You are on page 1of 4

- Curriculum Vitae -

Putut Panji Utomo


I had worked on various project such as on-shore plant like Receiiving Terminal LPG
and small LNG Plant project and also design of new ship projects.
I am proficient in the use of software such as, AutoCAD, Microsoft office, Microsoft
Project and Aveva Marine
I had wide experience for mechanical and pipe engineering design such as specification
and data sheet for main equipment, design for fire fighting system and also preparation
for project executiin. And I also had experience for project engineer that control all of
progress in a project such as preparing and developing schedule, developing and
controlling drawings, maintaining coordination with Client, subcontractors,
procurement and fabrication and Estimating for MTO.
PERSONAL DATA
Place/ date of Birth : Tulungagung, April 9
th
1985
Gender : Male
Martial Status : Single
Religion : Moslem
Residence Address : Jalan Mampang Prapatan IV RT/RW 07/05 No 43 Jakarta Selatan
Phone
Email
: +628113422322
: poetoet_7@yahoo.com
EDUCATION
Bachelor Degree from Sepuluh Nopember Institut of Technology, Major Discipline in Marine
Engineering
Master Degree from Sepuluh Nopember Institut of Technology, Major Discipline in Marine
Engineering
COMPUTER ABILITY
1. Engineering Drawing : Aveva Marine, Naviswork
2. CAD : AutoCAD 2D
3. WP / Spreadsheet : Microsoft Word, Microsoft Excel, Microsoft
PowerPoint, Visio, Microsoft Project,
COURSES & TRAINING
1. English Course at UPT Bahasa ITS, Advanced Level
2. AutoCAD 2000 Course in ITS Surabaya
3. ISO 9001 training in Jakarta by NQA
4. OHSAS 18001 training in Jakarta by NQA
5. Aveva Marine training at PT. DSME Indonesia
6. Naviswork training at PT DSME Indonesia
FOREIGN LANGUAGE SKILL
English : Active (writing and speak)
WORKING EXPERIENCE
Company
Work Period
Job Description
PT. DOK
PERKAPALAN
SURABAYA.
June 2006 July 2006
On the job Training
PT. ALSTOM
Power Energy
System Indonesia
June 2007 July 2007
On the job Training In Manufacturing
Engineering
PT. Citra Panji
Manunggal
April 2008 April 2010
Project Construction Engineer of LPG
SEMARANG Terminal Facility PROJECT
Ensure that project management plan,
project start up check list and standard
operating procedure are complied with
Take particular responsibility to ensure
that Company policy for quality, safety,
and environment is adhered to
Monitoring for installation equipment :
LPG pump, Fire pump, Gas
Compressor, Marine Loading Arm, etc.
Control and monitor the progress and
performance of all functional areas of
the Project Team as per design.
Collect, review and coordinate all
engineering division document such as
Specification, calculation sheet, data
sheet, drawing and technical review.
Commisioning all process and
equipment on Terminal LPG Semarang.
PT. OPSICO April 2010 December 2010
Operation Supervisor for Terminal LPG
Semarang
Supervising the receiving process of
LPG from LPG Tanker at OPSICOs
private port.
Supervising the distribution of LPG from
LPG terminal to LPG Filling Plant by
tank trucks.
Monitoring all equipment working
process as per Standart Operating
Procedure.
Supervise everyday working of
department operating process and
increase efficiency of workers for
various growth oriented programs
DSME.Co.Ltd Dec 2010 Dec 2012
Project Research Engineer for DSME - ITS
Joint Research Project
Carry out Gas & LNG business related
research work
Capture Oil & Gas market trend in
South East Asia
Understand local rules and regulation
on Oil & Gas
Set up local business network in South
East Asia
Testing Pilot Project of Mini LNG plant
model in the DSME Okpo Yard South
Korea
Investigate market of gas demand
specially in Central Java
Design, prelimenary engineering data
document support for mini LNG plant in
Gresik with PT Bayu Buana Gemilang
Design, review of pressurized LNG
storage system
Design, review of process liquefaction
plan in mini LNG plant
Design, layout for hazardous area and
fire fighting system in mini LNG plant
Design, LNG regasification system and
area for costumer site
Design, transportation method from Mini
LNG plant to costumer site.
Development, pressurize LNG ship for
transportation
Design, prelimenary engineering data
document support for mini LNG plant for
PT. PLN Batam
Design, transportation method using
single propeller barge from Batam to
PLTD Siantan in the West Kalimantan
PT. DSME
INDONESIA
Dec 2012 - Now
Technical Operation Engineer
(Project Engineer)
Ensure that project management plan,
project start up check list and standard
operating procedure are complied with
Collect, review and coordinate all
engineering division document as
Specification, calculation sheet, data
sheet, drawing and technical review
Take particular responsibility to ensure
that Company policy for quality, safety,
and environment is adhered to
Bussines Development
Investigated Indonesia oil and gas
business
Investigated mini LNG supply chain
business in Indonesia
Investigated rules and regulation in
Indonesia oil and gas business
Investigated Indonesia power plant
business
Capture power plant market trend in
Indonesia
Investigated Indonesia shipbuilding
industry
ICHTHYS FPSO ~ INPEX
Prepare project execution plan
Design, interface modeling for module
FPSO Ichthys project Australia
Modeling review for module FPSO
Ichthys project Australia
Check and review vendor document of
Ichthys Project
Review specification and datasheet
MARINER SUBMERSIBLE RIG ~
STATOIL
Prepare project execution plan
Design, interface modeling for module
Marineer Project
Modeling review for module Marineer
project
Check and review vendor document of
Marineer Project
Review specification and datasheet

You might also like