You are on page 1of 47

PROFILE

RAJA SURYA

An Introduction

Rajasurya Engineering Enterprises, a proprietary, one of the leading


concern, in the field of Engineering, Detail Engineering, Mechanical, Electrical,
Civil works and Erection & Commissioning of Power Plant Equipments.

Rajasurya was established in the year 1999 and today, it has grown up to a
level of undertaking any challenge in to Engineering.

Rajasurya is a well knit Organization aspiring to do a cost effective, efficient


and reliable business.

“Time and Quality” are the principles and this alone has been the ‘Mantra’ of
our development.

Rajasurya has got its head quarters at Chennai, equipped with latest
technological background, infrastructure and a healthy financial resource.

A well-trained and experienced team of engineers is the asset of Rajasurya.

Power, Petroleum and Process are the key areas in developing a nation and
Rajasurya is marching firmly and successfully towards these major sectors in a
remarkable way.
Our strength and facilities:

 The core group consists of talented engineers supported by a panel of


specialists in various disciplines.

 Familiarity with ISO 9000 requirements

 RAJASURYA has link-ups in to manufacturing of components and to design


products.

 Spacious office located in Chennai with all modern office equipment and
Machinery.

Advantages working with RAJASURYA :

All our professionals have,

 solid work experience with leading MNC’s in the areas of boilers and auxiliaries.

 Full familiarity with ASME, BS, DIN and other international codes and standards.

 Excellent contacts with Indian customers and state / central government agencies.
OUR CAPABILITIES

We offer the following Services

CONSULTANCY IN POWER PLANTS & PROCESS INDUSTRIES

 Detail Engineering

 Piping Layout Drawings

 Piping Isometric Fabrication drawings

 Structural Drawings

 Platforms ,Duct Supports

 Platforms, Stringer, Gangway, Railings for all platforms

 Preparation of Schematic Drawings,

 Instrumentation Drawings, etc.,


IN CONTRACTS:

 Annual Maintenance Contracts

 Heavy Pumps Erection

 Electrical Works

 Control Panel Erection

 Control Boxes Erection, Stand Fabrication

 Painting Works

 Oil Guns Servicing

 Hot Well Erection

 Condenser Tube Renewal

 Hydrogen Cooler Cleaning and Erection

 Baffle Plate Fabrication

 Piping System Erection

 Coal and Vapour Piping Erection

 Dampers Erection

 Erection of WIND BOX Assembly

 Erection of Fans

 Erection Fuel Firing system

 Erection HFO System

 Main steam Supports Erection

 Overhauling of Pumps

 Erection of Air Pre Heater Tubes

 Sea Water Pipes Re Routing

 Erection of Steam Blowing Piping


 HP Heater, LP Heater , Ejector, M.O. Cooler Tube Renewal and Erection

MANUFACTURING & SUPPLY


 Guillotine Gates

 Oil Guns for 110 MW

 Tilting Spares

 Coupling Bolts

 Raw Coal Run back System

 Oil Filters

 Oil Strainer For Turbine

 Semi Circular Doors for Ball Mills

 Universal Coupling for Main Steam Stop valve Actuator

 Water Box for 110MW Units

 Water Box doors for 110MW Units

 Oil Nozzle Tip

 Supply of HT Studs and Nuts for control vale inter connection Pipes

 Stringer Steps for Conveyor System

 SS Mesh Oil Strainer

 Thrust Block and Cap Nuts for Boiler Drum Man Hole Doors

 Bearing Cooling Coils for 110MW Units

 Modified Re Circulation Dampers for Mill Plants


 Bearing Cooling Coils for M.C. Pumps

 Plat form Grills for CWS System

MAJOR RESOURCES AVAILABLE WITH RAJASURYA

Sl.No Category No. of Persons


.

1. Project Managers 1

2. Deputy Project Managers 2

3. Engineers 2

4. Supervisors 4

5. Material Controller 2

6. Formen 2

7. Fitters 3

8. Qualified Welders 5

9. Grinders & Gas Cutters 5

10. Riggers 10

11. Helpers (Semi-skilled) 10

12. Khalasis 15

13. Unskilled Labours 20


Note: Additional requirement of manpower in any Category shall be arranged as per work
content either locally or from other areas.

OUR MACHINERY

QTY. IN

Sl.N DESCRIPTION Nos.

o
1. Center Lathe 8 feet 01 No.

2. Center Lathe 12 feet 01 No.

3. Center Lathe 6 feet 01 No.

4. Radial Drilling Machine 01 No.

5. Portable Drilling Machine 01 No.

6. Metal cutting machine 01 No.

7. Shaping machine 01 No.

8. Table grinding machine 01 No.

9. Welding machine 03 Nos

10. Bug Cutting machine 01 No

11. Magnetic drilling Machine 02 Nos


Sl.No. Name of Work Work order / Letter Ref. Duration Clients Name

DESIGN ORDERS
1. Rate contract for OFF BHEL:PC:PUR:RC:001 1 year BHEL-CHENNAI
LOADING of Engineering Dt:16.08.2003
Drawings

2. Rate contract for OFF BHEL:PC:PUR:RC:3012 1 year BHEL-CHENNAI


LOADING of Engineering Dt:27.01.2004
Drawings

3. Rate contract for OFF PC-450-7100019295 1 year BHEL-CHENNAI


LOADING of Engineering Dt:27.07.2006
Drawings

4. Preparation of Isometric CNT 7386/MG-16/2799 6 Months FICHTNER


Drawings with Details Dt:26.06.2006 Consulting Engineers
( India ) P LTD.

5. Preparation of Isometric CNT 7486/MG-16/601A 6 Months FICHTNER


Drawings with Details Dt:26.04.2007 Consulting Engineers
( India ) P LTD.

6. Preparation of Isometric CNT 7996/MG-16/1698 6 Months FICHTNER


Drawings with Details Dt:12.06.2007 Consulting Engineers
( India ) P LTD.

7. Preparation of Isometric 327/06 6 Months ANDRITZ Separation


Drawings with Details ( India ) P LTD.
Dt:14.10.2006

8. As built drawings for Fuel PO/UTE/234P/UNIT-I SKODA / U-TECH


firing system in unit II 60 Dt:11.11.2006
2 Months
MW at ETPS

9. As built drawings for HFO PO/UTE/248 SKODA / U-TECH


Pumping Station system in Dt08.05.2006
2 Months
unit II 60 MW at ETPS
WORK ORDERS
PO/ETPS/S/028
1. Dismantling & erection of HP 1 Month SKODA EXPORT
Dt:14.11.2000
FLUSH Pumps
PO/ETPS/S/043
2. Dismantling & Erection of 2 Months SKODA EXPORT
Dt:23.04.2001
control boxes
PO/R&M/EN-1/002
3. Rectification of Baffle plates 2 Months L&T LTD.
Dt:20.01.2003
R&M K1&K2 Condenser in
Unit I 60 MW at ETPS
IN YEAR 2004
PO/ETPS/S/215/VJ/04
1. HOT WELL painting work at 15 days SKODA EXPORT
Dt:26.07.2004
ETPS

2. Refurbishment of Ennore 2 Months SKODA / U-TECH


Thermal Power Station –
Dismantling, Erection of
Condenser K1 & K2 – Unit
PO / ETPS/ 215C/02
II 60MW at ETPS.
Date :15.05.2004
IN YEAR 2005
Sl.No. Name of Work Work order / Letter Ref. Duration Clients Name

1. R&M Works in condenser PO/UTE/4346/01 3 Months TNEB / U-TECH


at Unit – IV 110MW at Dt:18.01.2005
ETPS

2. Fabrication & Erection of PO/UTE/220/HFO/UNIT- 1 Month SKODA / U-TECH


HFO Pumping station II/01 Dt:15.04.2005
works

3. Air Pre Heater Re Tubing PO/UTE/223/01 2 Months SKODA / U-TECH


Work at Unit II 60MW at Dt:14.05.2005
ETPS

4. Dismantling of Old Vapour PO/UTE/226/01 1 Month SKODA / U-TECH


Piping and Extra work at Dt:21.10.2005
HFO Pumping station at Unit
II – 60MW at ETPS

5. Erection of COAL & PO/UTE/226/ERE/01 1 Month SKODA / U-TECH


VAPOUR Pipe Lines of Dt:07.10.2005
Boiler in Unit II -60 MW at
ETPS

6. Extra Rectification works in PO/UTE/220/HFO/REC/ 1 Month SKODA / U-TECH


HFO Pumping station in UNIT-II/01 Dt:29.11.2005
Unit II 60MW at ETPS

7. Fabrication & erection of PO/UTE/220/SB/UNIT- 1 Month SKODA / U-TECH


Steam Blowing line in Unit II/01 Dt:25.11.2005
II 60MW at ETPS

8. Fabrication Supply of COAL PO/UTE/226CA/01 1 Month SKODA / U-TECH


& VAPOUR Pipe line of Dt:02.12.2005
Boiler at Unit II 60 MW at
ETPS

9. Modification of Pipe lines at PO/UTE/226CB/01 1 Month SKODA / U-TECH


Unit II 60 MW at ETPS Dt:02.12.2005

10. Overhauling of PO/UTE/220/GU/UNIT- 1 Month SKODA / U-TECH


GUILLOTINE GATES in I/01 Dt:24.12.2005
Unit I 60 MW at ETPS

11. Overhauling of HFO PO/UTE/220/HFO/OH/U 1 Month SKODA / U-TECH


PUMPING Station in Unit I NIT-I/01 Dt:24.12.2005
60 MW at ETSP
IN YEAR 2006
Sl.No. Name of Work Work order / Letter Ref. Duration Clients Name

1. Fabrication & Erection of PO/UTE/220/HFO/UNIT- 1 Month SKODA / U-TECH


HFO PUMPING station Skid 1/01 Dt:02.01.2006
in Unit I 60 MW at ETPS

2. Fabrication of MS VAPOUR PO/UTE/4445-52/01 1 Month SKODA / U-TECH


Pipes, MS VAPOUR Bends, Dt:02.02.2006
& Reducers in Unit II 60 MW
at ETPS

3. Dismantling work in COAL & PO/UTE/233/P/01 1 Month SKODA / U-TECH


VAPOUR Pipe lines in Unit I Dt:11.02.2006
60 MW at ETPS

4. Fabrication & Erection of PO/UTE/236/01 1 Month SKODA / U-TECH


MAIN OIL COOLER Pipes, Dt:08.03.2006
Flushing line Pipes and
bend in Unit II 60 MW at
ETPS

5. Dismantling and devolution PO/UTE/235SB/01 1 Month SKODA / U-TECH


of STEAM BLOWING line in Dt:18.03.2006
Unit II 60 MW at ETPS

6. Rectification of HFO Heating PO/UTE/226/02 1 Month SKODA / U-TECH


Station platform & Dt:19.05.2006
fabrication & Erection of
HFO Pumping station,
Return / Suction / Steam
lines

7. Fabrication of ATYP Flange PO/UTE/240/01 1 Month SKODA / U-TECH


for GUILLOTINE GATES of Dt:20.05.2006
Unit I 60 MW at ETPS

8. Air Pre Heater Re PO/UTE/223/02 2 Months SKODA / U-TECH


Tubing Work at Unit I Dt:31.05.2006
60 MW at ETPS

9. Renewal of CONDENSER PO/UTE/241 1 Month SKODA / U-TECH


TUBES, Partition plates, Dt:06.06.2006
condenser tubes at ETPS

10. Erection of WIND BOX PO/UTE/245 1 Month SKODA / U-TECH


BURNER and Fabrication
Dt :16.06.2006
and erection of Coal and Oil
Pipes of BURNER,LDO
PIPES, HFO Heating station
Piping
11. Fabrication and erection of PO/UTE/247 1 Month SKODA / U-TECH
MS VAPOUR pipes in Unit I
Dt:20.07.2006
60 MW at ETPS

12 Fabrication of wind box PO/UTE/252 1 Month SKODA / U-TECH


BURNER Frame at Unit I 60
Dt:25.08.2006
MW at ETPS

13. Fabrication and erection of PO/UTE/226/ERE/UNIT I 1 Month SKODA / U-TECH


COAL & VAPOUR pipes in
Dt:11.11.2006
Unit I 60 MW at ETPS

Fabrication & erection of PO/UTE/220/SB/UNIT-I 1 Month SKODA / U-TECH


Steam Blowing line in Unit
14. Dt:11.11.2006
I 60MW at ETPS
PO/UTE/235 SB/UNIT-I
15. Dismantling and devolution 1 Month SKODA / U-TECH
Dt:11.11.2006
of Steam Blowing line in
Unit I 60MW at ETPS

16. Fabrication & Erection of PO/UTE/236/UNIT-I 1 Month SKODA / U-TECH


MAIN OIL COOLER pipe Dt:11.11.2006
flushing line pipe and bend
including dismantling and
normalizing

17. Design, Fabrication & supply PO/UTE/215 1 Month SKODA / U-TECH


of Vapour pipe lines in Unit I
Dt:22.11.2006
60 MW at ETPS

18. Maching of PLATE HEAT PO/UTE/250 1 Month SKODA / U-TECH


EXCHANGERS Stay bolts Dt:10.10.2006
IN THE YEAR 2007
1. Fabrication and erection of Coal and PO/UTE/256 1 Month TNEB/U-
Vapour Piping in Unit – III 110 MW TECH
Dt:24.01.2007
at ETPS

2. Maching of PLATE HEAT 1 Month TNEB/U-


EXCHANGERS Stay bolts TECH

3. Erection of Economiser Beam PO/UTE/256A 1 Month SKODA / U-


cooling liles TECH
Dt:02.02.2007
Drum interval Exhaust piping
Feed manifold at 8.0 M Elevation
Furnace Bottom sealing Piping
Erection of HDPE Piping
Cyclone separator
Ash drain lines Membrane water
wall drain and vent

4. ETPS – MM II Circle – conveyor WCT.605/D.286 1 Month TNEB


division Attending modification works Dt:21.05.2007
in heavy oil pipe lines of the OIL
HANDLING plant

5. ETPS-MMI Circle – Mill plant division CE/MM-I / LT-697 1 Month TNEB


– Unit II Modification of vapour line – Dt:14.04.2007
fabrication of new vapour bend
removal of insulation
IN THE YEAR 2008
1. ETPS MM II Circle –Conveyor Dn. WCT-753/D1828 1 Month TNEB
OHP – Attending breakdown works Dt:01.03.2008
in heavy oil & light oil systems of oil
handling plant

2. ETPS – Mechanical maintenance – I WCT 1 Month TNEB


Circle – turbine Maintenance division No.1904/D.251/0
– 110 MW Unit V Cleaning of PLATE 8 Dt:27.02.2008
HEAT EXCHANGER plates with
soap and acid solution re fixing the
gasket with special adhesive &
assembling the plates.

3. ETPS – Mechanical Maintenance – I WCT 1 Month TNEB


Circle – Turbine Maintenance No.1896/d.225/08
division – Fabrication of Man hole
Dt:15.02.2008
doors for Debris filters with SS Plates
for unit I to V

4. ETPS – Mechanical Maintenance - I WCT 1 Month TNEB


Circle – Turbine Maintenance No.1847/D.126/0
division – fabrication and supply of 8 Dt:22.01.2008
Main steam stop valve actuator
connecting link mechanism with
universal coupling and erection in
Unit III

5. ETPS – Mechanical Maintenance - I WCT 20 days TNEB


Circle – Turbine Maintenance No.1843/D.122/0
division – Dewatering pump house 8
30HP Diesel engine pump –
Dt:22.01.2008
dismantling, Inspection,
Reconditioning of worn out parts
testing and commissioning of the 30
HP Diesel engine

6. ETPS – Mechanical Maintenance - I WCT 20 days TNEB


Circle – Turbine Maintenance No.1829/D.82/08
division – 110 MW Unit IV - Dt:14.01.2008
Machining of gland box oil guard
bolts and Nuts, MP Inner casing
studs and nuts and LP HEATER
studs and OIL SERVO lock nuts
WCT NO. 1828/
7. ETPS – Mechanical Maintenance - I 20 days TNEB
D. 86, Dt
Circle – Turbine Maintenance
14.01.08
division – 110 MW Unit IV - TG Set
machining of 60 nos seal oil pump
coupling bolt 2 nos, Flanges with
adapter, 5 nos, Casting studs,
dummy flanges pins inner thread
pins 35 nos Bolt machining etc.
ETPS – Mechanical Maintenance - I WCT NO. 1827/
8. 20 days TNEB
Circle – Turbine Maintenance D. 85, Dt.
division – 110 MW Unit IV - 14.01.08
Reconditioning of lub oil filters
machining of iylam sheet, bolt
machining and coupling bolt
machining.

ETPS – Mechanical Maintenance - I WCT NO 1961/


20 days TNEB
Circle –Mill Plant division – 110 MW D. 435 Dt
Unit IV - Renewal/ Recondiioning of 18.04.08
coal and vapour lines and bends
9. providing additional strenthening
plates in coal and vapour line and
bends renewal of insulation work
during shut down period

ETPS - CWS Division - Removing, WCT No-2024/D


10. 20 days TNEB
Reconditioning and Refixing of 586/08/Dt
Pinion gear Shaft and assembling of 24.06.08
gear box of cws pump No 6

11. ETPS – Mechanical maintenance – I WCT 30 days TNEB


Circle – turbine Maintenance division No.4930/D.943/0
– 110 MW Unit V Cleaning of PLATE 8 Dt.06.11.2008
HEAT EXCHANGER plates with
soap and acid solution re fixing the
gasket with special adhesive &
assembling the plates.
IN THE YEAR 2007
12. ETPS – Mechanical maintenance – I WCT 20 days TNEB
Circle – turbine Maintenance division No.2223/D.55/09
– 110 MW Unit IV Positioning of
Dt:28.01.2009
Debris filter flab at a time intervals
and online removal of debris chocked
in the debris filters in 110 MW Unit IV

SUPPLY ORDERS
Supply of coupling bolt and nuts for
1. PO NO. 07 S.178
cooling water main pumps. LP & HP TNEB
D.1596/ Dt 2 Months
Flush water pumps
01.12.07

Supply of HT studs and nuts for


2. PO NO. 07 S.134
control valves inter connection pipes TNEB
D.1576/ Dt 2 Months
05.09.07
Supply of stringer steps of JT 5
3. PO NO.2007 S.
TNEB
161 D. 1463/ 2 Months
Dt 12.11.07
Supply of SS Mesh oil Strainer
4. PO NO.2007 S.
TNEB
182 D. 1632/ 2 Months
Dt 13.12.07
IN THE YEAR 2007
Supply of semi circular door
1. PO NO. 2008 S.
TNEB
71 D. 175/ Dt 2 Months
05.02.08
PO NO. 2008 S.
2. Supply of Capnut and Thrust block
06 D. 38 Dt TNEB
for drum manhole doors in unit iii and 2 Months
14.01.08
iv (110MW)

Supply of Bearing and cooling coil


3. PO NO. 2008 S.
for110 mW unit for soft water pump TNEB
94 D. 241 Dt 2 Months
08.02.08
PO NO. 2008 S.
4. Supply of main steam stop valve
44 D. 257 Dt TNEB
actuator connector with universal 2 Months
17.03.08
coupling for 110MW

Fabrication and supply of modified PO NO. 2008 -


5.
recirculation flap valve for vapour 212 D. 367 Dt TNEB
2 Months
fans 60 MW with self lubricating 23.04.08

Supply of MC Pump bearing and P.O NO. 2008 - S


6.
cooling coil - 90 D - 803/08. TNEB
2 Months
Dt 13.05.08

Supply of M.S Fabricated platform P.O.No.2008 -


7.
grills 275 D - 452/08.Dt TNEB
3 Months
23.05.08

SS guide Roller with Bracket Pin and ETPS - CWS


8.
bush for travelling water Specn No 2238/ TNEB
3 Months
PO No 2008
423/D 556/08 /DT
03.07.08
Design fabrication supply and
9. 6 Months
erection of WATER CHAMBER for
K1 & K2 Condenser Unit V 110 MW
IN THE YEAR 2008
Fabrication, Supply errection with P.O.No.2009- 06
1.
supporting and commissioning of D050/09 TNEB
2 Months
silenser for CBD with vent and drain Dt.17.01.09
arrangement for unit iv ( 110 MW )
Boiler

Supply of Ignitor guide tube P.O.No.2009- 40


2.
assembly for Unit V 110 MW - boiler D126/09 TNEB
2 Months
filter for unit V 110 MW Boiler Dt.05.01.09
OUR VALUED CUSTOMERS :

1. BHEL – CHENNAI

2. TAMILNADU ELECTRICITY BOARD

3. M/s. SKODA EXPORT

CHENNAI-600 057

4. M/s ALSTOM POWER INDIA LTD

CHENNAI-600 018

5. M/s. LARSON TOUBRO LIMITED

CHENNAI- 600 057

6. U-TECH CONSULTANTS & ENGINEERS


P LTD CHENNAI-06

7. FICHTNER Consulting Engineers


( India ) P LTD.

8. ANDRITZ Separation ( India ) P LTD.

9. M/s. RADHA ENGINEERING P LTD

CHENNAI-600 057

10. M/s.KUMARAN ENGINEERING WORKS

CHENNAI-600 057
PHATO GALLERY
RE TUBING OF PLATE
HEAT EXCHANGERS
FOR UNIT IV 110 MW
ETPS

BURNER ASSEMBLY
ERECTION UNIT I - 60
MW ETPS
BURNER ASSEMBLY
ERECTION UNIT I - 60
MW ETPS

TUBE CLEANING FOR


AIR PRE HEATER UNIT
-60 MW ETPS
RE TUBING OF PLATE
HEAT EXCHANGERS
UNIT IV 110 MW ETPS

TUBLAR AIR PRE


HEATER POOJA WITH
SKODA EXPORT
OFFICALS

MODIFIED RE
CIRCULATION DAMPER
ASSY. FOR UNIT III&IV
110MW ETPS
COLD AIR CONTROL
DAMPER ASSY. FOR
UNIT III&IV 110MW
ETPS

HOT AIR CONTROL


DAMPER ASSY. FOR
UNIT III&IV 110MW
ETPS
HOT AIR CONTROL
DAMPER ASSY. FOR
UNIT III&IV 110MW
ETPS

HOT AIR CONTROL


DAMPER ASSY. FOR
UNIT III&IV 110MW
ETPS
HOT AIR CONTROL
DAMPER ASSY. FOR
UNIT III&IV 110MW
ETPS

DURING LOYDS
INSPECTION GROUP
INSPECTING WATER
CHAMBER UNTI V 110
MW ETPS
DURING LOYDS
INSPECTION GROUP
INSPECTING WATER
CHAMBER UNTI V 110
MW ETPS

DURING LOYDS
INSPECTION GROUP
INSPECTING WATER
CHAMBER UNTI V 110
MW ETPS
DURING LOYDS
INSPECTION GROUP
INSPECTING WATER
CHAMBER UNTI V 110
MW ETPS

DURING LOYDS
INSPECTION GROUP
INSPECTING WATER
CHAMBER UNTI V 110
MW ETPS
DURING LOYDS
INSPECTION GROUP
INSPECTING WATER
CHAMBER UNTI V 110
MW ETPS

WATER CHAMBER
MACHINING OF STAY
BOLT FOR CONENSER
ETPS

OIL GUN SPARES FOR


UNIT V 110 MW ETPS
FRONT WATER
CHAMBER FOR 110 MW

FABRICATION OF SHED
TRESS WORK IN OUR
FACTORY

FABRICATION OF SHED
TRESS WORK IN OUR
FACTORY
FABRICATION OF SHED
TRESS WORK IN OUR
FACTORY

FABRICATION OF SHED
TRESS WORK IN OUR
FACTORY

FABRICATION OF SHED
TRESS WORK IN OUR
FACTORY
ARM FOR WATER
CHAMBER

REAR WATER
CHAMBER
BRACKET
ASSEMBLY

DURING POOJA
FOR COMPLETION
OF WATER
CHAMBER
OUR WORK SHOP

WATER CHAMBER
DOOR FOR UNIT V
110 MW

FABRICATION OF
SHED TRESS
WORK IN OUR
FACTORY
DURING TNEB
OFFICAL
INSPECTION

DURING HYDRO
TEST TNEB
OFFICAL
INSPECTION
OUR
MACHINIRIES

RAW COAL RUN


BACK SYATEM
FOR CONVEYOR -
29
DURING DNV
INSPECTION
LOW PRESSURE
HEAT
EXCHANGERS

WATER CHAMBER
FOR UNIT V 110
MW
GUILLOTINE GATE
SPARES

DURING THE
ERECTION OF
COAL AND
VAPOUR PIPES
AND BENDS
MITRE BENDS
FOR COAL AND
VAPOUR PIPING

MITRE BEND
PREPARATION
BEARING
COOLING COIL
FOR BOILER
FEED PUMPS

MANUFACTURING
GRILLS FOR
ENNORE
THERMAL POWER
STATION
DURING THE
PLATE CUTTING

P.A.FAN LAYOUT
MARKING AND
INSPECTION
WITH TNEB
OFFICALS

P.A.FAN LAYOUT
CUTTING
P.A.FAN PRE -
ASSEMBLY
INSPECTION
WITH TNEB
OFFICALS

P.A.FAN CASING

P.A.FAN CASING
P.A.FAN CASING

DURING
ASSEMBLY OF
DIFFUSER MOUTH
PIECE FOR
P.A.FAN

DURING
ASSEMBLY OF
DIFFUSER MOUTH
PIECE FOR
P.A.FAN
AFTER WELDING
DIFFUSER MOUTH
PIECE FOR
P.A.FAN

AFTER WELDING
SUCTION BRANCH
FOR P.A.FAN

DURING FULL
ASSEMBLY OF
P.A.FAN
DURING FULL
ASSEMBLY OF
P.A.FAN AND
LOYDS
INSPECTION
GROUP
INSPECTING THE
ASSEMBLY

AFTER WELDING
DIFFUSER MOUTH
PIECE FOR P.A.FA

DURING FULL
ASSEMBLY OF
P.A.FAN
DURING FULL
ASSEMBLY OF
P.A.FAN

You might also like