You are on page 1of 72

Urban And Rural Water Supply Schemes

Sewerage Treatment Scheme


Solid waste Management
Road works ( Survey & Estimates, PMGSY )
Lift Irrigation Scheme
FROM TO
1
1 5
2
6 7
3
8 31
4
32 41
5
42 45
6
46 47
7
48 51
8
52 61
9
62 63
10
64 64
11
65 65
12
67 70
EXPERIENCE CERTIFICATE OF WATER SUPPLY,
UNDERGROUND, STROM WATER AND ALLIED
WORKS
SR.
No.
CONTENTS
PAGES
ABOUT US
OUR SERVICES
OUR VALUABLE CLIENTS
OTHER NECESSARAY DOCUMENTS
OUR TEAM
ROAD WORKS CERTIFICATES & LIST ROAD
WORKS
GIS BASED DIGITAL MAPPING WORKS
CERTIFICATES
LIFT IRRIGATION WORKS CERTIFICATES
CITY DEVELOPMENT WORKS CERTIFICATES
REGISTRATION CERTIFICATES
LIST OF EQUIPMENTS & SOFTWERS
About us
About The Company :-

The Marathi word NISARGA means Mother-Nature. We believe that welfare of
mankind is ensured while working hand in hand with nature & it helps in creating
sustainable infrastructure development. We are always aware of ecological &
environmental aspects while planning & designing our projects. We offer consultancy
services right from concepts to completion & further sustainable maintenance of the
projects.

Water is the most important element of nature & pure water is a need of all Humans. The
idea to help take this important element in its purest form to the common people was born
in the minds of 2 dynamic personalities in year 1996. They came together to form a
company with a common goal to save the environment & serve the nation with pure water,
The Nisarga Consultancy (TNC). Till date the company has blossomed into a formidable
organization handling projects in Water Supply, Sewerage, Road Works & Lift Irrigation.

The Nisarga Consultancy utilizes state-of-the-art computer technology to provide our
clients with exceptional service while remaining efficient and cost-effective. Our
Engineers, technicians and crews utilize the latest technology, including road design
software Geomatics, Water & Sewerage Network design softwares Aqua++ & Kanal++
& ESR & GSR structural design software & various modern surveying equipments.
Project Management & design skills are applied to feasibility studies, conceptual designs,
Government approvals, economic evaluation, detailed design and construction
management. Clients can access these capabilities as well as the wider skills of our group
which include a full range of civil, environmental, water and wastewater and project
management services.

Vision :-
To be a Nationwide Leader in the provision of Civil Engineering Professional Services to
Improve the Physical & Social Environment.

Core Purpose :-
To Continually Innovate, Develop and Adopt State-of-the-art Technology in Methods &
Materials to Enhance Productivity & Cost Effectiveness.

Core Values :-
Sustained Efforts to Enhance Customer Value and Quality.
Compliance and Respect for all Community, Environmental and Legal Requirements.
Foster a Culture of Caring, Trust & Honesty.
No Entitlement Attitude.

Nisarga Standards :-
To provide our clients with the Best Services.
To provide our Staff with better Remuneration & Benefits comparable to others doing
similar work within the industry & the region.

Quality Policy :-
We are committed to meet the expectations of our clients, through our well committed
service.
Nurturing Engineers with strong Technical Knowledge.
We shall continuously strive to improve the quality system, by upgrading ourselves and
our team members.
We are bound to deliver the products with best quality in short time.
We will achieve this one by optimal utilization of man, machineries, resources & time.
By working safely, faster & perfectly.
With the support of our strong hardworking team.
By continuous up gradation of our system, staff & sub-contractors.


FY 2009-10 2010-11 2011-12 2012-13 2013-14
Turnover
(In Lacs)
149.47 115.31 105.74 145.58 200.96
T U R N O V E R - C H A R T
Series1
0
50
100
150
200
250
2009-10
2010-11
2011-12
2012-13
2013-14
Series1
Our Services
Fields of Operation :-

Urban & Rural Water Supply Schemes
Underground Sewage Networks
City Development Plans
Road Works
Lift Irrigation Systems
GIS Based Digital Mapping
Solid Waste Management
Command Area Development



EXPERIENCE CERTIFICATE OF WATER
SUPPLY, UNDERGROUND, STROM WATER
AND ALLIED WORKS
Water Supply Projects :-
Sr.
No.
Name of Work Under
Type of
Work
Estimated
Cost
(in Cr.
Rs)
Remark
1 Aug. To Malegaon Water Supply Scheme,
Tal. Malegaon, Dist. Nashik (Distribution
System Only)
UIDSSMT DPR
Preparation
16.23 DPR is
Sanctioned
2 Aug. To Yeole Water Supply Scheme, Tal.
Yeole, Dist. Nashik
UIDSSMT DPR
Preparation
& PMC
12.09 70 % Work of
scheme is
completed.
3 Aug. To Rahuri Water Supply Scheme,
Tal. Rahuri, Dist. Ahemadnagar
UIDSSMT DPR
Preparation
& PMC
17.01 DPR is
Sanctioned by
Govt. of India
4 Aug. To Kopargaon Water Supply
Scheme, Tal. Kopargaon, Dist.
Ahemadnagar
UIDSSMT DPR
Preparation
& PMC
27.21 DPR is
Sanctioned by
Govt. of India
5 Aug. To Roha Water Supply Scheme, Tal.
Roha, Dist. Raigad
UIDSSMT DPR
Preparation
& PMC
25.76 DPR is under
Scrutiny.
6 Aug. To Junnar Water Supply Scheme,
Tal. Junnar, Dist. Pune
UIDSSMT PMC 7.11 40 % Work of
scheme is
completed.
7 Aug. To Trimbakeshwar Water Supply
Scheme, Tal. Trimbakeshwar, Dist. Nashik
(Only Water Treatment Plant)
Own Funds DPR
Preparation
& PMC
0.55 DPR is
Sanctioned.
8 Aug. To Pulgaon Water Supply Scheme,
Tal. Deoli, Dist. Wardha
Nagarotthan DPR
Preparation
& PMC
19.81 DPR is under
Scrutiny.
9 Rural Water Supply Schemes (231 Nos.) Tribal Sub
Plan, &
Bharat
Nirman
DPR
Preparation
& PMC
42.92 90% Schemes
are completed.
10 Aug. to Dindori Water Supply Scheme,
Tal. Dindori, Dist. Nashik
Tribal Sub
Plan (Special
Case)
DPR
Preparation
& PMC
11.68 30 % Work of
scheme is
completed.
11 Aug. to Kasabe Vani Water Supply
Scheme, Tal. Dindori, Dist. Nashik
Tribal Sub
Plan (Special
Case)
DPR
Preparation
& PMC
4.77 25 % Work of
scheme is
completed.
12 Aug. to Pimpalgaon (B) Water Supply
Scheme, Tal. Niphad, Dist. Nashik
Bharat
Nirman
(Special Case)
DPR
Preparation
& PMC
14.84 50 % Work of
scheme is
completed.
13 Gonde Dumala Water Supply Scheme,
Tal. Igatpuri, Dist. Nashik
Bharat
Nirman
(Special Case)
DPR
Preparation
2.34 DPR is
Sanctioned.
Total 202.32 Crores
Sewerage Systems :-
I Under Ground Sewerage Schemes
Sr.
No.
Name of Work Under
Type of
Work
Estimated
Cost
(in Cr. Rs)
Remark
1 Under Ground Sewerage Scheme for
Malegaon Town, Tal. Malegaon, Dist.
Nashik
UIDSSMT DPR
Preparation
138.76 DPR is
Sanctioned by
Govt. of India
2 Under Ground Sewerage Scheme for
Yeole Town, Tal. Yeole, Dist. Nashik
UIDSSMT DPR
Preparation
& PMC
26.03 DPR is under
Scrutiny.
3 Under Ground Sewerage Scheme for
Rahuri Town, Tal. Rahuri, Dist.
Ahemadnagar
UIDSSMT DPR
Preparation
& PMC
22.70 DPR is under
Scrutiny.
4 Under Ground Sewerage Scheme for
Kopargaon Town, Tal. Kopargaon, Dist.
Ahemadnagar
UIDSSMT DPR
Preparation
& PMC
48.00 DPR is under
Scrutiny.
5 Under Ground Sewerage Scheme for
Roha Town, Tal. Roha, Dist. Raigad
UIDSSMT DPR
Preparation
& PMC
21.99 DPR is under
Scrutiny.
6 Under Ground Sewerage Scheme for
Pusad Town, Tal. Pusad, Dist. Yavatmal
UIDSSMT DPR
Preparation
& PMC
44.72 DPR is under
Preparation.
7 Under Ground Sewerage Scheme for
Beed Town, Tal. Beed, Dist. Beed
Nagarotthan DPR
Preparation
& PMC
132.51 DPR is under
Preparation.
Total 434.71 Crores
I Sullage & Surface Drain Schemes
1 Sullage & Surface Drain Scheme for
Dindori Village, Tal. Dindori, Dist.
Nashik
Tribal Sub
Plan (Special
Case)
DPR
Preparation
& PMC
10.02 DPR is under
Scrutiny.
2 Sullage & Surface Drain Scheme for
Pachora Town, Tal. Pachora, Dist. Jalgaon
UIDSSMT DPR
Preparation
& PMC
31.32 DPR is under
Preparation.
3 Sullage & Surface Drain Scheme for
Pimpalgaon (B) Village, Tal. Dindori,
Dist. Nashik
Tribal Sub
Plan (Special
Case)
DPR
Preparation
& PMC
12.35 DPR is under
Preparation.
Total 53.69 Crores


Rural Water Supply Works :-
Sr.
No.
Name of Work Client Year
Estimated
Cost
(in Lakh
Rs)
Remark
1 Devegaon (Gable) Rural Water Scheme,
Tal Selu, Dist. Parbhani
MJP Works
Division,
Parabhani
1998 25.62
2 Aug. To Dengali Pimpalgaon Water
Scheme, Tal Selu, Dist. Parbhani
MJP Works
Division,
Parabhani
1998 23.12
3 Jawala Jiwali Rural Water Scheme, Tal
Selu, Dist. Parbhani
MJP Works
Division,
Parabhani
1998 21.50
4 Marsul (T) Sendursana Rural Water
Supply Scheme, Tal Basamat, Dist
Parbhani
MJP Works
Division,
Parabhani
1998 20.86
5 Sandas Chincholi Rural Water Supply
Scheme, Tal Majalgaon, Dist Beed
MJP Works
Division,
Beed
1998 17.81
6 Sultanpur Rural Water Supply Scheme,
Tal Majalgaon, Dist Beed
MJP Works
Division,
Beed
1998 16.27
7 Purushottampuri Rural Water Supply
Scheme, Tal Majalgaon, Dist Beed
MJP Works
Division,
Beed
1998 15.50
8 Pimpala Lokhande Rural Water Supply
Scheme, Tal Basamat, Dist Parbhani
MJP Works
Division,
Parabhani
1998 29.33
9 Takli Regional Rural Water Supply
Scheme, Tal Motala, Dist Buldhana
MJP Works
Division,
Buldhana
1997 154.88
10 Waghi (Bkd.) Rural Water Supply
Scheme, Tal Risod, Dist Akola
MJP Works
Division,
Akola
1997 103.34
11 Kusegaon & 5 villages Regional Rural
Water Supply Scheme
MJP Works
Division,
Nashik
1999 308.50
12 Aug. To Virgaon Rural Water Supply
Scheme
MJP Works
Division,
Malegaon
1999 110.45
13 Chougaon Rural Water Supply Scheme,
Tal Baglan, Dist Nashik
MJP Works
Division,
Malegaon
1999 85.00
Sr.
No.
Name of Work Client Year
Estimated
Cost
(in Lakh
Rs)
Remark
14 Hadgaon (Pavade) Rural Water Scheme,
Tal Selu, Dist. Parbhani
MJP Works
Division,
Parabhani
1999 45.20
15 Aug. To Peint Rural Water Supply
Scheme, Tal Peint, Dist Nashik
MJP Works
Division,
Nashik
1998 549.20
16 Shirbhavi & 81 villages Regional Rural
Water Supply Scheme, Tal Sangola, Dist.
Solapur
MJP Works
Division,
Solapur
1998
17 Pangara (T) Lasina Rural Water Supply
Scheme, Tal Basamat, Dist Parbhani
MJP Works
Division,
Parabhani
1998 41.96
Total 1568.54 Lakh Rs.

BHD ltlunicipal 0ouncil, B[H]
Tal. Beed, Dist. Beed
Ref :-
l
Zrl
Date
16/4/2otg
CERTIFICATE
TO WHOM SO EVER IT MAY CONCERN
This is to certify that, the Preparation work of Detailed Engineering Project Report &
Project Management Consultancy for Beed Underground Sewerage Scheme under The
Urban Infrastructure Development Scheme for Small & Medium Town (UIDSSMT) was
allotted to The Nisarga Consultancy, Nashik
Under Ground Sewerage Scheme For Beed Town :-
Sr.
No.
Details of Scheme Estimated
Cost
Work
Order &
TS
1)
2\
3)
4)
s)
Projected Population(2%6) 317918Souls.
Net work Provided - RCC NP-2/NP-3,
C1ass Pipe 150 to 1000 mm dia, Length - 289.921<m.
Area - 23.80 Sq. Km.
Sewage Pumping Machinery
a) AT ItS
-
I (V2,L & Peak DVVF) -
70 HP,130 HP,
3OO HP,
b) AT PS
-
il (-t
,2
8x Peak DVVF) -
,ffi
HP, e0 HP
Pumping Mairy D.I. K-9 Pipe
a) 800 mm dia. (frs
-
1 to STP) Length -
1590 M.
b) 600 mm dia. (I5
-
1 to STP) Length -
330 M.
Sewage Treatment Plant @Jirewadi -
29 MLD-
( Rs.In
Crore)
237.81
W. O. No
ft{q/ rfu/
W./"s/rq
otr
Dated
7ll2oro.
T.S.
Letter
No.
cE[\{IP-
PMCS
Punq|fB-
3/Beed-
vGD/57e,
Dated- L5
March
20L3
The agency has completed the preparation work of
schemes. And The Technical approval from Chief
Consultancy Services, Pune (MIP) is obtained.
The performance of the agency is satisfactory.
detailed project report of above
Engineer, Project Management
Copy to - The Nisarga Consultancy, Nashik for information.
it"-
Yeole llunicipal [ouncil, Yeole
Tal. Yeole, Dist. Nashik
Ref :-
Date o4
/o 3fzolj
CERTIFICATE
fO WUOtvt SO EVgn tf Vlay
This is to certify that the Preparation work of Detailed Engineering Project Report &
Project Management Consultancy for Yeole Water Supply & Underground Sewerage
Scheme under The Urban Infrastructure Development Scheme for Small & Medium
Town (UIDSSMT) was allotted to The Nisarga Consultancy, Nashik
The agency has completed the preparation work of detailed project report of above
schemes. And The Technical approval from Chief Engineer, Proiect Management
Consultanry Services Pune (MIP) is obtained. The performance of the agency is
satisfactory.
fr!l/!')@
"-f
Chief Officer,
Municipal Council, Yeole
Copy to - The Nisarga Consultancy, Nashik for information.
Sr.
No.
Details of Scheme Estimated
Cost
Status of
work
1.. Water Supply Scheme
a) Projected Population (20a5)
b) Water Treatment Plant Capacity
c) Pure water pumping main D.I. K-9
200 mm dia. Length
:
(2160+1560)
d) Elevated Service Reservoir
i) VIIP ESR Capacity
ii) Nagarsul ESR Capacity
e) Distribution Network D.I. K- 7 Pipe
150 to 500 mm dia., Length
85194 Souls
9.00 MLD.
3.72 Km.
9.00 Lacs
4.50 Lacs
45.47 Km.
( Rs. in
Lacs
)
1209.42
Work
completed
satisfactorily
2)
Under Ground Drainage Scheme
a) Net work Provided RCC NP-2/NP-3
,150
to 800 mm dia. Length
b) Sewage Pumping Machinery
i)ATI-I (r/2,L&2DWF)
it AT tls
-
II (1,2 & Peak DVVF)
c) Pumping Main,400 mm dia
D.I. K-9 Length
d) Sewage Treatment Plant
80.28 Km
2s HR 45 HP
3HP, 5HP
1790}/..
7.50 MLD
4210.AO
T.S. Letter'
No. CpIvIlP-
PMCS
Punq|fB-
vurDSSMrys
89/Dated -
2A/A2/ 2Ot3
Roho Municipol Council, Roho
Tal. Roha, Dist. Raigad
-
Dt
, z8\1'zl'z"a 1o
Ref :-
2-a
)L
CERTIFICATE
TO WHOM SO EVER IT MAY CONCERN
This is to certify that,
the work of Preparation of Detailed Engineering Project
Reports of Water Supply Scheme under Central Government's
"IJIDSSMT"
Scheme & Under Ground Drainage Scheme under Maharashtra State
Government's
"Maharashtra Suvarnajayanti Nagarotthan Maha-Abhiyaan"
Scheme were allotted to M/s. Nisarga Consultants, Nashik by us as per officc
orders given below.
Estimated Cost
(Lac Rs.)
w";[ aiidei outwar.l
2576.72Lac
no. ct{q / {tfu / UIDSSNI'I
qcqq
/ roo\gr
qelqq\?'
Work Order outward
no. rtcq / Eifu / g-q-ngqi /
ro\t
/ i""S-t", R.C-\e-lo!o
The agency has completed the preparation work of detailed project reptrt'ts o1'
above schemes. The performance of the agency is satisfactory.
Roha Municipal Council, Roha
Tal. Roha, Dist. I{aigacl
Copy to M/s. Nisarga Consultants, Nashik for information.
Work Order No. & Date
Name of Scheme
Water Supply Scheme
Under Ground
Drainage Scheme
2198.57 Lac
MALEGAON
CORITORAflON
WAIII II'E,Y FI]IFT
c E tftlllca-fl
Torh-nt--
tli. t s dd& 6r, ri. Nt of
F -.i...add
h--a
h!i"
nddri; Di. de; .1d-, .o lltl.,E trb sttat tu
(oii o-
'
i"lir o saa r Mn. iri.r od-b' N* tt
-.
F.do'
or-
i_
Tb.
|*y
b c.4Lnd tt nErdid tqt of ddk'
Fjtd
tt"t d
ev!..r@
ri.Ffr''d. of li.lsvn.ad..ott
o,
,*)4Y
6rrfu
Mi.rdalol4.l
Cd[.Etl-
M.lin idd.lcrt
ri*
I Ar. . l,ld.rd VG SqdY
r.b(on-Ito.lrc
FdofNdDi-iLd
It.163 m/'!sa
0tr-
rb r,l2lll
Road Works Certificates & List of
Road Works
Road Works :-
Sr.
No.
Name of Work Under
Type of
Work
Estimated
Cost
(in Cr. Rs)
Remark
I Integrated Road Works
1 Integrated Road Works for Roha
Municipal Council, Roha, Tal. Roha, Dist.
Raigad
Nagarotthan DPR
Preparation
& PMC
35.43 DPR is under
Scrutiny.
Total 35.43 Crores

II Pradhan Mantri Gram Sadak Yojana

Sr.
No.
Name of Zilla Parishad (Owner) Phase Year
Estimated
Cost
(in Cr. Rs)
Length of
Roads (Km)
1 Sangli (18 Nos. of Roads) VII 2008-09 19.41 77.07
2 Sangli (30 Nos. of Roads) VII 2007-08 40.76 137.00
3 Sangli (7 Nos. of Roads) VI 2006-07 22.29 96.87
4 Nashik (19 Nos. of Roads) V 2005-06 26.03 107.07
5 Nandurbar (50 Nos. of Roads) V 2005-06 38.05 163.30
6 Nandurbar IV 2004-05 14.39 37.84
7 Nashik IV 5004-05 18.55 104.23
8 Nashik III 2003-04 8.19 51.39
Total 187.67 774.77


(Govemment oflndia)
Zilla Parishad Sangi li
Phofe No. 02332327701
This-is_to certiry that, lvts. Nisarga Consultants Nashik, have canied out the complete
Detailed Engineedng Survey, Soil investigation, Estjrates & DpR, and Auto
-CAD
drawings for PMGSY Phase
.VI
works, The above wo-ks are Administratively Approved
from State Technical Agency (Govemment
College of Engineering,
pune)
and Tecir'nically
Sanctioned from Competent Authority ofNRRDA under
pradhan
Mantri Gram Sadak
yoiana
for Sangli Disrrict ofMaharashlra Srare
Dare: 04/l12009
CERTI FI CATE
Sr.
No.
Name of Work
Year No of
Roads
Length of
Roads
Estimated cost
of Projact
I
Providing Consultancy Services for
Detailed Survey and Preparation of
Detailed Project Report ( DPR) for
Rural Roads Under Pradhan Manui
Gmm Sadak Yojana (Phase-VII)
2008-09
18
'77.07
Km.
They have completed detailed Road Survey and
project
Report
preparation
works
satisfacto ly; under work order O No/ Zp Sanglj/pMGSy/DpR/WO
1240/OB dt.26/051200g.
Nodal Exe{utuve Engi neer (
Pl U)
Pradban Mari tri Gram Sadak Yoj ana
Zilla Parishad, Sangli
GIS based Digital Mapping Work
Certificate
Geographical Information System :-
Sr.
No.
Name of Work Client Year Remark
1 Digital Mapping on the Basis of GIS
Method For Yeole Municipal Council
Yeole, Tal Yeole, Dist. Nashik
Yeole
Municipal
Council
2010 Work is in
progress
2 Digital Mapping on the Basis of GIS
Method For Rahuri Municipal Council
Yeole, Tal Yeole, Dist. Nashik
Rahuri
Municipal
Council
2010 80% work is
completed.


LIFT IRRIGATION WORKS
CERTIFICATE
City Development Plans :-
Sr.
No.
Name of Work Under
Type of
Work
Estimated
Cost
(in Cr. Rs)
Remark
1 City Development Plan of Nallasopara
City, Tal. Vasai, Dist. Thane
UIDSSMT CDP
Preparation
2765.06 Sanctioned by
NMC
2 City Development Plan of Vasai City, Tal.
Vasai, Dist. Thane
UIDSSMT CDP
Preparation
342.14 Sanctioned by
VMC
3 City Development Plan of Manmad City,
Tal. Manmad, Dist. Nashik
Nagarotthan CDP
Preparation
469.00 Sanctioned by
MMC
4 City Development Plan of Rahata City,
Tal. Rahata, Dist. Ahemadnagar
Nagarotthan CDP
Preparation
198.80 Sanctioned by
RMC
5 City Development Plan of Roha City, Tal.
Roha, Dist. Raigad
Nagarotthan CDP
Preparation
202.70 Sanctioned by
RMC


Manmad Municipal Councilo Manmad
,
Tal - Nandgaon, Dist. Nashik
xer -f
uof
f
to.
, r Date
63t
O9/2010
CERTIFICATE
It is certified that the "Work of preparation of City Development
Plan of Manmad City for Manmad Municipal Councif' has been
awarded to The Nisarga Consultancy, D-\5, 2'd Floor, Sethi's City
Plaza., Nasik as per our Work Order No. MMC
/PWD/?310/2010-1I
dated 20/07
/2010.
The proposal of the said company is qualified our
Technical criterion. The work has been approved by Standing ..
Committee held on 01/09
/2010.
The cost of works that are includ.ed in the CDP is Rs.469.00 Crore (in
words Rs. Four Hundred Sixty Nine Crore only).
The work is successfully completed by The Nisarga Consultancy,
Nashik.
\g{"4*,
./
Chief Officer,
Manmad Municipal Council,
Manmad.
ffirehm*m ff$ nmwn&* frp re& {apaxwrucil&, ffiroema
Kat
*
Wwfumfa, ffi*sf. Ailqsaaae#msgffir
Ref-
g'dr8lr.olo
Date Lq t
l,;t2010
CERTIFICATE
It is certified that the "work
of preparation of City Development
Plan of Rahata Town for Rahata Municipal Council" has been
awarded to The Nisarga Consultancy, D-15, 2nd Floor, sethi's City
Plaza, Nasik as per our Work Order No.
qr.m.
oTfr/qRT c/\?u/?oqo
dated 22/10/2010.
The cost of works which are included in the CDP is Rs. 1"99.00 Crore
(in words Rs. One Ninety Nine Crore only).
The work awarded is successfully completed by The Nisarga
Consultancy, Nashik.
Rahata Municipal Council,
Rahata
$\.upxs"
_\,'$sr):$*.R$$*:$ {"W\*Rv x$- sqs rs:
'N'sN
- WwNxss-* NlNsN. \xwssssNvN
i
**'
",*
t
Rcf --
2'o
9 V- Date
2$
r
)2-2070
CERTIFICATE
It is certified that the
"Work of preparation of City Development
Plan of Roha City for Roha Municipal Council" has been awarded to
The Nisarga Consultancy, D-15,2"d Floor, Sethi's Ctty Plaza, Nasik as
per our Work Order No. rtcq/qr.{./qquq/loqo-qq, dated 25/11/2010. The
proposal of the said company is qualified our Technical criterion.
The cost of works that are included in the CDP is Rs. 203 Crore (in
words Rs. Two hundred and Three Crore only).
The work is successfully completed by The Nisarga Consultancy,
Nashik.
Roha Municipal Council,
. Roha.
cWE{officer,
Registration Certificate
Registration :-

The Nisarga Consultancy has initiated the process of registration with various Government
Sectors with a goal of increasing its footprint & looks forward to new challenges in the
Infrastructure industry.

1) Maharashtra Jeevan Pradhikaran, Mumbai B Class
2) Public Works Department, Govt. of Maharashtra
3) Airports Authority of India
4) Jalswarajya Prakalp, Z. P. Nashik


riEoftA srITuFr:
ffi
@
vs&lqd
Tue IlrpraN PlRtt rpRsstl' Acr, 1932
' '
I
\0'14
1qO3t9""'
' 'qT
ftF?ft
qrrft'q q.ffii
srtufrqq,
qq,.
(qqil
qr
3TfuFiqq'mqr.F
3)
ci-'ern dFq fi-fri ffi ow-qm 3{rfr 3nt,
Given under my hand this ... day of 200"
' " '
FORM
'H'/q5fl '
E'
(
See Rule 17 7ftqq eo
q-dT)
CERTIFICATE OF REGISTRATION
(Acl No. IX or 1932)
qrr#q qrrffi
e{tsft{n,
qt3?
(rrc a3i?
qr
crfqn-qq mqio
q)
Registration No
+ilfr;Fqifi
:dilq
-
33er{(, ,
It is certified that a firm bY name
with its head office at
qrqFrlall{a}*
'" '
t**wsc wffifiGi$r
qFffi
r{qan
ffi
,ffi
i ilJ,",Triu
ry r e g i s re re.,ffis,trffi
:
E H
^fr
:ilil
.5d
qrdn
ci-
qqrDTd
6{uqrc sn,Jr-iE or,
EE
-
ETII4-'FEi
;
.
................\....
q"QrA
!t S
.v
"&\
\
.&,*-,:
Ssgl$i'tq/tu-
LIST OF EQUIPMENTS & SOFTWARES
List of Instruments / Equipments :-
Sr. No. Instruments / Equipments Quantity Model
1 Hand GPS 2 Magellan/315
2 Electronic Total Station 6 Leica (2), Nikon (4)
3 Auto Level 30 Lawrence & Mayo
4 Theodolite 6 Lawrence & Mayo
5 Dumpy Level 10 Lawrence & Mayo
6 Prismatic Compass 15 Lawrence & Mayo
7 Plane Table Sets 10 Lawrence & Mayo
8 Staves 55 Lawrence & Mayo
9 Ranging Rods + Prisms 42 Lawrence & Mayo
10 Measuring Tapes & Chains 40 Lawrence & Mayo
11 Vehicles 3 Indigo, Bolero, Omni Van
12 Computers 15 Intel P IV & Core 2 Duo
13 Printers / Plotters 4 + 2 Hewlett Packard
14 Scanner 2 Hewlett Packard

List of Softwares :-
1) Kanal ++ :- For Sewerage Scheme Design
2) Aqua++ :- For Water Supply Scheme Design
3) Geomatics :- For Irrigation, Command Area & Road Work

Our Valuable Clients :-
1 Panam Irrigation Project Division - Godhara ( Gujrat )
2 Pachayat Raj Engineering Department Banglore ( Karnatka )
3 Central Railway Pune ( Construction )
4 Godawari Marathwada Irrigation Development Corporation
5 Nashik Municipal Corporation
6 Malegaon Municipal Corporation
7 Dhule Municipal Corporation
8 Fortress Infrastructure Advisory Services, Mumbai
9 Bhagur Municipal Council
10 Nandgaon Municipal Council
11 Manmad Municipal Council
12 Yeole Municipal Council
13 Trimbakeshwar Municipal Council
14 Rahuri Municipal Council
15 Kopargaon Municipal Council
16
17
18
19 Rahata Municipal Council
20 Pulgaon Municipal Council
21 Pusad Municipal Council
22 Pachora Municipal Council
23 Roha Municipal Council
24 Ratnagiri Municipal Council
25 Junnar Municipal Council
26 Beed Municipal Council
27 Devlali Pravara Municipal Council
28 Dondaicha Municipal Council
29 Shrirampur Municipal Council
30 Zilla parishad, Nashik
31 Zilla parishad, Sangli
32 Zilla Parishad Nandoorbar
33 Zilla Parishad Kolhapur
Kandhar Municipal Council
Shirdi Nagarpanchayat
Satara Municipal Council
No. Name Qualification Field of
Expertise
Experience Status in the firm
1 Mr. P. N. Gokhale M. E. (Env. Engg.),
M.B.A.
43 Associate
Consultant
Team Leader & Water
Supply Specialist
2 Mr. R. B. Patil D. Arch 29 Full Time Partner (Manager -
Finance)
3 Mr. S. B. Patil D. C. E. & R. E. 27 Full Time Partner (Team Leader)
4 Mr. C. R. Bhavsar D.E.E. 42 Associate
Consultant
Elect. Engg. Expert
5 Mr. M. K. Mundada M. Com. MBA (Fin), ACA 10 Associate
Consultant
Finance Manager
6 Mr. Sandip Loharkar B. E. Civil 9 Full Time Project Manager
7 Mr. Vinayak Patil B Arch. 8 Full Time Arch. work
8 Mr. S. H. Bhalerao D. C. E. 23 Full Time Project Manager
9 Mr. G. S. Borade D. C. E. 13 Full Time Sr. Engineer
10 Mr. N. S. Kadam D. C. E. 14 Full Time Sr. Engineer
11 Mr. V. D. Bhagat B.A. 4 Full Time Computer Operator
12 Mr M.B. Dange B. E. Civil 2 Full Time Project Manager
13 Mr. R. V. Niphade ITI Draftsman 5 Full Time Auto CAD Specialist
14 Mr. Deepak Kale Surveyor 5 Full Time Manager - Survey
15 Mr. Amol Shelke D.C.E 3 Full Time Sr. Engineer
OUR RESOURCES
No. Name Qualification Field of
Expertise
Experience Status in the firm
16 Mr. Gunvant Nehete I. T. I. 4 Full Time Site supervisor
17 Mr. Adinath Bhagat D.C.E 3 Full Time Sr. Engineer
18 Mr. R.B. Badawane Draftsman 2 Full Time Auto CAD Specialist
19 Mrs. Rohini Wagh B. A. 8 Full Time Account work
20 Mr. V. T. Jadhav B.A./ PPT 9 Full Time Computer Operator
OTHER NECESSARY DOCUMENTS
BI!-{|ER trf-Tfrf
INCOMETA)(
DEPARTMINT
THE HISARGA
CONSULTAHCY
01t0412oo7
Ee
...
..
"
\'-
,,.r-:
.1.
i
:
AAFFT4458A
r. .-r la.:
-r
'qrRT
g{#r{
GOVT. OF INDIA
,1,-
rl
l
I
Fax Nq
Tele No
I 09,58 tlt{a-t
g
@5$ 2574W
SnivejiUdyan Brench
HotelKubera Building
Old Agm Road, Nasik
Maharasiha 422 00'1
lndia
Dat6: 27-06 2011
BANK OF INDIA
Thk is to certify th.t to the best or our knowledge and
information THE NISARGA CONSULTANCY NASHIK, 6 custom. of our Bank
ii respect ble.nd m.y be reolrded !s good up to ! sum of R3. zO.OoLAcs
(Rs.
T\,,ENTY LACS ONL,
This i! certiried lh.t this inldrm.lion is furnished without rny risk
and responsibility an our
pa.t
in ny rsP8ct whatoEver mors
particulrly
ejther !s gurf.ntor or otherwile.
This.ertific.te i.
Consultrncy N.shik.
TO Wlloll SO FVER IT llAY COlfCERll
issled rt speciFn request of The Nis.rgs
FOT 6ANK OFINOIAI
SHIVA]I UDYAN ARANCH
\. n---tt-)

You might also like