You are on page 1of 5

-----------------------------------------------------------------------------

-----------------------------------------------------------------------

Sairazi
YPTN University

Box-Batam Centre

Batam Island Tiban Lama, RT: 006, RW: 012

Phone: +62 81364 131 792 /+62 813 6497 33 91

E-Mail: sairazicici@yahoo.co.id

OBJECTIVE

Language of English position Management my education and Skills with

QC-Electrical / Instrument Inspector

QUALIFICATIONS SUMMARY

Eight years of mix experience Instrument Inspector, Commissioning Technician Electrical and
Instrument, Document Control, Electrical Process and electrical Technician.

SYSTEM SKILLS

Microsoft office.

EDUCATION

YPTN –ABA Batam Centre

Major: Language of English

Minor: Management

RELAVANT COURSES

Quality Management System

Safety Disnaker

Instrument Inspector

Industries oil and gas Yoss soudarso Ikbal Batam Island

Cables Glands CMP made in Australia of Company Mcdermotth

TRAVEL OF DOCUMENT

1|Page
Sairazi
Name of Document Number Date of Place date of Issued Date of Expiry
Issued

Passport R902094 04 Jun 2008 Batam 04 Jun 2013

CERTIFICATE OF COMPETENCY

Name of Certificate Number of Certificate Issued of Date

Oil & Gas Industries Instrument 036/INST-III/III/2008 10 March 2008


Inspector

DURING OF WORKING EXPERIENCE

1. June,20th ,2009 until November,02nd,2009 in Tri Karya Alam Mitra Semesta Company

 Project :DLB Kurhusio1 { Crane Buss of Board }

 Position : Electrician & Instrument Technician

2. April ,27th ,2009-Jule,17th ,2009 in Karya Alam Engineering Company

 Project : Shipyard { Play Board }

 Position : Commissioning Electrician

3. March,20th,2009-April,22nd ,2009 in Sinar Mulia Abadi Company

 Project : Skids to Platform of Installation Violia

 Position : Electrician and Instrument Skill

4. January,10th ,2009-February,28th ,2009 in Synco Synergy Company

 Project : Pipe Spiral

 Position : Maintenance

5. Juny,01st,2008-December,30th,2008 in Sinar Mulia Abadi Company

 Project : CPP North Belut { Platform }

 Position : Commissioning Technician and Document Control

6. May,22nd,2007-May,22nd,2008 in Mcdermotth Company

 Project : Stuulang { Platform }

 Position : Electrical Process

7. Juny,20th ,2007-October,10th ,2007 in Synco Synergy Company

 Project : Sisi Nubi { Crane Buss of Board }

 Position : Electrical Technician

8. May,22nd ,2005-April,23th,2007 in Mcdermotth Company

 Project : Wood Side Phase V { Platform }

2|Page
Sairazi
 Position : Electrical Process

9. January,20th ,2003-Maret,25th ,2003in Mcdermotth Company

 Project : EPSO { Platform }

 Position : Electrical Process

10. Juny,26th ,2000-December,24th ,2002 in Sat Nusa Persada Company

 Project : Industries Electronic { Assembly }

 Position : Technician

INSTRUMENT INSPECTOR OF THE COMPENTENCY

• Interpretation, Review and Check Specifications, Procedures, Code,


Government Regulation & ITP (Inspection & Test Plan) for Modification

• Directly responsible to the Company Site Representative on all engineering,


planning, commissioning, material and all other technical service essential to
support the construction activities at the offshore Worksite

• Check actual, Review Drawings & Data Sheet (Piping & Instrument Drawing
“P&ID”, Piping Plant, Isometric Drawing, Structure Drawings And Pipe Support,
Pipeline Drawing)

• Prepared, Check actual and Executions Plant is a Process that has been
developed as a result of Engineering Technical Integrity into the design,
drawings, planning, certification, construction, commissioning, maintenance
and operational activities of a facility

• Check actual & Review Installations Schedules Project

• Coordination with subcontractor when apply job what should be do before


installation and erection

• Check, Review Drawings & Monitoring installation and erection refer to


construction drawing (Piping & Instrument Drawing “P&ID”, Piping Plant,
Isometric Drawing, Structure Drawings And Pipe Support )

• Responsibility Make & Prepared test Package

• Verify material Carry Over raised by contractor due to material deviation and
work out with Field Engineer to solve the problems

3|Page
Sairazi
• Verify, Inspection Test & Calibration for Valves (Pressure Safety Valve “PSV”,
Control Valve, Ball Valve, Check Valve, Glob Valve, etc.), Flow Elements (FE),
Pressure Gauge, Thermo Well, Flow Transmitter, and other equipment E&I

• Drawing, Specification and Instrument Procedure


• P & ID and Isometric Drawing
• Material Selection and Installation
• Support Fabrication and Installation
• Install valve and Hook Up
• Tubing Installation and Testing
• Instrument Hook Up Installation
• Mechanical Completion

COMMISSIONING TECHNICIAN E / I AND DOCUMENT CONTROL

• Continuity and Cable Testing for Electrical and Instrument loop test, calibration
and function test of various instrument equipment I,e;Transmitter,control
valves and Fire & gas System I,E: acoustic Leak Detector, Flame and Gas
Detectors

• Flushing tubing and pipe of instrument

• Checking wiring diagram In and Out Cables

• Loop Check Diagram and another

• Trouble Shooting of Loop Diagram Drawing

DOCUMENT CONTROL

• Visual Recorting to report in the field

• Prepartition of Certificate completed E / I

• Marking up Drawing suitable in the feild of construction

• Preparing of punch list in the field

• The arrangement to ITR / ITP and per-discipline sub system for Document
Control

ELECTRICAL TECHNICIAN

4|Page
Sairazi
• Continuity wiring diagram cables

• Merger suitable equipment cables schedules

• Check punch list and pre-commissioning

• Make to report if any problems

ELECTRICAL PROCESS

• See Drawing for item : Support, routing Tray , Cables schedules and Wiring Diagram

• Fabrication Support and file support.

• Installation of Support and Cables Tray in the field

• Glands with a Procedure

• Termination in the Drawing of Wiring Diagram

MAINTENANCE

• Prepare Machine Gin set or Generator


• Install of Panel
• Make to reporting Daily of the working
• Repairing Trafo welding FCAW

TECHNICIAN

• Repairing machine operator

• Check Quality set operator

• Make to Reporting daily machine

• Calibration set electronic and Another

REFERENCES

Available upon request.

5|Page
Sairazi

You might also like