TOWN DEVELOPMENT SCHEME 04 [KAMAL VIHAR] PROJECT REPORT
RAIPUR DEVELOPMENT AUTHORITY, BUILDKRAFFT, ENGINEERING & ARCHITECTURE
RAIPUR [CG.] Page 1 RAIPUR [CG.]
1. INTRODUCTION
Raipur Development Authority (RDA) is a Development Authority constituted under Chhattisgarh Nagar Tatha Gram Nivesh Adhiniyam, 1973. Town Development Scheme-4, also referred to as the KAMAL VIHAR, is a Town Development Scheme drawn in accordance with the Chhattisgarh Nagar Tatha Gram Nivesh Adhiniyam 1973, and the Raipur Development Plan 2021(Punarvilokit), [RDP, 2021]. The scheme involves reconstitution of land which is an accepted method of urban development. Reconstitution of land is a process wherein undeveloped urban land is developed due to laying of all urban infrastructure services and utilities, including making provisions as stipulated in the Chhatisgarh Bhumi Vikas Niyam 1984, National Building Code of India 2005, the relevant Development Plan of the city, National Urban Housing and Habitat policy, 2007 and the Chhatisgarh Awas Niti 2003/1995. The process involves partnering with landholders in the scheme area wherein the landholders surrender their undeveloped land to the Development Authority. The Development Authority, in turn Prepares detail layout plans in accordance with the City Development Plan (The Master plan), relevant laws, guidelines and norms, Causes the urban infrastructure development in the scheme area, and Returns developed plots to the land holders who had surrendered their undeveloped land to the Authority.
The urban infrastructure development works include construction of all roads, drains, water supply system, sewerage system, electrical network, street lighting, community open spaces and gardens, bus-stops, fire stations, land reservation for EWS, etc. The entire cost of the infrastructure development works is assessed by the Development Authority and a certain portion of the developed plots is retained by the Authority. The cost of the Infrastructure development works is TOWN DEVELOPMENT SCHEME 04 [KAMAL VIHAR] PROJECT REPORT
recovered by the Authority by sale of these plots retained by it. Therefore, the entire area of land available with the Development Authority after laying the services and facilities as detailed above is divided under two heads: (i) Land pool for financing the infrastructure development [Land retained by RDA]. (ii) Developed plots returned to land holders.
The developed plot of land returned to the land holder is therefore a certain percentage of the original undeveloped land. The developed plot returned to the land owner is the entire developed land available after laying of all infrastructure facilities and utilities and the portion retained by the Authority for financing the project on a no profit no loss basis. The process does not require land acquisition for urban infrastructure development which is laid well before any significant population starts residing in the area.
The object of proposing the Town Development Scheme is to cause controlled urban development of the city in accordance with the City Development Plan (The Master plan), relevant laws, guidelines and norms, in the absence of which the city growth goes unregulated, without appropriate urban infrastructure and without any regard to environmental issues. The aim and the object of the Authority in proposing the Town Development Scheme-4 is to cater to the demands of a rapidly growing city by development of an appropriate urban infrastructure in a well planned township with a desired quality of physical Environment. This will not only cause an improvement in the quality of urban life in Raipur but in the process also definitely improve the environmental status of the city.
The Proposed Town Development Scheme-4 [Kamal Vihar] is an area development project spread over 647.84 Ha, covering parts of villages Tikrapara, Devpuri, Dumartarai, Boriyakhurd and Dunda , Tahisil and District TOWN DEVELOPMENT SCHEME 04 [KAMAL VIHAR] PROJECT REPORT
Raipur. The project has earmarked 169.07 Ha for roads, 170.03 Ha. for parks ,gardens and other utilities, 32.19 Ha. for EWS housing, 6.14 Ha. for schools and 2.23 Ha. for health facilities. All scheme level roads are proposed with dedicated green strips, sidewalks and cycle tracks.
The Physical infrastructure proposed includes construction of:
a. a network of urban roads including roads proposed in RDP 2021 b. a well planned underground drainage network c. water supply network based a Hydro-pneumatic water supply system, d. an underground electrical supply network e. an underground conduit network for future laying of telecommunication network, and f. an environmentally appropriate decentralized sewage treatment system
TOWN DEVELOPMENT SCHEME 04 [KAMAL VIHAR] PROJECT REPORT
2. LOCATION The proposed Town Development Scheme- 4 (Kamal Vihar) is located approximately in the south by south-east region of the city planning area. The scheme area is located between the Old and the New Dhamtari roads (NH- 43), covering parts of village Tikrapara, Devpuri, Dumartarai, Boriyakhurd and Dunda.
Figure 1: The location of the State of Chhattisgarh and Raipur city
Figure 2: The location of proposed Project Area
TDS-04 [KAMAL VIHAR] [Planning area]
TOWN DEVELOPMENT SCHEME 04 [KAMAL VIHAR] PROJECT REPORT
The Town Development Scheme 4 [Kamal Vihar] has been proposed as part of strategy drawn by the Raipur Development Authority for the implementation of the Raipur Development Plan 2021 [Punarvilokit].
The Aims and Objects of proposing the Town Development Scheme 4 [Kamal Vihar] are:
a. Initiate a process for the implementation of the Raipur Development Plan 2021 [Punarvilokit], by taking up urban development works in a part of the planning area b. To cause residential, commercial, cultural, institutional and educational sector developments with adequate urban infrastructure and public amenities including health, sports and recreation. c. To lay an environmentally appropriate urban infrastructure in a city peripheral region to accommodate a rapidly growing city population. d. To cause developments that improves the quality of urban life in Raipur. e. To initiate o process for a planned and a regulated city development and expansion.
The State of Chhattisgarh was carved out of the erstwhile State of Madhya Pradesh on 1 st November 2000 with Raipur as its capital. A new capital city Naya Raipur is being developed about 15 kms from Raipur. This city is envisaged as the administrative and institutional capital of the State, with a long term perspective and goals.. However the setting up of a satellite city Naya Raipur in the vicinity of existing Raipur has not been able to restrict the growing demands of a rapidly increasing urban population in Raipur. In the absence of creation of a planned and an environmentally appropriate urban infrastructure, unauthorized and illegal plotting in the city peripheral areas have become rampant. These illegal residential areas are devoid of any kind TOWN DEVELOPMENT SCHEME 04 [KAMAL VIHAR] PROJECT REPORT
of urban physical infrastructure and the development in these areas gradually takes the shape of an urban slum. In order to restrict an unorganised, unregulated and an environmentally inappropriate growth of the city, The Raipur Development Authority has initiated a planned development of the city by proposing Town Development Schemes on city peripheral areas with development of necessary quality urban infrastructure and facilities to meet the aspirations of the people of the new State. This is proposed to accommodate a rapidly increasing city population and provide for a improved quality of urban life in Raipur. The implementation of Town Development Schemes (TDS) will cause a planned and a regulated city development and expansion incorporating residential, commercial, cultural, institutional and educational sector developments with adequate public amenities and quality urban infrastructure.
Kamal Vihar is, therefore a step towards a planned urban growth of Raipur. The department of Town and Country Planning, Chhattisgarh has prepared a master plan Raipur Development Plan (RDP) 2021 [Punarvilokit] for the development of Raipur. Raipur Development Authority (RDA) is a development authority constituted under Chhattisgarh Nagar Tatha Gram Nivesh Adhiniyam, 1973 for implementation of these development plans.
TOWN DEVELOPMENT SCHEME 04 [KAMAL VIHAR] PROJECT REPORT
Land use of major part of scheme area is residential. However, Recreation and Public semi-public land use have also been proposed in the RDP 2021 [Punarvilokti] in major parts of the scheme area. The land use beyond the southern scheme boundary is predominantly Agricultural. However, major Educational Institutions and Residential sectors have been established in this area. Additionally a major wholesale market called the Mandi is under construction across the North- east scheme boundary, in village Dumartarai.
The entire scheme area and its surroundings are dotted with lakes/ tanks. The largest of these is the Boriya reservoir in village Boriyakhurd. The reservoir is a major storm water retention area formed due to the construction of an earthen bund along the Old Dhamtari Road. This reservoir and its surroundings have been proposed for Recreation land use in RDP 2021 and accordingly this site has been proposed for a major recreational/ water sport zone in the Town Development Scheme in addition to its existing community use.
The scheme area is also surrounded by urban villages the Abadi areas of village Dunda, Tikrapara, Devpuri and Dumartarai. The Krishna Public School, spread across 3.69 Ha has been functioning almost in the middle of the scheme area for quite some time now. It is served by the existing Devpuri- Dunda road. Scattered constructions, both large and small [Totaling 70] exist across the scheme area. Some of these constructions exist on the proposed road alignments. The scattered/ isolated constructions existing on the proposed road alignments have been identified and have either been dismantled or are proposed to be dismantled.
Layouts approved in the recent past but not developed , are scattered and few. These have been retained and not disturbed. TOWN DEVELOPMENT SCHEME 04 [KAMAL VIHAR] PROJECT REPORT
1. Total notified scheme area 879.22 Ha. 2. Area under agricultural land use (-) 110.50 Ha. 3. Area under existing 'Abadi' [Abadi' (-) 111.36 Ha. areas excluded from the scheme area] 4. Area under commercial 'Mandi' excluded (-) 9.52 Ha. From the scheme Total available scheme Area 647.84 Ha.
Part (B) TDS-4 level Area Statement
1. Total available scheme area 647.84 Ha. 2. Area under Recreational land use (a) Regional park i/c Boriya Lake (-) 95.23 Ha. (b) City park (-) 30.93 Ha.
3. Area under existing water bodies (-) 1.08 Ha. 4. Area under Cremation ground / graveyard (-) 3.27 Ha. 5. Area under Roads. (a) R.D.P. level roads. (-) 54.12 Ha. (b) T.D.S. level roads (-) 19.92 Ha. 6. Area under commercial (TDS level) (a)Central Business District[ C.B.D.] (-) 8.02 Ha. (b) Commercial strips (-) 1.79 Ha. 7. Areas under approved layout/ Existing Construction. (-) 38.04 Ha. 8. Area provided for E W S (-) 32.19 Ha. 9. Area Available for Residential sectors 363.24 Ha. (Net available planning area) TOWN DEVELOPMENT SCHEME 04 [KAMAL VIHAR] PROJECT REPORT
Part (C) Land use analysis for net available planning area 1. Net available planning area (B9) 363.24 Ha. 100.00 % 2. Area under reconstituted Residential /PSP/Composite plots 213.94 Ha. 58.90 % 3. Area under reconstituted Commercial [Local Shopping Centers] 6.26 Ha. 1.72 % 4. Area under education: Nursery, Primary High school 6.26 Ha. 1.72 % 5. Area under Health: Health Centre (Dispensary, Nursing Home 2.23 Ha. 0.61 % 6. Area under public utilities and amenities (Bus Stand/ fire station, electric sub-station etc.] 2.49 Ha. 0.68 % 7. Area under Internal Roads [Sector level roads] 95.03 Ha. 26.16 % 8. Area under gardens and play fields 37.03 Ha. 10.19 % Total C2 to C8 363.24 Ha. 100.00 % 9. Area under EWS plots 32.19 Ha. 15.05% [Of C2] Part [D] Land use statement of TDS-4 I. TOTAL SCHEME AREA 647.84 Ha. (i) Less approved Layout & Existing Construction (-) 38.04 Ha. 609.80 Ha. (ii) Area under Roads 169.07 Ha. (iii) Community open spaces i/c Regional and city parks/utility 170.03 Ha. (vi) Area provided for E.W.S. 32.19 Ha. (v) Area provided for Commercial use 16.06 Ha. (vi) Area provided for reconstituted PSP use 24.81 Ha. (vii) Area provided for Composite Land use 8.38 Ha. (viii) Area provided for reconstituted plotted (Residential) development 189.25 Ha. 609.80 Ha. TOWN DEVELOPMENT SCHEME 04 [KAMAL VIHAR] PROJECT REPORT
6. PLANNING AND MANAGEMENT OF TDS-04 [KAMAL VIHAR]
Town Development Scheme -04 [Kamal Vihar] is a town development scheme as described in Chhattisgarh Nagar Tatha Gram Nivesh Adhiniyam, 1973. All development works proposed are in accordance with the Raipur Development Plan 2021 [Punarvilokit], Chhattisgarh Bhumi Vikas Niyam 1984 and National Building Code of India 2005. Once the infrastructure is laid down and made fully operational, the project shall be consigned to Raipur Municipal Corporation, for further management. The scheme is being implemented in accordance with the reconstitution of land method as prescribed in section-50 of the Chhattisgarh Nagar Tatha Gram Nivesh Adhiniyam 1973.
The process, as laid down in the said act involves following proposals:
a. Define and demarcate the areas allotted to / reserved for public purpose. b. Demarcate the reconstituted plots.* c. Evaluate the value of original and reconstituted plots. d. Determine whether the areas reserved for public purpose are wholly or partially beneficial to the residents within the area of the scheme. e. Estimate and apportion the compensation to or contribution from the beneficiaries of the scheme on account of the reconstitution of the plot and reservation of portions for public purpose. f. Evaluate the increment in value of each reconstituted plot and assess the development contribution leviable on the plot holder: Provided that the contribution shall not exceed half the accrued increment in value. g. Evaluate the reduction in value of any reconstituted plot and assess the compensation payable thereafter.
TOWN DEVELOPMENT SCHEME 04 [KAMAL VIHAR] PROJECT REPORT
* The land owners in the scheme area are allotted a developed plot in the scheme in the lieu of their original land. The area of plot allotted to individual land owners is a certain percentage of the original land. Following land allotment formula has been followed in the Town Development Scheme -04 [Kamal Vihar]:
ORIGINAL PLOT AREA ALLOTTED PLOT AREA 90 120 52.50 SQM. 120-150 60.00 SQM. 150-200 71.875 SQM. 200-240 86.25 SQM. 240-270 96.875 SQM. 270-290 102.50 SQM. 290 and above 35% of original plot area
Land holders with area of their land below 90 sqm have not been allotted a developed plot, instead they have been proposed for payment of appropriate compensation through land acquisition.
The minimum size of a developed plot proposed in the scheme is 52.50 sqm, which in turn means that the maximum percentage of developed plot returned to a scheme beneficiary is 58.33%. [For an original undeveloped land area of 90 sqm.] The minimum percentage of developed plot returned to a scheme beneficiary is 35 %. All scheme beneficiaries holding an original undeveloped land area of 290 sqm or more have been allotted either a single or multiple plots, in accordance with their specific request according to this ratio.
Scheme beneficiaries holding land in residential land use areas have been allotted a residential plot[s], while those holding land in the PSP land use areas, or the composite land use areas have been allotted a PSP or a composite land use plot[s], respectively.
TOWN DEVELOPMENT SCHEME 04 [KAMAL VIHAR] PROJECT REPORT
While allotting plots it has been ensured that the allotted plot[s] to any beneficiary lies in the village where the original land was held. Care has also been taken to keep the allotted plot within a distance of 250 m from the original land. Beneficiaries having land on existing major roads have been allotted plots on the road on which the original land was held. Beneficiaries holding land in a recreational land use area have been allotted a residential plot in accordance with the allotment slab detailed in Chapter 5. However in this category, the restriction of allotting final plot in the same village and keeping this allotment within 250 m from the original land has not necessarily been adhered to.
Community Open areas and amenities in each sector have been provided in accordance with Chhattisgarh Bhumi Vikas Niyam, 1984/ National Building Code, 2005 and these have been well spread out. Existing cremation grounds/grave yards have been retained but with an increase in the existing area.
Road widths in the sectors have been provided in accordance with the guidelines stipulated in the Chhattisgarh Bhumi Vikas Niyam, 1984.
The existing Guidelines do not stipulate any land reservation for the economically weaker sections in Town Development Schemes. However 15% area of developed plots in each sector has been allotted for this purpose.
Adequate land reservations, based on detailed engineering designs have been made for the water, sewerage, electrical and IT infrastructure.
Water demand of 32 MLD [ultimate demand] for the scheme shall be met through the Bhatagaon WTP, while the total connected electrical load of 76 MVA shall be met through the Doma substation. The existing electrical TOWN DEVELOPMENT SCHEME 04 [KAMAL VIHAR] PROJECT REPORT
infrastructure in the scheme area feeds the Abadi areas in the vicinity of the scheme. This shall be retained by rerouted and laying underground cables.
RDA has retained approximately 10% of land, so as to sell the same and recover the cost of proposed infrastructure development.
TOWN DEVELOPMENT SCHEME 04 [KAMAL VIHAR] PROJECT REPORT
The Town Development Scheme-04 [Kamal Vihar] has been planned as a modern urban township to cater to the future growth of Raipur. The guiding vision in planning the scheme is to provide a decent, healthy and a socio- culturally improved and vibrant quality of urban life. The stress has been on creating a state-of-the-art urban infrastructure for the future needs of its population.
The scheme is envisaged to be: Set in its natural surroundings thus conserving its existing landscape. Lively and vibrant in character with shopping malls, multiplexes, food courts, restaurants and other intensive urban activities and recreational areas. A visually pleasing cityscape in tune with the aesthetic principles of urban design and landscaping. Equipped with state of the art physical, social and economic infrastructure, providing the scheme with high degree of urban convenience and cleanliness and thus with providing an investor friendly environment. An environmentally conscious urban zone caring for a sustainable living.
TOWN DEVELOPMENT SCHEME 04 [KAMAL VIHAR] PROJECT REPORT
The general topography of the scheme area is a gently sloping land with contours that have high points in village Tikrapara and Devpuri and low areas around the Boriya reservoir and the scheme boundry at the south. The area is well drained and not very long ago was used for agricultural purposes.
GEOLOGY
The outcrops in the study area belong to the Chhattisgarh Supergroup, which is upper proterozoic in age. The geological succession is as follows: - Sandstone/ Shale and Chandi Limestone belonging to Raipur group. - Karstification in stromatolithic. - Limestone is prominent.
SEISMICITY
The project site is located in central India that falls in seismic zone II [IS 1893, Part I, 2002] and therefore has a very low risk of any damage due to seismic activity. No reports of any significant earthquake is available, although the area has experienced a few occasional minor tremors that may be associated with earth quakes originating in the Great Himalayan Boundary Fault Zone. However possibilities of earthquakes of slight intensity due to local crust movements/adjustments cannot be ruled out.
SOIL
The upper 2.5m-3.5m of the crust is mostly black cotton soil/sandy clay with an underlying layer of yellow shale with gravel, light reddish clay with gravel and clay with lime kankar, extending to about 3.0-3.5m. Beyond this depth of approximately 5.0m- 7.0m rock was encountered which extended unto 15m depth. Investigations beyond this depth were not carried out. Soil samples were Alkaline with a pH range of 6.7 to 7.3 and high organic content. TOWN DEVELOPMENT SCHEME 04 [KAMAL VIHAR] PROJECT REPORT
All existing water bodies in the scheme area have not only been retained but are also proposed to be conserved at an appropriate ecological level. All waste water is proposed to be treated and the effluent water is proposed to be used to maintain the ponds at an appropriate ecological level. Effective pond management system shall help in ground water recharging.
WATER SUPPLY
Provision of safe, adequate water is a basic necessity for the healthy living of a community. On the basis of the total water, identification of the water source and storage reservoirs have been estimated. The total water demand for the scheme shall be met through the Municipal water-works at Bhatagaon.
Presently, the area is rural with ponds, small reservoirs and canals. It is also dotted with small to very large water tanks, which are used by the villagers for ablutions, drinking, domestic purpose and for irrigation.
WATER QUALITY
All water flowing in the ponds in the scheme area shall be treated to meet standards for inland surface waters in accordance with norms laid down by CPCB.
ELECTRICAL SUPPLY
The entire 76 MVA electrical demand shall be met through the 220 kVA substation at village Doma.
CLIMATE AND METEOROLOGY
The climate of the area is moderate and tropical, characterized by a hot summer from March to mid June, a humid monsoon or rainy season stretching from mid June to September, a short pleasant post monsoon during October TOWN DEVELOPMENT SCHEME 04 [KAMAL VIHAR] PROJECT REPORT
and November, and a cool winter spanning between December to February. Therefore, climatologically, four seasons viz. summer (pre-monsoon), monsoon, post-monsoon and winter could be deciphered comprising the following months.
Summer : March, April, May, max. 48 deg. C Monsoon : June, July, August, September Post-monsoon : October, November Winter : December, January, February, Min. 7 deg. C
RAINFALL
The average annual rainfall in the area is around 1170mm. Rains are predominant during July and August with the monsoon beginning in mid June and extending to September.
TOWN DEVELOPMENT SCHEME 04 [KAMAL VIHAR] PROJECT REPORT
The Final Town development Scheme was approved by the Department of Town and Country Planning, Raipur, vide its Memo No.4383 dated 02.07.2010
Environmental Clearance was obtained from the State Level Environment Impact Assessment Authority, Chhattissgarh vide its letter No. 648/SEAC- CG/EC/Housing/RYP/10, dated 25.01.2011.
Revised Final Town Development Scheme [R1] was approved by the Government of Chhattisgarh on 24.11.2011vide its Memo no 6599.
REVISED FINAL LAYOUT PLAN [R1] A Revised Final Layout plan was prepared by the Raipur Development Authority, Raipur and submitted to The Director, Town and Country Planning, Chhattisgarh, for approval.
Revision in the Final [approved] layout was necessitated due to:
1. The directive from the State Government to incorporate one higher slab plot size to all applicable scheme beneficiaries who consented for such an option. 2. The Raipur Development Authority had made an application for changes in land use in parts of the scheme area as under [a] Residential to Recreational and [b] An equivalent area from Recreational to Residential
TOWN DEVELOPMENT SCHEME 04 [KAMAL VIHAR] PROJECT REPORT
This request was turned down by the GoC, and therefore a need to change the scheme Layout plan.
Changes made in the approved final layout plan to prepare the Revised final layout plan [R1]
[1] Each sector was planned to accommodate one upper slab plot to applicable land holders who opted for the same. [2] Each Sector was planned to accommodate all applications received and verified in cases of Sub- Division [Batankan] of original Land, where such Sub- division was made before The Draft Notifications for the Town Development Scheme. [3] Applications of land holder wanting their final plots to be allotted adjacent to each other were accommodated wherever feasible. [4] Applications of land holders requesting to rectify the area of their original land [and consequently area of Final plot] was verified and incorporated in the revised final layout. [5] Applications of land holders desiring a different plot size than was allotted to them were verified and incorporated in the revised final layout wherever feasible. [Keeping the final total plot area same as applicable]. [6] Applications received and verified for corrections in name were incorporated in allotment forms. [7] Land use: The land use change from recreational to residential and residential to recreational requested by RDA was not accepted by the GoC. Sector-1 was therefore revised with its location in the Revised Final Plan in accordance with the residential land use area as per Raipur Development Plan 2021 [Punarvilokit]. Location of City Park (recreational) was retained as provided in the Raipur Development Plan 2021 (Punarvilokit). TOWN DEVELOPMENT SCHEME 04 [KAMAL VIHAR] PROJECT REPORT
[8] Scheme Boundary/ Alignment of Ring Road-4: The Scheme Boundary and the alignment of Ring road-4 was carried out by the officials of the Revenue Department. The Final Revised Layout Plan [R1] was drawn in accordance with this demarcation at site.
Changes made in the approved Revised final layout plan [R1] to prepare the Revised final layout plan [R2]
[1] A 45 m wide TDS road has been introduced to avoid the dismantling of large number of existing construction if MR 21 were to be constructed as provided for in the Master Plan. This means that for a large part of the scheme area, RDA is constructing the MR 21. However where its alignment falls over densely constructed areas, this road is not being constructed and instead, a new TDS road has been provided so as to achieve the required connectivity. [2] Areas reserved for sector level infrastructure development have been relocated and reorganized in some parts, ensuring better connectivity and efficiency of services. [3] Changes due to change in area of water bodies as per survey have been incorporated. Revenue land records provide for a smaller water body. However the water body presents at site is larger and therefore it is being retained in this revised layout as it exists. [4] Changes in layout due to re-alignment of sector level roads in some parts have been incorporated in revised final layout [R2]. [5] Applications of land holders desiring a different plot size than was allotted to them were verified and incorporated in the revised final layout [R2] wherever feasible. [Keeping the final total plot area same as applicable]. [6] Applications received and verified for corrections in name were incorporated in allotment forms. TOWN DEVELOPMENT SCHEME 04 [KAMAL VIHAR] PROJECT REPORT
[7] Scheme Boundary/ Alignment of Ring Road-4: The Scheme Boundary and the alignment of Ring road-4 was carried out by the officials of the Revenue Department. The Final Revised Layout Plan [R2] has been drawn in accordance with this demarcation at site.
10. INFRASTRUCTURE FACILITIES IN TDS-4:
All roads in the scheme are proposed as flexible pavements, and have been designed in accordance with the various provisions of the relevant IRC codes and guidelines. ROADS: SCHEME LEVEL:
TYPE LENGTH PAVEMENT FACILITIES 75 M (Ring road 4 & bypass road) 4146 M (3346 + 800) 4 Lane, main carriage way [2 lanes for each direction] + 2 lane service roads on each side. Street lighting, utility corridor and ducts, u/g drains, median, green verges, and footpaths cum cycle tracks. 45 M 1675 M 4 Lane, main carriage way [2 lanes for each direction]. Street lighting, utility corridor and ducts, u/g drains, median, green verges, and footpaths cum cycle tracks. 30 M 6434 M 4 Lane, main carriage way [2 lane for each direction] Street lighting, utility corridor, u/g drains, median, green verges, and footpaths cum cycle tracks. 24 M 1658 M 2 Lane, main carriage way [1 lane for each direction] Street lighting, utility corridor, u/g drains, median, green verges, and footpaths cum cycle tracks. 18 M 4515 M 2 Lane divided carriage way.
Street lighting, utility corridor, u/g drains, median, green verges, and footpaths cum cycle tracks. TOWN DEVELOPMENT SCHEME 04 [KAMAL VIHAR] PROJECT REPORT
TYPE LENGTH PAVEMENT FACILITIES 18M 16290 M 2 Lane main carriage way.
Street lighting, utility corridor, u/g drains, median, green verges, and footpaths cum cycle tracks. 12M 34980 M 2 Lane main carriage way. Street lighting, utility corridor, green verge, u/g drains. 9M 14820 M Single Lane main carriage way.
Street lighting, utility corridor, u/g drains. 7.5M 9960 M Single Lane main carriage way.
Street lighting, utility corridor, u/g drains.
STORM DRAINS:
An efficient underground storm sewer network consisting of RCC hume pipes, cc brick manholes, precast kerb inlet and kerb inlet chambers along all roads has been proposed. The design for the drainage network has been done in accordance with the CPHEEO manual and IRC SP50, Guidelines on Urban Drainage.
WATER SUPPLY:
The Total water demand has been assessed at 32 MLD, which shall be met through the Bhatagaon WTP. A dedicated DI pumping main from the WTP to the zonal reservoirs [Five numbers]is proposed to be laid. A hydro-pneumatic water supply system for 24 x 7 supply has been proposed. The distribution network shall consist of u/g DI pipes. Water supply provision has been made as under: For plots upto 200 sqm in area : 135 liter/ person/ day. For plots above 200 sqm in area : 150 liter/ person/ day. TOWN DEVELOPMENT SCHEME 04 [KAMAL VIHAR] PROJECT REPORT
The designs have done in accordance with the recommendations of the CPHEEO Manual on Wastewater Treatment. The network proposed consists of SN 8, PE 100 HDPE pipes for sanitary sewers upto 250 mm dia., beyond which the sewers proposed are RCC NP3 hume pipes. Manholes proposed consist of CC brick masonry/ precast manholes. The decentralized system has been proposed, using the recently approved FBAAS technology. A total of 28.8 MLD sewage is proposed to be treated through seven STPs located strategically across the scheme area..
Treated effluent water [Treated sewerage water, TSE] is proposed to be recycled and used for maintaining the existing water bodies in the scheme area, meet the irrigation requirements of proposed gardens and green verges on roads and to meet the fire demand of the scheme area. TSE network consists of u/g SN 8, PE 100 HDPE pipes.
ELECTRICITY
The total power demand of 76 MVA is proposed to be met through the Doma Substation. A 132 KV transmission line from Doma to Kamal Vihar has been proposed. The infrastructure proposed consists of a 132/33 KV substation, a 33/11 KV substation and HT/ LT buried cables laid to complete the system upto individual plots. The power requirement has been assessed as under: Residential : 50w per sqm Commercial/PSP : 100 w per sqm.
TOWN DEVELOPMENT SCHEME 04 [KAMAL VIHAR] PROJECT REPORT
TELECOMMUNICATION INFRASTRUCTURE IT conduits have been laid in accordance with IS 14930(Part 2)-Conduit System for electrical and communication installation. Two separate conduits have been laid for two service provider to lay their IT cables through conduits on a later stage. Five exchanges have been identified by BSNL and Airtel within scheme area. Chambers have been provided at every 20-30m interval for maintenance and to provide service house connection. The IT Conduit network been laid is so designed to provide option of two service provider to every plot owner.
TOWN DEVELOPMENT SCHEME 04 [KAMAL VIHAR] PROJECT REPORT
The entire cost of infrastructure development works, both scheme level as well as sector level, is proposed to be recovered through disposal of land available with RDA in the scheme [infrastructure land pool], since the scheme beneficiaries have been exempted from paying any development cost.
RDA proposes to make following corrective modifications on the base land rate in keeping with its land use and the market values of land of different land use in the vicinity of the scheme area. The base land rate shall be the rate of residential plots. The rates derived here are general average rates and the same may vary based on the location of different plots in the various sectors as well as the sector itself.
MECHANISM FOR RATE FIXATION AND DISPOSAL OF LAND WITHIN THE PROJECT AREA.
The rates as derived above are the mean average rates over the disposal lifecycle of the project and therefore shall require modifications and adjustments from time to time. The Authority has not received any grant from any source for the execution of the infrastructure development works. It is therefore, important to achieve the above mean average rates so that the entire cost of the scheme may be duly recovered from disposal of land pool retained by the Authority. The Authority shall need to work out a model for land disposal so as to meet its entire financial commitments, including repayment of borrowings. The disposal rates shall also meet the sentiments of the market, in order to make the disposal itself viable. The Chief Executive Officer, Raipur Development Authority, shall therefore constitute a committee under his chairmanship for this purpose. This committee shall consist of the following members:
1. Joint Director, Town and Country Planning, Raipur. 2. The Addl. Chief Executive Officer, RDA 3. The Chief Engineer/Superintending Engineer/Technical Consultant, RDA 4. An officer, not below the rank of a Dy. Collector, to be nominated by the Collector, Raipur. 5. Assistant Engineer [Planning], RDA 6. The Finance Officer/Accounts Officer of the Authority 7. Revenue Officer of the Authority/Tahsildar, Raipur, 8. Consultant, TDS-4 [Kamal Vihar] 9. Consultant for Financial Monitoring of the Project. 10. Expert - Marketing / Expert Finance, Project Support Consultant.
The Land rate fixation committee, constituted as above shall meet periodically, as approved by the CEO, RDA and shall make its TOWN DEVELOPMENT SCHEME 04 [KAMAL VIHAR] PROJECT REPORT
recommendations regarding the land disposal rates, i.e. the upset prices for a defined period of time. The decision of the committee shall be based on sound marketing and finance policy in order to ach ieve the best possible rates during land disposal phases so that the Authority is able to fully recover the entire cost of the scheme from disposal of lands it has held for the purpose. In this regard the Committee shall be fully empowered to adopt any existing policy/rule prevalent in Naya Raipur Development Authority or The Chhattisgarh Housing Board or any other State in order to optimize the financial returns from the scheme.