You are on page 1of 5

747 SIMULATOR

http://www.hyway.com.au/747/minipic/Thumbnails.html
PICTURES PAGE


Scale Balsa wood model of cockpit only
CAD drawing of sim wit instr!ctors enclo!s!re

Early CAD drawing of Sim"
#atest CAD drawings Isometric $iew
%ront $iew
Side $iew
Top $iew
&at it will look like inside
CONSTRUCTION
TIME TABLE

'ome


Pict!res
&ay aead of te targeted sced!le
(an!ary )**+ to (an!ary
)***
Design pase incl!ding ,D CAD drawings of sell"
%e-r!ary )***
Te sim!lator will -e -!ilt and operated on a me..anine
constr!ction/ 0mtrs wide and )1mtrs long" Tis gi2es !s access
to remo2e and transport te sim!lator if needed at a later date"
Sim!lator site preparation/ d!st proofing and water proofing"
Tis will incl!de work -enc/ power so!rce/ 'i3-ay ligting and
remo2a-le plastic seet walls"
4arc )*** to (!ly )***
Constr!ction of -ase and main s!pport -eams incl!ding lifting
l!gs/ and floor access panels" CAD -ase and -eams
Completed Pict!res of completed section"
A!g!st )*** to Septem-er
)***
Installation of Instr!ctors station and rear access door/ incl!ding
skinning" Instr!ctors Station
5cto-er )*** to 6o2em-er
)***
Installation of side wall ri-s and nose plate" Ri-s and nose plate
Decem-er )***
Installation of window frames" window frames
(an!ary 7111
Installation of roof ri-s and s!pports" Roof ri-s and s!pports
%e-r!ary 7111 to April
7111
E8ternal skinning of all walls and roof wit alloy seet" Interior
walls to -e completed later" Start CAD drawings of internal
panels and interior" E8terior skins
4ay 7111
Preparation and painting of e8ternal and internal sell"
(!ne 7111
Install airconditioning/ e8a!st fans and power so!rce
(!ly 7111 to 5cto-er 7111
Internal cockpit and pedestal panel frame" Incl!ding remo2a-le
glaresield"
6o2em-er7111 to
Decem-er 7111
Installation of 52eread panel and circ!it -reaker s!pport
frames" Instr!ctors station ta-le and screen
(an!ary 711) to %e-r!ary
711)
Installation of linked control col!mns !nder te floor" Stems
and col!mns will -e remo2a-le"
4arc 711) to (!ne 711)
4an!fact!re and Installation of all interior wall and roof panels/
all will -e remo2a-le for r!nning ca-les/ aircon and power"
(!ly 711) to Decem-er
711)
4an!fact!re and install all -acklit panels"
Tat is eno!g for now/ , years wort9
Te wole sim will -e constr!cted from Steel/ Alloys/ plastics and wood/ te o-:ecti2e is to
keep te total weigt down"
It may seem e8cessi2e te time frame tat we are working on/ -!t we want to a2e te most
e8act and real ome sim!lator e2er -!ilt"

You might also like