You are on page 1of 6

Report No.

:
Working Time: -
Date:
Weather:
Prepared By: Verified / Checked By: Reviewed By PMT:
Name: Taufik Date: Name: Date: Name: Date:
DAILY REPORT
MLNG NEW BOILER (MNB) PROJECT
WEATHER TIME RECORD
Time 0700 0730 0800 0830 0900 1230 0930 1000 1030 1100 1130 1200
1800 1830
Rain
Time 1900 1930 2000 2030 2100
Time 1300 1330 1400 1430 1500 1530 1600 1630
0730 1830
1700 1730
Rain
Raining Cloudy
6 May, 2013
0130 0200 0230 0300 0330
2130 2200 2230 2300 2330 0000 0030
Rain
PREVIOUS DAY ACTIVITIES
Clear Sunny
Rain
0400 0430 0500 0530 0600 0630 Time 0100
ACTIVITY ID
PLAN FOR TODAY ACTIVITIES
1
2
3
Welding Loose part for Furnace Rear Wall.
Welding the lifting frame & stiffener for furnace rear wall at Boiler area.
4
PLAN FOR NEXT DAY ACTIVITIES
Mobilize ducting to MNB area. - 2 trip
Boiler Bank Tube checking & Marking.
Steamdrum alingment works.
6/5/13
Remarks: Area of concern:
Install step track for Secondary structure at Boiler Area
Install & bring in the grating for main drum tower to Boiler area.
Welding fins for Furnace Left Side Wall.
Welding loose part for Furnace Left Side Wall.
Cleaning Boiler Bank Left & Right Side Wall.
Alingment work for Steamdrum at Boiler Area.
- Off day (Election Day)
Contractor: Date:
REMARK
1 Coring machine
TOOLS AND MACHINERIES REPORT
MLNG NEW BOILER (MNB) PROJECT
SYNERLITZ 17/11/2012
NO. ITEM DESCRIPTION QTY.
WORKING
HOURS
WORK DESCRIPTION
3 Bar bending machine
2 Concrete drilling machine
5 Bar cutting machine
4 Scanning Machine
7 Piling machine
6 Welding Machine
9 Crane-45T
8 Crane-25 T
11 Excavator
10 Backhoe
13 Concrete cutter
12 Concrete hacker
15 Plate compactor
14 Roller compactor
17 Water pump
16 Grout pump
19 Mixer
18 Air compressor
21 Spot light
20 Gen set
23 Grinder
22 Hacker
25 5 ton lorry
24 1 ton lorry
27 Dump truck
26 10 ton lorry
29
28 Crane 200T
30
Sub Contractor:
Date: Day:
Director 0
Manager 2 2
Project Engineer 2 2
Project Controller 0
Safety 1 1
Supervisor 1 2 3
Coordinator 2 2
QA/QC 1 1
Chargeman 0
Admin Staff 1 1
Material Controller 1 1
Tea Lady 0
Security 0
Vendor 0
Driver 0
.
.
.
9 4 0 13
CIVIL WORK
Work Leader 0
Civil Foreman 0
Carpenter 0
Barbender 0
Painter 0
Plaster 0
Surveyor 0
Mason 0
Bricklaying & plaster 0
Welder 0
Fire Watcher 0
General worker 0
Piling Worker 0
.
TANK ERECTION WORK
Work Leader 0
Foreman 0
Fitter 0
Rigger 0
Semi Skilled 0
Welder 0
Painter 0
Fire Watcher 0
General worker 0
.
.
PIPING WORK
Work Leader 0
Piping Foreman 0
Monday, May 06, 2013
DAILY MANPOWER REPORT
MLNG NEW BOILER (MNB) PROJECT
Boiler
MANPOWER
B NB F SUB TOTAL
DIRECT
INDIRECT
Sub Contractor:
Date: Day: Monday, May 06, 2013
DAILY MANPOWER REPORT
MLNG NEW BOILER (MNB) PROJECT
Boiler
MANPOWER
B NB F SUB TOTAL
Piping Fitter 0
Piping Rigger 0
Piping Semi Skilled 0
Welder 0
Painter 0
Fire Watcher 0
General worker 0
.
.
ELECTRICALWORK
Work Leader 0
Electrical Foreman 0
Electrician Fitter 0
Electrician Semi Skill 0
Welder 0
Fire Watcher 0
General worker 0
.
.
INSTRUMENT WORK
Work Leader 0
Instrument Foreman 0
Instrument Filter 0
Instrument Semi Skill 0
Welder 0
Fire Watcher 0
General worker 0
.
.
BOILER ERECTION WORK
Work Leader 2 2
Foreman 5 5
Fitter 11 11
Pipe Fitter 11 11
Welder 5 5
Rigger 6 6
Semi Skilled 8 8
Insulation 0
Millwright 1 1
Painter 0
Fire Watcher 2 2
General worker 3 3
.
.
WTP ERECTION WORK
Work Leader 0
Sub Contractor:
Date: Day:
Director 0
Manager 2 2
Project Engineer 2 2
Project Controller 0
Safety 1 1
Supervisor 0 2 2
Coordinator 2 2
QA/QC 0 0
Chargeman 0
Admin Staff 1 1
Material Controller 1 1
Tea Lady 0
Security 0
Vendor 0
Driver 0
.
.
.
7 4 0 11
CIVIL WORK
Work Leader 0
Civil Foreman 0
Carpenter 0
Barbender 0
Painter 0
Plaster 0
Surveyor 0
Mason 0
Bricklaying & plaster 0
Welder 0
Fire Watcher 0
General worker 0
Piling Worker 0
.
TANK ERECTION WORK
Work Leader 0
Foreman 0
Fitter 0
Rigger 0
Semi Skilled 0
Welder 0
Painter 0
Fire Watcher 0
General worker 0
.
.
PIPING WORK
Work Leader 0
Piping Foreman 0
Monday, May 06, 2013
DAILY MANPOWER REPORT
MLNG NEW BOILER (MNB) PROJECT
Boiler
MANPOWER
B NB F SUB TOTAL
DIRECT
INDIRECT
Sub Contractor:
Date: Day: Monday, May 06, 2013
DAILY MANPOWER REPORT
MLNG NEW BOILER (MNB) PROJECT
Boiler
MANPOWER
B NB F SUB TOTAL
Piping Fitter 0
Piping Rigger 0
Piping Semi Skilled 0
Welder 0
Painter 0
Fire Watcher 0
General worker 0
.
.
ELECTRICALWORK
Work Leader 0
Electrical Foreman 0
Electrician Fitter 0
Electrician Semi Skill 0
Welder 0
Fire Watcher 0
General worker 0
.
.
INSTRUMENT WORK
Work Leader 0
Instrument Foreman 0
Instrument Filter 0
Instrument Semi Skill 0
Welder 0
Fire Watcher 0
General worker 0
.
.
BOILER ERECTION WORK
Work Leader 1 1
Foreman 5 5
Fitter 11 11
Pipe Fitter 11 11
Welder 5 5
Rigger 6 6
Semi Skilled 8 8
Insulation 0
Millwright 1 1
Painter 0
Fire Watcher 2 2
General worker 3 3
.
.
WTP ERECTION WORK
Work Leader 0

You might also like