LSTC001 CONCRETE DESIGN PROCEDURE
FOR APPROVAL
Jos Gilarranz Eduardo Santamaria DEC.85 DEC.85
ENGINEERING SPECIFICATION
DEC.85
NOV.93 L.T.
J.S.
1
0
GENERAL REVISION 4
5
E.J.
J.G.
A.N.
E.S.
ENGINEERING DESIGN MANUAL
ESPECIALISTAS
APPD.BY
PDVSA
REVISION FECHA
ENGINEERING SPECIFICATION
CONCRETE DESIGN PROCEDURE
NOV.93
1
PDVSA LSTC001
Pgina 1
PDVSA
.Men Principal Indice manual Indice volumen Indice norma
Index
1 SCOPE 2 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2 REFERENCES 2 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.1 Project Engineering Guides 2 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.2 Engineering Specifications 2 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.3 Industry References 2 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3 DESIGN 2 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.4 Schedule of Test Cylinders 3 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
REVISION FECHA
ENGINEERING SPECIFICATION
CONCRETE DESIGN PROCEDURE
NOV.93
1
PDVSA LSTC001
Pgina 2
PDVSA
.Men Principal Indice manual Indice volumen Indice norma
1 SCOPE
This section deals with basic practices and minimum requirements governing the
selection of materials and design criteria for all concrete and is not intended to
replace the judgment of the design engineer.
2 REFERENCES
2.1 Project Engineering Guides
90615.1.003 Concrete Design
90615.1.004 Reinforced Concrete Beams
90615.1.005 Reinforced Concrete Columns
90615.1.001 Pile Foundations
90615.1.007 Vertical Vessel Foundations
90615.1.008 Horizontal Vessel Foundations
90615.1.010 Storage Tank Foundations
2.2 Engineering Specifications
A211 Concrete Material & Construction
A251 Concrete Bellow GradeDesign
AE213T Road Reinforced Concrete
AG212PT Concrete Dikes for Storage Tanks
JA251 Concrete Structure Design
2.3 Industry References
ACI American Concrete Institute
ANSI American National Standards Institute
UBC Uniform Building Code
ASTM C94 Ready Mix Concrete
ASTM C150 Portland Cement
ASTM C192 Mixing and Curing Concrete Test Specimens in the
Laboratory
3 DESIGN
3.1 A statement covering the properties of the materials and the proportion by weight
of cement, water, aggregates and additives proposed for each class of concrete
required for the job shall be submitted by the contractor.
3.2 Design strength of concrete mixes shall be not less than those given in the
following:
REVISION FECHA
ENGINEERING SPECIFICATION
CONCRETE DESIGN PROCEDURE
NOV.93
1
PDVSA LSTC001
Pgina 3
PDVSA
.Men Principal Indice manual Indice volumen Indice norma
USE
COMPRESSIVE
STRENGTH
kg/cm
2
psi
Low strength conc. for filling purposes
mass is the principal requirement
100 1500
Conc. on or below grade such as footings,
pile caps, tie beams, grade beams,
anchor blocks, catch basins, pumps
blocks, paving and sidewalks
140 2000
Buildings, covers, girders, beams, slabs,
stands and columns not exposed to
weather
175 2500
Cast in place piling 175 2500
Bolster, girders, beams, slabs, piers and
columns exposed to weather super
structures, concrete structures over sea
and lacustrine water, pipe supports
concrete for fireproofing
250 3000
Precast pipe, crossbeam, precast conc.
sills, ornamental conc., chimneys,
foundation in areas in contact with sulfuric
acid or sea water, separators and
reservoirs
250 3500
Precast prestressed con. structures and
precast piling
280 4000
Prestressed piling Exposed to sea water 350 5000
3.3 The values shown in 3.2 represent 28 day compressive strength of normal
portland cement concrete or 7 day compressive strenght of highearly strength
conc. as determined by test on 152 mm. (6 in.) diameter by 305 mm. (12 in.) height
cylinder per Covenin 340 through to 346 (ASTM C192).
3.4 Schedule of Test Cylinders
Quantity of Conc.
Min. N of
Cylinders
7 Days 8 Days
30 m
3
or less 2 1 1
30 75 m
3
yds. 4 2 2
75 m
3
and over 6 3 3
3.5 Test specimen shall be taken and tested by an approved laboratory in accordance
with Covenin 1680, 484 (ASTM Specification C172, C31, and C39, latest issue).
Results of test shall immediatley be submitted to PDVSAs representative.
REVISION FECHA
ENGINEERING SPECIFICATION
CONCRETE DESIGN PROCEDURE
NOV.93
1
PDVSA LSTC001
Pgina 4
PDVSA
.Men Principal Indice manual Indice volumen Indice norma
3.6
a. Where the ultimate 28 day compressive strength of concrete in test cylinder
falls below the strength specified for the class of conc. tested, at below
proportional minimum 7 day strengths, the proportions, water content or
temperature conditions shall be changed to secure the required strength.
b. Concrete temperatures should be kept within desirable limits using methods
recommended in Covenin 1680, 486 (ACI 305).
3.7 A slump test shall be performed to each test cylinder taken and results recorded
will be submitted in the same report.

RECOMMENDED SLUMPS Slump in mm.


S.N
Type of Construction max. min.
1 Exposed roof slabs 50 25
2 Heavy mass construction 50 25
3 Pavements 75 25
4 Plain footings 75 25
5 Reinforced foundations walls and footings 75 25
6 Columns, beams, reinforced walls and slabs 100 25
Note: Max slump may be increased 25 mm. for methods of consolidation other
than vibration.
3.8 Where cylinder tests indicate strengths below those specified, at the discretion of
the PDVSAs representative, cores shall be taken of the work as builts, and tested
in accordance with Covenin 345 (ASTM Specification C42), latest revision. If the
tests of the core samples indicate concrete of specified strength of cores shall be
defined in each particular project, but in no case shall be less than fifteen percent
below the herein specified values. If the core tests indicate strenght of fifteen
percent or more below those specified, the cost of coring and testing shall be at
the contractors expense, remove all unstisfactory concrete from the work and
replace it with sound concrete of the specified strength.