You are on page 1of 64

Steve J arvis MEng MCIHT

HDS BIM Coordinator Mott MacDonald


Adding Value through
utilising BIM in the highways
and transportation sector:
Case Studies
The Mott MacDonald BIM definition
A c o-or di nat ed set of pr oc esses,
suppor t ed by t ec hnol ogy, t hat add
val ue t hr ough c r eat i ng managi ng and
shar i ng t he pr oper t i es of an asset
t hr oughout i t s l i f ec yc l e
BIM is more than fabulous 3-D design
London 2012 Olympic Shooting Venue
BIM is more than just stunning 3D visualisation
Virtual world
Real world
Image: Hatch Mott MacDonald
BIM is not just about buildings
Image: Hatch Mott MacDonald
Process/workflow
Data
BIM
Model
BIM is all about information
Deliverables
2D drawings
Schedules
Designers
BIM
Model
BIM is about collaboration
Customers
Suppliers
Contractors
BIM is all about outcomes
BIM
model
Define desired
outcomes
See that they
are delivered
Put in place a PROCESS and audit to make it happen
BIM is for the whole lifecycle
Source: Autodesk
BIM
Model
BIM in asset management
The biggest potential value is over the life of the
asset.
design
build
operate
LifeCycle
Capital
Energy
Inspections
Cleaning
Redecorations
Occupancy
Asset Replacement
Reactive maintenance
Planned maintenance
10 benefits we are bringing with BIM
Better outcomes through collaboration
Enhanced performance
Optimised solutions
Greater predictability
Faster project delivery
10 benefits we are bringing with BIM
Reduced safety risk
Fits first time
Reduced waste
Whole life asset
Continual improvement
Highways has done BIM since the 1990s
Processes
3D model
Sharing
Whole life cycle
Data integration
Interoperability
4D (time)
5D (cost)
nD(carbon, sustainability, etc)
Data rich
GIS
Visualisation
Clash detection
3d model for quantities
Drawings
3D model for
construction
Planning
Facilities management
Etc.
Direct Outcomes: By-products:
Highways has done BIM since the 1990s
Processes
3D model
Sharing
Whole life cycle
Data integration
Interoperability
4D (time)
5D (cost)
nD(carbon, sustainability, etc)
Data rich
GIS
Visualisation
Clash detection
3d model for quantities
Drawings
3D model for
construction
Planning
Facilities management
Etc.
Direct Outcomes: By-products:
Yes
Yes
Yes
Yes
Yes
Partly
Partly
The benef i t s ar e
al r eady her e
London Underground: Victoria Station Upgrade
Project constraints modelled
Design co-ordination
Clash detection
Engineering analysis integration
Bi-directional use of model data between modelling tools
and engineering analysis software
New applications: ground treatment
Clashes and voids eliminated before site works
New applications: ground treatment
Auto report extraction from model listing
unique reference coordinates
J et grout plant selection
Digital setting out
GPS or LPS 3D total station system
Advanced Excavator Control
System works directly from 3D
design data
Working around existing assets
laser scan imported to model
Communication using 3D prints
CDM Workshops & Inductions
Improved visualisation
3D walk-throughs
Construction sequences
tested
Site inductions
Port Mann/ Highway 1
Improvement Project
Vancouver, British Columbia
Project Objectives
Reduce congestion at entry and exit points to
Highway 1;
Reduce travel times for trips across the corridor
and improve connections within and between
communities;
Improve access to and egress from the corridor
for goods movement;
Facilitate the introduction of transit service along
the corridor and the improvement of transit
service across the corridor;
Expand HOV, cycling and pedestrian networks
along or in the vicinity of the corridor
Improve safety for vehicle operators and
passengers, cyclists and pedestrians.
www.pmh1project.com
Project Background and Timeline
Teaming Summer/Fall 2006
RFP Released - J uly 2007
Technical Submittal February 2008
Financial Submittal J uly 2008
Preferred Proponent Announced August 2008
LNTP / Mobilization September 2008
Design Complete Early 2011
Bridge opens to Traffic December 2012
Substantial Completion December 2013
Final Completion December 2014
The Project
Cape Horn Interchange
Key Traffic Capacity
Improvements
Model Based Design
Cape Horn Interchange Civil3D Model
Model Based Design
Model Based Design
3D Design for Bybanen
LRT
Bergen, Norway
Bybanen Operation Dates
Phase 1
(2010)
Phase 2
(2013)
Phase 3
(2015)
Depot
(2015)
Flesland
Terminal
(2017?)
Project 3D Design
Construction
Controls
Mott MacDonald Team Locations
Dublin : Civils / LRT Systems / Coordination
Cork : Roads / Retaining Structures
Croydon : Tunnels
Budapest : Tunnels
Bristol : Geotechnical
Prague : Bridges
Bergen : Project Management
Project 3D Design
Construction
Controls
Project Challenges
Multiple Design Disciplines and
Locations
New Client and Territory for MM
3D from Ground Up
Language
Localisation and Standards
Stakeholders
Sub-consultants
Project 3D Design
Construction
Controls
Design Coordination - ProjectWise
Project 3D Design
Construction
Controls
3D & 2D Workflow
Project 3D Design
Construction
Controls
Preliminary Concept : Agree Basics
3D Coordination : Early Stage review
from all Project Stakeholders in 3D
2D Extractions and Drawings : Once
3D designs clash checked and fully
coordinated
3D & 2D Workflow
Project 3D Design
Construction
Controls
3D PDFs Early Stage Reviews
Project 3D Design
Construction
Controls
3D & 2D Workflow
Project 3D Design
Construction
Controls
Novapoint - Norwegian Design
Project 3D Design
Construction
Controls
Novapoint - Norwegian Design
Water/Drainage/Cabling & Roads & Tunnels
Design Modules
3D Product Libraries
Cross Sections Defined
Project 3D Design
Construction
Controls
Terrains Defined & Design in Plan & Profile
Norwegian Drawing Standards
Quantity Take-offs
Novapoint - Norwegian Design
Project 3D Design
Construction
Controls
Novapoint - 3D Model
Project 3D Design
Construction
Controls
Novapoint - Setting Out
Project 3D Design
Construction
Controls
Setting Out From 3D Model 360 Glue on iPads
Project 3D Design
Construction
Controls
Setting Out From 3D Model
Project 3D Design
Construction
Controls
Information directly from 3D model
Appreciation of construction interfaces
Maintain Project Controls
Setting Out From 3D Model
Project 3D Design
Construction
Controls
Site Clearance
Project 3D Design
Construction
Controls
Site Clearance
Project 3D Design
Construction
Controls
Road & Track Geometry
Project 3D Design
Construction
Controls
Surfaces and Strings in 3D Model
Supplemented with LandXML and Genio
Files
4D Preliminary Construction Sequencing
Project 3D Design
Construction
Controls
Project Controls Define Change
Project 3D Design
Construction
Controls
Project 3D Design
Construction
Controls
Project Controls Define Change
Project 3D Design
Construction
Controls
Project Controls Define Change
Project Controls Define Change
Project 3D Design
Construction
Controls
3D Design for Bybanen LRT
Bergen, Norway

You might also like