APPENDIX I

(See paragraph-6)

FORM 1
(I) Basic Information
Serial
Number
Item Details
1. Name of the project/s SKYLINE Proposed Group Housing Project
promoted by M/s Sunprime Infratech Pvt. Ltd.
2. S. No. in the schedule Category B under item 8(a) of the schedule of
Gazette Notification dated September 14
th
, 2006.
3. Proposed
capacity/area/length/tonnage to
be handled/command area/lease
area/number of wells to be
drilled
S.
No.
Particulars Details
1. Total Plot Area 7582.62 Sq. m
2. Built up Area 35549.12 Sq. m
3. Gross Built up Area 42251.02 Sq. m
4. Floor
Area
Ratio
Permissible 2.25 (17060.89
Sq. m)
Total Net
FAR
Achieved
3.13=2.25+0.88*
(23760.37 Sq. m)
5.

Ground
Coverage
Permissible

35 % (2653.91 Sq.
m)
Achieved 25.59 % (1940.98
Sq. m)
6. Landscape
Area
Permissible 1137.39 Sq. m (15
% of total plot
area- 7582.62 Sq.
m)
Achieved 1623.16 Sq. m
(21.41 % of total
plot area- 7582.62
Sq. m)
7. Height Achieved

44.90 m (up to
Terrace Floor)
& 52.65 m (up to
Machine Room)
*By Laws Permitting purchase of FAR is enclosed
as Annexure XXVII.
4. New/Expansion/Modernization It is a new project.
5. Existing Capacity / Area etc. -
6. Category of Project i.e. A or
B
B
7. Does it attract the general
condition? If yes, please specify
No
8. Does it attract the specific No
M/s Sunprime Infratech Pvt. Ltd. TEAM Institute of Science & Technology Pvt. Ltd.


Authorized Signatory EIA Consultant
condition? If yes, please specify
9. Location Kota
Plot/Survey/Khasra No. Plot No. 1/A,
Village Rajiv Gandhi Nagar
Tehsil Ladpura
District Kota
State Rajasthan
10. Nearest railway station/airport
along with distance in Kms.
Dakaniya Talaav Railway station at about1.67 km
towards NE
Kota Railway Station at about 10.12 km towards
NNE
Kota Airbase at 2.90 km towards North
NH- 12 at about 0.02 km towards East.
11. Nearest Town, city, District
Headquarters along with
distance in Kms.
The Project is situated in Kota city.
12. Village Panchayats, Zila
Parishad, Municipal
Corporation, Local body
(complete postal addresses with
telephone nos. to be given)
Urban Improvement Trust,
Near C.A.D Circle, Kota,
Rajasthan
(+91-0744) 2500777, 2414149; +9198290-38031
13. Name of the applicant M/s Sunprime Infratech Pvt. Ltd.
14. Registered Address F-316, Bhamashah Mandi Road, Road No. 6, IPIA
Kota-324005
15. Address for correspondence:
Name Mr. Ramesh Kumar Yadav
Designation (Owner/
Partner/CEO)
Director & Authorized Signatory
Address 1/A, Rajeev Gandhi Nagar, Opp. City Mall,
Jhalawar Road, Kota, Rajasthan
Pin Code 324005
E-mail hindustanmetals@yahoo.co.in &
yadavtractors_kota@yahoo.com
Telephone No. 09414188396
Fax No. 0744-2490584
16. Details of Alternative Sites
examined, if any. Location of
these sites should be shown on
a topo sheet.
No alternative site was examined as the land is
developed and allocated to the proponent by UIT
(Urban Improvement Trust) kota.
Plot is developed for Group Housing Purpose.
Geographical location-
Latitude- 25 08'08.53"N
Longitude - 7551'13.89" E
17. Interlinked Projects No
18. Whether separate application of
interlinked project has been
submitted?
Not Applicable
19. If yes, date of submission Not Applicable
20. If no, reason Not Applicable
21. Whether the proposal involves
approval/clearance under: if
No
M/s Sunprime Infratech Pvt. Ltd. TEAM Institute of Science & Technology Pvt. Ltd.


Authorized Signatory EIA Consultant
yes, details of the same and
their status to be given.
(a) The Forest
(Conservation)
Act, 1980?
(b) The Wildlife
(Protection) Act,
1972?
(c) The C.R.Z
Notification, 1991?
22. Whether there is any
Government Order/Policy
relevant/relating to the site?
No
23. Forest land involved (hectares) No
24. Whether there is any litigation
pending against the project and
/or land in which the project is
proposed to be set up?
(a) Name of the court
(b) Case No.
(c) Orders/directions of the
Court, if any and its
relevance with the
proposed project.
No

(II) Activity
Construction, operation or decommissioning of the Project involving actions,
which will cause physical changes in the locality (topography, land use, changes in
water bodies, etc.)

S. No. Information/ Checklist
confirmation
Yes/No Details thereof (with approximate
quantities/rates, wherever possible)
with source of information data
1.1 Permanent or temporary change in
land use, land cover or topography
including increase in intensity of
land use (with respect to local
land use plan)
No








Yes






Land use
The proposed site has been auctioned by
UIT Kota and allocated to project
proponent. Therefore the proposed
project will not significantly differ from
existing land use of locality and it will
not bring any significant change in land
use of locality.
Land cover
Due to human activities land cover is
either directly affected from activity like
construction of road-building leading to
deforestation or indirectly from water
diversion leading to lowering of the water
table. The proposed project will not
involve any deforestation only small work
M/s Sunprime Infratech Pvt. Ltd. TEAM Institute of Science & Technology Pvt. Ltd.


Authorized Signatory EIA Consultant











No
of site clearance will be done in which
some shrubs and grasses will be
removed. It will be balanced by planed
landscaping on site.
Excavation of soil will be involved. The
total expected quantity of earthwork
involved is about 8000 M
3
. The
excavated soil will be balanced within
site by back filling. Therefore the
changes will be localized and
insignificant.
Topography
The site is plane but it will need some
leveling activities. The proposed site
does not involve any major natural
drainage channel of locality therefore no
changes in drainage pattern are
envisaged.
1.2 Clearance of existing land,
vegetation and buildings?
Yes The proposed site is devoid of any
buildings thus no demolition of building
will be practiced.
The project site is not having any
vegetation except local perennial herb,
shrubs and grasses like Crotalaria
burhia, Leptadenia pyrotechnica,
Saricostoma pauciflorum and Zizyphus
nummularia etc. These will be removed
during site preparation. To compensate
that it is proposed to plant 70 tree in
addition to shrubs. The proposed
landscaping and plantation will have
positive impact on environment. Details
of flora are enclosed as Annexure-
XVI.
1.3 Creation of new land uses? No The proposed site has been auctioned by
UIT Kota and allocated to project
proponent. Therefore the proposed
project will not create new land uses
that significantly differ from existing
land use of locality as per the master
plan.
1.4 Pre-construction investigations
e.g. bore houses, soil testing?
Yes The soil investigation was carried out by
Indian Geotechnical Consultants,
Kota. The detailed Soil investigation
report is enclosed as Annexure- XIV.
1.5 Construction works? Yes The Proposed Group Housing Project
will involve construction of Basement+
Ground (Stilt) +1
st
to 14
th
Floor. Details
are given below:
M/s Sunprime Infratech Pvt. Ltd. TEAM Institute of Science & Technology Pvt. Ltd.


Authorized Signatory EIA Consultant
Area Statement:
S. No. Blocks BUA
(Sq. m.)
Gross B.U.A.
(Sq. m.)
Net FAR
(Sq. m.)
1 Basement 5615.08 5615.08 344.63
2 Ground (Stilt) 2928.10 3396.36 378.06
3 First Floor 1940.98 2389.72 1554.15
4 Second Floor 1949.77 2389.72 1666.82
5 Third Floor 1949.77 2389.72 1666.82
6 Fourth Floor 1949.77 2389.72 1666.82
7 Fifth Floor 1949.77 2389.72 1666.82
8 Sixth Floor 1949.77 2389.72 1666.82
9 Seventh Floor 1949.77 2389.72 1666.82
10 Eighth Floor 1949.77 2389.72 1666.82
11 Ninth Floor 1949.77 2389.72 1666.82
12 10
th
Floor 1949.77 2389.72 1666.82
13 11
th
Floor 1949.77 2389.72 1666.82
14 12
th
Floor 1949.77 2389.72 1666.82
15 13
th
Floor 1721.27 2106.43 1457.69
16 14
th
Floor 1721.27 2106.43 1457.69
17 Terrace 350.08 350.08 Nil
Total 35549.12 42251.02 23527.24
Total F.A.R Achieved = 23527.24 Sq. m
Club House Area Permissible = 23527.24 X 0.05 = 1176.36 Sq. m
Total Club House Achieved = Basement= 833.34 Sq. m (stilt = 576.15 Sq. m)=1409.49 Sq. m
Club House F.A.R = 1409.49 1176.36 = 233.13 Sq. m
Total Net F.A.R Achieved = 23527.24 + 233.13 = 23760.37 Sq. m (3.13)
1.6 Demolition works? No Not involved
1.7 Temporary sites used for
construction works or housing of
construction workers?
Yes They will be housed in temporary houses
supported by flush WCS during
construction period only.
1.8 Above ground buildings,
structures or earthworks including
linear structures, cut and fill or
excavations
Yes The maximum height of proposed project
will be 44.90 m (up to Terrace Floor)
52.65 m (up to Machine Room).
Expected quantity of earth work involved
is about 8000 M
3
.
1.9 Underground works including
mining or tunneling?
No No tunneling activity is involved.
1.10 Reclamation works? No No reclamation works involved
1.11 Dredging? No Not involved
1.12 Offshore structures? No Not applicable
1.13 Production and manufacturing
processes?
No Not applicable
1.14 Facilities for storage of goods or Yes Temporary stores or sheds were
M/s Sunprime Infratech Pvt. Ltd. TEAM Institute of Science & Technology Pvt. Ltd.


Authorized Signatory EIA Consultant
materials? constructed for storage of construction
materials.
1.15 Facilities for treatment or disposal
of solid waste or liquid effluents?
Yes






STP of capacity 125 KLD for treatment
of sewage will be provided. Total sewage
generated will be 93 KLD. After
treatment 90% i.e. 83.7 KLD will be
available. Out of which 29 KLD will be
used for flushing & gardening and
remained 54.7 KLD recycled water will
be discharged in drains maintained by
PHED after taking necessary permission
from PHED.

All solid waste from different sections
will be collected in separate bins. The
non-organic waste shall be disposed off
to authorized vendors. The organic waste
will be converted into manure and used
within premises for green belt
development.
1.16 Facilities for long term housing of
operational workers?
Yes Cabins for watchmen, gardeners etc and
persons engaged in essential services.
1.17 New road, rail or sea traffic during
construction or operation?
No The existing infrastructure is sufficient to
catch-up for the need of such a small
project, insignificant increase in traffic
for transport of men & material is
envisaged.
1.18 New road, rail, air waterborne or
other transport infrastructure
including new or altered routes
and stations, ports, airports etc?
No The proposed project site has well
connectivity therefore will not require
any change in existing infrastructure.
1.19 Closure or diversion of existing
transport routes or infrastructure
leading to changes in traffic
movements?
No No public road or infrastructure is
crossing or within the proposed site.
1.20 New or diverted transmission lines
or pipelines?
No No pipeline or transmission line is
crossing or within the proposed site.
1.21 Impoundment, damming,
culverting, realignment or other
changes to the hydrology of
watercourses or aquifers?
No The proposed site does not involve any
major natural drainage channel of
locality therefore no changes in drainage
pattern are envisaged.
1.22 Stream crossings? No -
1.23 Abstraction or transfers of water
from ground or surface waters?
Yes Water will be taken from PHED supply.
For which application has been submitted
and receiving photocopy of application is
enclosed as Annexure- XXIV.
1.24 Changes in water bodies or the
land surface affecting drainage or
run-off?
yes Only treated water will be discharged
in drains maintained by PHED after
taking necessary permission from
PHED.

M/s Sunprime Infratech Pvt. Ltd. TEAM Institute of Science & Technology Pvt. Ltd.


Authorized Signatory EIA Consultant
1.25 Transport of personnel or
materials for construction,
operation or decommissioning?
Yes During construction phase material of
construction will be transported to site
from local market and other sources
depending on availability.
During operation stage the transportation
activities will be due to cars, two
wheelers and other vehicles of the
residents.
1.26 Long-term dismantling or
decommissioning or restoration
works?
No There is no building needing dismantling
exist on the plot.
1.27 Ongoing activity during
decommissioning which could
have an impact on the
environment?
No There will be no decommissioning
activity.

1.28 Influx of people to an area in
either temporarily or permanently?
Yes During construction phase, there will be
inward and outward movement of local
labour in the construction site. However
during the post construction phase, there
will be regular movement of residents,
visitors and other related persons. The
residential apartment will house about
1075 persons which will not bring any
significant increment in total population
of locality.
1.29 Introduction of alien species? No Only the plant/ tress of local species and
suitable for the region will be planted.
1.30 Loss of native species or genetic
diversity?
No There are no grown trees on the proposed
site, some shrubs and grasses will be
removed. The same will be amply
compensated by proposed plantation and
landscaping.
1.31 Any other actions? No -

2. Use of Natural resources for construction or operation of the Project (such as
land, water, materials or energy, especially any resources which are non-
renewable or in short supply):
S. No. Information/checklist
confirmation
Yes/No Details thereof (with approximate
quantities/rates, wherever possible)
with source of information data
2.1 Land especially undeveloped or
agricultural land (ha)
No The proposed site is in developing urban
area and site has been auctioned by UIT
Kota and allocated to project proponent.

2.2 Water (expected source &
competing users) unit: KLD





Yes
During construction phase water
requirement will be 15 KLD which will be
met from authorized water suppliers.
During post construction phase daily
water requirement will be about 115 KLD.
86 KLD - Fresh water from PHED supply.
M/s Sunprime Infratech Pvt. Ltd. TEAM Institute of Science & Technology Pvt. Ltd.


Authorized Signatory EIA Consultant
29 KLD - Recycled water from STP.
2.3 Minerals (MT) No -
2.4 Construction material stone,
aggregates, and /soil (expected
source-MT)





Yes
The construction will involve use of
Stone, Stone Grit, Sand bricks and timber.

The Stone and Stone grit is available from
various queries operative around Kota
city.
The source of sand will be river bed sand
from nearby river of Kota.
Details are enclosed as Annexure-I.
2.5 Forests and timber (source MT) Yes Timber will be obtained from authorized
local timber merchant.
2.6 Energy including electricity and
fuels (source, competing users)
Unit: fuel (MT), energy (MW)


The total power demand of the project
will be 1723 KW.
The power will be received from JVVNL
at 11 KV supply voltage, it will be
stepped down to 0.433 KV through 1
transformer of capacity 2500 kVA.
To supplement above during power
failure, it is proposed to provide 1 D.G.
set of capacity 160 kVA for common
facilities to cater the essential load only.
2.7 Any other natural resources (use
appropriate standard units)
Yes Solar energy will be utilized for lighting
of common areas and solar water heaters
for providing hot water to residents.

3. Use, storage, transport, handling or production of substances or materials,
which could be harmful to human health or the environment or raise concerns
about actual or perceived risks to human health.

S. No Information/checklist
confirmation
Yes/No Details thereof (with approximate
quantities/rates, wherever possible)
with source of information data
3.1 Use of substances or materials,
which are hazardous (as per
MSIHC rules) to human health
or the environment (flora, fauna,
and water supplies)
No The proposed project will not use any
hazardous material. Hazardous
material in proposed project will be
generated only as used lubricating oil
from DG Sets which can cause health
hazard. This used oil will be sold to
authorized recyclers.
3.2 Changes in occurrence of disease
or affect disease vectors (e.g.
insect or water borne diseases)
No Hygienic conditions will be
maintained.
3.3 Affect the welfare of people e.g.
by changing living conditions?
Yes


The urban cities including Kota are
suffering from shortage of adequate
and hygienic living conditions. This
has resulted in mushrooming of
unauthorized Colonies which lacks
basic amenities.
M/s Sunprime Infratech Pvt. Ltd. TEAM Institute of Science & Technology Pvt. Ltd.


Authorized Signatory EIA Consultant
The proposed project will provide all
basic amenities and hygienic and
comfortable living conditions.
3.4 Vulnerable groups of people
who could be affected by the
project e.g. hospital patients,
children, the elderly etc.,
No There are a number of Schools,
Colleges, Hospitals etc but it is a small
group housing project and will not
affect vulnerable group of people.
3.5 Any other causes No -

4. Production of solid wastes during construction or operation or
decommissioning (MT/month)

S. No. Information/checklist
confirmation
Yes/No Details thereof (with approximate
quantities/rates, wherever possible)
with source of information data
4.1 Spoil, overburden or mine wastes No -
4.2 Municipal waste (domestic and
commercial wastes)
Yes Municipal waste generated from
residential portions:
Total population of Residents =1075
Persons (considering @ 0.41
Kg/day/person)
Solid waste generation=10750.41
=440.75 Kg/day Say 441 Kg/day
Consider that 60 % of the total solid
waste will be dry garbage and rest (40
%) will be wet garbage.
Dry Garbage = 441 0.60 = 264.6
Kg/day
Wet Garbage = 4350.40 = 176.4
Kg/day
Commercial area =2310.65 m
2

Considering one worker for every 20
m
2
area.
No. of persons employed in
commercial area are 115.
Solid waste generated @ 0.41
Kg/day/person
Solid waste generation =0.41 x 115=
47.2 Kg/day Say 47 Kg/day
Dry Garbage = 47 0.60 = 28.2
Kg/day
Wet Garbage = 470.40 = 18.8
Kg/day
Total Solid waste generation at project
site =441 +47 =488 Kg/day
Total Dry Garbage =292.8 Kg/day
M/s Sunprime Infratech Pvt. Ltd. TEAM Institute of Science & Technology Pvt. Ltd.


Authorized Signatory EIA Consultant
Total wet Garbage =195.2 Kg/day
Segregation will be practiced at the
source level itself.
Dry waste will be stored in the area
marked for it, from where it will be
sent for further disposal.
Green waste will be converted into
manure along with S.T.P. sludge by
vermiculture at the project site -
provisions are made close to STP. The
manure will be used to develop the
greenbelt within the premises.
Area specified for vermiculture will be
surrounded by fast growing and
canopy forming trees.
4.3 Hazardous wastes (as per
Hazardous waste Management
Rules)
Yes Used lubricating oil from DG Set will
be generated during construction of
the building.
Waste oil will be properly stored and
sold to authorized recyclers.
4.4 Other industrial process wastes No Not applicable as the proposed project
is of construction and will not involve
any industrial activity.
4.5 Surplus product No Not applicable , Residential
Apartment
4.6 Sewage sludge or other sludge
from effluent treatment
Yes Dried sludge from STP will be used as
manure for plants after treatment.
4.7 Construction or demolition
wastes
Yes Construction wastes will be used for
road construction.
4.8 Redundant machinery or
equipment
No All machinery after construction will
be removed from site
4.9 Contaminated soils or other
materials
No No such material envisaged
4.10 Agricultural wastes No Not applicable
4.11 Other solid wastes No Not applicable

5. Release of pollutants or any hazardous, toxic or noxious substances to air
(Kg/hr)

S. No. Information/checklist
confirmation
Yes/No Details thereof (with approximate
quantities/rates, wherever possible) with
source of information data
5.1 Emissions from combustion of
fossil fuels from stationary or
mobile sources
Yes The only source of pollution will be 1 D.G.
Set of capacity 160 kVA. The emissions
will be discharged through vent of proper
height.
D.G Set will confirm emission limits as
prescribed under E P Act- 1986 and having
M/s Sunprime Infratech Pvt. Ltd. TEAM Institute of Science & Technology Pvt. Ltd.


Authorized Signatory EIA Consultant
acoustic arrangement as per EP act- 1986.
The D.G Set will carry Type approval
Certificate.
5.2 Emissions from production
processes
No -
5.3 Emissions from materials handling
including storage or transport
Yes Dust during transportation and unloading
of material. The measures to minimize the
effects are given in Environmental
Management Plan.
5.4 Emissions from construction
activities including plant and
equipment
Yes The measures to minimize the effects are
given in Environmental Management Plan.
5.5 Dust or odours from handling of
materials including construction
materials, sewage and waste
Yes The measures to minimize the effects are
given in Environmental Management Plan.
5.6 Emissions from incineration of
waste
No No such operations envisaged
5.7 Emissions from burning of waste
in open air (e.g. slash materials,
construction debris)
No Waste would be collected and handed over
to the authorized vendor.
5.8 Emissions from any other sources No -


6. Generation of Noise and Vibration, and Emissions of Light and Heat:

S. No. Information/Checklist
confirmation
Yes/No Details thereof (with approximate
quantities/rates, wherever possible) with
source of information data with source
of information data
6.1 From operation of equipment
e.g. engines, ventilation plant,
crushers
Yes but
negligibl
e
Noise generated by equipment will be
nominal. The measures to minimize the
effects are given in Environmental
Management Plan.
6.2 From industrial or similar
processes
No It is a construction Project.
6.3 From construction or demolition Yes But insignificant to result in adverse effect
on environment.
6.4 From blasting or piling No Not involved
6.5 From construction or operational
traffic
Yes During construction phase the noise will be
generated from movement of vehicles,
earthwork, concrete mixer etc.
6.6 From lighting or cooling systems No Silent generators will be used.
6.7 From any other sources No -

7. Risks of contamination of land or water from releases of pollutants into the
ground or into sewers, surface waters, groundwater, coastal waters or the sea:

S. No. Information/checklist
confirmation
Yes/No Details thereof (with approximate
quantities/rates, wherever possible)
with source of information data
M/s Sunprime Infratech Pvt. Ltd. TEAM Institute of Science & Technology Pvt. Ltd.


Authorized Signatory EIA Consultant
7.1 From handling storage, use or
spillage of hazardous materials
Yes Used lubricating oil from D.G Set will be
properly stored and sold to authorized
recyclers.
7.2 From discharge of sewage or other
effluents to water or the land
(expected made and place of
discharge)
Yes The Sewage generated will be treated and
handled properly to minimize the impact.
During construction phase septic tank
would be provided and during operation
phase STP would be provided.
7.3 By deposition of pollutants
emitted to air into the land or into
water
No The only source of air pollution will be 1
D.G. Set of capacity 160 kVA which
would have vent of proper height.
7.4 From any other sources No -
7.5 Is there a risk of long term build
up of pollutants in the environment
from these sources?
No Not envisaged.

8. Risk of accidents during construction or operation of the Project, which could
affect human health or the environment


S. No. Information/checklist
confirmation
Yes/No Details thereof (with approximate
quantities/rates, wherever possible)
with source of information data
8.1 From explosions, spillages, fires
from storage, handling, use or
production of hazardous substances
No These operations are not involved.
8.2 From any other causes No -
8.3 Could the project be affected by
natural disasters causing
environmental damage (e.g. floods,
earthquakes, landsides, cloudburst
etc)?
Yes There is no history of such disasters.
Proper safety measures as per Disaster
Management Plan will be adopted to
face such incidents.

9. Factors which should be considered (such as consequential development)
which could lead to environmental effects or the potential for cumulative impacts
with other existing or planned activities in the locality.

S. No. Information/checklist
confirmation
Yes/No Details thereof with approximate
quantities/rates, wherever possible)
with source of information data
9.1 Lead to development of supporting.
cities, ancillary development or
development stimulated by the
project which could have impact on
the environment e.g.:
Supporting infrastructure

(Roads, power supply, waste or
No The project is within municipal area of
Kota district with well developed
infrastructure.
This is a small project and will not
make any significant impact.


M/s Sunprime Infratech Pvt. Ltd. TEAM Institute of Science & Technology Pvt. Ltd.


Authorized Signatory EIA Consultant
waste water treatment etc.)
Housing development
Extractive industries
Supply industries
Other
9.2 Lead to after-use of the site, which
could haven impact on the
environment
No This is a construction Project.
9.3 Set a precedent for later
developments
No The project will be developed strictly
as per UIT rules.
9.4 Have cumulative effects due to
proximity to other existing or
planned projects with similar effects
No It is a well developed residential area.

(III) Environmental Sensitivity

S. No. Areas Name/
Identity
Aerial distance (within 15 km.)
Proposed project location boundary
1 Areas protected under international
conventions, national or local
legislation for their ecological,
landscape, cultural or other related
value
No No such areas exist in the project
influence area.
2 Areas which are important or
sensitive for ecological reasons
Wetlands, watercourses or other
water bodies, coastal zone,
biospheres, mountains, forests
No No such areas exist in the near
vicinity.
3 Areas used by protected, important
or sensitive species of flora or fauna
for breeding, nesting, foraging,
resting, over wintering, migration
No No such areas exist.
4 Inland, coastal, marine or
underground waters
No Water requirement of construction
will be met from authorized water
supplier and during post construction
water will be met from PHED supply.
The application to PHED has been
submitted. We are sure to get
connection from PHED before
operation phase of project.

We are planning to recharge runoff on
100 % basis and also propose to
recycle.
5 State, National boundaries No -
6 Routes or facilities used by the
public for access to recreation or
other tourist, pilgrim areas
No -
7 Defense installations Yes -
8 Densely populated or built-up area Yes The project is proposed to come up in
M/s Sunprime Infratech Pvt. Ltd. TEAM Institute of Science & Technology Pvt. Ltd.


Authorized Signatory EIA Consultant
developing area of Kota city.
9 Areas occupied by sensitive man-
made land uses (hospitals, schools,
places of worship, community
facilities)
No Number of Schools, places of worship
and hospitals are there in Kota but the
project will not make any significant
impact on these.
10 Areas containing important, high
quality or source resources
(ground water resources, surface
resources, forestry, agriculture,
fisheries, tourism minerals)
No It is very small non polluting project.
It will not have any impact on high
quality resource.
11 Areas already subjected to pollution
or environmental damage.(those
where existing legal environmental
standards are exceeded)
No Project is situated in urban setting (of
Kota district). Moreover the housing
projects do not warrant general
condition or specific condition as per
EIA Notification.
12 Areas susceptible to natural hazard
which could cause the project to
present environmental problems
(earthquakes, subsidence,
landslides, erosion, flooding or
extreme or adverse climatic
conditions)
No Kota is semiarid region and in the last
40 years just five flooding events in
Kota district have been reported.
Kota is under seismic zone II as per
NBC 2005. Hence it is a safe region.
However, in structural design
provision for earthquake forces have
been made. Map of India showing
seismic zones of India is enclosed
with the questionnaire as Annexure-
XVII.

(b)
I hereby given undertaking that the data and information given in the application and enclosures
are true to the best of my knowledge and belief and I am aware that if any part of the data and
information submitted is found to be false or misleading at any stage, the project will be rejected
and clearance give, if any to the project will be revoked at our risk and cost.

Date:
Place: Kota

Ramesh Kumar Yadav


(Director & Authorized Signatory)
1/A, Rajeev Gandhi Nagar, Opp. City Mall,
Jhalawar Road, Kota, Rajasthan
Pin Code-324005
M/s Sunprime Infratech Pvt. Ltd. TEAM Institute of Science & Technology Pvt. Ltd.


Authorized Signatory EIA Consultant