You are on page 1of 8

** Resource persons need to give the seprate text formated into JBIC and ADB sections as per respective

contents.
CONTENTS - ADB SECTION PROJECT RESOURCE PERSONS
NTSW PPG NR LLR MA KJ SB NPDG DAJR MJ ST LMA
1 EXECUTIVE SUMMARY
1.1 Background
1.2 The Existing Environment (a) Main Trace b) Galle Port Access Road Separately)
1.3 Description of the Project (a) Main Trace b) Galle Port Access Road Separately)
1.4 Anticipated Impacts of the Project (a) Main Trace b) Galle Port Access Road Separately)
1.5 Mitigation Measures (a) Main Trace b) Galle Port Access Road Separately)
1.6 Monitoring Programme and Updates to EMP (a) Main Trace b) Galle Port Access Road Separately)
2 INTRODUCTION
2.1 General
2.2 Summary of Past Environmental Studies
2.2.1 Early Studies
2.2.2 Recent Studies
2.2.3 Implications of CEA Conditions of Approval
2.2.4 Updating and Reporting Limitations
2.3 General Methodology used in SEAR
2.3.1 Purpose, Scope and Terms of Reference
2.3.1.1 Study Objectives
2.3.1.2 Purpose and Scope
2.3.1.3 Terms of Reference
2.3.2 Study Area
2.3.2.1 Deviations and Description
2.3.2.2 Study Area of Each Expert
2.3.3 Maps
2.3.4 Other Baseline Data
2.3.5 Field Work
2.3.6 Meetings and Consultations
2.3.7 Impact Assessment
2.3.7.1 Impacts Identification
2.3.7.2 The Impact Matrices
2.4 Purpose of Report and General Approach
2.5 Report Contents
3 DESCRIPTION OF THE PROJECT
3.1 General
3.2 Historical background
3.3 Project Description and Design Rationale
3.3.1 Stages of Construction
3.3.2 Alignment of Final Trace
3.3.3 Galle Port Access Road (GPAR)
3.3.4 Local Circulation (a) Main Trace b) Galle Port Access Road Separately)
3.3.5 Bridge and Drainage Structures (a) Main Trace b) Galle Port Access Road Separately)
3.4 Land Acquisition and Involuntary Resettlement (a) Main Trace b) Galle Port Access Road Separately)
3.5 Construction Processes (a) Main Trace b) Galle Port Access Road Separately)
3.5.1 General Activities
3.5.2 Land Clearing
3.5.3 Earth Work
3.5.4 Stabilization of Embankments and Cuts
3.5.5 Quarrying Operations
3.5.6 Construction Materials
3.5.7 Construction Equipment
3.5.8 Construction Work Force
3.5.9 Implementation Schedule
3.6 Operation and Maintenance Activities (a) Main Trace b) Galle Port Access Road Separately)
4 EXISTING ENVIRONMENT AND SITE DESCRIPTION
4.1 Physical Environment
4.1.1 Earth (a) Main Trace b) Galle Port Access Road Separately)
4.1.1.1 Mineral Resources
4.1.1.2 Construction Materials
4.1.1.2.1 Rock and Coarse Aggregate
4.1.1.2.2 Gravel and Fill Material
4.1.1.2.3 Sand
4.1.1.3 Stability of the Sub Surface
4.1.1.3.1 Soils
4.1.1.3.2 Earth Stability
4.1.1.4 Settlement and Ground Subsidence
4.1.1.5 Landform
4.1.2 Water (a) Main Trace b) Galle Port Access Road Separately)
4.1.2.1 Surface Water Quantity
4.1.2.2 Ground Water Quantity
4.1.2.3 Surface Water Quality
4.1.2.4 Ground Water Quality
4.1.3 Air (a) Main Trace b) Galle Port Access Road Separately)
4.1.3.1 Air Quality
4.1.3.2 Noise and Vibration
4.1.4 Processes (a) Main Trace b) Galle Port Access Road Separately)
4.1.4.1 Floods/Hydrology and Drainage Patterns
4.1.4.2 Soil Erosion, Siltation and Sedimentation Runoff
4.1.4.4 Irrigation and Flood Protection Strutures
4.2 Biological Environment (a) Main Trace b) Galle Port Access Road Separately)
4.2.1 Flora
4.2.1.1 Terrestrial Flora
4.2.1.2 Aquatic Flora
4.2.2 Fauna
4.2.2.1 Terrestrial Fauna and Amphibians
4.2.2.2 Aquatic Fauna
4.2.2.3 Avifauna
4.3 Social Environment
4.3.1 Land Use Aspects (a) Main Trace b) Galle Port Access Road Separately)
4.3.1.1 Land Use Pattern
4.3.1.2 Land Tenure Pattern
4.3.1.3 Settlement Pattern
4.3.2 Human Environment (a) Main Trace b) Galle Port Access Road Separately)
4.3.2.1 Social Structure, Local Life Style and Values
4.3.2.2 Population, Ethnic Composition, Migration and Settlement
4.3.2.3 Education
4.3.2.4 Accessibility and Mobility for Normal Activities
4.3.2.5 Accessibility and Mobility for Special Services
4.3.2.6 Public Health and Safety
4.3.2.7 Housing
4.3.2.8 Other Infrastructure Facilities
4.3.2.9 Transport
4.3.2.10 General Life Style
4.3.3 Socio-Economic Environment (a) Main Trace b) Galle Port Access Road Separately)
4.3.3.1 Employment in the Project Area
4.3.3.2 Agriculture
4.3.3.3 Tourism
4.3.3.4 Income Distribution
4.3.3.5 Structures
4.3.3.6 Business Volumes and Tax Revenues
4.3.3.7 Property Values
4.3.3.8 Rural Economy
4.3.4 Aesthetic Aspects (a) Main Trace b) Galle Port Access Road Separately)
4.3.4.1 Visual Intrusion and Landscape
4.3.4.2 Historical and Archeological Monuments
4.3.4.3 Places of Worship and Religious Interest
4.3.5 Road Safety Aspects
5 ANTICIPATED ENVIRONMENTAL IMPACTS
5.1 Physical Environment
5.1.1 Earth (a) Main Trace b) Galle Port Access Road Separately)
5.1.1.1 Mineral Resources
5.1.1.2 Construction Materials
5.1.1.2.1 Rock and Coarse Aggregate
5.1.1.2.2 Gravel and Fill Material
5.1.1.2.3 Sand
5.1.1.3 Stability of the Sub Surface
5.1.1.3.1 Soils
5.1.1.3.2 Earth Stability
5.1.1.4 Settlement and Ground Subsidence
5.1.1.5 Landform
5.1.2 Water (a) Main Trace b) Galle Port Access Road Separately)
5.1.2.1 Surface Water Quantity
5.1.2.2 Ground Water Quantity
5.1.2.3 Surface Water Quality
5.1.2.4 Ground Water Quality
5.1.3 Air (a) Main Trace b) Galle Port Access Road Separately)
5.1.3.1 Air Quality
5.1.3.2 Noise and Vibration
5.1.4 Processes (a) Main Trace b) Galle Port Access Road Separately)
5.1.4.1 Floods/Hydrology and Drainage Patterns
5.1.4.2 Soil Erosion, Siltation and Sedimentation Runoff
5.1.4.3 Irrigation and Flood Protection Strutures
5.2 Biological Environment (a) Main Trace b) Galle Port Access Road Separately)
5.2.1 Flora
5.2.1.1 Terrestrial Flora
5.2.1.2 Aquatic Flora
5.2.2 Fauna
5.2.2.1 Terrestrial Fauna and Amphibians
5.2.2.2 Aquatic Fauna
5.2.2.3 Avifauna
5.3 Social Environment
5.3.1 Land Use Aspects (a) Main Trace b) Galle Port Access Road Separately)
5.3.1.1 Land Use Pattern
5.3.1.2 Land Tenure Pattern
5.3.1.3 Settlement Pattern
5.3.2 Human Environment (a) Main Trace b) Galle Port Access Road Separately)
5.3.2.1 Social Structure, Local Life Style and Values
5.4.2.2 Population, Ethnic Composition, Migration and Settlement
5.3.2.3 Education
5.3.2.4 Accessibility and Mobility for Normal Activities
5.3.2.5 Accessibility and Mobility for Special Services
5.3.2.6 Public Health and Safety
5.3.2.7 Housing
5.3.2.8 Other Infrastructure Facilities
5.3.2.9 Transport
5.3.2.10 General Life Style
5.3.3 Socio-Economic Environment (a) Main Trace b) Galle Port Access Road Separately)
5.3.3.1 Employment in the Project Area
5.3.3.2 Agriculture
5.3.3.3 Tourism
5.3.3.4 Income Distribution
5.3.3.5 Structures
5.3.3.6 Business Volumes and Tax Revenues
5.3.3.7 Property Values
5.3.3.8 Rural Economy
5.3.4 Aesthetic Aspects (a) Main Trace b) Galle Port Access Road Separately)
5.3.4.1 Visual Intrusion and Landscape
5.3.4.2 Historical and Archeological Monuments
5.3.4.3 Places of Worship and Religious Interest
5.3.5 Road Safety Aspects
5.3.5.1 EIA Background/Baseline Data
5.3.5.2 Anticipated Construction Impacts
5.3.5.3 Anticipated Operational Imapcts
6 MITIGATION MEASURES
6.1 During Investigation and Preparation (a) Main Trace b) Galle Port Access Road Separately)
6.1.1 Social and Socio-Economic Impacts
6.1.2 Hydrological Impacts
6.1.3 Impacts on Road Trace Design
6.2 During Construction (a) Main Trace b) Galle Port Access Road Separately)
6.2.1 Hydrology and Drainage Aspects
6.2.2 Orientation for Contractor and Workers
6.2.3 Water Quality
6.2.4 Air Quality
6.2.5 Noise/Ground Vibration
6.2.6 Soil Erosion/Surface Run-off
6.2.7 Exploitation Handling, Transportation and Storage of Construction Materials
6.2.8 Spoil and Construction Waste Disposal
6.2.9 Work Camp Operation and Location
6.2.10 Loss of Vegetation Cover of the Areas for Temporary Work Space
6.2.11 Safety Precautions for the Workers and General Public
6.2.12 Traffic Condition
6.2.13 Salinization
6.2.14 Impact on Wetlands
6.2.15 Social and Socio Economic Impacts
6.2.16 Institutional Strengthening and Capacity Building
6.3 During Operation (a) Main Trace b) Galle Port Access Road Separately)
6.3.1 Air Quality
6.3.2 Noise
6.3.3 Road Accidents
6.3.4 Garbage Disposal
6.3.5 Transportation of Dangerous Chemicals/Goods
6.3.6 Landslides and Soil Erosion
6.3.7 Socail and Socio Economic Imapcts
6.4 Further Studies Needed (a) Main Trace b) Galle Port Access Road Separately)
7 INSTITUTIONAL REQUIREMENTS AND MONITORING PROGRAMME
7.1 Introduction
7.2 Institutional Requirements
7.2.1 Project Management Structure
7.2.1 CEA Environmental Monitoring Committee
7.2.2 Environmental Management Requirements
7.2.3 Pre-Construction Monitoring/Analysis Actions
7.2.4 Environmental Management in Pre-Construction and Construction Activities
7.2.5 Supervision of Operational Baseline Monitoring and Further Analyses
7.3 Organization and Staffing
7.3.1 Project Manaegement Unit (PMU)
7.3.2 Environmental Equipment Needs
7.3.3 Expansion of RDA Environmental Staff PMU Duties
7.4 Monitoring Programme
7.4.1 CEA Guideline Overview
7.4.2 CEA Recommended Monitoring Approach and Evaluation Criteria
7.4.3 CEA Recommended Reporting Approach
7.4.4 Proposed Monitoring Programme
7.4.4.1 Monitoring of Hydrolgical Aspects
7.4.4.2 Water Quality Monitoring
7.4.4.3 Air Quality Monitoring
7.4.4.4 Noise/Ground Vbration Monitoring
7.4.4.5 Social Impacts and Resettlement Monitoring
7.4.4.6 Monitoring Natural Environment
7.4.4.7 Road Accidents - During Operation
7.4.4.8 Garbage Disposal - During Operation
7.4.4.9 Transportation of Dangerous Goods - During Operation
7.4.4.7 Other Aspects of Monitoring
7.4.5 Work Plan for Monitoring Programme
7.4.6 Cost Estimates for Monitoring Programme
7.4.7 Mechanisms for Feedback and Adjustment
7.4.8 Observations on Working Draft of EMP
7.4.9 Recommendations
8 CONCLUSIONS AND RECOMMENDATIONS
8.1 General
8.2 Key Findings and Conclusions (a) Main Trace b) Galle Port Access Road Separately)
8.3 Recommendations (a) Main Trace b) Galle Port Access Road Separately)
8.4 Comments and Conclusions on EMP
8.5 Recommendations on EMP

You might also like