PROPERTY: RESIDENTIAL DEVELOPMENT MAIN STREET SHADWELL CLIENT: JWT HOMES OUR REFERENCE: 2014-599-PL-02
REVISION STATUS DESCRIPTION RECIPIENT DATE 01 FOR PLANNING APPROVAL
FIRST ISSUE FOR JWT HOMES, THINK DESIGN AND PLANNING OFFICER. 16.05.2014 02 FOR PLANNING APPROVAL
MINOR AMMENDMENTS FOR DESIGN COORDINATION FOR JWT HOMES, THINK DESIGN AND PLANNING OFFICER. 02.06.2014
BDS STRUCTURAL DESIGN SERVICES LTD
Calculations for JWT DEVELOPMENTS
BDS structural calculation Notes
Scope of the calculations
These calculations have been prepared at the request of the present owners of the above property and cover the design of the new build as a design concept.. No warranty is given by the issue of the calculations to the structural integrity of any other part of the proposed structure for which the calculations and structural advice has been given.
Measurement and dimensions
Dimensions and details are the purpose of the calculations has been taken from the Architects drawing. The person responsible for carrying out the works should ensure that the dimensions used in the calculations are checked onsite before ordering materials or fabrication. Any discrepancies or dimensions found to be significantly different from that assumed should be brought to the attention of BDS, so that such a discrepancy can be checked, and if necessary, the calculations amended.
Building Regulations approval
The owners of the property are advised that the approval of the local authority and the discharge consent from the adopting water company and utilities company should be obtained to the calculations prior to any ordering of materials or fabrication. No responsibility is accepted for any changes that may be required as a result of work having proceeded before such approvals have been obtained.
Disclosure
All calculations are the intelligent property of BDS and can only be sent to the intended recipients of BDS. The intended recipients are; the client, and Building control and any checking authorities for and on behalf of Building control. The administering, copying or revealing of these calculations to any other unauthorized third parties in any format whatsoever is strictly prohibited without the express permission of the Director of BDS structural design services namely James Robert Burgess BSc (Hons).
Liability By checking and reading these calculations the reader accepts severable Liability of the design. BDS accepts no Liability for the installation of the design and the quality of workmanship, materials and construction operations implicated by the design. Nothing in the contract confers nor purports to confer on any third party neither any benefit nor any right to enforce any terms of this contract pursuant to the contracts (Rights to third parties) act 1999.
Design references
LCC PPS25 BS8305 Drainage code Building Regulations Part H URBAN DRAINAGE SPON DAVIS AND BUTLER WALLINGFORD REPORTS VOLUMES 1 AND 4 WALLINGFORD ANNUAL RAINFALL MAPS
BDS STRUCTURAL DESIGN SERVICES LTD NOTES
These calculation have been prepared in order to discharge the original planning conditions
16) Development shall not commence until a feasibility study into the use of infiltration drainage methods has been submitted to, and approved by the council. The analysis shall contain the results of soakaway tests and an appraisal of various infiltration drainage methods that could reasonably be employed on the site. If disposal of surface water via infiltration is not feasible, disposal to sewer may be acceptable. In order to assess the allowable discharge from the site, (ie 30% less than existing discharge), the developer shall provide details of the existing drainage layouts on the site, together with pipe sizes, gradients and connection points, as well as a plan showing the measured impermeable areas of the site. A surface water attenuation system shall be provided which ensures that the allowable discharge is not exceeded for the 1 in 100 year event including a 30% uplift for climate change.
To ensure sustainable drainage and flood prevention in accordance with LCCs Natural Resources and Waste LDF 2013 and the NPPF.
17) Development shall not commence until a scheme detailing surface water drainage works has been submitted to and approved in writing by the Local Planning Authority. The works shall be implemented in accordance with the approved scheme before the development is brought into use, or as set out in the approved phasing details. To ensure sustainable drainage and flood prevention in accordance with LCCs Natural Resources and Waste LDF 2013 and the NPPF.
18) The site shall be developed with separate systems of drainage for foul and surface water on and off site.
In the interest of satisfactory and sustainable drainage.
19) No development shall take place until details of the proposed means of disposal of foul and surface water drainage, including details of any balancing works and off -site works, have been submitted to and approved by the Local Planning Authority.
To ensure that the development can be properly drained.
20) Unless otherwise approved in writing by the local planning authority, there shall be no piped discharge of surface water from the development prior to the completion of the approved surface water drainage works and no buildings shall be occupied or brought into use prior to completion of the approved foul drainage works.
Many of the Surface attenuation calculations, brownfield and Greenfield calculations are shown in the Appendix of the Feasibility report the calculations in this document cover the proposed drainage network and components
SURFACE WATER CALCULATIONS
MANHOLE FLOOD VOLUME
EXTRA VOLUME IN MANHOLES
THE MANHOLES ARE DEEMED TO GIVE SOME ATTENUATION STORAGE WITH A MADD FACTOR OF 2.0 THE MANHOLES CAN FILLUP TO 50MM BELOW THE U/S OF THE MANHOLE COVER GIVING 700MM DEPTH OF WATER STORAGE.
CALCULATION OF SUBBASE THROUGH SOIL INFILTRATION
INFILTRATION RATE 5.5 RATEMM/MIN AREA DRAINED 750 M2 CARPARK AREA 350 M2
CALCULATION OF SUBBASE THROUGH SOIL INFILTRATION Factored infiltration rate 35
FACTOR
3 INFILTRATION RATE 106 RATEMM/MIN based on Av result 4 =80 mm /Hour AREA DRAINED
1340 M2 PERMEABLE PAVING AREA 350 M2
Subbase Depth DURATION OF RAINFALL PORISTY OF SUBBASE ratio of Drained to infiltration area rainfall intensity Infiltration rate H max D N R i f mm hrs - - mm/H mm/H 116 M-100-5 0.08 0.4 3.83 0.15 0.0353333 168 M-100-10 0.17 0.4 3.83 0.11 0.0353333 200 M-100-15 0.25 0.4 3.83 0.09 0.0353333 234 M-100-30 0.5 0.4 3.83 0.06 0.0353333 300 M-100-60 1 0.4 3.83 0.04 0.0353333 247 M-100-120 2 0.4 3.83 0.02 0.0353333 174 M-100-180 3 0.4 3.83 0.02 0.0353333 108 M-100-240 4 0.4 3.83 0.01 0.0353333 163 M-100-360 6 0.4 3.83 0.01 0.0353333 ADOPT A 300 MM SUBASE BELOW THE CAR PAR PARK FOR ALL PERMEABLE PAVING UNDER 50 MM SAND BEDDING AND 65 MM THICK PERMEABLE BLOCKS WITH 5 MM GAPS BETWEEN. PIPE No PIPE LENGTH RISE PIPE FALL IMPERVOUS AREA DIAMETER VELOCITY TIME OF FLOW DISTANCE TO START OF PIPE PIPE CAPACITY 1in 100 Year RAINFALL INTENSITY Qp IMP Qp Total COMMENTS M M M Ha MM M/S MINS M L/S mm/H L/s L/s STATUS S1.001 2 0.1 17 0.0045 100 1.5 0.02 2 6.1 154.56 2.1 2.7 PIPE OK S1.002 11.7 0.1 98 0.0045 100 0.81 0.24 13.7 6.8 154.56 2.1 2.7 PIPE OK S1.003 11.8 0.1 148 0.009 150 0.764 0.26 25.5 14.5 154.56 4.2 5.5 PIPE OK S1.004 7 0 149 0.0135 150 0.822 0.14 32.5 14.5 154.56 6.3 8.2 PIPE OK S1.005 9.95 0.1 149 0.0135 150 0.843 0.20 42.45 14.5 154.56 6.3 8.2 PIPE OK S1.006 15.8 0.1 198 0.018 225 0.768 0.34 58.25 34.3 154.56 8.4 11.0 PIPE OK S1.007 3.8 0 190 0.018 225 0.94 0.07 62.05 34.3 154.56 8.4 11.0 PIPE OK S1.008 2 0 200 0.0225 225 0.73 0.05 64.05 34.3 154.56 10.6 13.7 PIPE OK
SURFACE WATER DRAINAGE
S.001 SURFACE WATER PIPE
OK BY INSPECTION FOR 100 DIAMETER PIPE
S.002 SURFACE WATER PIPE
DESIGN OF A SURFACE WATER DRAIN
Drain design details Design flow rate; Qdesign = 2.70 10 -3 m 3 /s Length of the drain; L = 11.7 m Fall along length of drain; h = 0.1 m Gradient of drain; i = h / L = 0.010; (1 in 98) Minimum flow velocity; Vmin = 0.750 m/s Minimum pipe diameter; Dmin = 100 mm Surface roughness; ks = 0.6 mm Mean hydraulic depth factor; m = 0.25 Kinematic viscosity of fluid; = 1.31 10 -6 m 2 /s Using the Chezy equation Constant; c = 56 Diameter of pipe required; D = ((Qdesign 2 16) / ( 2 m c 2 i 1m/s 2 )) 0.2 = 68 mm Nearest pipe diameter; Dchezy = 100 mm Flow velocity using Chezy; Vchezy = c (m Dchezy i 1m/s 2 ) = 0.897 m/s Using the Escritt equation Diameter of pipe required; D = (Qdesign 1000 (1 / i) / 0.00035 m 3 /s) 0.382 1mm = 73 mm Nearest pipe diameter; Descritt = 100 mm Flow velocity using Escritt; Vescritt = 26.738 (Descritt / 1mm) 0.62 1 m/s / ((1 / i) 60) = 0.784 m/s Using the Colebrook-White Equation for pipe running full and partially full Design pipe diameter; Ddesign = max(Dchezy, Descritt, Dmin) = 100 mm Constant; Z = (2 (gacc / 1m/s 2 ) (Ddesign /1000mm) i) = 0.142 Flow velocity; Vfull = -2Zlog((ks/(3.7 Ddesign))+((2.51)/(DdesignZ1m/s)))1m/s Vfull = 0.775 m/s Flow rate running full; Qfull = Vfull Ddesign 2 / 4 = 6.09 10 -3 m 3 /s PASS - Maximum flow rate is greater than design flow rate From Hydraulics Research Tables 35 and 36 Depth as proportion of D; x = 0.466
Flow velocity at design flow rate; Vdesign = 0.751 m/s PASS - Design velocity is greater than 0.750 m/s
L h S.003 SURFACE WATER PIPE DESIGN OF A SURFACE WATER DRAIN
Drain design details Design flow rate; Qdesign = 5.50 10 -3 m 3 /s Length of the drain; L = 11.8 m Fall along length of drain; h = 0.1 m Gradient of drain; i = h / L = 0.007; (1 in 148) Minimum flow velocity; Vmin = 0.750 m/s Minimum pipe diameter; Dmin = 150 mm Surface roughness; ks = 0.6 mm Mean hydraulic depth factor; m = 0.25 Kinematic viscosity of fluid; = 1.31 10 -6 m 2 /s Using the Chezy equation Constant; c = 56 Diameter of pipe required; D = ((Qdesign 2 16) / ( 2 m c 2 i 1m/s 2 )) 0.2 = 98 mm Nearest pipe diameter; Dchezy = 150 mm Flow velocity using Chezy; Vchezy = c (m Dchezy i 1m/s 2 ) = 0.893 m/s Using the Escritt equation Diameter of pipe required; D = (Qdesign 1000 (1 / i) / 0.00035 m 3 /s) 0.382 1mm = 104 mm Nearest pipe diameter; Descritt = 150 mm Flow velocity using Escritt; Vescritt = 26.738 (Descritt / 1mm) 0.62 1 m/s / ((1 / i) 60) = 0.820 m/s Using the Colebrook-White Equation for pipe running full and partially full Design pipe diameter; Ddesign = max(Dchezy, Descritt, Dmin) = 150 mm Constant; Z = (2 (gacc / 1m/s 2 ) (Ddesign /1000mm) i) = 0.141 Flow velocity; Vfull = -2Zlog((ks/(3.7 Ddesign))+((2.51)/(DdesignZ1m/s)))1m/s Vfull = 0.821 m/s Flow rate running full; Qfull = Vfull Ddesign 2 / 4 = 14.5 10 -3 m 3 /s PASS - Maximum flow rate is greater than design flow rate From Hydraulics Research Tables 35 and 36 Depth as proportion of D; x = 0.426
Flow velocity at design flow rate; Vdesign = 0.764 m/s PASS - Design velocity is greater than 0.750 m/s
L h S.004 SURFACE WATER PIPE DESIGN OF A SURFACE WATER DRAIN
Drain design details Design flow rate; Qdesign = 8.20 10 -3 m 3 /s Length of the drain; L = 7.0 m Fall along length of drain; h = 0.0 m Gradient of drain; i = h / L = 0.007; (1 in 149) Minimum flow velocity; Vmin = 0.750 m/s Minimum pipe diameter; Dmin = 150 mm Surface roughness; ks = 0.6 mm Mean hydraulic depth factor; m = 0.25 Kinematic viscosity of fluid; = 1.31 10 -6 m 2 /s Using the Chezy equation Constant; c = 56 Diameter of pipe required; D = ((Qdesign 2 16) / ( 2 m c 2 i 1m/s 2 )) 0.2 = 116 mm Nearest pipe diameter; Dchezy = 150 mm Flow velocity using Chezy; Vchezy = c (m Dchezy i 1m/s 2 ) = 0.889 m/s Using the Escritt equation Diameter of pipe required; D = (Qdesign 1000 (1 / i) / 0.00035 m 3 /s) 0.382 1mm = 121 mm Nearest pipe diameter; Descritt = 150 mm Flow velocity using Escritt; Vescritt = 26.738 (Descritt / 1mm) 0.62 1 m/s / ((1 / i) 60) = 0.816 m/s Using the Colebrook-White Equation for pipe running full and partially full Design pipe diameter; Ddesign = max(Dchezy, Descritt, Dmin) = 150 mm Constant; Z = (2 (gacc / 1m/s 2 ) (Ddesign /1000mm) i) = 0.141 Flow velocity; Vfull = -2Zlog((ks/(3.7 Ddesign))+((2.51)/(DdesignZ1m/s)))1m/s Vfull = 0.817 m/s Flow rate running full; Qfull = Vfull Ddesign 2 / 4 = 14.4 10 -3 m 3 /s PASS - Maximum flow rate is greater than design flow rate From Hydraulics Research Tables 35 and 36 Depth as proportion of D; x = 0.540
Flow velocity at design flow rate; Vdesign = 0.842 m/s PASS - Design velocity is greater than 0.750 m/s
L h S.005 SURFACE WATER PIPE DESIGN OF A SURFACE WATER DRAIN
Drain design details Design flow rate; Qdesign = 8.20 10 -3 m 3 /s Length of the drain; L = 10.0 m Fall along length of drain; h = 0.1 m Gradient of drain; i = h / L = 0.007; (1 in 149) Minimum flow velocity; Vmin = 0.750 m/s Minimum pipe diameter; Dmin = 150 mm Surface roughness; ks = 0.6 mm Mean hydraulic depth factor; m = 0.25 Kinematic viscosity of fluid; = 1.31 10 -6 m 2 /s Using the Chezy equation Constant; c = 56 Diameter of pipe required; D = ((Qdesign 2 16) / ( 2 m c 2 i 1m/s 2 )) 0.2 = 116 mm Nearest pipe diameter; Dchezy = 150 mm Flow velocity using Chezy; Vchezy = c (m Dchezy i 1m/s 2 ) = 0.890 m/s Using the Escritt equation Diameter of pipe required; D = (Qdesign 1000 (1 / i) / 0.00035 m 3 /s) 0.382 1mm = 121 mm Nearest pipe diameter; Descritt = 150 mm Flow velocity using Escritt; Vescritt = 26.738 (Descritt / 1mm) 0.62 1 m/s / ((1 / i) 60) = 0.817 m/s Using the Colebrook-White Equation for pipe running full and partially full Design pipe diameter; Ddesign = max(Dchezy, Descritt, Dmin) = 150 mm Constant; Z = (2 (gacc / 1m/s 2 ) (Ddesign /1000mm) i) = 0.141 Flow velocity; Vfull = -2Zlog((ks/(3.7 Ddesign))+((2.51)/(DdesignZ1m/s)))1m/s Vfull = 0.819 m/s Flow rate running full; Qfull = Vfull Ddesign 2 / 4 = 14.5 10 -3 m 3 /s PASS - Maximum flow rate is greater than design flow rate From Hydraulics Research Tables 35 and 36 Depth as proportion of D; x = 0.539
Flow velocity at design flow rate; Vdesign = 0.843 m/s PASS - Design velocity is greater than 0.750 m/s
L h S.006 SURFACE WATER PIPE DESIGN OF A SURFACE WATER DRAIN
Drain design details Design flow rate; Qdesign = 11.0 10 -3 m 3 /s Length of the drain; L = 15.8 m Fall along length of drain; h = 0.1 m Gradient of drain; i = h / L = 0.005; (1 in 198) Minimum flow velocity; Vmin = 0.750 m/s Minimum pipe diameter; Dmin = 225 mm Surface roughness; ks = 0.6 mm Mean hydraulic depth factor; m = 0.25 Kinematic viscosity of fluid; = 1.31 10 -6 m 2 /s Using the Chezy equation Constant; c = 56 Diameter of pipe required; D = ((Qdesign 2 16) / ( 2 m c 2 i 1m/s 2 )) 0.2 = 138 mm Nearest pipe diameter; Dchezy = 225 mm Flow velocity using Chezy; Vchezy = c (m Dchezy i 1m/s 2 ) = 0.945 m/s Using the Escritt equation Diameter of pipe required; D = (Qdesign 1000 (1 / i) / 0.00035 m 3 /s) 0.382 1mm = 143 mm Nearest pipe diameter; Descritt = 225 mm Flow velocity using Escritt; Vescritt = 26.738 (Descritt / 1mm) 0.62 1 m/s / ((1 / i) 60) = 0.911 m/s Using the Colebrook-White Equation for pipe running full and partially full Design pipe diameter; Ddesign = max(Dchezy, Descritt, Dmin) = 225 mm Constant; Z = (2 (gacc / 1m/s 2 ) (Ddesign /1000mm) i) = 0.149 Flow velocity; Vfull = -2Zlog((ks/(3.7 Ddesign))+((2.51)/(DdesignZ1m/s)))1m/s Vfull = 0.923 m/s Flow rate running full; Qfull = Vfull Ddesign 2 / 4 = 36.7 10 -3 m 3 /s PASS - Maximum flow rate is greater than design flow rate From Hydraulics Research Tables 35 and 36 Depth as proportion of D; x = 0.374
Flow velocity at design flow rate; Vdesign = 0.807 m/s PASS - Design velocity is greater than 0.750 m/s
L h S.007 SURFACE WATER PIPE DESIGN OF A SURFACE WATER DRAIN
Drain design details Design flow rate; Qdesign = 11.0 10 -3 m 3 /s Length of the drain; L = 15.8 m Fall along length of drain; h = 0.1 m Gradient of drain; i = h / L = 0.005; (1 in 198) Minimum flow velocity; Vmin = 0.750 m/s Minimum pipe diameter; Dmin = 225 mm Surface roughness; ks = 0.6 mm Mean hydraulic depth factor; m = 0.25 Kinematic viscosity of fluid; = 1.31 10 -6 m 2 /s Using the Chezy equation Constant; c = 56 Diameter of pipe required; D = ((Qdesign 2 16) / ( 2 m c 2 i 1m/s 2 )) 0.2 = 138 mm Nearest pipe diameter; Dchezy = 225 mm Flow velocity using Chezy; Vchezy = c (m Dchezy i 1m/s 2 ) = 0.945 m/s Using the Escritt equation Diameter of pipe required; D = (Qdesign 1000 (1 / i) / 0.00035 m 3 /s) 0.382 1mm = 143 mm Nearest pipe diameter; Descritt = 225 mm Flow velocity using Escritt; Vescritt = 26.738 (Descritt / 1mm) 0.62 1 m/s / ((1 / i) 60) = 0.911 m/s Using the Colebrook-White Equation for pipe running full and partially full Design pipe diameter; Ddesign = max(Dchezy, Descritt, Dmin) = 225 mm Constant; Z = (2 (gacc / 1m/s 2 ) (Ddesign /1000mm) i) = 0.149 Flow velocity; Vfull = -2Zlog((ks/(3.7 Ddesign))+((2.51)/(DdesignZ1m/s)))1m/s Vfull = 0.923 m/s Flow rate running full; Qfull = Vfull Ddesign 2 / 4 = 36.7 10 -3 m 3 /s PASS - Maximum flow rate is greater than design flow rate From Hydraulics Research Tables 35 and 36 Depth as proportion of D; x = 0.374
Flow velocity at design flow rate; Vdesign = 0.807 m/s PASS - Design velocity is greater than 0.750 m/s
L h S.008 SURFACE WATER PIPE DESIGN OF A SURFACE WATER DRAIN
Drain design details Design flow rate; Qdesign = 22.5 10 -3 m 3 /s Length of the drain; L = 2.0 m Fall along length of drain; h = 0.0 m Gradient of drain; i = h / L = 0.005; (1 in 200) Minimum flow velocity; Vmin = 0.750 m/s Minimum pipe diameter; Dmin = 225 mm Surface roughness; ks = 0.6 mm Mean hydraulic depth factor; m = 0.25 Kinematic viscosity of fluid; = 1.31 10 -6 m 2 /s Using the Chezy equation Constant; c = 56 Diameter of pipe required; D = ((Qdesign 2 16) / ( 2 m c 2 i 1m/s 2 )) 0.2 = 184 mm Nearest pipe diameter; Dchezy = 225 mm Flow velocity using Chezy; Vchezy = c (m Dchezy i 1m/s 2 ) = 0.939 m/s Using the Escritt equation Diameter of pipe required; D = (Qdesign 1000 (1 / i) / 0.00035 m 3 /s) 0.382 1mm = 189 mm Nearest pipe diameter; Descritt = 225 mm Flow velocity using Escritt; Vescritt = 26.738 (Descritt / 1mm) 0.62 1 m/s / ((1 / i) 60) = 0.905 m/s Using the Colebrook-White Equation for pipe running full and partially full Design pipe diameter; Ddesign = max(Dchezy, Descritt, Dmin) = 225 mm Constant; Z = (2 (gacc / 1m/s 2 ) (Ddesign /1000mm) i) = 0.149 Flow velocity; Vfull = -2Zlog((ks/(3.7 Ddesign))+((2.51)/(DdesignZ1m/s)))1m/s Vfull = 0.917 m/s Flow rate running full; Qfull = Vfull Ddesign 2 / 4 = 36.5 10 -3 m 3 /s PASS - Maximum flow rate is greater than design flow rate From Hydraulics Research Tables 35 and 36 Depth as proportion of D; x = 0.569
Flow velocity at design flow rate; Vdesign = 0.963 m/s PASS - Design velocity is greater than 0.750 m/s
L h CALCULATION OF INFILTRATION TRENCHS
Factored infiltration rate 105 MM/H Factor = 1
INFILTRATION RATE 105 MM/H
free volume agg.% 0.3
WIDTH 0.5 m
DEPTH 0.45 m
PERMEABLE PAVING AREA
130 M2
DURATION OF RAINFALL rainfall intensity Volume PROVIDED Volume required status u/r Length DISCHARGE TIME D i H mm/H m3 m3 m HRS M100-5 0.083 154.56 0.7 0.6625 trench ok 0.9814 10 5.0 M100-10 0.167 114.82 1.2 0.6686 trench ok 0.9905 18 5.1 M100-15 0.250 92.74 1.6 0.6573 trench ok 0.9738 23 5.2 M100-30 0.500 58.14 2.0 0.6490 trench ok 0.9616 29 5.2 M100-60 1.000 40.60 2.6 0.6239 trench ok 0.9243 39 5.2 M100-120 2.000 22.11 2.4 0.5984 trench ok 0.8864 36 5.2 M100-180 3.000 15.28 2.2 0.6184 trench ok 0.9161 32 5.2 M100-240 4.000 12.06 2.0 0.5539 trench ok 0.8207 30 5.2 M100-360 6.000 12.06 2.5 0.6183 trench ok 0.9160 37 5.2
FOUL WATER CALCULATIONS
F.003 FOUL WATER PIPE
DESIGN OF A FOUL SEWER
Design pipe flow limited to 0.75 times full depth Sewer design details Design flow rate; Qdesign = 3.70 10 -3 m 3 /s Length of the sewer; L = 12.0 m Fall along length of sewer; h = 0.2 m Gradient of sewer; i = h / L = 0.012; (1 in 80) Minimum flow velocity; Vmin = 0.750 m/s Minimum pipe diameter; Dmin = 150 mm Surface roughness; ks = 1.5 mm Mean hydraulic depth factor; m = 0.30 Kinematic viscosity of fluid; = 1.31 10 -6 m 2 /s Using the Chezy equation Constant; c = 56 Diameter of pipe required; D = ((Qdesign 2 16) / ( 2 m c 2 i 1m/s 2 )) 0.2 = 72 mm Nearest pipe diameter; Dchezy = 150 mm Flow velocity using Chezy; Vchezy = c (m Dchezy i 1m/s 2 ) = 1.328 m/s Using the Escritt equation Diameter of pipe required; D = (Qdesign 1000 (1 / i) / 0.00035 m 3 /s) 0.382 1mm = 80 mm Nearest pipe diameter; Descritt = 150 mm Flow velocity using Escritt; Vescritt = 26.738 (Descritt / 1mm) 0.62 1 m/s / ((1 / i) 60) = 1.113 m/s Using the Colebrook-White Equation for pipe running full and partially full Design pipe diameter; Ddesign = max(Dchezy, Descritt, Dmin) = 150 mm Constant; Z = (2 (gacc / 1m/s 2 ) (Ddesign /1000mm) i) = 0.192 Flow velocity; Vfull = -2Zlog((ks/(3.7 Ddesign))+((2.51)/(DdesignZ1m/s)))1m/s Vfull = 0.978 m/s Flow rate running full; Qfull = Vfull Ddesign 2 / 4 = 17.3 10 -3 m 3 /s PASS - Maximum flow rate is greater than design flow rate From Hydraulics Research Tables 35 and 36 Depth as proportion of D; x = 0.313 PASS - Design pipe flow less than 0.75 times full depth Flow velocity at design flow rate; Vdesign = 0.779 m/s PASS - Design velocity is greater than 0.750 m/s
L h F1.004 FOUL WATER PIPE DESIGN OF A FOUL SEWER
Design pipe flow limited to 0.75 times full depth Sewer design details Design flow rate; Qdesign = 5.70 10 -3 m 3 /s Length of the sewer; L = 11.5 m Fall along length of sewer; h = 0.1 m Gradient of sewer; i = h / L = 0.013; (1 in 80) Minimum flow velocity; Vmin = 0.750 m/s Minimum pipe diameter; Dmin = 150 mm Surface roughness; ks = 1.5 mm Mean hydraulic depth factor; m = 0.30 Kinematic viscosity of fluid; = 1.31 10 -6 m 2 /s Using the Chezy equation Constant; c = 56 Diameter of pipe required; D = ((Qdesign 2 16) / ( 2 m c 2 i 1m/s 2 )) 0.2 = 85 mm Nearest pipe diameter; Dchezy = 150 mm Flow velocity using Chezy; Vchezy = c (m Dchezy i 1m/s 2 ) = 1.329 m/s Using the Escritt equation Diameter of pipe required; D = (Qdesign 1000 (1 / i) / 0.00035 m 3 /s) 0.382 1mm = 94 mm Nearest pipe diameter; Descritt = 150 mm Flow velocity using Escritt; Vescritt = 26.738 (Descritt / 1mm) 0.62 1 m/s / ((1 / i) 60) = 1.114 m/s Using the Colebrook-White Equation for pipe running full and partially full Design pipe diameter; Ddesign = max(Dchezy, Descritt, Dmin) = 150 mm Constant; Z = (2 (gacc / 1m/s 2 ) (Ddesign /1000mm) i) = 0.192 Flow velocity; Vfull = -2Zlog((ks/(3.7 Ddesign))+((2.51)/(DdesignZ1m/s)))1m/s Vfull = 0.979 m/s Flow rate running full; Qfull = Vfull Ddesign 2 / 4 = 17.3 10 -3 m 3 /s PASS - Maximum flow rate is greater than design flow rate From Hydraulics Research Tables 35 and 36 Depth as proportion of D; x = 0.394 PASS - Design pipe flow less than 0.75 times full depth Flow velocity at design flow rate; Vdesign = 0.878 m/s PASS - Design velocity is greater than 0.750 m/s
L h F1.005 FOUL WATER PIPE REV 02
DESIGN OF A FOUL SEWER
Design pipe flow limited to 0.75 times full depth Sewer design details Design flow rate; Qdesign = 6.30 10 -3 m 3 /s Length of the sewer; L = 6.8 m Fall along length of sewer; h = 0.1 m Gradient of sewer; i = h / L = 0.012; (1 in 80) Minimum flow velocity; Vmin = 0.750 m/s Minimum pipe diameter; Dmin = 150 mm Surface roughness; ks = 1.5 mm Mean hydraulic depth factor; m = 0.30 Kinematic viscosity of fluid; = 1.31 10 -6 m 2 /s Using the Chezy equation Constant; c = 56 Diameter of pipe required; D = ((Qdesign 2 16) / ( 2 m c 2 i 1m/s 2 )) 0.2 = 89 mm Nearest pipe diameter; Dchezy = 150 mm Flow velocity using Chezy; Vchezy = c (m Dchezy i 1m/s 2 ) = 1.325 m/s Using the Escritt equation Diameter of pipe required; D = (Qdesign 1000 (1 / i) / 0.00035 m 3 /s) 0.382 1mm = 98 mm Nearest pipe diameter; Descritt = 150 mm Flow velocity using Escritt; Vescritt = 26.738 (Descritt / 1mm) 0.62 1 m/s / ((1 / i) 60) = 1.111 m/s Using the Colebrook-White Equation for pipe running full and partially full Design pipe diameter; Ddesign = max(Dchezy, Descritt, Dmin) = 150 mm Constant; Z = (2 (gacc / 1m/s 2 ) (Ddesign /1000mm) i) = 0.191 Flow velocity; Vfull = -2Zlog((ks/(3.7 Ddesign))+((2.51)/(DdesignZ1m/s)))1m/s Vfull = 0.976 m/s Flow rate running full; Qfull = Vfull Ddesign 2 / 4 = 17.2 10 -3 m 3 /s PASS - Maximum flow rate is greater than design flow rate From Hydraulics Research Tables 35 and 36 Depth as proportion of D; x = 0.417 PASS - Design pipe flow less than 0.75 times full depth Flow velocity at design flow rate; Vdesign = 0.899 m/s PASS - Design velocity is greater than 0.750 m/s
F1.006 FOUL WATER PIPE REV 02 DESIGN OF A FOUL SEWER
L h
Design pipe flow limited to 0.75 times full depth Sewer design details Design flow rate; Qdesign = 5.70 10 -3 m 3 /s Length of the sewer; L = 4.1 m Fall along length of sewer; h = 0.1 m Gradient of sewer; i = h / L = 0.012; (1 in 80) Minimum flow velocity; Vmin = 0.750 m/s Minimum pipe diameter; Dmin = 150 mm Surface roughness; ks = 1.5 mm Mean hydraulic depth factor; m = 0.30 Kinematic viscosity of fluid; = 1.31 10 -6 m 2 /s Using the Chezy equation Constant; c = 56 Diameter of pipe required; D = ((Qdesign 2 16) / ( 2 m c 2 i 1m/s 2 )) 0.2 = 85 mm Nearest pipe diameter; Dchezy = 150 mm Flow velocity using Chezy; Vchezy = c (m Dchezy i 1m/s 2 ) = 1.325 m/s Using the Escritt equation Diameter of pipe required; D = (Qdesign 1000 (1 / i) / 0.00035 m 3 /s) 0.382 1mm = 94 mm Nearest pipe diameter; Descritt = 150 mm Flow velocity using Escritt; Vescritt = 26.738 (Descritt / 1mm) 0.62 1 m/s / ((1 / i) 60) = 1.111 m/s Using the Colebrook-White Equation for pipe running full and partially full Design pipe diameter; Ddesign = max(Dchezy, Descritt, Dmin) = 150 mm Constant; Z = (2 (gacc / 1m/s 2 ) (Ddesign /1000mm) i) = 0.191 Flow velocity; Vfull = -2Zlog((ks/(3.7 Ddesign))+((2.51)/(DdesignZ1m/s)))1m/s Vfull = 0.976 m/s Flow rate running full; Qfull = Vfull Ddesign 2 / 4 = 17.2 10 -3 m 3 /s PASS - Maximum flow rate is greater than design flow rate From Hydraulics Research Tables 35 and 36 Depth as proportion of D; x = 0.395 PASS - Design pipe flow less than 0.75 times full depth Flow velocity at design flow rate; Vdesign = 0.876 m/s PASS - Design velocity is greater than 0.750 m/s
F1.007 FOUL WATER PIPE L h DESIGN OF A FOUL SEWER
Design pipe flow limited to 0.75 times full depth Sewer design details Design flow rate; Qdesign = 10.5 10 -3 m 3 /s Length of the sewer; L = 1.6 m Fall along length of sewer; h = 0.0 m Gradient of sewer; i = h / L = 0.013; (1 in 78) Minimum flow velocity; Vmin = 0.750 m/s Minimum pipe diameter; Dmin = 100 mm Surface roughness; ks = 1.5 mm Mean hydraulic depth factor; m = 0.30 Kinematic viscosity of fluid; = 1.31 10 -6 m 2 /s Using the Chezy equation Constant; c = 56 Diameter of pipe required; D = ((Qdesign 2 16) / ( 2 m c 2 i 1m/s 2 )) 0.2 = 108 mm Nearest pipe diameter; Dchezy = 150 mm Flow velocity using Chezy; Vchezy = c (m Dchezy i 1m/s 2 ) = 1.349 m/s Using the Escritt equation Diameter of pipe required; D = (Qdesign 1000 (1 / i) / 0.00035 m 3 /s) 0.382 1mm = 118 mm Nearest pipe diameter; Descritt = 150 mm Flow velocity using Escritt; Vescritt = 26.738 (Descritt / 1mm) 0.62 1 m/s / ((1 / i) 60) = 1.131 m/s Using the Colebrook-White Equation for pipe running full and partially full Design pipe diameter; Ddesign = max(Dchezy, Descritt, Dmin) = 150 mm Constant; Z = (2 (gacc / 1m/s 2 ) (Ddesign /1000mm) i) = 0.195 Flow velocity; Vfull = -2Zlog((ks/(3.7 Ddesign))+((2.51)/(DdesignZ1m/s)))1m/s Vfull = 0.994 m/s Flow rate running full; Qfull = Vfull Ddesign 2 / 4 = 17.6 10 -3 m 3 /s PASS - Maximum flow rate is greater than design flow rate From Hydraulics Research Tables 35 and 36 Depth as proportion of D; x = 0.558 PASS - Design pipe flow less than 0.75 times full depth Flow velocity at design flow rate; Vdesign = 1.037 m/s PASS - Design velocity is greater than 0.750 m/s
L h F10.04 FOUL WATER PIPE DESIGN OF A FOUL SEWER
Design pipe flow limited to 0.75 times full depth Sewer design details Design flow rate; Qdesign = 2.10 10 -3 m 3 /s Length of the sewer; L = 13.4 m Fall along length of sewer; h = 0.3 m Gradient of sewer; i = h / L = 0.025; (1 in 40) Minimum flow velocity; Vmin = 0.750 m/s Minimum pipe diameter; Dmin = 100 mm Surface roughness; ks = 1.5 mm Mean hydraulic depth factor; m = 0.30 Kinematic viscosity of fluid; = 1.31 10 -6 m 2 /s Using the Chezy equation Constant; c = 56 Diameter of pipe required; D = ((Qdesign 2 16) / ( 2 m c 2 i 1m/s 2 )) 0.2 = 50 mm Nearest pipe diameter; Dchezy = 100 mm Flow velocity using Chezy; Vchezy = c (m Dchezy i 1m/s 2 ) = 1.534 m/s Using the Escritt equation Diameter of pipe required; D = (Qdesign 1000 (1 / i) / 0.00035 m 3 /s) 0.382 1mm = 56 mm Nearest pipe diameter; Descritt = 100 mm Flow velocity using Escritt; Vescritt = 26.738 (Descritt / 1mm) 0.62 1 m/s / ((1 / i) 60) = 1.224 m/s Using the Colebrook-White Equation for pipe running full and partially full Design pipe diameter; Ddesign = max(Dchezy, Descritt, Dmin) = 100 mm Constant; Z = (2 (gacc / 1m/s 2 ) (Ddesign /1000mm) i) = 0.221 Flow velocity; Vfull = -2Zlog((ks/(3.7 Ddesign))+((2.51)/(DdesignZ1m/s)))1m/s Vfull = 1.052 m/s Flow rate running full; Qfull = Vfull Ddesign 2 / 4 = 8.27 10 -3 m 3 /s PASS - Maximum flow rate is greater than design flow rate From Hydraulics Research Tables 35 and 36 Depth as proportion of D; x = 0.343 PASS - Design pipe flow less than 0.75 times full depth Flow velocity at design flow rate; Vdesign = 0.880 m/s PASS - Design velocity is greater than 0.750 m/s