Scale Power. Standardized5MWSolar PV GenerationUnit Designed& Engineeredfor Large Utility Scale Power.
Scalable from 0.5 to 200 MegaWatts in multiples of 5 MegaWatt Units Scalablefrom0.5to200MegaWattsinmultiplesof 5MegaWatt Units
Each 5 MW Unit is Comprised of 12,000 Total Panels using the PV-460U @ 460 Watts each. Each5MWUnit isComprisedof 12,000Total PanelsusingthePV-460U @460Wattseach.
Total Output Capacity = 5,520,000 Watts DC ; Total Output Capacity=5,520,000 Watts DC ; Can be deployed in only 16 months to finish! Can be deployed in only 16 months to finish!

S SP PE EC CI IF FI IC CA AT TI IO ON NS S: :
40 Acre Footprint =1/16 sq. mile with a 3:1 Ground to Panel ratio. 40AcreFootprint =1/16sq. milewitha3:1GroundtoPanel ratio.
Typical is array is five ( 5) ~1.1 MegaWatt blocks made of 120 rows x 20 panels of 2400 panels ea. Typical isarrayisfive( 5) ~1.1MegaWatt blocksmadeof 120rowsx20panelsof 2400panelsea.
Access Service Ways are spaced between all 120 rows East to West, 2 panels wide spaced in 5 blocks. AccessServiceWaysarespacedbetweenall 120rowsEast toWest, 2panelswidespacedin5blocks.
Hardened for wide Desert Extremes, with 40 Year Design Life Hardenedfor wideDesert Extremes, with40Year DesignLife
Typical 23% Capacity Rating in Southwestern USA. Typical 23%CapacityRatinginSouthwesternUSA.
PV+BOS+O+M =Total Life Cost ~$4 to $5 / Watt =13 -15 cents LCOE - Levelized Cost of Energy PV+BOS+O+M =Total LifeCost ~$4to$5/ Watt =13-15centsLCOE - LevelizedCost of Energy
Local & Remote SCADA over IP Instrumentation Package Included Local & RemoteSCADA over IP InstrumentationPackageIncluded
Galvanized Steel & Thermoplastic Vinyl Polymer Composites is used in most construction materials GalvanizedSteel & ThermoplasticVinyl Polymer Compositesisusedinmost constructionmaterials

B BI IL LL L O OF F M MA AT TE ER RI IA AL LS S: : T Th he e F Fa al lc co on n D DD D- -5 50 05 5 5 5 M MW W S So ol la ar r P PV V G Ge en n U Un ni it t i in nc cl lu ud de es s: :
All mounting hardware for 12,000 PV- 460U a-Si Solar PV panels plus; All mountinghardwarefor 12,000PV- 460U a-Si Solar PV panelsplus;
60 ea. 100 KW Inverters at 480 VAC ea. 3 Phase ** 60ea. 100KWInvertersat 480VAC ea. 3Phase**
60 ea. 100 KVA, 480 to 12 KV 3 Phase Transformer. 60ea. 100KVA, 480to12KV 3PhaseTransformer.
60 ea. 100 KVA, 3 Phase HV Vacuum / Mechanical Relays. 60ea. 100KVA, 3PhaseHV Vacuum/ Mechanical Relays.
1 ea. 6 MVA, 138 KV to 12 KV Delta-Wye Transformer. 1ea. 6MVA, 138KV to12KV Delta-WyeTransformer.
1 ea. 6 MVA, 3 Phase HV Vacuum Relay. 1ea. 6MVA, 3PhaseHV VacuumRelay.
Over Engineered Wire Runs, Trenches and Underground Conduit Service assures copper life. Over EngineeredWireRuns, TrenchesandUndergroundConduit Serviceassurescopper life.
Entry roadways, access roads, service ways, all designed for full access throughout project. Entryroadways, accessroads, serviceways, all designedfor full accessthroughout project.
IOIP & AOIP Dual Layer Security Fences and Gates included in design. IOIP & AOIP Dual Layer SecurityFencesandGatesincludedindesign.
Polymer Soil Erosion Abatements, runoff and drainage water control and ground engineering included. Polymer Soil ErosionAbatements, runoff anddrainagewater control andgroundengineeringincluded.
Best and proper Land Use considers water, runoffs, wildlife, birds, livestock, & native plant flora. Best andproper LandUseconsiderswater, runoffs, wildlife, birds, livestock, & nativeplant flora.
The DD-505 includes all engineering blueprints and our State Registered PE team signoffs for combined
county, state & federal approval of all civil, mechanical & electrical designs and construction plans.
TheDD-505includesall engineeringblueprintsandour StateRegisteredPE teamsignoffsfor combined
county, state& federal approval of all civil, mechanical & electrical designsandconstructionplans.
Site planning with all survey, environmental and construction data for rapid permitting. Siteplanningwithall survey, environmental andconstructiondatafor rapidpermitting.
Lowest Cost Operational & Maintenance (O&M) Budget of any Renewable Generation Source. Lowest Cost Operational & Maintenance(O&M) Budget of anyRenewableGenerationSource.
** <2% Failure Mode for Inverters, MTBF >average ~8 months ea.=30 inverters for 240 month term, with
only five (5) actual replacements & remainder reentered into service as rebuilds or factory swap outs.
** <2%FailureModefor Inverters, MTBF >average~8monthsea.=30invertersfor 240monthterm, with
onlyfive(5) actual replacements& remainder reenteredintoserviceasrebuildsor factoryswapouts.
Can be deployed in as little as 16 months from site plan to the power sale at less than <$150 / MW-H *** Canbedeployedinaslittleas16monthsfromsiteplantothepower saleat lessthan<$150/ MW-H***
A Complete EPC Turnkey Solution Implementing the Future of Utility Scale Large Scale Solar Parks. A CompleteEPC TurnkeySolutionImplementingtheFutureof UtilityScaleLargeScaleSolar Parks.


FGE - Falcon Green Energy
FGE - A Solar Power Developer
100 KiloWatt - 500 KW Rooftop & Parking Solar Systems PO BOX 3321 - Austin, TX 78764-3321
MEDIUM 500KW - 5 MW Solar PV Power Systems for Industry (512) 462-9171
LARGE 5 MW 100 MW Solar PV Power Systems for Utilities Dan.Vogler@FalconGreen.com