VIRGILIO M. GASANG - Associate ELECTRICAL ENGINEER
No. of Years of Experience 31
Manager / I & C Superintendent / Supervisor / Sr. Equipment Operator
Summary of abilities and work experience
As East West Commerce-Asia Pacific Corp. Project Manager:
o Engineering works and cost estimation for the project proposal.
o Managing the following;
(http://www.east-westcommerce.com/)
HOME (HTTP://WWW.EAST-WESTCOMMERCE.COM/?PAGE_ID=506)
COMPANY OVERVIEW (HTTP://WWW.EAST-WESTCOMMERCE.COM/?PAGE_ID=5)
VISION AND MISSION (HTTP://WWW.EAST-WESTCOMMERCE.COM/?PAGE_ID=10)
OUR SERVICES (HTTP://WWW.EAST-WESTCOMMERCE.COM/?PAGE_ID=13)
OUR PRODUCTS (HTTP://WWW.EAST-WESTCOMMERCE.COM/?PAGE_ID=158)
OUR OPERATIONS (HTTP://WWW.EAST-WESTCOMMERCE.COM/?PAGE_ID=16)
OUR TEAM (HTTP://WWW.EAST-WESTCOMMERCE.COM/?PAGE_ID=19)
CONTACT US (HTTP://WWW.EAST-WESTCOMMERCE.COM/?PAGE_ID=31)
Web Links (#)
Project Planning
Project Implementation and Supervision
As NAPOCOR-Batangas Coal-Fired Thermal Power Plant I & C
Superintendent/ Supervisor:
o Performed various responsibilities in Batangas Coal-Fired Thermal Power Plant as I & C
Superintendent / Supervisor
As Rockwell Thermal Power Plant Sr. Equipment Operator:
o Performed various responsibilities in Rockwell Thermal Power Plant as Sr. Equipment Operator
ERIBERTO D. GLORIOSO Registered MECHANICAL ENGINEER
No. of Years of Experience 31
Manager/ Maintenance Supervisor/ Welding Field Engineer/ Production Supt./ Supervisor
Summary of abilities and work experience
As East West Commerce-Asia Pacific Corp. Project Manager:
o Engineering works and cost estimation for the project proposal.
o Managing the following;
Project Planning
Project Implementation and Supervision


As NAPOCOR-Batangas Coal Fired Thermal Power Plant Mechanical Maintenance
Supervisor:
o Responsible for the accomplishment of all maintenance servicing, overhauling and repair job in
all existing plant mechanical equipment, machineries and accessories. Also responsible for
maintaining an adequate supply of spare parts, tools and other maintenance materials
necessary for the continuous and efficient operation of the plant. There are some mechanical
equipment, machineries under my supervision.
o Check daily machineries work orders; assign jobs to maintenance men thru the leadman giving
specific instructions regarding trouble analysis, repair procedures, materials to be used and
priority of the jobs.
o Prepare servicing schedule of plant mechanical equipment and machineries, determine
necessity of maintenance inspection to correct early stages of defects so as to prevent the
occurrence of major breakdowns.
o Check and follow up progress of length repair jobs, works involving new installations, project
modifications, and revisions; inform the Mechanical Superintendent of the progress thereof
and discuss problems and difficulties that are encountered, if any.
o Assist the Mechanical Superintendent in the general supervision of the maintenance men
during emergency repairs, unit shutdowns and major overhaul. Responsible for all testing of
all welder applicants during emergency repairs, unit shutdowns and major activities.
o Device special tools, adapters, jigs and fixtures and other mechanical aids that are necessary
for accomplishing maintenance and repair jobs. Consult manual, blue prints and other
records in carrying out jobs.
o Determine and preparing drawings and sketches of machine parts for local fabrication to be
used as spare or as substitute parts. Direct the fabrication of such parts and see to it that
measurements and critical dimensions are accurately followed within close tolerance.
o Check spare parts, tools, materials and supplies in the stockroom to ensure the availability.
Initiate replenishment orders when necessary.
o Prepare drawings, specification and information necessary for the purchase requisition of spare
parts, maintenance stock materials and supplies.
o Check deliveries of requisitioned items; determine acceptability as to conformance to
specification, workmanship quality and suitably to intend use.
o Prepared performance evaluation report and subordinates. Recommend training needs to
improve their skills and to promote effective flexibility among them.
o Provide the Maintenance Superintendent A (Mechanical) with pertinent data in the preparation
of the annual budget of the section.
o Keep complete records of maintenance manual, reports, brochures, and memos pertaining to
maintenance
o Observe, comply and enforce the existing rules and regulations, code of discipline, corporate
policies and guidelines, special instructions or orders.
o Promote harmonious relationship among the mechanical maintenance and with other function.
As Atlantic Gulf Pacific Company Welding Field Engineer
o Prepare daily work accomplishment with regards to welding in all areas, Boiler and BOP.
o Scheduling of welders for the daily welding work according to priorities.
o Coordinate to QA/QC concerning radio graphic test results both welders Qualification test and
finished weldments joints.
o Monitor the fit-up / welded joints in the boiler area for engineering reference prior to final billing.
o Coordinate with engineering supervisors regarding isometric drawings, general plan layout for
all welding works.
o Implement the correct usage of welding electrodes for their corresponding base materials.
o Perform daily completed weldments joint as such as boiler piping lines, boiler tubes, water
lines, etc., demineralized tank, water treatment tank, heavy and light fuel oil tanks at BOP
area.
o Perform materials control with regards to welding, such as welding electrodes, welding gloves,
etc.
o Perform tool box meeting twice a week for good relationship among the welders and to discuss
also the problem encountered at the site dailies, so that we can plan ahead the corrective
measures.
o Submit daily distribution of welders to manage office.
o Perform coordination works for welding as per report in water treatment area / demineralized
tank / heavy and light oil tanks and submit to monitoring office for final billing.
o Implement rules and regulations of the company to all welding personnel.
As Primex Coco Products Inc. Production Superintendent:
o Responsible for the plant production operation. Plant operated at 24 hours for three shifts.
o Responsible for maintaining good product quality as per customers ahead.
o Responsible for maintenance crew with regards to equipment breakdown,
repair, for proper scheduling.
o Responsible for the stock inventory, shipments scheduling of production
operation and manpower, Coordinate to the quality control inspector
concerning the clearance of products for shipments for BACTI free, etc.
o Dealing / Explaining with people involve in the production line in the importance
of sanitation and hygienic practices, for good & valuable result of the product
produce.
o Responsible for all paper works concerning production and suggesting
important factor dealing with the low cost, manpower supply etc.
o Conducted final interview for the newly applied personnel in the production
section.
o Answering memos from customers abroad defects / questions against the
quality products.
As Franklin Bakers of the Philippines Production Supervisor:
o Production supervisor is responsible for the day production activities in my
area.
o Performed evaluation of production personnel with regards to work attitudes,
etc.
o Continues reminder to all production people involved in maintaining the
hygienic & sanitation practices.
o Performed remedial measures of unpredictable equipment breakdown due to
sudden loss of power & other varied causes.
o Act as safety officer for the continuous verifying of the health conditions of the
personnel under my supervision.
o Direct reporting to the management the usual activities, such as machine
breakdown, shortage of raw materials, etc. during operation.
o Performed other duties related to production on a case basis such as input of
raw materials, maintaining the production yield and production scheduling.
o Performed also the scheduling of manpower in a day to day activities.
o Responsible to the management for the day production of desiccated products.

ANSELMO T. DELOS SANTOS Registered MECHANICAL ENGINEERING, Lic.
No. 23508
No. of years of Experience 29
Manager / Superintendent / Supervisor
Summary of abilities and work experience
As East West Commerce-Asia Pacific Corp. Project Manager
o Engineering works and cost estimation for the project proposal.
o Managing the following;
Project Planning
Project Implementation and Supervision

As JGSPC Mechanical Maintenance and Engineering Department Manager:
o Engineering works and maintenance of Petrochemical (Polypropylene and
Polyethylene) for the safe, and effective and efficient operation.
o Managing the following ;
Projects under CAPEX & OPEX
Preventive maintenance program for all mechanical equipment.
Reliability program
Testing program
Execution works of all mechanical equipment in the plant.
As NAPOCOR Mechanical Maintenance & Engineering Superintendent to
Manager:
o Maintenance & Engineering works of almost all types of Power Plants
o (Nuclear, Oil-Fired Thermal, Coal-Fired Thermal, Geothermal, Hydro & Diesel)
o Performed rehabilitation / Overhauling & repair of Power Plant Major
Equipments.
o Handled Project management as Project Head of Rehabilitation and Major
Overhauling of various NAPOCOR Power Plants: such as Rehabilitation of
Rockwell Thermal Power Plant Unit Nos. 6 & 8; Calaca Coal-fired Thermal
Power Plant Unit Nos. 1 & 2; and Masinloc Coal-fired Thermal Power Plant
Unit No. 1
o Undertook various replacement of equipments (high pressure heaters, Valves
and piping, heat exchangers, pumps, etc.) and complete re-tubing of
equipment (heat exchangers, boiler, low pressure heater, etc.)
o Task Force Chairman in Preparation of Bid Documents and Bidding for the
supply of Manpower and Equipment for the General Diving Services and
Supply of Skilled and Semi-Skilled in the Overhauling of NAPOCOR Thermal
Power Plants and other Facilities.
o Performed all types of maintenance activities with strict compliance in
clearances or dimensions from equipment manufacturers maintenance
manual and other parameters based on Companys Standard, Operating
Procedures, Work Instruction Procedures and International Standards.
o Specialized in other project planning and implementation, development of
preventive and corrective maintenance procedure, training and development
of manpower / efficient labor force supervisory skills development with
emphasis on multi-skilling , mechanical equipment trouble shooting and
problem analysis. Material / Equipment / Manpower requisitions, planning and
implementation.
o With knowledge in Computerized Maintenance System (Maximo and SAP),
Microsoft Project, office applications such as Microsoft Excel, Word, Power
Point & Publisher.

BERNANRD S. TAMPUS
No. of years of experience 20
Project Supervisor / Pipe Filter / Welder
Summary of abilities and work experience
Over 20years Extensive Experience in construction of coal fired thermal plant project.
Function mostly under the direct supervision executive members of the firm; proven ability to
manage supervisory affairs of the highest degree of professionalism and morale; ability to
cope with pressures; well-motivated, honest and capable of interacting with all levels of
management.
As East West Commerce-Asia Pacific Corp, Project Manager
o Project Supervisor for the following;
Boiler Rehabilitation which includes burner, Valves, Dampers, etc.
Piping and Insulation
Duties and Responsibilities:
o Implement of safety rules regulation and practices.
o Check and Monitors isometric drawings before issuing to construction, updates
engineering drawings and piping layouts.
o Responsible for piping plans and schedule of works such as carbon steel,
stainless, alloys at above ground.
o Supervise review and monitors the subcontractors work during execution to
ensure full compliance with the company requirements.
o Discuss technical queries and problems in site with sub-contractors supervisor.
o Ensures that the construction follow the good practice to avoid/ eliminate
reworks.
o Check and verify the exact ground location and elevation before start work.


HORSE POWER BUILDER AND INDUSTRIAL SUPPLY , INC.
Supervisor AIR HEATER / EXPANSION JOINT
Mirant Pagbilao Power Plant
Located in Pagbilao Quezon
START: February 27, 2006
Duties and Responsibilities:
o Implement of Safety rules regulations and practices
o Responsible to plan and schedule of works in erection, installation and inspection of Air
heater basket and expansion bellows.
o Discusses technical problems on site with the main contractor
o Ensure that the construction follow good practices to avoid / eliminate reworks.
o Check and monitor isometric drawings before issuing to construction.
o Supervise reviews and monitors the site before full blast of manpower

NATIONAL POWER CORPORATION
Pipe Fitter assigned at NPC- Batangas
Batangas Coal-Fired Thermal Power Plant II
Located in San Raphael Calaca, Batangas
START: November 25, 2000
Duties and Responsibilities:
o For exemplary services in the on-line repair of BCFTPP-I, Pulverizer D, Paso Damper
o Installation and Inspection of Piping works, cutting, grinding of defective one.

MITSUBISHI CORPORATION
Structural Welder / Pipe Fitter Assigned at NPC- Batangas
Batangas Coal-Fired Thermal Power Plant II
Located at San Raphael Calaca, Batangas
START: September 28, 1996 to May 31, 1997

Duties and Responsibilities:
o Welding of all support pipe, fit-up all boiler tube during emergency shut-down, maintenance of
all equipment and Overhauling of the plant.

AG & P, General Contracting Division
Structural Welder Assigned at NPC Batangas
Coal-Fired Thermal Power Plant II
Located in San Raphael Calaca, Batangas
START: April 8, 1995 to July 29, 1986
Duties and Responsibilities:
o Welding of all structural beam, railing order from my supervisor
o Fabricate defective beams and burner nozzle
o Cutting and Fabrication of Pipe support such as fabricated pipe hanger, pipe shoe and
dummy support defend on situation.
MOISES EMIA JR. Associate Maritime Engineering
No. of years of experience 21
Maintenance Supervisor / Technician / Plant Mechanic / Machinist
Summary of abilities and work experience
As East West Commerce-Asia Pacific Corp. Project Manager:
o Project Supervisor for the following activities;
Air Heater Rehabilitation
Overhauling of Pumps, Fans, Pulverizer, Gearbox, Valves, etc.
As JGSPC Mechanical Maintenance and Engineering Sr. Technician/Foreman:
o Sr. Technician/Foreman for the Overhauling/ Repair of all rotating and non-rotating
equipment of Petrochemical (Polypropylene and Polyethylene) Plant for the Safe,
effective and efficient operation.
o Overhauling of the following;
Compressors, mixers, gearbox, pumps, fans and blowers
Valves, Heat exchangers, tanks etc.
As NAPOCOR Mechanical Maintenance Sr. Plant Mechanic/ Machinist:
o Performed various machining works such as machining of Turbine Bearing, Equipment parts,
etc.
o Performed rehabilitation/Overhauling of Power Plant Major Equipment such as; Turbine,
Pumps, Fans, Blowers, Air Heater, Valves, etc. (Oil-Fired, Coal-Fired Thermal, Geothermal,
Hydro & Diesel).

JONEL RETUERMA
No. of Years of Experience 12
Maintenance Supervisor/Foreman
Summary of abilities and work experience
Supervisor/Foreman in the Overhauling of Turbines & other rotating Equipment
such as Pulverizer, Air Heater, Fans, etc. in the following Power Plants :
o Sual Coal-Fired Thermal Power Plant Unit Nos. 1 & 2
o Pagbilao Coal-Fired Thermal Power Plant Unit 1 & 2
o Quezon Power Plant (Coal-Fired Thermal Power Plant)
o Toledo Power Plant
o Salcon Power Plant
RUBEN L. SORIANO Registered MECHANICAL ENGINEER, Lic. No. 9993
No. of years of experience 32
Maintenance Superintendent/Supervisor

Duties and Responsibilities:
Supervise in the preparation of plans, prepares work schedules in the repair, maintenance &
overhauling of stationary & rotating equipment of power plant in accordance with
clients/manufacturers recommendations & instructions to suit actual field conditions.
Consults operation personnel regarding observed symptoms of trouble during operations
o Assess the extent of work to be done & priority of each individual task to ensure complete
repair of equipment & to avoid delay of other activities.
o Confers with subordinates to provide technical advice on work procedure & proper
techniques & inspects their work progress to ensure that workmanship conform with
manufacturers/clients specification & work schedule
o Conducts final inspection & observes the test run of start up of repaired & newly installed
equipment
o Supervise in turbine rotor re-blading & repair works & upgrade subordinates in all aspects of
turbine maintenance work
DANILO P. REYES Registered MECHANICAL ENGINEER,
Registered WELDING ENGINEER TESDA/JWES
Certified Welding Inspector
No. of years of experience 18
Maintenance Supervisor/Foreman

Duties and Responsibilities
Lead in the preparation of work plan & cost estimate necessary in the repair, maintenance &
overhauling of rotating & stationary equipment of power plant.
Lead in the repair, maintenance & overhauling of stationary & rotating equipment of power
plant in accordance with clients/manufacturers recommendations & instructions to suit
actual field conditions.
Conduct training course on turbine rotor re0blading & repair works to upgrade subordinates
in all aspects of turbine maintenance work.

RIZALDE L. MELECIO Registered MECHANICAL ENGINEER,
No. of years of experience 18
Supervisor/Senior Engineer

Duties and Responsibilities
Performed / conduct the Repair, Maintenance & Overhauling of Stationary & rotating
equipment of Power Plant in accordance with clients/manufacturers recommendations &
instructions to suit actual field conditions.

DEMETRIO A. RAMOS Certified Plant Mechanic
No. of years of experience 29
Senior Mechanic / Leadman
Duties and Responsibilities:
Performed / conduct the repair, maintenance and overhauling of stationary & rotating
equipment of power plant in accordance with client/manufacturers recommendations &
instructions to suit actual field conditions.

ORLANDO D. GARCIA Certified Plant Mechanic
No. of years of experience 18
Senior Mechanic/ Leadman
Duties and Responsibilities:
Performed / conduct the repair, maintenance and overhauling of stationary and rotating
equipment of power plant in accordance with clients / manufacturers recommendations and
instructions to suit actual field conditions.

REYNALDO A. TEJAL Certified TIG Welder
No. of years of experience 29
Senior Welder
Duties and Responsibilities:
Performed / conduct the repair, maintenance and overhauling of stationary and rotating
equipment of power plant in accordance with the clients / manufacturers recommendations
and instructions to suit actual field conditions.
Performed welding works of various type of Ferrous Metals.
TURBINE OVERHAULING (PAST PROJECTS) DURING NAPOCOR TIME:
2007 MAJOR OVERHAULING OF MAIN TURBINE VALVES OF BATANGAS COAL-
FIRED THERMAL POWER PLANT UNIT NO. 1
1. Major Overhauling of Control Valve Nos. 1, 2, 3 & 4.
2. Major Overhauling of Intercept Control Valve Right Side
3. Major Overhauling of Reheat Stop Valve Right Side
4. Major Overhauling of Intercept Control Valve Left Side
5. Major Overhauling of Reheat Stop Valve Left Side
6. Major Overhauling of Main Stop Valve Right Side
2006 EMERGENCY MAINTENANCE OF BATANGAS COAL-FIRED TPP UNIT NO.1
1. Overhauling of Turbine Reheat Stop Valve Left-Side
2005 MAJOR OVERHAULING OF MASINLOC COAL-FIRED TPP UNIT NO.1
1. Major Overhauling of HP-IP and LP Turbines
2. Major Overhauling of Turbine Main Valves (Main Stop Valve Left & Right;
Governing Valve Nos. 1, 2, 3, & 4; Intercept Control Valve Left & Right; &
Re-heat Stop Valve Left & Right).
3. Major Overhauling of Turbine Main Valve Servomotors (Main Stop Valve
Left & Right; Governing Valve Nos. 1, 2, 3, & 4; Intercept Control Valve Left
& Right; and Reheat Stop Valve Left & Right;)
4. Major Overhauling of Turbine Lube Oil Pumps (Turning Oil Pump, Auxiliary
Oil Pump and Emergency Oil Pump)
5. Cleaning and Inspection Turbine Lube Oil Cooler A & B
2005 MINOR OVERHAULING OF MASINLOC COAL-FIRED TPP UNIT NO.2
1. Inspection of turbine Main Valves (Intercept Control Valve Left & Right &
Governing Valve No.2
2004 EMERGENCY REPAIR OF MASINLOC COAL-FIRED TPP UNIT NO.1
1. Replacement of Main Turbine Crossover Pipe Expansion Joint Assembly.
2003 MINOR OVERHAULING OF MASINLOC COAL-FIRED TPP UNIT NO.1
1. Inspection of Main Turbine Bearings & Re-alignment of Turbine & Generator
Couplings
2003 ANNUAL PLANT OVERHAULING OF BATANGAS COAL-FIRED TPP UNIT
NO.1
1. Overhauling of Turbine IP Control Valves & LP Turbine By-Pass Valve
1999 PROJECT HEAD IN THE MAJOR OVERHAULING OF BATANGAS COAL-
FIRED TPP UNIT NO.1
1. Major Overhauling of Main Turbine (HP, IP & LP), Main Turbine Stop Valve,
Combines Reheat Valves, LP By-Pass Valves, Control Valves Nos. 1, 2, 3, &
4, Auxiliary Steam Pressure regulator Valve
2. Major Overhauling of Auxiliary Turbine, Auxiliary Stop Valves & Control Valves
TURBINE REPAIR/REBLADING (PAST PROJECTS)
PLANT CAPACITY
LGPP 37.5 MW
LGPP 37.5 MW
PAL-1 37.5 MW
PAL SONGONGON 20 MW
PAL-2 37.5 MW
MGPP-6 55 MW
MGPP-5 55 MW
Repair/Reconditioning of Turbine Rotor (March 2006)
MGPP-6 55 MW
Repair/Reconditioning of Turbine Rotor (Feb 2006)
MGPP-1 55 MW
Repair/reconditioning of Turbine Blades & Diaphragm 3
rd
& 4
th
stage
(Sept-Oct. 2004).
MGPP 1 & 2 55 MW
Removal of Radial lock Blades Stages 1, 2 & 3 gov. side & gen side &
axial blades 4 & 5 stages gov & gen side (Inspection by NDT (MT) of disc
groove to determine the turbine shaft status) July 2001
TGPP 55 MW
Repair/Reconditioning of Turbine Rotor, Nozzle Diaphragm, 1
st
, 2
nd
& 3
rd
stage. (Nov-Dec 2004)
Following are some list of completed projects stationary diaphragm repair / reconditioning
ORLANDO D. GARCIA Certified Plant Mechanic
No. of years of experience 18
Senior Mechanic/ Leadman
Duties and Responsibilities
Performed / conduct the repair, maintenance and overhauling of stationary and rotating
equipment of power plant in accordance with clients / manufacturers recommendations and
instructions to suit actual field conditions.
REYNALDO A. TEJAL Certified TIG Welder
No. of years of experience 29
Senior Welder
Duties and Responsibilities
Performed / conduct the repair, maintenance and overhauling of stationary and rotating
equipment of power plant in accordance with the clients / manufacturers recommendations
and instructions to suit actual field conditions.
Performed welding works of various type of Ferrous Metals.
EAST WEST COMMERCE ASIA PACIFIC CORP.
You must be logged in (http://www.east-westcommerce.com/wp-login.php?
redirect_to=http%3A%2F%2Fwww.east-
westcommerce.com%2F%3Fpage_id%3D84) to post a comment.
LEAVE A REPLY
WEB SEARCH
Search
CATEGORIES
Branch Offices
(http://www.east-
westcommerce.com/?
cat=4)
Featured Products
(http://www.east-
westcommerce.com/?
cat=5)
OUR LOCATION
CONTACT US
Phone: +632- 559-9029
Fax: +632- 559-9030
wc_apc@east-
westcommerce.com
(mailto:wc_apc@east-
westcommerce.com)
(#)
Ads by Clip-High_D_06
bj1DbGlwLUhpZ2hfRF8wNiZoPW5zbC5tYXB0aWNrZXQubmV 0JmM9Z3JlZW4mbz13c2Fy JmQ9JnQ9JmE9OTcwMCZzPTEwNDYmdz13d3cuZWFzdC13ZXN0Y29tbWV y Y2UuY29tJm9v dT1odHRwOi8v dHJ5LnBy b2NlZWRv ci5jb20v b3B0X291dC8zJmI9YmQy JnJkPSZy aT0=)

You might also like