DATE MACHINE MACHINE SECTION

IR
Hot Air Cassette
6.04.2014
CTP AIR COMPRESSOR
6.04.2014
Brausse Punching M/C OIL COLLECTOR TREY
7.04.2014
YOKO Sucker Assembly
7.04.2014
HYCUT 4 AMP MCB
7.04.2014
MANUAL LAMINATION MACHINE Feeder Section
7.04.2014
Nova Cut Delivery Section
7.04.2014
LIFT GATE
9.04.2014
Champion Glue Section
9.04.2014
Meaiguang Feeder Roller
CANPAC TRENDS PRIVATE LIMITED
DAILY MAINTENANCE REPORT
H-2
6.04.2014
9.04.2014
H2 Indicator
9.04.2014
COMPRESSOR 2 (COMMMON)
-
9.04.2014
ROTARY SLOTTING
Sheet Cutting
10.04.2014
WINDOW PATCHING
Feeder
Main Motor
Feeder
10.04.2014
STEINAMANN
Lamination
10.04.2014
ROTARY SLOTTING
Slotting section
10.04.2014
BRAUSSE DIE PUNCHING
Feeder
11.04.2014
H2
Delivery
11.04.2014
POLAR 2
Hydraulic
11.04.2014
ETP
Pump
11.04.2014
GENERAL
Office
11.04.2014
H2
Delivery
0 11.04.2014
MAXIMA DIE CUTTING
Feeder
11.04.2014
GENERAL
IR Panel
Hot Air
12.04.2014
EXPERT FOLD
Sealing Fan
12.04.2014
CHAMPION
Liner Cutter
12.04.2014
STEINAMANN
Knife
13.04.2014
ROTARY SLOTTING
Main Motor
13.04.2014
YOCO
Preventive Maintenance
Preventive Maintenance
Counter
13.04.2014
H2
Ink Motor
14.04.2014
HAND TROLLY
Maint.
14.04.2014
BFY SLITTING & SCORING
Preventive Maintenance
14.04.2014
HAND TROLLY
14.04.2014
Braussee Punching Machine
Feeder
12.04.2014
H2
Reel TO SHEET CUTTING
13.04.2014
MAXIMA DIE CUTTING
10.04.2014
15.04.2014
Nova Cut Punching Machine
Preventive Maintenance
15.04.2014
PAKTEK
Preventive Maintenance
16.04.2014
BOX STRIPING
Power Supply
16.04.2014
CHAMPION
Glue Section
16.04.2014
STEINAMANN
Cutting
Maxima Machine
Office
16.04.2014
MAXIMA DIE CUTTING
Feeder
16.04.2014
BRAUSSE DIE PUNCHING
Delivery
17.04.2014
STEINAMANN
Glue Section
17.04.2014
HYCUT
Blower
Delivery
Delivery
Feeder
Operator
Delivery
18.04.2014
MAXIMA DIE CUTTING
Main Motor
19.04.2014
YOCO
Feeder
19.04.2014
WINDOW PATCHING
Feeder
19.04.2014
ROPE TYMING
New Machine
19.04.2014
MANUAL STRIPING
19.04.2014
AUTO STRICHING
Air supply
19.04.2014
GRAVURE
UV
20.04.2014
STEINAMANN
Glue Pump
20.04.2014
HIGHER DIE CUT
Gripper
21.04.2014
H1
Main sub panel
21.04.2014
ROPE TYMING
21.04.2014
STEINAMANN
Delivery
21.04.2014
PAKTEK
Glue
POLAR CUTTING M/C
POLAR CUTTING M/C New
COMPRESSOR 3 (HEIDELBERG 2)
EXPERT FOLD
18.04.2014
22.04.2014
GRAVURE
GENERAL
18.04.2014
16.04.2014
MANUAL LAMINATION M/C
23.04.2014
MANUAL STRICHING
Stretching
23.04.2014
STEINAMANN
Glue
23.04.2014
BRAUSSE DIE PUNCHING
Feeder
24.04.2014
UGVCL POWER MAIN SUPPLY
Sub Station
24.04.2014
BOX STRIPING
24.04.2014
GENERAL
Industrial Padalstand Fan
24.04.2014
H2
Chiller
25.04.2014
BOX STRIPING
Striping
25.04.2014
AIR COMPRESSOR 1 & 2
25.04.2014
HYCUT
Air Blower
25.04.2014
MANUAL HAND PUNCHIG
Drive
25.04.2014
WINDOW PATCHING
Glue
26.04.2014
H2
Feeder
HYCUT
Wall
PREPRESS
Wall
PLANT MANAGER CABIN
Wall
27.04.2014
SLITING
New Machine
27.04.2014
H2
Unit 3
27.04.2014
MANUAL HAND PUNCHIG
Drive
27.04.2014
AUTO STRICHING
Stitching
27.04.2014 Gripper Chain
27.04.2014 Delivery
28.04.2014
H1
Fodder Air
28.04.2014
Central AC
Printing
29.04.2014
All Plant Duct AC
29.04.2014
MAIN GATE CABIN WALL FAN
Wall Fan
30.04.2014
SINGLE PIN MANUAL STICHING
Clutch
30.04.2014
HIGHER DIE CUT
Feeder
01.05.2014
HIGHER DIE CUT
Feeder
01.05.2014
PAKTEK
Delivery
26.04.2014
22.04.2014
HIGHER DIE CUT
01.05.2014
PAKTEK
Glue
02.05.2014
H1
Feeder
02.05.2014
H2
Coating unit
02.05.2014
HYCUT
Gauge
03.05.2014
GRAVURE
03.05.2014
PAKTEK
Counter
Unit 3
Delivery
Delivery
04.05.2014
H2
Air Blower
04.05.2014
CHAMPION
Flute
04.05.2014
Nova Cut Punching Machine
Delivery
04.05.2014
HIGHER DIE CUT
Cutting
04.05.2014
YOCO
Feeder
UV Dryer
End press
05.05.2014
CHAMPION
Flute
06.05.2014
SPLITING
06.05.2014
H1
Feeder
06.05.2014
H1
Preventive Maintenance
07.05.2014
Overhead Crane - Stores
Roller
New Machine
Power Supply
07.05.2014
HIGHER DIE CUT
Feeder
07.05.2014
BRAUSSE DIE PUNCHING
Feeder
07.05.2014
Nova Cut Punching Machine
Cutting
08.05.2014
WEIGHT SCALE
Display
08.05.2014
GRAVURE
UV Duckt
08.05.2014
MAXIMA DIE CUTTING
Delivery
08.05.2014
H1
04.05.2014
H1
H2
03.05.2014
07.05.2014
SLITING
09.05.2014
POLAR CUTTING (NEW)
Knife
09.05.2014
ROPE TYMING
09.05.2014
H1
Chiller
09.05.2014
MAXIMA DIE CUTTING
Delivery
09.05.2014
H1
Interduck Unit 1
09.05.2014
VIDEOJET PRINTER
New Printer
11.05.2014
HIGHER DIE CUT
Feeder
11.05.2014
BOILER
Feed Pump
11.05.2014
AUTO STRICHING
Drive
11.05.2014
BOX STRIPING
11.05.2014
STEINAMANN
Feeder
12.05.2014
YOCO
Preventive Maintenance
12.05.2014
Meaiguang
Preventive Maintenance
12.05.2014
Meaiguang
Liner Feeder
12.05.2014
BOILER
Feed Pump
14.05.2014
Nova Cut Punching Machine
Feeder
14.05.2014
Meaiguang
Liner Feeder
14.05.2014
STEINAMANN
Pasting
14.05.2014
MAXIMA DIE CUTTING
Feeder
15.05.2014
CCTV Camera
Parking
15.05.2014
MAXIMA DIE CUTTING
Main Motor
16.05.2014
MAXIMA DIE CUTTING
Main Motor
17.05.2014
BOX STRIPING
Electrical
17.05.2014
Street Light
Light
17.05.2014
CCTV Camera
Camera
17.05.2014
Brausse
Feeder
IR Lamp
UV Lamp
Lubrication Pump
Delivery
19.05.2014
Nova Cut
Feeder
H1
18.05.2014
Maxima
18.05.2014
19.05.2014
Manual Die Punching 1
Preventive Maintenance
20.05.2014
Packtek
Pasting flap grinder
20.05.2014
HYCUT
Preventive Maintenance
20.05.2014
Polar Cutting- Old
Preventive Maintenance
20.05.2014
Compressor 1
Preventive Maintenance
21.05.2014
Polar Cutting - New
Preventive Maintenance
21.05.2014
Compressor 2
Preventive Maintenance
21.05.2014
Packtek
Pasting flap grinder
23.05.2014
H2
Coating
23.05.2014
Compressor 2
Electrical
23.05.2014
Polar 2
Air
23.05.2014
H1
UV Intrerduck Unit 1
23.05.2014
Nova Cut
Delivery
23.05.2014
H2
Air
24.05.2014
H2
Air
24.05.2014
Packtek
Conveyer
25.05.214
Meaiguang
Feeder
25.05.214
Hand Trolly
25.05.214
Window Pasting
Feeder
25.05.214
H2
Coatting
25.05.214
Generator
25.05.214
Champion
25.05.214
26.05.214
Boiler
FD
26.05.214
Box Case Siller
Drive
26.05.214
H2
New Coating Pump
26.05.214
AC
Motor
26.05.214
AC
Motor
22.05.2014
H1
UV Dryer
27.05.214
AC
Indoor Machine
27.05.214
28.05.214
28.05.214
Knife Grinding
28.05.214
Compressor 2
29.05.2014
Generator
29.05.2014
H1
Unit 2
29.05.2014
Auto Stiching
Stiching
29.05.2014
Striping
Electrical
29.05.2014
Manual Die Punching 1
29.05.2014
Manual Die Punching 2
Die
30.05.2014
H2
Unit 4
30.05.2014
H2
Air
30.05.2014
H2
Dilevery
30.05.2014
Bailing Machine 40 Ton
Wasteg Chamber
01.06.2014
Bailing Machine 40 Ton
Hydrolic
01.06.2014
Bailing Machine 25 Ton
01.06.2014
H1
Ink Dry Chamber
01.06.2014
H1
Hand Trolly
02.06.2014
Steinamann
Feeder
02.06.2014
Meaiguang
Liner
02.06.2014
Bailing Machine 40 Ton
02.06.2014
Nova Cut
Sensor Controling (Double
Sheet & Side Lay)
03.06.2014
H1
Feeder
03.06.2014
H2
Preventive Maintenance
03.06.2014
Nova Cut
Die
04.06.2014
Bailing Machine
04.06.2014
Steinamann
04.06.2014
Champion
Counting
04.06.2014
Compressor
04.06.2014
Nova Cut
Die
04.06.2014
Maxima
Gripper Bar
05.06.2014
Rotory Slooter
Cutter
05.06.2014
Compressor
05.06.2014 Sealing Fan
05.06.2014
Crean
Stores - Godown
06.06.2014
Meaiguang
06.06.2014 Lighiting
06.06.2014
Compressor
Drive
06.06.2014
Compressor Room
06.06.2014
Maxima
Gripper Bar
07.06.2014
Nova Cut
Feeder
07.06.2014
H1
Feeder
07.06.2014
H2
08.06.2014
Stores
Hand Trolly
08.06.2014
HIGHER DIE CUT
Delivery
09.06.2014
BOX STRIPING
Strip Guide
09.06.2014
Box Wraping
09.06.2014
Lift 1
09.06.2014
Brausse
Cutting
09.06.2014
Yoco
Preventive Maintenance
11.06.2014
Brausse
11.06.2014
H2
Coating
12.06.2014
Brausse
Compressor
07.06.2014
Cutting
Main motor
12.06.2014
Polar Cutting 2
Main motor
12.06.2014
Window Pasting
Feeder
13.06.2014
CTP Compressor
Preventive Maintenance
13.06.2014
New ELGI Compressor
13.06.2014
GRAVEURE
Delivery
14.06.2014
Stores Lift
14.06.2014
Rope Tying
Tying
14.06.2014
Box Striping
Striping
14.06.2014
Srink Warping 2
Warping
14.06.2014
New ELGI Compressor
15.06.2014
Maxima
Display
15.06.2014
Yoco
Foiling
15.06.2014
ROTATORY SLOTTER
Drive
15.06.2014
GENREL
Office
16.06.2014
H1
Coating
16.06.2014
GRAVIER
Delivery
16.06.2014
HICUT
Knief
16.06.2014
KNIFE GRINDING
Drive
16.06.2014
BOX STRIPPING
17.06.2014
H1&H2
17.06.2014
PEKTEC
Folding
17.06.2014
GENRAL
Purchase
17.06.2014
GENRAL
Colony
18.06.2014
Packtek
Drive
18.06.2014
Srink Warping 1
12.06.2014
HIGHER DIE CUT
18.06.2014
Srink Warping 2
18.06.2014
Yoco
Cutting
18.06.2014
Packtek
18.06.2014
UGVCL
19.06.2014
New ELGI Compressor
19.06.2014
UGVCL
21.06.2014
Maxima
Delivery
21.06.2014
H1
Delivery
21.06.2014
New ELGI Compressor
21.06.2014
Lift 1
Delivery
Coating
22.06.2014
Case Sealer
Sealing
22.06.2014
Hycut
22.06.2014
Stores Lift
Controling
23.06.2014
BOX STRIPPING
Dryer
24.06.2014
New ELGI Compressor
24.06.2014
Polar 115 EMW 2
25.06.2014
H1
Dryer
25.06.2014
Maxima
Delivery
25.06.2014
Stores
25.06.2014
Champion
Glue Room
Delivery
Dryer
Punching
22.06.2014
H2
Higher Die
27.06.2014
H1
26.06.2014
23.06.2014
New ELGI Compressor
25.06.2014
GENRAL
Delivery
27.06.2014
28.06.2014
Lift 1
Oil Tank
28.06.2014
H2
Chilling
28.06.2014
Brausse Die Punching
Feeder
28.06.2014
Meaiguang
Glue
29.06.2014
H2
Chilling
29.06.2014
Meaiguang
Glue
29.06.2014
GENRAL
30.06.2014
BOX STRIPPING
Soldering
01.07.2014
NovaCut
Preventive Maintenance
01.07.2014
Higher Die
Preventive Maintenance
01.07.2014
Manual Die Punching 1
Preventive Maintenance
01.07.2014
Manual Stiching 2 Pin
Stiching
01.07.2014
H2
Unit 3 and 4
02.07.2014
NovaCut
Cutting window
02.07.2014
Higher Die
Cutting
02.07.2014
S.T.P
Blower
02.07.2014
H2
02.07.2014
Champion
Glue
02.07.2014
H2
Coating
03.07.2014
NovaCut
Feeder
03.07.2014
Yoco
03.07.2014
Higher Die
Drive
04.07.2014
Higher Die
Delivery
04.07.2014
Polar 115 EMW 2
Clutch
05.07.2014
H1
UV hot air
04.07.2014
Brausse Die Punching
Drive
28.06.2014
H2
Higher Die
27.06.2014
Central Air Compressor
05.07.2014
ELGI Air Compressor
Receiver
Coating
Unit 8
06.07.2014 Feeder
07.07.2014 Preventive Maintenance
07.07.2014
BOX STRIPPING
Striping
07.07.2014
Higher Die
Feeder
08.07.2014
Steinmann
08.07.2014
Polar 115 EMW 2
Clutch
08.07.2014
Window Pasting
Conveyer
09.07.2014
Higher Die
Drive
10.07.2014
Polar 115 EMW 2
10.07.2014
Meaiguang
Feeder
10.07.2014
11.07.2014
11.07.2014
Higher Die
Drive
12.07.2014
H1
Damping Solution
12.07.2014
13.07.2014
13.07.2014
H2
Coating
14.07.2014
Meaiguang
Feeder
14.07.2014
GENRAL
14.07.2014
BOX STRIPPING
14.07.2014
STP Pump
16.07.2014
Shring Warping
16.07.2014
H1
Display
16.07.2014
Steinmann
Feeder
Higher Die
H2
Unit 1
06.07.2014
H2
Steinmann
16.07.2014
H1
Coating
17.07.2014
Maxima
Delivery
Drive
17.07.2014
Higher Die
Delivery
17.07.2014
Champion
Counter
18.07.2014
Brausse Die Punching
Gripper
18.07.2014
ELGI Air Compressor
18.07.2014
Weighbridge
19.07.2014
Higher Die
Delivery
19.07.2014
NovaCut
Feeder
19.07.2014
Brausse Die Punching
Drive
19.07.2014
Boiler
Condensate Tank
20.07.2014
Yoco
Gripper
20.07.2014
H2
UV Lamp
21.07.2014
Yoco
Gripper
21.07.2014
H2
Chilling
21.07.2014
Rotory Sloter
Cutter Blade
21.07.2014
Maxima
Feeder
22.07.2014
H1
22.07.2014
Maxima
Feeder
23.07.2014
Store
23.07.2014
Maxima
Side lay
23.07.2014
H2
Feeder
23.07.2014
Packtek
Glue
23.07.2014
Maxima
Feeder
24.07.2014
Compressor 1 & 2
Preventive Maintenance
25.07.2014
H1
Coating
25.07.2014
Yoco
Delivery
Brausse Die Punching
17.07.2014
26.07.2014
H1
Coating
26.07.2014
Yoco
Delivery
26.07.2014
Dispatch
27.07.2014
Hand Trolly
28.07.2014
Boiler
30.07.2014
Yoco
Preventive Maintenance
30.07.2014
Graviour
Delivery
30.07.2014
Seapage Motor
31.07.2014
Street Light
31.07.2014
ETP
31.07.2014
STP Pump
31.07.2014
H1
Rediator
31.07.2014
Centerlised AC
31.07.2014
Packtek
Drive
Controller
Preventive Maintenance
01.08.2014
Packtek
Drive
01.08.2014
H2
Delivery
01.08.2014
Bobst Vision Fold
01.08.2014
Packtek
31.07.2014
Bobst Vision Fold
NATURE OF COMPLAIN
COMPLAIN GIVEN
BY
ATTENDED BY
2 Lamps Replaced by Ultra light which
were recd in damaged condition.
operator Ashok Panchre
All old coils were not working. Maint. Manoj
Air not Unloading Maint. Pankaj
Oil Collector trey Broken.
Oil Pump is not working Properly.
Two new Body and Clutch were taken
from Galaxy but both the parts are not
perfect.
Satya Manoj
Was not working Maint. Pankaj
Support Rod was Worn out and was
roller drive gear.
Parkash Ashok Panchre
Brush Bearing is not Working. As per
the intial report due bearing jammed
shaft is cut.
Satya Ashok Panchre
Both the two gate of old lift
are broken due to negligence.
Sachin
Air leakage problem Nimay Pankaj & Tejas
Liner feeding is not properly working Nimay Manoj
CANPAC TRENDS PRIVATE LIMITED
Danveer Ashok Panchre
Bulb replace Maint. Manoj
- Maint. Pankaj & Tejas
Cutting is not ok. Rough Cutting Nimay Ashok Panchre
Setting Problem Chandan Manoj
Clutch not engaged
Front lay is not properly working
Rankling Prakash Manoj & Ashok
Pressure uneven Nimay
Manoj, Ashok &
Tejas
Side lay problem Danvir Manoj & Ashok
Lock Alagraj Manoj & Ashok
Pressure not develop Mishraji Tejas & Pankaj
Not working Joginder Pankaj
Wall Fan and Tube Light Sachine Manoj & Pankaj
Hot Air Maint. Manoj
Front lay is not properly working Sushant Manoj & Ashok
Welding Sachine Sachine
Contactor sort
Blower not working
Sealing Fan Chandan Manoj & Pankaj
Main moter belt Nimay Maint. Team
Knife Cutting Prakash Manoj & Ashok
Main moter not Running Nimay Manoj & Pankaj
Preventive Maintenance Maint. Team
Preventive Maintenance Maint. Team
Not working Nimay Maint. Team
Push button not working (02 Nos) Reddy Manoj
Tejas & Pankaj
Preventive Maintenance Maint. Team
Nimay Manoj
Side lay Problem Danvir Ashok and Manoj
Reddy Manoj
Arvind Manoj & Ashok
Preventive Maintenance Danvir Maint Team
Preventive Maintenance Chandan Maint Team
Three pin socket not working Chandan Pankaj
Air leakage problem Nimay Manoj & Tejas
Knife Holder Broken (6 nos) Gautam Ashok & Manoj
Sealing Fan Mounting
Wall Fan
Double sheet not working Arvind Maint Team
Belt jaam Danvir Ashok & Manoj
Glue coating uneven Gautam Ashok
Air blower not working Rakesh Manoj & Tejas
UV Lamp Maint. Maint Team
Tube Light Prakash Pankaj
Clutch not engaged Arvind Ashok
Side lay problem Bharat Maint Team
Air vacuum pump motor Chandan Manoj & Pankaj
New Machine Manoj
Pankaj & Tejas
Moisture separator Nimay Manoj
UV Pump not working properly Prakash Manoj & Pankaj
Seal not working Prakash Manoj
Play in gripper Shushant Ashok
MCB 63 AMP trip Alagraj Manoj & Tejas
Manoj
Jogger Gautam Ashok
Chandan Maint Team
Maint Team Khalid Sealing Fan
Ashok & Tejas
Pankaj & Tejas
Pin blockage Nimay Manoj
Pressure uneven Prakash Maint. Team
Side lay problem Danvir Ashok & Manoj
D.O. Fuse Jugal Maint. Team
Manoj & Tejas
Not working Rakesh Ashok & Tejas
Pump not working Reddy Manoj & Tejas
Not working Chandan Manoj
Maint. Team Maint. Team
Manoj
Extra ordinary sound Khalid Manoj & Tejas
Glue sticker surface uneven Vishal Ashok
Jamm Reddy Maint. Team
Fan Prakash Manoj & Tejas
Fan Prakash Manoj & Tejas
Fan Prakash Manoj & Tejas
Shifting Argade Maint. Team
Pneumatic Valve Reddy Manoj & Tejas
Extra ordinary sound Khalid Maint. Team
Doubling Nimay Ashok
Chain loose error
Gripper
Air pressure low Alagraj Ashok & Manoj
AC not working Alagraj Sachin & Manoj
Cooling Problem Maint. Sachin & Tejas
Old wall fan not working Yadav Tejas
Doubling Nimay Ashok
Gripper Maint. Ashok & Manoj
Gripper pin (OUT) at front lay Khalid Ashok
Extra ordinary sound Chandan Ashok & Manoj
Manoj
Ashok & Tejas
Khalid
Disc new Khalid Ashok & Manoj
Main pile Alagraj Ashok & Manoj
Uneven sound Reddy Ashok & Manoj
Gauge out Prakash Ashok
Manoj
Not working Chandan Manoj
Plate does not unlock Reddy Ashok & Manoj
Reddy Manoj
Reddy Manoj
Unit not working Reddy Manoj
Pressure uneven Nimay Maint. Team
Chain guide bolt broken Khalid Manoj & Pankaj
Error (Loose Sheet) Khalid Manoj & Pankaj
Not working properly Khalid Manoj
Lamp short
shutter not open
"E" flute gear Nimay Maint. Team
Electric supply cabling Argade Ashok & Pankaj
Main pile drive motor Alagraj Maint. Team
Preventive Maintenance Alagraj
Maint. Team &
Printing Team
Clamping nut comes out Mahesh Sachine
New Machine Argade
New Machine Maint. Team
Pile not come down Dhrumpal Ashok
Machine not run (Error-sheet infeed) Abdul Ashok
Safety guard open Ashish Ashok
Weight not display Dinesh Sachine
Duckt rubber packing Shivshankar Ashok
Gripper wear with opner Arvind Maint. Team
hand trolly not working Alagraj Pankaj&Kamlesh
Maint. Team Alagraj
Maint. Team
Shifty Bolt Broken Rakesh Pankaj & Kamlesh
Manoj
Temp. Controller (Error Temp. above T1
Distributor)
Alagraj Ashok & Manoj
Pile not come up Arvind
Ashok,Pankaj &
Kamlesh
Lamp not working (Old) Alagraj Manoj
Errection and Testing
VP Sir and Maint.
Dept.
On/Off (Pile) not working Khalid Manoj
Auto not working Nimay Maint. Team
Key Comes Out Nimay Manoj
Pankaj
Ashok
Preventive Maintenance Maint. Team
Preventive Maintenance Maint. Team
Maint. Team
Auto not working (Pending Work) Maint. Team
Double sheet not working Khalid Ashok & Manoj
Maint. Team
Hydrolic lift Gautam Manoj
Pile not working in auto mode Khalid Maint. Team
Cable brakage Sachine Manoj
Clutch not engaged Arvind Maint. Team
Clutch not engaged Arvind Maint. Team
Sort circuit Pankaj
Mercury Lamp sort Maint. Team Maint. Team
Not working Sachine Pankaj & Kamlesh
Side lay sensor not working Doonpal Manoj & Pankaj
Over Heating T Nagraj Maint. Team
Over Heating T Nagraj Maint. Team
Low Oil Error
Tube Light
Front Lay Doonpal Manoj
Arvind Pankaj & Kamlesh
Preventive Maintenance Maint. Team
Not working Maharaj Ashok & Kamlesh
Preventive Maintenance Maint. Team
Preventive Maintenance Maint. Team
Preventive Maintenance Maint. Team
Preventive Maintenance Maint. Team
Preventive Maintenance Maint. Team
Not working Ashok Sir (VP) Sachine
Kamlesh
Trip Khalid Maint. Team
Blower Not Working Rakesh Maint. Team
Error Lamp Failed Shushant Maint. Team
Sheet not setting properly Doonpal Ashok & Manoj
Error Air Low Ashok Gautam Ashok
Error Air Low Maint. Team
Belt titner bracket broken Chandan Manoj
Timing Out Nimay Ashok & Manoj
Rakesh Pankaj & Kamlesh
Feeder Belt Chandan Maint. Team
Maint. Team
Load Testing Maint. Team
Sachin & Maint.
Team
Lighting Nimay Pankaj
Office Passage Lighting Sachin Pankaj
Fan not working Nimay Manoj & Pankaj
Machine not running Chandan Kamlesh
Manoj & Pankaj
Office Area AC not working Sachin Pankaj
Store Cabin AC not working Sachin Pankaj
Lamp not working Maint. Team
Cooling not properly Sachin Sachin
Office - Marketing Dpt. Fan Sachin Pankaj
Office - Reception Area Fan Sachin Pankaj
Rakesh Pankaj
Servicing Maint. Team Manoj & Pankaj
Service Maint. Team Maint. Team
Damping (Water Level) Shushant Manoj & Kamlesh
Timing Out Nimay Tejas
Cable burnt Chandan Manoj & Kamlesh
Oil Lickege Khalid Kamlesh
Uneven Doonpal Kamlesh
Impression Not Working Reddy Manoj
Preventive Maintenance Pankaj&Kamlesh
Suction Belt Reddy Pankaj&Kamlesh
Bolt Loose Pankaj & Tejas
Shaft Broken Maint. Team
Maint. Team
Not working Deepak Ashok & Manoj
Not working Maint. Team Kamlesh
Vaccum Low Praksh Manoj & Pankaj
Top Sheet Lapping Nimay Maint. Team
Maint. Team
Doonpal Ashok & Manoj
Pile Motor
Preventive Maintenance Maint. Team
Plate Lock Jamed Doonpal Ashok
Maint. Team
Ashok & Manoj
Sensor not working Nimay Maint. Team
Maint. Team
Plate Lock Jamed Doonpal Ashok
Tejas & Kamlesh
Broken Nimay
Pankaj, Tejas &
Kamlesh
Not working Maint. Team
Capacitor 2.5 ohm Sachin Maint. Team
Crean not working Rakesh Manoj & Tejas
Maint. Team
Rakesh Pakaj & Kamlesh
Tajes
Maint. Team
Tejas
Not working Khalid Ashok & Manoj
Main Pile Motor (New) Ashok & Manoj
Maint. Team
Pankaj, Tejas &
Kamlesh
Ashok, Manoj &
Kamlesh
Rakesh Tejas & Kamlesh
Gripper not open properly Doonpal
Ashok, Tejas &
Kamlesh
Broken Chandan Manoj
Not working Chandan Ashok & Manoj
Not working Ashok Maint. Team
Jame Doonpal Maint. Team
Preventive Maintenance Maint. Team
Ashok, Manoj &
Tejas
Pankaj & Kamlesh
Ashok & Manoj
Gripper guide band
Belt
Not working Rakesh Pankaj
Belt not working Maharaj Maint. Team
Preventive Maintenance Maint. Team
Maint. Team
Gripper Jam Shivshankar Ashok & Kamlesh
Operating Panel comes out from fixture Maint. Team Maint. Team
Not working properly Maharaj Tejas
Not working properly Maharaj Pankaj
Not working properly Maharaj Ashok & Tejas
Maint. Team
Oil Level Low Arvind Ashok & Pankaj
Pressure Not Release Dileep Ashok
Motor Not Run Nimay Ashok&Pankaj
Sachin Pankaj
U.V Pump Not Working Alakhraj Ashok&Tajus
Trasfer Gripper Timing Out Prakash Ashok&Tajus
Not Comes Down Prakash Tajus
Belt Broken Rakesh Tajus
Not Working Maharaj Ashok&Tajus
Ashok&Alakhraj
Drive Shaft Maharaj Ashok&Tajus
Sachin Pankaj&Tajus
Hingh of Sealing Fan H.R Maint.team
Tejas & Kamlesh
Not Working Maharaj Manoj
Doonpal
Pankaj, Tejas &
Kamlesh
Not Working Maharaj Manoj
Plate lock not working Dilip
Manoj, Kmlesh &
Tejas
Manoj
D.O. fuse 2 nos and factory side 1 nos Maint.team
Maint.team
D.O. fuse 1 nos Maint.team
Gripper not open Doonpal Kamlesh
Pile temp. high Ashok Gautam Ashok & Manoj
Maint.team
Not working Ashok Ashok, Raj & Pankaj
Pannel Fan not working Alagraj Manoj & Kamlesh
Pressure Uneven Alagraj Manoj & Kamlesh
BOPP Tape not cut Maharaj Manoj
Sefty bolt broken Arjun Kamlesh
Operating switch not working Dinesh Mishra Manoj
Motor not running Maharaj Ashok & Tejas
Maint.team
Knife late Dinesh Mishra Ashok & Manoj
Temp. High Alagraj Ashok & Manoj
Gripper not open Arvind Tejas
Exhaust Fan Dinesh Mishra
Manoj, Pankaj &
Tejas
Ashok Gautam
Manas
Arvind
Wall Fan Sachin
Sealing Tube Light Nimay Pankaj&Tejas
Pile temp. high Alagraj Ashok & Manoj
Cooling temp. high Pushpraj
Ashok,Manoj &
Pankaj
Sefty bolt broken Dhoonpal Pankaj & Tejas
Maint.team
Sealing Fan
Pankaj&Tejas
Gripper not open Dhoonpal Ashok & Manoj
Ashok & Kamlesh
Maint.team
Maint.team
Maint.team
Not working Reddy Maint.team
Sensor not working Dhoonpal Ashok & Manoj
Roller not working Nimay Kamlesh
Pankaj
Sensor not working Nimay Manoj & Pankaj
Manoj & Pankaj
Not Working Maharaj Manoj & Tejas
Preventive Maintenance Maint. Team
Preventive Maintenance Maint. Team
Preventive Maintenance Maint. Team
Not working Nimay Manoj & Tejas
Impression not working Reddy Manoj
Manoj
Die chease gauge Sonu Maint. Team
Jam Nair Maint. Team
Maint.Team
Stopper out of order Nimay Ashok&Manoj
Not working properly Reddy Ashok&Manoj
Double sheet not working Doonpal Manoj&Pankaj
Maint.Team
Chain Loose Sonu Manoj&Kamlesh
Jogger Sonu Manoj&Pankaj
Not working Mishra Maint.Team
Delivery temp. high Alagraj Maint.Team
Ashok&Manoj Motor not running Doonpal
Reddy Not Working
UV Pump not working Ashok & Tejas
Lock Error
Ashok, Manoj &
Tejas
Lever Broken Shiv Shankar
Ashok, Manoj &
Tejas
Preventive Maintenance Maint. Team
Manoj
Front lay not working Sonu Pankaj & Tejas
Maint. Team
Tejas & Kamlesh
Belt Change Maharaj Pankaj
Jark Sonu Ashok & Kamlesh
Maint. Team
Belt Nimay
Ashok,Tejas &
Kamlesh
Temp. High Alagraj Maint. Team
Uneven sound Reddy Ashok
Conveyor Roller jaam Nimay Pankaj
Staff Quarter Joginder Ashok & Tejas
Maharaj Manoj & Tejas
Nair Pankaj & Kamlesh
Pankaj
Temp. High Alagraj Ashok & Manoj
Belt Broken Prakash Manoj
Perfaction gripper Reddy Maint. Team
Ashok Gautam
UV lamp not working Alagraj
Ashok,Manoj &
Kamlesh
Gripper not open Dhoonpal Pankaj & Tejas
Pankaj & Tejas
Plate bolt broken Tejas
Gripper not open Sonu Ashok & Manoj
Not working Nimay Manoj
Register out Dhoonpal Manoj & Tejas
Water drain pump not working Yadav
Manoj,Pankaj &
Tejas
Pile support bolt broken Sonu Ashok & Manoj
Uneven sound Tushar Ashok & Manoj
Gripper jaam Tushar Manoj & Tejas
Motor Jaam Nimay Manoj
Register out Dhoonpal Maint. Team
Lamp Trip Alagraj Ashok & Manoj
Register out Dhoonpal Ashok & Manoj
Water not cool Alagraj Manoj & Pankaj
Bolt Broken Nimay Maint. Team
Table belt roller jaam Dhoonpal Ashok
Maint. Team
Table belt roller jaam Pankaj, Tejas & Raj
Pedalstand Fan Sachin Manoj & Kamlesh
Not working Dhoonpal Manoj & Kamlesh
Maint. Team
Nozzel not working Maharaj Ashok & Manoj
Not work properly Dhoonpal Manoj
Preventive Maintenance Maint. Team
Uneven sound Alagraj Maint. Team
Air pipe brust Dhoonpal Pankaj
Pressure Uneven Alagraj Ashok
Pile motor not work Dhoonpal Ashok & Manoj
Street light not working Sachin Maint. Team
Manoj & Tejas
Leackeg Nimay
Ashok, Manoj &
Tejas
Preventive Maintenance Pankaj & Tejas
Pile not working Prakash Manoj
Jaam Nair Maint. Team
Street light not working Sachin Maint. Team
Valve Jaam Nair Ashok
Nair Pankaj
Temp. High Alagraj Manoj
Maint. Team
Maharaj Ashok & Manoj
Software Error Maharaj Maint. Team
Preventive Maintenance
Ashok & Manoj
Vaccum not ok Alagraj
Manoj, Pankaj &
Tejas
Raj
RECTIFICATION / ACTION
TARGET
DATE
APPROXIMATE
COST
2 new lamps fitted and tested. Now Complete set
of 4 is working
6.04.2014
Amount already
paid. This is a
replacement.
10 New Coils came from Industrial Heat Product
@2200 per pc, but out of ten only two are
working. Sachin to take up with Supplier. This is
under warranty for one year.
15.04.2014
Loading/unloading kit was arranged and fitted 7.04.2014 6700
Ashok Adlakha Spoke to Mr. Neeraj of Galaxy and
on 8.04.2014 we are sending these parts to Galaxy
Delhi.
will confirm
Changes 7.04.2014 Rs 400
Setting Done as stop gap arrangement. Rod to be
taken out for Machining.
12.04.2014 Rs 250
Bearing has been changed but we will take out
shaft on next Tuesday.
20.04.2014
We are taking cost from BR> Equipment. RS 36000
Solenoid Valve Change but leakage is not solved
b'coz of unavailability of "O" ring
11.04.2014 RS 250
Roller opened and packing given packing to run
machine, but shaft should be send for repairing
CANPAC TRENDS PRIVATE LIMITED
12.04.2014 Rs 200
Trey Removed for the time being. After welding
this will be fitted
- 09.04.2014 RS 150
Preventive Maintenance 09.04.2014 -
Blade must be changed. Last time blade Blade was
from Lilawati A Patel @500 per blade. Have
informed party for replacement with a assurance
that we are 2 more.
15.04.2014 RS 1000
Drive shaft chain lock 2 Nos fitted and done
preventive
10.04.2014
Carbon Change 10.04.2014 RS 130
Problem is not shortout
Setting core roller pressure and also film pressure
roller
10.04.2014
Setting roller eccentric from both side 10.04.2014
Pressure setting of side lay 10.04.2014
24V Supply given to circuit 11.04.2014
Pump Motor Belt Broken, Replaced New Belt A46
Length 1204
11.04.2014
Pump Motor Belt Broken, Replaced New Belt A34
Length 900
11.04.2014
QC, Reception & VP Sir Cabin Wall Fan Installed 11.04.2014
Hot Air Cassette Re-Installed and under inspection 16.04.2014
Front Lay Properly Setting and Run Machine 11.04.2014
Dispatch Slope Ladder, Hand Trolley 11.04.2014 800
Contactor Change - 3TF45 12.04.2014 4800
Pressure switch properly settled 12.04.2014
Wiring Done 12.04.2014
A56(1540) - 2 nos belt changed 12.04.2014 340
Timing belt - HTD800-8M Changed 12.04.2014 580
Control Wire connect to drive 13.04.2014
Preventive Maintenance 13.04.2014
Preventive Maintenance 13.04.2014
Brakeage wire connected 13.04.2014
Repair and change 13.04.2014
Repair 14.04.2014
Drive port change 14.04.2014
Repaired 14.04.2014
Frequency of photo cell setting done. 14.04.2014 0
Feeder section- oiling and Greasing. Brush unit of
delivery section sent for repair as bearing sheet
having play problem. Front lay housing screw was
jammed and maint done. Punching section some
extra noise was coming. Punching lever -oiling and
greasing done
15.04.2014
Oiling & Greasing done. 15.04.2014
Replaced with new pin socket 16.04.2014
"O" ring 132mm change 16.04.2014
Broken face inter change 16.04.2014
Clean limit switch point 16.04.2014
Overload really trip open 16.04.2014
Air pressure of pneumatic cylinder setting 17.04.2014
Dissemble send for preparing (winding burn) 17.04.2014
New UV Lamp Nos.3 18.04.2014
New Tube light assembly fitted 18.04.2014
New Fan Installed Nos.2
New Fan Installed Nos.1
New Fan Installed Nos.1
New Carbon Installed 18.04.2014
Increase frequency of photo cell 19.04.2014
Repaired motor assembled 19.04.2014
Erecssion & commission 19.04.2014
Shifting 19.04.2014
Remove defected & bypass air line - sample given
to sachine
19.04.2014
Servicing UV pump 19.04.2014
Change Seal 20.04.2014
Tension spring wear out (sample sent new
purchase) given to raj patel (Machine is running)
20.04.2014
Defected mcb replace by new 21.04.2014
Training given to operate the machine 21.04.2014
Setting the jogger 21.04.2014
New glue disc fitted 21.04.2014
18.04.2014
Preventive Maintenance 21.04.2014
16.04.2014
Setting cutter knife (but problem not solved -
Engineer will come tomorrow - 25.04.2014)
23.04.2014
Setting pneumatic valve 23.04.2014
Increase frequency of photo cell 23.04.2014
D.O. Fuse installed and "R" phase cable repairing
work
24.04.2014
Machine servicing now in working condition (Nos.
2)
24.04.2014
Barring 6203 and capacitor 5 ohm change 24.04.2014
1 wire come out from connector, connection done 24.04.2014
Proper Setting 25.04.2014
Servicing 25.04.2014
Repaired motor assembled 25.04.2014
Search but fault doesn't found 25.04.2014
Send for machining and fitted 25.04.2014
Feeder bearing wear out sample send for new
purchase (Machine is running)
26.04.2014
New Wall fan fitted 26.04.2014
New Wall fan fitted 26.04.2014
New Wall fan fitted 26.04.2014
Make space and shifted 27.04.2014
Standby Valve 2704.2014
Wisher lock fitted in drive gear 27.04.2014
Sensor setting 27.04.2014
Operator side chain tight
Gripper opener setting
Air pipe break change the pipe 28.04.2014
Search and find compressor & exhaust motor not
working and calling blue star engineer for permant
rectification
28.04.2014
Engineer from company comes and services all
duct ac. Now in working condition
29.04.2014
Replace old fan and new fan fitted 29.04.2014
Change clinker cam and clutch sleeve 30.04.2014
Change gripper spring nos.5 30.04.2014 50
Setting pin on guide plate on front lay 01.05.2014
Main motor shaft and delivery conveyor shaft
pedestal bearing (FC205 and FC206) change
01.05.2014
27.04.2014
Preventive Maintenance 21.04.2014
New glue disc local develop fitted 01.05.2014 5400
Engineer Call from Siemens 02.05.2014
Cylinder of Pneumatic cylinder fitted 02.05.2014
Gauge setting 02.05.2014
Setting done for running 400GSM sheet 03.05.2014
Counter Pneumatic cylinder change 03.05.2014
Pneumatic Valve coil change
Delivery belt change
Pneumatic Valve change
MCB Change 04.05.2014
New Repaired gear change but not ok 04.05.2014
Bolt change 04.05.2014
Sensor setting 04.05.2014
Setting feeder (2 time) 04.05.2014 nge
Lamp change, in end press 02 nos, intreduct 03
nos, lamp holder 01 nos and lamp holder 01 nos is
rejected and return to party and hand over to
sachin
Air cylinder pipe leakage, pipe change
Repaired gear change and original rejected gear
fitted
05.05.2014
Cabling done but erection site was not finalized
hence MCB not fitted
06.05.2014
Engg. From Siemens comes and rectify the problem
(change motor)
06.05.2014
Preventive Maintenance 06.05.2014
Engg. Call from Hi-King engineers 07.05.2014
Erecssion of new machine
MCB 32 A 4 Pole
Relay trip reset relay/ on-off switch problem 07.05.2014
Clean PH2 Sensor (Called sheet leat fast sensor
situated in between front lay sensor)
07.05.2014
Setting guard sensor (at midnight) 07.05.2014
Telephonic talk with "Axpert Engg." and
reprograming the display data
08.05.2014
Silicon rubber bar purchase from market and
making packing in house
08.05.2014
Seatting gripper opner and brush lever 08.05.2014
Down liver rod changed 08.05.2014
04.05.2014
03.05.2014
07.05.2014
Bolt Change 09.05.2014
Servicing - Done by company engg. 09.05.2014
Temp. Controller Valve Setting 09.05.2014
Pile Chain open from chain spocket, setting chain
and sensor
09.05.2014
Lamp Change (Old) 09.05.2014
Errection and Tested 09.05.2014
Disconnected wire connected 11.05.2014
Not rectify 11.05.2014
Lock Key Insert 11.05.2014
Spring fitted 11.05.2014
Local Sucker Assembly Fitted and Successfully Run
(04 Nos)
11.05.2014
Preventive Maintenance 12.05.2014
Preventive Maintenance 12.05.2014
Liner Feeder Roll Sent for repairing 12.05.2014
Rectification Done 12.05.2014
Not rectify (Interconnection Box - Ordered)
Machine on runnig condition
13.05.2014
Liner Feeder Roll repaired assambled 14.05.2014
Losse Connection commanding realy tighting 14.05.2014
Command not transfer to PLC wire brakage loop
given
14.05.2014
Brackage cable cut and joint provided 15.05.2014
Clutch coil send for machining 15.05.2014
Clutch coil machined fitted, all gripper opner front
lay and delviery setting and 10 nos bus and pin set
change
16.05.2014
New wiring of three pin done 17.05.2014
Halozon fitted insteade of mercury lamp 17.05.2014
Replaced Camera 17.05.2014
Fecuancy of photo sensor increase 17.05.2014
Hot air exhaut pipe open (re fitted) 18.05.2014
Hot air exhaut pipe open (changed) 18.05.2014
Oil 150 no 2 ltr filled 18.05.2014
Tube rod change 18.05.2014
Pin fitted in upper-lower lever of front lay 19.05.2014
Preventive Maintenance 19.05.2014
Dissemble and send for repairing (but not ok) 20.05.2014
Preventive Maintenance 20.05.2014
Preventive Maintenance 20.05.2014
Preventive Maintenance 20.05.2014
Preventive Maintenance 21.05.2014
Preventive Maintenance 21.05.2014
Dissemble and send for repairing 21.05.2014
Interduck 1 lamp change, but not ok
Endpress IST Lamp 2 no removed 1 no holder fitted
3 no - (New Sohem fitted)
New Varnish Pump tested 23.05.2014
63A 4 Pole MCB Change, new wiring done, 18A
Contector change
23.05.2014
Blower dissamble, 6203 bearring change 2 nos. and
refitted
23.05.2014
Old IST Lamp fitted butproblem not solved hence
voltage of stabilizer incress to 407V instead of 390V
23.05.2014
Delivery Pile Sheet not setting properly, Brush
pressure, sheet remover setting done
23.05.2014
1 no delivery air valve, 1 no ink charging roll air
valve change
23.05.2014
Pneumatic cylinder of ink charging roll unit 7 chang 24.05.2014
Broken part welded and fitted 24.05.2014
Setting Timing 25.05.214
Repaired 25.05.214
8 nos new feeder belt fitted and preventive done 25.05.214
New Varnish Pump tested (but not ok) 25.05.214
Load tested with company engineer, service report
given by engineer
25.05.214
Halozon fitted 25.05.214
LED light change nos.5 25.05.214
Broken belt change 26.05.214
Chain Spocket which comes out, refitted 26.05.214
Setting (Inlet with new pump and Outlet with
olderpump)
26.05.214
New Fan motor fitted 26.05.214
Burnt motor diassemble and sent for repairing 26.05.214
22.05.2014
Clean Filter 27.05.214
New Wall Fan Fitted 27.05.214
New Wall Fan Fitted 28.05.214
New Wall Fan Fitted 28.05.214
Air filter change 28.05.214
Full Generator Service (Full Load Testing 100 amp) 29.05.2014
Water Sensor Setting 29.05.2014
Set timing 29.05.2014
Damge cable removed and give joint 29.05.2014
Give Packing, Problem solve 29.05.2014
Setting Die Lock Gear Position 29.05.2014
Peumatic Clyinder Seal Changed 30.05.2014
Preventive Maintenance Of Air Compressor 30.05.2014
Suction Belt Changed 30.05.2014
Tighting Bolt 30.05.2014
Broken shaft remove from machine and send for
new making
01.06.2014
Shifted from ground to first floor 01.06.2014
Due to voltage fluctuation (power shutdown) 24 V
supply MCB to LSP is short, change MCB
01.06.2014
Repaired 01.06.2014
Compressor Change 02.06.2014
Stabilizer R phase voltage low setting carbon 02.06.2014
New Hydrolic Shaft Fitted 02.06.2014
Received New Inter Connection box fitted 02.06.2014
New otor fitted but not tested 03.06.2014
Preventive Maintenance 03.06.2014
Disassamble and send for repairing 03.06.2014
Connectiton given to 40 ton machine, and 32A
MCB fitted in pannal now both machine are
working
04.06.2014
Stabilizer R phase voltage low, new carbon fitted 04.06.2014
Sensor change 04.06.2014
Contector & Wiring Burned, Change wiring and
contector coil
04.06.2014
Repairing part assambled 04.06.2014
New purchase gripper patti set change 04.06.2014
Broken part removed and send for repairing 05.06.2014
Controling relay not working, by-pass, and semple
for new purchase
05.06.2014
Factor and Colony fan capacitor change 10 nos 05.06.2014
Setting done by - hiking engineer 05.06.2014
Prevantive Done 06.06.2014
Halogen Fitted 06.06.2014
Belt Changed 06.06.2014
6x3 Husk Mate Fitted 06.06.2014
Opner setting 06.06.2014
Feeder Setting 07.07.2014
Testing Done (Ok) 07.06.2014
Oil 100 no 100 ltr filled 07.06.2014
Belt Changed 07.06.2014
Belt Changed (Original) 07.06.2014
Hand Trolly Repair 08.06.2014
Gripper opner shaft setting 08.06.2014
Broken guide welded and fitted 09.06.2014
After 5 Cycle machine trip, controller not reset
(Controller has to be repaired)
09.06.2014
Service engineer call from vikas pandit repair
estimate waited
09.06.2014
Due to over pressure machine jam, jam remove
manually after which timing of machine out after
talking with Mr. ramesh (suba solution) Encoder
out of order, search market for new encoder to run
machine (Manual folt)
09.06.2014
Preventive Maintenance 09.06.2014
New encoder purchase from market but it doesn't
synchronize with machine hence order given suba
solutions (machine not ok)
11.06.2014
Engineer from delhi comes for settings new coating
pump but he not rectify problem hence pump send
back to spplier for proper settings (machine is
runnig condition)
11.06.2014
New Encoder From Suba Solution Fitted, Now
Machine In Working condition
12.06.2014
Band removed of gipper guide
Broken belt remove and new belt fitted (B-3200)
On-Off commanding switch repaired and run
machine
12.06.2014
New local belt inter change with old original belt (4
nos)
12.06.2014
Preventive Maintenance 13.06.2014
Shifted to Boiler Side 13.06.2014
Sheet succer runer Assembly tilted due to whitch
gear shifted to gripper change setting assembly
properly (Manual fault)
13.06.2014
Re fixed 14.06.2014
Proper setting 14.06.2014
Proper setting 14.06.2014
Speed of rotating table and shrink film shrink roller
not synchronize. Synchronization done
14.06.2014
Shifted to proper location 14.06.2014
Oil field 5 ltr. (150) 15.06.2014
Pressure assembly setting properly 15.06.2014
Main motor break not working,after tracing find wire dry in pot soldering wire.
Two no. stand fan assembel&shifted to MD chamber
Diagpharm of coating pump broken change with new one.
Setting timing of transfer gripper(MANUL FAULT)
Wire disconect from contector,conect it.
Belt change A-3200
Realy set to camanding cam.
Leveling done.
Remove shaft send for reparing
Wall fan fitted.
Roof clamp inspected.
Repair shaft fitted
Plate form drive and film drive setting
12.06.2014
Limit switch setting
Repair and fitted
Repaired vaccum pump assembled and hand over
to supervisor
UGVCL Helper setted D.O. Fuses
Cabaling and proper setting of compressor and
other parts (Dryer and Receiver)
UGVCL Helper setted D.O. Fuses
Gripper bush and pin change
Pile temp. sensor clean
Piping done
Support holder weld, guide roller welded on
foundation give proper allingment
3 Nos Pannel fan change
Proper setting of pessure
Cutter setting properly
Change sefty bolt
Change switch
After traceing find 1 wire broken from socket joint
wire.
10A 5 pole MCB fitted
Power Supply connected
Trail Run, find there is leackeg in receiver valve
joint
Inpected by engineer and give ok
Coolant filled in circulation pump
Opner setting
Exhaust Fan Change
Sealing Fan Change
Sealing Fan Capacitor Change (Manas Block)
Sealing Fan Capacitor Change (Above Machine)
Driver Rest Cabin Wall Fan fitted
Tube light fitted
Sensor defective
Centerlised AC Motor trip due to which ac not
running reset ac and run
Sefty Bolt Change
Gripper opner bar holding bolt loose, tighting the
bolt
Contector and motor short circuit
Motor dissamble & send for repairing
Compressor shited from 1st flr to grnd flr and run
machine
Shifted from lift bottom to main panel room
Chiller motor burned, dissamble from unit and sent
for repairing
P3 sensor frequency increase
Bearring 6002 change
Repaired motor fitted
Glue sensor wire broken, sensor wire change
Tube lght and sealing fan fitted for stores vendor
(new colony)
Strip block on heating section (manual fault) strip
fix in wrong direction, open machine, remove strip
and fixed properly
Preventive Maintenance
Preventive Maintenance and display problem
solved and gauge seatting
Preventive Maintenance
Stiching pnproperly set (Cutter not working - Cutter
change)
Pneumatic cylinder hydrolic seal change
Hydrolic cylinder (spring) received from bobst india
pvt ltd is fixed
Chease and gauge calibrate
Jam removed&oil filled
Reapaired moter fixed
Glue stopper changed
Eccentric of o.s jam,remove jam.
Sensor wire broken, changed wire
Preventive maint.
Chain[o.s] tighiting
Jogger plate welded&fitted
Clutch open and send for repairing
Error[lub pressure low]
after traceing find relayQM3 trip reset relay
New Exhaust blower fitted
New Auto drain valve fitted
Diaphragm broken, replace diaphragm fitted
Sensor fault removed
Lever open and send for new making, machine
under breakdown (Manual Fault)
Preventive Maintenance
New part proximaty lever fitted
Engaging frontlay gear with lever
New lever (local) received and fitted
Repaired clutch assembled but there is some
setting problem, work panding
Replace with 4 nos new belt change by engineer
from suba solution
Engineer call from mumbai b'coz it is critical
problem
Clutch pending work done, run machine
Inter changing belt, run machine
Open gripper, setting but not ok, machine under
break down
Setting gripper properly run machine at 9500 speed
Engineer from mumbai partially solved
problem,run machine at 3000 speed, but problem
occur once again at 3am night
Relay trip reset
Jark problem solved, run machine 6pm, for trial and
instruct engineer to stay
Machine run whole night, now finaly machine ok
Engineer from Heidelberg open the unit find
coating (metering) cylinder is oblong send for
repairing, oil leakage problem not solved
Bearring 6002 change
Wiring sort-circute, MCB and wiring change
Strip burn and paste on highter clear jaam
Pump open send for repairing
Repaired PLC fitted and run machine
Temp. sensor wire broken from lugs, lugs change
Re-paste belt
Recirculating coolent and clean sensor
Setting gripper
Air filter cleaning
Plate adjusting bolt fittde
Gripper adjustment
Counter wire broken, Change wire
Change gripper no 3 with standby
New fan fitted on driyer unit
Open pump and send for repairing
Due to miss allingment of pile all 4 nos bolt broken
(Manual Fault)
Gripper is friction with front window, window fram
band removed problem solved
Flywheel limit switch bolt loose due to which its
setting disturbe, tighting the bolt and properly
done setting
Condensate pump servicing done
Setting gripper side lay but machine not ok,under
breakdown
UV dryer is started but it's cooling system is not
proper (air cooled) due to which water temp. rised,
demping water solution chiller is used for cooling,
now machine ok
Gripper bar no 3 change, now machine ok
Chiller from water tank and connected to machine
Another seting for locking wheel
Dissamble from machine bearing jaam work
pending
Oil Changed
Pending work done
Repair
Proper setting
Flate cage bearing received fitted
Controller SMPS not work send for repairing
Cam properly setted
Preventive Maintenance
Jaam bearing change
Air pipe change
Eccentric jaam open unit make proper seting and
removed jaam - Night shift
After tracing find foot sensor not work reflectd and
sensor proper allieng
Street light repaired
Trolly Repair
Fusiable pluge change
Preventive Maintenance
Sensor proper setting and reset
Impler jaam remove
Repair
New butterfly valve fitted
New pump fitted
Water filter clean
Filter Cleain
Perameter disturbed
Controller main board memory card corrupt
Preventive Maintenance
Perameter received from galaxy engineer loaded
the perameter reset drive and run machine
Clean the vacuum drum but problem not rectify
Send for repairing to chennai
Glue controller send for repairing with raj to pune
Supplier's Name and contact Number
Patsan Ent.
we will try integrally.
Open Market. Is Running
Open Market.we Have to stop
Machine for Three days
CANPAC TRENDS PRIVATE LIMITED
Open Market
-
No Prod stoppage
J K Industries
Local
J K Industries
NAME OF MACHINE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 REMARK
POLAR CUTTI NG M/C P
HYCUT CUTTI NG M/C P
POLAR PI LE TURNER W W P W W W
POLAR CUTTI NG M/C New E E P E E E
HEI DELBERG 1 E E E P E E
HEI DELBERG 2 K K K P K K
COMPRESSOR 3 (HEI DELBERG 2) L L L P L L
STEI NAMANN Y Y P Y Y Y
GRAVEURE PTG. M/C P
MANUAL LAMI NATI ON M/C O P O O O O
MEI GUANG SHEET PASTI NG F F F P F F
YOKO DI ECUTTER F P F F F F A
BOBST NOVCUT DI ECUTTER A P
MAXI MA DI ECUTTER P
HI GHER DI ECUTTER A P
MANUAL DI ECUTTER 1 A P
MANUAL DI ECUTTER 2 P
CHAMPI ON FLUTI NG M/C P
BOBST FOLDER GLUER P A
ARBUDA FOLDER GLUER P
CMMPLASTI C FOLDER GLUER P
PAKTEK FOLDER GLUER P
WI NDOW PATCHI NG MACHI NE P
SHRI NK WRAPPI NG P
MANUAL SHEET PASTI NG MACHI NE P
HYB ROTARY SLOTTI NG MACHI NE P
BFY SLI TTI NG & SCORI NG MACHI NE P
AUTOMATI C STI TCHI NG MACHI NE P
MANUAL STI TCHI NG MACHI NE P
ROLL TO SHEET CUTTI NG MACHI NE P
HEI DELBERG CTP MACHI NE P
COMPRESSOR 4 (CTP) P
PLATE COATI NG MACHI NE P
PLATE HEATI NG MACHI NE P
AUTO CORROSI ON MACHI NE P
PLATE EXPOSI NG MACHI NE P
ESKO SAMPLE MAKER P
COMPRESSOR 1 (COMMMON) P A
COMPRESSOR 2 (COMMMON) P A
GENERATOR P
LI FT 1,2 AND 3 P
BOI LER P
KNI FE GRI NDI NG P
BOBST EXPERT FOLD P
HYDROLI C WEST BEALI NG P
EMBOSI NG BLOCK MAKI NG P
BROUSEE DI E PUNCHI NG M/C P
SLI TTER M/C P
ISSUED BY: MR
P/A Mai ntenance Pl anni ng Date & Actual Mai ntenance Date P Mai ntenance Pl anni ng Date
NAME OF MACHINE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 REMARK
POLAR CUTTI NG M/C P
HYCUT CUTTI NG M/C P
POLAR PI LE TURNER W W P W W
POLAR CUTTI NG M/C New E E P E E
HEI DELBERG 1 E E E P E
HEI DELBERG 2 A K K P K
COMPRESSOR 3 (HEI DELBERG 2) L L L P L
STEI NAMANN Y P Y Y Y
GRAVEURE PTG. M/C P
MANUAL LAMI NATI ON M/C O P O O O
MEI GUANG SHEET PASTI NG F A F P F F
YOKO DI ECUTTER F P A F F F
BOBST NOVCUT DI ECUTTER P
MAXI MA DI ECUTTER P
HI GHER DI ECUTTER P
MANUAL DI ECUTTER 1 P
MANUAL DI ECUTTER 2 P
CHAMPI ON FLUTI NG M/C P
BOBST FOLDER GLUER P
ARBUDA FOLDER GLUER P
CMMPLASTI C FOLDER GLUER P
PAKTEK FOLDER GLUER P
WI NDOW PATCHI NG MACHI NE P
SHRI NK WRAPPI NG P
MANUAL SHEET PASTI NG MACHI NE P
HYB ROTARY SLOTTI NG MACHI NE P
BFY SLI TTI NG & SCORI NG MACHI NE P
AUTOMATI C STI TCHI NG MACHI NE P
MANUAL STI TCHI NG MACHI NE P
ROLL TO SHEET CUTTI NG MACHI NE P
HEI DELBERG CTP MACHI NE P
COMPRESSOR 4 (CTP) A P
PLATE COATI NG MACHI NE P
PLATE HEATI NG MACHI NE P
AUTO CORROSI ON MACHI NE P
PLATE EXPOSI NG MACHI NE P
ESKO SAMPLE MAKER P
COMPRESSOR 1 (COMMMON) P
COMPRESSOR 2 (COMMMON) P
GENERATOR P
LI FT 1,2 AND 3 P
BOI LER P
KNI FE GRI NDI NG P
BOBST EXPERT FOLD P
HYDROLI C WEST BEALI NG P
EMBOSI NG BLOCK MAKI NG P
BROUSEE DI E PUNCHI NG M/C P
ROPE TYI NG MACHI NE
BOX TAPPI NG MACHI NE
SLI TTER M/C P
ISSUED BY: MR
P/A Mai ntenance Pl anni ng Date & Actual Mai ntenance Date P Mai ntenance Pl anni ng Date
NAME OF MACHINE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 REMARK
POLAR CUTTI NG M/C P A
HYCUT CUTTI NG M/C P A
POLAR PI LE TURNER W P W W W
POLAR CUTTI NG M/C New E P E E A E
HEI DELBERG 1 A E P E E
HEI DELBERG 2 K K K P K
COMPRESSOR 3 (HEI DELBERG 2) L L L P L
STEI NAMANN Y P Y Y Y
GRAVEURE PTG. M/C P
MANUAL LAMI NATI ON M/C P O O O O
MEI GUANG SHEET PASTI NG F A F P F F
YOKO DI ECUTTER F P A F F
BOBST NOVCUT DI ECUTTER A P
MAXI MA DI ECUTTER A P
HI GHER DI ECUTTER P
MANUAL DI ECUTTER 1 A P
MANUAL DI ECUTTER 2 P
CHAMPI ON FLUTI NG M/C A P
BOBST FOLDER GLUER P
ARBUDA FOLDER GLUER P
CMMPLASTI C FOLDER GLUER P
PAKTEK FOLDER GLUER P
WI NDOW PATCHI NG MACHI NE P A
SHRI NK WRAPPI NG P
MANUAL SHEET PASTI NG MACHI NE P A
HYB ROTARY SLOTTI NG MACHI NE P A
BFY SLI TTI NG & SCORI NG MACHI NE P A
AUTOMATI C STI TCHI NG MACHI NE P A
MANUAL STI TCHI NG MACHI NE P
ROLL TO SHEET CUTTI NG MACHI NE P
HEI DELBERG CTP MACHI NE P
COMPRESSOR 4 (CTP) P
PLATE COATI NG MACHI NE P
PLATE HEATI NG MACHI NE P
AUTO CORROSI ON MACHI NE P
PLATE EXPOSI NG MACHI NE P
ESKO SAMPLE MAKER P
COMPRESSOR 1 (COMMMON) P A
COMPRESSOR 2 (COMMMON) P A
GENERATOR P
LI FT 1,2 AND 3 P
BOI LER P
KNI FE GRI NDI NG P
BOBST EXPERT FOLD P
HYDROLI C WEST BEALI NG P
EMBOSI NG BLOCK MAKI NG P
BROUSEE DI E PUNCHI NG M/C P
ISSUED BY: MR
P/A Mai ntenance Pl anni ng Date & Actual Mai ntenance Date P Mai ntenance Pl anni ng Date
NAME OF MACHINE STATUS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 REMARK
POLAR CUTTI NG M/C P A
HYCUT CUTTI NG M/C P
POLAR PI LE TURNER W W P W A W
POLAR CUTTI NG M/C New DONE E E P/A E E
HEI DELBERG 1 E E E P E
HEI DELBERG 2 K K K P K
COMPRESSOR 3 (HEI DELBERG 2) L L L P A L
STEI NAMANN DONE Y P/A Y P Y Y
GRAVEURE PTG. M/C P
MANUAL LAMI NATI ON M/C O P O O A O
MEI GUANG SHEET PASTI NG F F F P F
YOKO DI ECUTTER DONE P A
BOBST NOVCUT DI ECUTTER P A P
MAXI MA DI ECUTTER DONE W P
HI GHER DI ECUTTER P E
MANUAL DI ECUTTER 1 DONE P/A E P
MANUAL DI ECUTTER 2 K P
CHAMPI ON FLUTI NG M/C P L
BOBST FOLDER GLUER Y P
ARBUDA FOLDER GLUER P
CMMPLASTI C FOLDER GLUER O
PAKTEK FOLDER GLUER DONE A P F
WI NDOW PATCHI NG MACHI NE DONE P A
SHRI NK WRAPPI NG P
MANUAL SHEET PASTI NG MACHI NE P
HYB ROTARY SLOTTI NG MACHI NE DONE P/A P
BFY SLI TTI NG & SCORI NG MACHI NE DONE P/A P
AUTOMATI C STI TCHI NG MACHI NE P
MANUAL STI TCHI NG MACHI NE P
ROLL TO SHEET CUTTI NG MACHI NE DONE P/A P
HEI DELBERG CTP MACHI NE DONE P
COMPRESSOR 4 (CTP) P/A P
PLATE COATI NG MACHI NE P
PLATE HEATI NG MACHI NE P
AUTO CORROSI ON MACHI NE P
PLATE EXPOSI NG MACHI NE P
ESKO SAMPLE MAKER P
COMPRESSOR 1 (COMMMON) P/A P
COMPRESSOR 2 (COMMMON) P P/A
GENERATOR P
LI FT 1,2 AND 3 P
BOI LER P
KNI FE GRI NDI NG P
BOBST EXPERT FOLD P
HYDROLI C WEST BEALI NG P
EMBOSI NG BLOCK MAKI NG P
BROUSEE DI E PUNCHI NG M/C P
ISSUED BY: MR
P/A Mai ntenance Pl anni ng Date & Actual Mai ntenance Date P Mai ntenance Pl anni ng Date
APPROVED BY: MD
F:MNT:03/00/01/06/11
Preventive Maintenance Schedule - JULY 2014
F:MNT:03/00/01/06/11
Preventive Maintenance Schedule - APRIL 2014
APPROVED BY: MD
F:MNT:03/00/01/06/11
Preventive Maintenance Schedule - MAY 2014
APPROVED BY: MD
F:MNT:03/00/01/06/11
Preventive Maintenance Schedule - JUNE 2014
APPROVED BY: MD
Machine Name Part Specification Qty Supplier's Name Target Date Completion Status of Machine
Helicon Guide 10 JK Industries 19.05.2014 SACHIN Parts today delivered
Folding Tongue 2 JK Industries 19.05.2014 SACHIN Parts today delivered
Tommy Bar 2 JK Industries 19.05.2014 SACHIN Parts today delivered
Paktek Vacuum Pump Toshiba 1 Jay Ambe Electrical and Service 16.05.2014 SACHIN Local repair
Meiguang- 3 ply Pasting Machine Main Roller repaired through Filling 1 Mr. Ashok to Give Report 14-05.2014 ASHOK/SACHIN Waiting for 3-4 day
Yoco Foiling Delivery Brush 4 Quotation 16.05.2014 SACHIN Waiting for 3-4 day
Glue Tank Control Valve GP20 (GU-C09-06) 1
Glue Tank Foot Valve FS-201 for GP20 (GU-CX01-8) 1
DG Set Power Loading 1 Supernova 26.05.2014 SACHIN
Teflon 28x40x4 Washar 10 Ordered
Nylon 28x40x4 Washar 10 Ordered
Auto Stiching FRL as per sample 1 Ravi Bearing Co. 28.05.2014 SACHIN Ordered
Knife 0.5/12x1122 1 Ordered
Plate 40/20x60 2 Ordered
Support 22/20x100 7 Ordered
Support 22x20x70 2 Ordered
Lubricator Perma 6-SF01 2 Ordered
MBEG(Piston for Sucker) 6 Ordered
Scraber 15x96x120 2 Ordered
Sleeve 10/7x15 4 Ordered
Forwarding Sucker - Right 2 Ordered
Forwarding Sucker - Left 2 Ordered
Suction Pad 2 Ordered
Rubber Rollers 4 Ordered
Brausse Die Punching 48"Hx33"Wx17"Deep with 3 Compartment 1 Mak Engineering Works 27.05.2014 SACHIN Ordered
98.184.1051/03 4/2 WAY VALVE 2 Ordered
2 87.334.001 PNEUMATIC CYLINDER D25 H25 1 Ordered
3 00.580.1010 INSULATING TAPE 6X9X10000 GRAU 10 Ordered
4 SU06.P246913 CORROSION PROTECTIVE TRAC111 2 Ordered
5 SU06.P036678 CORROSION PROTECTIVE VARIDOS 1 + 1 2 Ordered
6 M2.015.848F/SUCTION TAPE SXM2.015.880 2 Ordered
7 C3.015.453 SUCTION TAPE 2 Ordered
8 M2.015.840 F/ SUCTION TAPE 2 Ordered
9 00.580.5591/LUBRICATING OIL 8P 2 51-GEBINDE 2 Ordered
Window Pasting Window Pasting Feeder Belt 4 I K Belting 26.05.2014 SACHIN Ordered
CTP UPS Emerson 2 Accutech Power Solutions Pvt.Ltd. 26.05.2014 SACHIN Ordered
Heidelberg Heidelberg India Pvt. Ltd. 28.05.2014 SACHIN
Steinamann Bright Rubber 19.05.2014 SACHIN
Steinamann S.R.K. Technology Pvt. Ltd. 30.05.2014 SACHIN
CANPAC TRENDS PRIVATE LIMITED
DAILY MAINTENANCE REPORT
Expert Fold
Champion 2 Ply Suba Solutions 24.05.2014 SACHIN Ordered
Machine Name Part Specification Qty Supplier's Name Target Date Completion Status of Machine
Expert Fold
Paktek Vacuum Pump Toshiba 1 Jay Ambe Electrical and Service 22.05.2014 SACHIN Local Repair done, Fan search
Meiguang- 3 ply Pasting Machine Main Roller repaired through Filling 1 Mr. Ashok to Give Report 21-05.2014 ASHOK/SACHIN Done
Teflon 28x40x4 Washar 10 Done
Nylon 28x40x4 Washar 10 Done
Champion 2 Ply
DG Set
Steinamann
Auto Stiching
Steinamann
Brausse Die Punching
98.184.1051/03 4/2 WAY VALVE 2
2 87.334.001 PNEUMATIC CYLINDER D25 H25 1
3 00.580.1010 INSULATING TAPE 6X9X10000 GRAU 10
4 SU06.P246913 CORROSION PROTECTIVE TRAC111 2
5 SU06.P036678 CORROSION PROTECTIVE VARIDOS 1 + 1 2
9 00.580.5591/LUBRICATING OIL 8P 2 51-GEBINDE 2
Heidelberg
CANPAC TRENDS PRIVATE LIMITED
DAILY MAINTENANCE REPORT
19.05.2014 SACHIN Steinamann Bright Rubber
Heidelberg 20.05.2014 SACHIN
NAME BILL NO. DATE
Cutting\Store Department
Polar 115X LILAVATI A PATEL 94 2/4/2014
YAMUNAJI TRADERS 2/11/2014
INDO POLY MACHINE 10120 2/15/2014
LILAVATI A PATEL 35 4/17/2014
Polar 115EMC CASH MEMO 2/10/2014
LILAVATI A PATEL 106 2/18/2014
Bhalchandra Traders TI365 2/21/2014
Bhalchandra Traders LB/80/13-14 3/5/2014
Polar Pile Turner
Knife Grinding Indo Poly Machines Corporation 10157 4/11/2014
Hycut PRATAP ELECTRICALS 123 1/13/2014
Lamination Department
Steinmann ZENITH RUBBER R0627 1/3/2014
PRATAP ELECTRICALS 122 1/10/2014
KANT ENGINEERING CO 150 1/10/2014
VOLGA (INDIA) RUBBER PVT. LTD. 8867 1/14/2014
C DAS & CO. 2793 1/20/2014
SRK TECHNOLOGY PVT.LTD. SRK/INV/026 1/30/2014
Ravi Bearing Co. 111 3/6/2014
Cash Memo 4/29/2014
Cash Memo 07/5/201
Cash Memo 5/22/2014
Manual Lamination
Gravure Flexo Coater S L KULKARNI CYRIL GRAPHICS SE025 1/23/2014
Cash Memo 5/6/2014
Dipin Enteprise 5/14/2014
Slitter Cash Memo 5/9/2014
MACHNE NAME
SUPPLIER'S DETAILS
Printing Department
Heidelberg CD 102 6 + L UV TECH ON ENGINEERS 1/2/2014
HEIDELBERG INDIA PVT. LTD. CH258011279 1/3/2014
DEEV OFFSET ORGANS 359 1/6/2014
PATEL ELECTRIC COTRACTOR 245 2/10/2014
CASH MEMO 2/16/2014
KUNAL PNEUMATICS 153 1/24/2014
MAYANK INDUSTRIES 25 1/26/2014
MAYANK INDUSTRIES 28 2/13/2014
HEIDELBERG INDIA PVT. LTD. CH258011863 2/28/2014
HEIDELBERG INDIA PVT. LTD. 3/31/2014
Suvik Electronics 85 2/3/2014
Heidelberg India Pvt. Ltd. CH258012247 4/4/2014
Heidelberg India Pvt. Ltd. CH258012263 4/4/2014
CASH MEMO 5/22/2014
Heidelberg CD 102 7 + L USED UNIVERSAL WELDING WORKS 1/4/2014
DEEV OFFSET ORGANS 358 1/6/2014
SARASWATI MECHANICAL WORKS 54 1/7/2014
LAKSHMI DEVICES 655 1/11/2014
HEIDELBERG INDIA PVT. LTD. CH258011367 1/11/2014
LILAVATI A PATEL 1/11/2014
HEIDELBERG INDIA PVT. LTD. 1367 1/11/2014
MAYANK INDUSTRIES 25 1/26/2014
Ultralight AG 913897 3/6/2014
Volga (India) Rubber Pvt. Ltd. 9052 4/7/2014
Cash memo 5/18/2014
RMC Hard ware 5/22/2014
Yamunaji Traders 5/22/2014
Postpress Department
Yoco Foil Stamping SOHAM INDUSTRIES 93 1/30/2014
Galaxy Propac P. Ltd. T1279 3/3/2014
Galaxy Propac P. Ltd. 108 3/27/2014
Galaxy Propac P. Ltd. 001 4/7/2014
Bobst Nova Cut CASH MEMO 1/8/2014
SARASWATI MECHANICAL WORKS 83 1/10/2014
LILAVATI A PATEL 1/11/2014
BOBST INDIA PVT LTD 71 1/2/2014
DHL EXPRESS D64585438 1/23/2014
BOBST HONG KONG LTD H20945 1/25/2014
N K Engineering Works 299 2/20/2014
BOBST India Pvt. Ltd. T-1410407 3/6/2014
Naman Corporation T/554 2/1/2014
Ahmedabad Hardware 5/8/2014
Maxima Die Cutter MAYANK INDUSTRIES 1/2/2014
Kunjal Patel (Montu) 2/27/2014
Excel Machinery (Guj.) Pvt. Ltd. L-56 4/12/2014
Cash Memo 4/5/2014
Cash Memo 4/17/2014
Higher Semi Auto Diecutter SOHAM INDUSTRIES 81 1/2/2014
Sanajy Engineering 38 4/29/2014
Brausse Die Cutting Darshan Electric 206 3/4/2014
Darshan Electric 222 3/19/2014
Cash Memo 5/18/2014
Ahmedabad Hardware 5/22/2014
Meflix 5/22/2014
Priya Indutres 5/22/2014
Manual Die Punch 1 MAYANK INDUSTRIES 1/2/2014
Manual Die Punch 2 SHREEJI CUT & BEND T/-631 1/3/2014
SAGAR HARDWARE 388 12/12/2014
AARTI ENTERPRISE 122 1/25/2014
Corrugation Department
Champion 2 Ply NAMAN CORPORATION 1/2/2014
LILAVATI A PATEL 1/4/2014
NAMAN CORPORATION 585 2/5/2014
YAMUNAJI TRADERS 2/10/2014
YAMUNAJI TRADERS 2/13/2014
SUBA SOLUTIONS 448 1/17/2014
HARI INDUSTRIES 51 1/28/2014
Cash Memo 4/5/2014
Depin Entepise 5/8/2014
Meiguang Flute Laminate SUBA SOLUTIONS CE/143 1/18/2014
SARASWATI MECHANICAL WORKS 88 2/18/2014
SOHAM INDUSTRIES 92 1/28/2014
SOHAM INDUSTRIES 93 1/30/2014
Pratap Electrical 152 2/17/2014
Cash memo 5/14/2014
Cash memo 5/15/2014
Sanjay Engineering 5/22/2014
Steem Boiler Aero Therm Systems Pvt. Ltd. TI-202 2/14/2014
Aero Therm Systems Pvt. Ltd. TI-007 4/14/2014
Rotary Slotter
Slitter Scorer
Auto Stitching
Rill to Sheet Cutter
Manual Stitching LILAVATI A PATEL 175 1/6/2014
Cash Memo 500 5/18/2014
LILAVATI A PATEL 180 5/3/2014
Finishing Department
Bobst Vision Fold GUJARAT GAS WELDING 1/4/2014
RAVI BEARING 92 1/4/2014
LILAVATI A PATEL 84 1/11/2014
KANT ENGINEERING CO. 173 2/11/2014
Packtek BELT-N-BELT T/0346 1/2/2014
SENSOTRONICS SYSTEMS 1/3/2014
BELT-N-BELT 1/3/2014
CASH MEMO 1/5/2014
BELT N BELT 1/6/2014
SOHAM INDUSTRIES 89 1/10/2014
SOHAM INDUSTRIES 91 1/18/2024
Kant Engineering Co. 174 2/12/2014
I K Bealting 659 2/19/2014
I K Belting 684 3/3/2014
I K Belting 515 4/22/2014
Cash Memo 4/17/2014
SKF bearing 30 5/18/2014
CASH MEMO 5/3/2014
CASH MEMO 5/22/2014
Jay Ambe Service 5/22/2014
CASH MEMO 5/22/2014
Bhavna Enteprise 5/22/2014
Window Patching Deev Offset Organs 414 2/12/2014
Lilavati A Patel 105 2/12/2014
Soham Industries 685 2/19/2014
J K Industrial Components R-62 4/17/2014
Cash Memo 5/18/2014
Bobst Expert Fold GOKULESH K THAKKAR 62 1/17/2014
HYDRO PNEUMATIC EQUIPMENT 1905 1/18/2014
BELT-N-BELT T/0369 1/25/2014
I K BELTING 625 2/7/2014
BOBST India Pvt. Ltd 1104351600 3/8/2014
Darshan Electric 175 1/10/2014
Arbuda
Auto Strapping 1
Auto Strapping 2 Dipen Enteprise 12 18/0/2014
Simer Enteprise 20 18/0/2014
Manual Strapping 1
Manual Strapping 2
Shrinking
Strapex
Striching Manilal Pack Plast Pvt. Ltd. 14-45/1 4/3/2014
Cash Memo 5/22/2014
Stretching
Hydraulic West Baling
Embos Bloking Mahi Enterprise T-167 1/11/2014
Mahi Enterprise T-172 1/28/2014
Esko Sample Table ESKO-GRAPHICS INDIA PVT.LTD. EGI-161/2013 1/1/2014
Machine General Naman Corporation T-357 1/10/2014
JAY CORPORATION T/1089 1/16/2014
Naman Corporation T/554 1/21/2014
M & M ENGINEERS 393 1/25/2014
Naman Corporation T-585 2/5/2014
SOHAM INDUSTRIES 94 2/11/2014
JAY CORPORATION T1186 2/19/2014
Pratap Electricals 159 2/25/2014
Arth Air Technologies Pvt. Ltd. 783 2/27/2014
Cash Memo 3/1/2014
Radix Innovations Pvt Ltd T1279 3/3/2014
Deev Offset Organs 429 3/4/2014
Cash Memo 3/4/2014
Cash Memo 3/4/2014
Cash Memo 3/6/2014
Cash Memo 3/6/2014
Pratap Electricals 169 3/6/2014
I K Belting 682 3/6/2014
Cash Memo 3/12/2014
Cash Memo 3/13/2014
Cash Memo 3/13/2014
Cash Memo 3/13/2014
Cash Memo 3/13/2014
Cash Memo 3/13/2014
Cash Memo 3/13/2014
Cash Memo 3/13/2014
Cash Memo 3/14/2014
Cash Memo 3/20/2014
Cash Memo 3/21/2014
Cash Memo 3/21/2014
Cash Memo 3/21/2014
Cash Memo 3/24/2014
Cash Memo 3/24/2014
Cash Memo 3/24/2014
Cash Memo 3/24/2014
Cash Memo 3/24/2014
Cash Memo 3/25/2014
Cash Memo 3/25/2014
Cash Memo 3/25/2014
Cash Memo 3/25/2014
Cash Memo 3/26/2014
Cash Memo 3/27/2014
Cash Memo 3/27/2014
Cash Memo 3/29/2014
Cash Memo 3/29/2014
Cash Memo 3/29/2014
Cash Memo 3/31/2014
Deev Offset Organs 473 3/31/2014
Cash Memo 4/4/2014
Cash Memo 4/5/2014
Cash Memo 4/5/2014
Cash Memo 4/7/2014
Cash Memo 4/7/2014
Cash Memo 4/7/2014
Cash Memo 4/7/2014
Cash Memo 4/8/2014
Cash Memo 4/9/2014
Cash Memo 4/9/2014
Cash Memo 4/9/2014
Cash Memo 4/9/2014
Cash Memo 4/9/2014
Cash Memo 4/9/2014
Cash Memo 4/10/2014
Cash Memo 4/10/2014
Cash Memo 4/10/2014
Cash Memo 4/12/2014
Cash Memo 4/12/2014
Cash Memo 4/12/2014
Cash Memo 4/14/2014
Cash Memo 4/14/2014
Cash Memo 4/14/2014
Cash Memo 4/14/2014
Cash Memo 4/14/2014
Cash Memo 4/15/2014
Cash Memo 4/15/2014
Cash Memo 4/15/2014
Cash Memo 4/15/2014
Cash Memo 4/16/2014
Cash Memo 4/16/2014
Cash Memo 5/18/2014
Cash Memo 5/18/2014
Cash Memo 5/18/2014
Patsan Enteprise 25 4/16/2014
General Electric Darshan Electric 159 1/1/2014
Radhe Corporaton 4386 1/1/2014
Radhe Corporaton 7912 1/2/2014
Radhe Corporaton 7913 1/2/2014
Darshan Electric 164 1/3/2014
Naman corporation T/1089 1/19/2014
Naman corporation T/537 2/2/2014
Cash Memo 3/4/2014
Cash Memo 4/12/2014
Ink Room Hari Enteprise 5/3/2014
Shreenath Enterprise 413 3/27/2014
Pratap Electricals 193 3/31/2014
Cash Memo 4/1/2014
Jay corporation T/11 4/3/2014
IT Dept. Compex Technologies Pvt. Ltd. T-3280 12/31/2013
Compex Technologies Pvt. Ltd. T-4199 3/10/2014
Other General Patel Electricals 526 1/9/2014
Vishvash Graphics 66 2/25/2014
Cash Memo 4/1/2014
Cash Memo 4/1/2014
Cash Memo 4/1/2014
Cash Memo 4/17/2014
Cash Memo
Cash Memo 5/3/2014
Yamunaji Traders 735 5/5/2014
Cash Memo 5/6/2014
Raj Stationery 5/15/2014
Cash Memo 4/17/2014
Cash Memo 4/17/2014
Cash Memo 4/17/2014
Cash Memo 4/17/2014
Yamunaji Traders 4/17/2014
Cash Memo 3/17/2014
Manual Lamination Machine Cash Memo 4/17/2014
Cash Memo 4/17/2014
AMOUNT
2520 BOTL WITH WASHER 2520
520 BOLT 520
19200 KNIFE QTY.2 19200
5950 Nylon Stick 35 nos
1000 HYDRULIC TESTING
3240 BOLTS WITH HARDNESS 3240
21999 Knife 2 Nos 21999
1560
6250 Grinding Stone
630 BLOWER REPAIR
3371 ROLLER GRINDING
340 MOTOR REPAIRING
464 BEARING 464
77500 RUBBER ROLLER
3100 BEARING 3100
12240 GUM STRIPPER
3000 Jogger Air Cylinder 3000
571 timing Belts 571
40 Spring 40
150 Sucker Assembply Piston 150
12000 4,5 Dec.2013 Services
100 Silicon Rubber 100
446 Timing Belt 446
44 Slitter Blade - 1 Pkt 44
SUPPLIER'S DETAILS
DETAILS SPARE PARTS OIL AND LUBRICANTS
8918 8918
10053 RUBBER WASHUP BLADE 10053
6900 WASHUP BLADE 6900
900 COPPER LUG FITTING WORKS
60 CAPACITOR 60
1365 SENSOR WIRE 1365
3675 ROLLER WASH TANK
1100 MS Channel - 1 Nos
17737 Filtering Softflow Bags 17737
135000
ANNUAL CONTRACT FOR OCT'2013 TO
SEPT'2014) RS. 270000/-
615099 Stablizer &
457029 Controller
13724 Support Rail - 1 Nos 13724
10680 2148 Temperature (Techno Trans) 10680
80 Brazing of Rechet Tools 80
480
CHAIN WEIGHT MILLIN WORKS & BLOCK
GAS WELDING WITH GRINDING WORKS
7245
3350 BLOWER REPAIR
112360
LTK500 NEW,LTK500 OLD, STK BOARD, BAK
BOARD AND GRM120-2 BAU BOARD
25250 91.165.2621 SENSOR OPT RS PROX 25250
1400 PIN BUSH 1400
24105 SENSOR 24105
3675 ROLLER WASH TANK
212783 IR 14606 400V, 6200V 212783
2745 Ink Roller Rerubberizing (Die 66)
850 Woode patty for Pallet
190 Ball Valve 190
720 Brass Connector 720
1000
29632 Forwading Sucker Head assembly 29632
23805 Wire for Operation Side & Drive Side
41175
60 SPRING 60
13000 PRESSURE PUMP REPAIR
3600 PARTS 3600
36915 ROLLER 36915
6514.25 CUSTOME DUTY
36774 KNIFE, ROLLER 36774
700 Tools Making
66000 Thin Plate 1mm 185hv part No 0565102100
891 Tool Box
192 Nose Pliers 01 Nos 192
6300 DIE SUPPORT PLATE 6300
3500
Feeder Spring -2, Delivery Spring -1 and Side
Lay Repair
1000
7000 Machine Shifting 2 days Engineer 7000
240 Copper Carbon Brush - 4 Nos
120 Carbon Brush
500 500
300 Spring for Gripper 300
3213
63A TPN MCB 4 Core, LCID 28M7 220V coil
Contactor and LRD ZIE13-18 Relay
3213
9938
6 Sq.mm x4 core copper armoared cable 52
mtr.,4 way tpn mcb, d.b.board, 32 amp 4
pole tpn mcb switch
9938
500 Freight Charge for
117 Drill, Bolt
Paper Roll 420
Paper Rooll Cutting 1000
4725 DIE SUPPORT PLATE 4725
1850
2576 SR 998 FEVICOL
720 DOUBLE SIDE TAPE
4347 4347
3360 BLADE GRINDING WITH MAKING BLOCK
2254 STEAM PIPE 2254
600 MEASUREMENT TAPE
350 CHAIN LOCK 350
46659
SINGLE FACE MACHINE AND 7 FRO
CHARGES
25000 FLUTE GEAR 25000
80 Key Shaft 80
655 Figner Joint 0 3 Nos 655
17996 Forwarding succker Assembly 17996
13000 VACUUME PUMP REPAIR
250 NEW PARTS MAKE FOR SQURE BAR PLATE 250
1000 PLASTIC PIPE 1000
1220 Gum Mixer Motor Rewinding
50 Gum Tray Repair
210 Sucker Piston 210
400 Spring 400
3600 Smoke Tube 3600
2250 Mobery - 1 Nos
1260 1260
500 Machine Repair to Engineer
180 Cutting Plate 180
50 PATTI GAS WELDING
2500 2500
5000 V Shap Chapla Nos.84
1300 Bearing 6022ZZ-10 Nos 1300
3500
3675 3675
3675
150 GUM WHEEL TAPING WORKS 150
3176
3000
GUM TANK WHEEL REPAIR, ALUMINIUM
BUSH - TURNING
1600 SHAFT 1600
1050 Bearring 690422 - Nos 1050
2804 Belt - 3 Nos
945 Belt 2300m x 15 m (4 M) 3 Nos
12756
150 Hole & Welding
375 6203 Bearing 0 3 Nos 375
100 Counter Cylinder Repair 100
100 Support Belt Welding 100
1500 Vacuum Pump Repair 1500
50 Bearing & Circlip 50
372 FRL 372
2250 Rubber Strip-5 Mtr.
750 Gluing Board - 1 Nos
10100 Teflon VMC Glue Stopper 1 Set 10100
700 Gear Chakkar Repair
100 Shaft Alluminium Shaft Repair
2500 Air Pipe Fitting
4392 Air Pipe Fitting Material
2430 Belt - 6850x30x3 - 2 Nos
684 Belt - 1460x50 - 1 Nos
37440 Feeder Belt - 13 Nos
8269 New Wiring for Machine
399 V Belt 02 Nos 399
380 Limit Switch 380
2500 PCB Card Repairing
130 V Belt 130
16200
Toyobo F 95.95 mm A2-3 Nos and Toyobo
KM 152 1.52 A2
39000 Toyobo F 95.95 mm A2-20 Nos
27435 SERVICE OF SAMPLE TABLE
2550
6120 WD 40 NOS.24
640
MS Tool Box, MS Round Lock, GI Pipe,
Nipple and GI Elbow
2250 Compressor-4 and Goods Lift for ISO
3482 Champion and Bobst - Gateps Stemo
1200 EN Bearring 1200
1645 Hammer 10kg-1,Seal-10
5100 Common Compressor Motor
648 Common Compressor Parts 648
945 Compressor - 2 Belt XPDF 1090 Qty.3
12438 Hand Pallet Trolly Material 12438
2750
Seprator Strip Hard, Seperotor Stripo hard
U Type
30 CTP Compressor Parts
105 Brass Valve Qty.1 105
100 Bush Welding and Greasing
280 Attach with bill
3240 H-2 Comprossor Motor
34708
Belt for Bobst Vison Fold, Pakteck, Bobst
Expert Fold
850 Champion Machine Puller 1 Set 850
900 Higher Die Cutting M/c. SMPS Qty.1
150 Paktek Shaft Welding,Cutting & Key set
1300 Polar 2 Knife Hole (Leath Machine)
500 Adhesive Tape - 2 Nos
160 Paktek Gum Tank Oil Seal
3000 Steinaman Roller Grinding
220 Pedastal Fan, Motor and Cylinder
660 MDF Sheet for Maxima Die Punching M/c.
420 Polar 1 Nylon Stick Qty.2
40 Industrial Fan Qty. 1
150 Oil Seal 50x72 Champion M/c.
25 Bolt Nos.10
100 Samonia Solution
30 Hand Trolly - Oil Seal
230 Hycut Stick
390 Cutter - 3 Nos Die Punching
360
Shaft Drilling Bit - 2 Nos,Measuring Tape - 2
Nos
620 Allen Key Set 1
490 Spring 35 Nos
700 Bobst Novacut Bearing - 1Nos 700
326 General - Anchor Fastner, Tester
380 Fixed Tool 380
50 Paktek Shaft Repair
165 Bobst Vision Fold
280 Maxima Die M/c. Spring 280
340 Maxima Die M/c. Needel Bearing 1 Nos 340
840 Polar Nylon Stick 4 Nos
100 Higher die cutting M/c. Spring Welding
7875 Rubber Sucker 7875
200 Air Pipr Contector
262.5 General - Contector
50 Glycerine IP
15 Washer and Lock Nut
70 Wire 70 Mtr.
80 Outer Clip
390 6A MCB DP-1, 1 HP Motor Fan
100 Cealing Fan Hook - 7 Nos
420 New Bealing Machine Road - 2 Nos
588 Champion Machine V-Belt 2 Nos 588
403 Heidelberg Oil Seal - 2 Nos
225 Bealing Machie Bolt - 5 Nos, Hemery - 4 Nos
150 Heidelberg - Switch Bulb 1 Nos
157 Drill Brit 4 & 5 mm
340
20 Brush
800 Dispatch Slider, Hand Trolly Boady Welding
100 Cleanning Brush
550 Timing Belt Qty.1
536 Bearring
90 Fan Clamp with Rubber Bush, Nut & Bolt
660 Needle Bearing
80 "O" Ring for Champion
650 Allen Key Set 1,Bolt Allen Key & SS Bolt
240 Magic Socket Tape
120 Carbon Brush 2 - Maxima Die Punching
693 Pipe - Factor Sealing Fan Fitting 20 ft. 3 Nos
110 Bolt and RCC Drill Bit
175 Printer Spool
120 As per Sample Angle new making
90 Prepole Plug 1 Nos - Auto Striping
50 Fevi Quick -5nos
500 ugcl engineering
625 LN Key Set Nut Bolt
6007 CTP - Compressor Unloader Valve 6007
4681
Capaciter,Copper Chowk, Halogen Lamp &
Holder,Wire
7763 TS 54 Tube
3209 T5 Fitting - 1 Nos
4520 150W HPSV Set E40-3 Nos
2760 Helogen Lamp - 20 Pcs
7426 WD Spray
3231 WD Spray
1124 63 AMP FP (CTP Compressor) Qty.1
90 Maintenance Team Qty.2
650 Ink Room Tube
2645 Exzost Fan (Pentry & Toilet)
1180 1.5 HP Motor Rewinding, Wall Fan Repair
490 QC and Punching Dept.
2996 WD 40 Spray 400 ml
5333
Prepress Dept. Epson Printer Cleanning
Cartdrige
1332
Prepress Dept. Epson Printer Maintenance
Cartdrige
3200 Water Bor Submarcible Pump Repair
1075 Visiting Card - Back side Printing
314 Hardware
480 Die Punching Machine
548 Die Punching Machine
126 Teflon tape
75 Cutter
Plyer, Lock Tight, Bolt for Die Punching
80 Circlip
360 Scoth Tapes
322 Angle 3 nos 322
400 Connector Air Pipe
192 Connector & Elbow
430 High Speed Drill
380 Emery Paper , Multimeter Wire 380
120 Angle 1 Nos 120
200 Manual Lamination Machine cutter Repair
50 Shaft Bolt Removed 50
5950
1000
1560
6250
630
3371
340
80050
12240
12000
REPAIRING CONSUMBALE PARTS OTHERS REMARKS SERVICE CONTRACT/AMC
RUBBER WASHUP BLADE
900
3675
1100
135000
615099
457029
480
RUBBER WASHUP BLADE
3350
112360
3675
2745
850
1000
13000
6514.25
700
66000
891
2500
7000
240
120
500
1850
2576
720
3360
600
46659
13000
1220
50
2250
500
50
5000
3500
3675
150
3176
3000
2804
945
12756
150
375
100
2250
750
700
100
2500
4392
2430
684
2500
16200
39000
27435
2550
640
2250
1645
5100
945
2750
30
100
280
3240
34708
150
1300
500
160
3000
220
660
420
40
150
10
100
30
230
390
360
620
490
326
50
165
840
100
200
262.5
50
15
70
80
390
100
420
403
225
150
157
20
800
100
550
536
90
660
80
650
240
120
693
110
175
120
90
50
500
656
4681
7763
3209
4520
2760
1124
90
650
2645
1180
490
2996
5333
1332
3200
314
480
548
126
75
735
80
360
400
192
430
200
NAME BILL NO. DATE
Cutting\Store Department
LILAVATI A PATEL 35 4/17/2014
LILAVATI A PATEL 312 6/1/2014
Lilavati A Patel 143 5/15/2014
Cash Memo 4/10/2014
Knife Grinding Indo Poly Machines Corporation 10157 4/11/2014
Deepak Petrloluim 79 6/13/2014
Reel to paper Cut Senstronic System 55 4/25/2014
Lamination Department
Shiva Industries 83 5/5/2014
vaishal B Panchal 3 09/052014
Bright Rubber 4247 5/15/2014
Deepak Petroleum 61 5/6/2014
Khodiyar Krupa kd 6/14/2014
Cash Memo 4/29/2014
Cash Memo 07/5/201
Cash Memo 5/22/2014
Cash Memo 4/12/2014
Cash Memo 4/14/2014
Printing Department
Heidelberg India Pvt. Ltd. CH258012247 4/4/2014
Heidelberg India Pvt. Ltd. CH258012263 4/4/2014
Volga Rubber 9052 4/3/2014
Deev Offset 27 4/18/2014
Heidelberg India Pvt. Ltd. 2433 4/23/2014
Zenith R0063 4/25/2014
I K Belting S-140 4/26/2014
Deev Offset 85 5/14/2014
CASH MEMO 5/25/2014
Heidelberg India Pvt. Ltd. 732 5/21/2014
IST Mets Gmbh 56 4/26/2014
Siemens ltd 5/6/2014
Mayur Enterprise 58 5/6/2014
Heidelberg India Pvt. Ltd. 633 5/13/2014
Soham Technologies 17 4/19/2014
Deepark Petroleum 71 6/5/2014
Amit Plast 45 6/6/2014
MACHNE NAME
SUPPLIER'S DETAILS
Postpress Department
Yoco Foiling & Punching Galaxy Propac P. Ltd. 001 4/7/2014
Galaxy Propac P. Ltd. Jy106 6/2/2014
Bobst Nova Cut
Bobst Nova Cut 667 4/12/2014
I K Belting 96 4/5/2014
Kant Engineering 13 5/17/2014
I K Belting 71 5/2/2014
I K Belting 5/10/2014
Maxima Die Cutter
Excel Machinery (Guj.) Pvt. Ltd. L-56 4/12/2014
Kunjal Patel 4/4/2014
Excel Machinery (Guj.) Pvt. Ltd. 162 2/16/2014
Excel Machinery (Guj.) Pvt. Ltd. 11 5/5/2014
Excel Machinery (Guj.) Pvt. Ltd. 15 5/12/2014
Excel Machinery (Guj.) Pvt. Ltd. 33 6/3/2014
Cash memo 6/17/2014
Brausse Die Cutting
Ahmedabad Hardware 5/22/2014
Manual Die Punch 1 J K Industrial Componet t-5 5/9/2014
Manual Die Punch 2
Corrugation Department
Lilavati A Patel 222 6/3/2014
Meiguang Flute Laminate Cash Memo 5/14/2014
J K Indusrial T-8 5/14/2014
J K Indusrial r-4 5/14/2014
Cash Memo 5/14/2014
Steem Boiler
Aero Therm Systems Pvt. Ltd. TI-007 4/14/2014
Ankita Enterprise 15 4/18/2014
Ankita Enterprise 69 6/2/2014
Rotary Slotter
J K Industrieal Componets T-29 4/29/2014
Slitter Scorer
LILAVATI A PATEL 585 4/19/2014
LILAVATI A PATEL 113 4/29/2014
Finishing Department
Bobst Vision Fold J K industrial Componet T024 4/25/2014
Packtek
I K Belting 515 4/22/2014
J K Industrial Componet T-3 4/27/2014
Ravi Bearing 743 5/6/2014
Lilavat A patel 212 5/20/2014
J K Industrial Componet R8 5/20/2014
J K Industrial Componet T-6 5/21/2014
Window Patching
J K Industrial Components R-62 4/17/2014
J K Industrial Components 1 4/24/2014
Deev Offset 62 5/5/2014
I K Belting 122 6/1/2014
Bobst Expert Fold
Arbuda
Auto Strapping 1
manilal 355 5/6/2014
Manual Strapping 1
Manual Strapping 2
Bailing Machine Shree Rameshwar Eng. Works L-002 6/2/2014
Shrinking
Strapex
Striching Manilal Pack Plast Pvt. Ltd. 14-45/1 4/3/2014
Embos Bloking
Esko Sample Table
Jay Corporation 4/3/2014
Jay Corporation T-92 4/29/2014
Raj Stationery 5/15/2014
Lift BR Equipments pvt. Ltd. 4/22/2014
BR Equipments pvt. Ltd. 6 4/22/2014
Compressor Patsan Enteprise 25 4/16/2014
DG Set Supernova Systems pvt. Ltd. 159 5/28/2014
Supernova Systems pvt. Ltd. 160 6/2/2014
Stablizer Industrial Electrical Corporation T--6 6/5/2014
Store Crane Hiking Engineers 3 6/5/2014
IT Dept.
Other General
AMOUNT
5950 Nylon Stick 35 nos 5950
766 Polar Safety Bolt - 04 Nos 766
440 Polar Safety Bolt - 02 Nos 440
340 Belt 340
6250 Grinding Stone 6250
3601 Oil 3601
600 Sensor 600
5500 Glue Stopper 5500
4400 Suckerassembply 4400
1450 Glue Seal 1450
4625 Oil 4625
2800 Stinemaan roller Gridning 2800
571 timing Belts 571
40 Spring 40
150 Sucker Assembply Piston 150
550 Timing Belt Qty.1 550
660 Needle Bearing 660
13724 Support Rail - 1 Nos 13724
10680 2148 Temperature (Techno Trans) 10680
2745 Ink Roller 2745
1000 Brush Hard 1000
78447 Blower 78447
41234 Ink Roller 41234
1270 Sandwich Belt 1270
1650 Paper Separator 1650
190 Tool Repair 190
22290 Protective , 22290
318586 UV Lamp 381586
8250 Motor Testing 8250
1795 Contractor Kits 1795
86648 86648
65631 UV Lamp 65631
24538 Oil 24538
1250 Tray 1250
SUPPLIER'S DETAILS
DETAILS SPARE PARTS OIL AND LUBRICANTS
41175 41175
6260 Gripper Upper Plate 6260
132000 Bobst Parts 132000
1935 Belts 1935
650 Needel Bearing 650
14633 Belts 14633
992 Belts 992
7000 Machine Shifting 2 days Engineer 7000
3500 Service Charge 3500
1405 Gripper Stoper 1405
4964 Brush Holder 4964
4908 carbon brush , Belt, 4908
21600 Bush, Stud, pressing Pars 21600
90 Carbon Brush 90
117 Drill, Bolt 117
350 washer 350
2100 Blade Gridning 2100
50 Welding Tray 50
770 Bearing 770
3800 Roller Repair 3800
210 Sucket Piston 210
2250 Mobery - 1 Nos 2250
5300 Chemcial for Boiler Wate 5300
3750 Chemcial for Boiler Wate 3750
2000 Creasing Roller 2000
580 Parts 580
2299 parts 2299
126380 Bob parts 126380
12756 12756
5200 Gum Wheel 5200
2680 Bearing with Pedestal 2680
250 Roller 250
2730 Bearing & Repair 2730
6850 Gum Wheel 6850
700 Gear Chakkar Repair 700
600 Bracket Repair 600
4500 Rubber Strip 4500
9880 Belt for Feeder 9880
1376 Limit Switch 1376
7500 Bailing Machine Repair 7500
2500 PCB Card Repairing 2500
2400 WD 40 2400
2400 WD 40 2400
360 Scoth Tape 360
31821.55 Lift Door 4 31821.6
3000 Labour Charge 3000
6007 CTP - Compressor Unloader Valve 6007
1174 Fuel Filter Core and Oil Filter 1174
2400 Coolant 2400
1250 Carbon Brush 1250
2500 Crane Repairing 2500
5950
6250
REPAIRING CONSUMBALE PARTS OTHERS REMARKS SERVICE CONTRACT/AMC
7000
3500
2250
12756
700
2500
8600 4042 4558
6400 1920 4480
NAME BILL NO. DATE
Cutting\Store Department
LILAVATI A PATEL 35 4/17/2014
Cash Memo 4/10/2014
LILAVATI A PATEL 312 6/1/2014
Lilavati A Patel 143 5/15/2014
Cash Memo 28/6/20144
LILAVATI A PATEL 522 6/21/2014
Polar Pile Turner
Knife Grinding Indo Poly Machines Corporation 10157 4/11/2014
Deepak Petrloluim 79 6/13/2014
Reel to paper Cut Senstronic System 55 4/25/2014
Lamination Department
Stinamannn Cash Memo 4/29/2014
Cash Memo 07/5/201
Cash Memo 5/22/2014
Shiva Industries 83 5/5/2014
vaishal B Panchal 3 09/052014
Bright Rubber 4247 5/15/2014
Cash Memo 4/12/2014
Cash Memo 4/14/2014
Khodiyar Krupa kd 6/14/2014
Manual Lamination
Cash Memo 5/6/2014
Dipin Enteprise 5/14/2014
Cash Memo 6/24/2014
Slitter Cash Memo 5/9/2014
Deepak Petroleum 61 5/6/2014
Graviour Cash Memo 5/6/2014
Cash Memo 5/14/2014
MACHNE NAME
SUPPLIER'S DETAILS
Printing Department
Heidelberg India Pvt. Ltd. CH258012247 4/4/2014
Heidelberg India Pvt. Ltd. CH258012263 4/4/2014
CASH MEMO 5/22/2014
Volga Rubber 9052 4/3/2014
Deev Offset 27 4/18/2014
Heidelberg India Pvt. Ltd. 2433 4/23/2014
Zenith R0063 4/25/2014
I K Belting S-140 4/26/2014
Deev Offset 85 5/14/2014
CASH MEMO 5/25/2014
Heidelberg India Pvt. Ltd. 732 5/21/2014
Cash Memo 4/9/2014
Soham Technologies 17 4/19/2014
Deepark Petroleum 71 6/5/2014
Amit Plast 45 6/6/2014
CASH MEMO 6/28/2014
CASH MEMO 6/29/2014
Bhavna Enteprise 6/30/2014
CASH MEMO 6/30/2014
Deev Offset 135 6/23/2014
Prism Calibration Center 30 6/30/2014
Heidelberg CD 102 7 + L USED
Cash memo 5/18/2014
RMC Hard ware 5/22/2014
Yamunaji Traders 5/22/2014
IST Mets Gmbh 56 4/26/2014
Siemens ltd 5/6/2014
Mayur Enterprise 58 5/6/2014
Heidelberg India Pvt. Ltd. 633 5/13/2014
Cash Memo 4/9/2014
Zenith
Postpress Department
Yoco Foiling & Punching Galaxy Propac P. Ltd. 001 4/7/2014
Cash Memo 4/5/2014
Cash Memo 4/17/2014
Galaxy Propac P. Ltd. Jy106 6/2/2014
Bobst Nova Cut
Ahmedabad Hardware 5/8/2014
Bobst Nova Cut 667 4/12/2014
I K Belting 96 4/5/2014
Kant Engineering 13 5/17/2014
Cash memo 5/8/2014
I K Belting 71 5/2/2014
I K Belting 5/10/2014
Lilavati A patel 6/24/2014
Maxima Die Cutter
Excel Machinery (Guj.) Pvt. Ltd. L-56 4/12/2014
Cash Memo 4/5/2014
Cash Memo 4/17/2014
Kunjal Patel 4/4/2014
Excel Machinery (Guj.) Pvt. Ltd. 162 2/16/2014
Excel Machinery (Guj.) Pvt. Ltd. 11 5/5/2014
Excel Machinery (Guj.) Pvt. Ltd. 15 5/12/2014
Cash Memo 4/5/2014
Cash Memo 4/15/2014
Cash memo 6/17/2014
Excel Machinery (Guj.) Pvt. Ltd. 33 6/3/2014
Cash memo 6/17/2014
Bajarang Ramniwas Chauhan 6/20/2014
Higher Semi Auto Diecutter
Sanajy Engineering 38 4/29/2014
Brausse Die Cutting
Cash Memo 5/18/2014
Ahmedabad Hardware 5/22/2014
Meflix 5/22/2014
Priya Indutres 5/22/2014
Cash Memo 4/10/2014
Cash Memo 5/8/2014
Cash Memo 6/10/2014
Manual Die Punch 1 J K Industrial Componet t-5 5/9/2014
Manual Die Punch 2
Corrugation Department
Champion 2 Ply
Lilavati A Patel 222 6/3/2014
Cash Memo 4/5/2014
Depin Entepise 5/8/2014
Cash Memo 4/9/2014
Cash Memo 4/10/2014
Cash Memo 5/8/2014
Sensotronic System 143 6/10/2014
Meiguang Flute Laminate Cash Memo 5/14/2014
J K Indusrial T-8 5/14/2014
J K Indusrial r-4 5/14/2014
Cash Memo 5/14/2014
Cash memo 5/14/2014
Cash memo 5/15/2014
Sanjay Engineering 5/22/2014
Steem Boiler
Aero Therm Systems Pvt. Ltd. TI-007 4/14/2014
Ankita Enterprise 15 4/18/2014
Ankita Enterprise 69 6/2/2014
Rotary Slotter
J K Industrieal Componets T-29 4/29/2014
Slitter Scorer
Auto Stitching Manilal Pac Plast 355 5/6/2014
Cash Memo 4/17/2014
Cash Memo 4/17/2014
Manual Stitching
Cash Memo 500 5/18/2014
LILAVATI A PATEL 180 5/3/2014
LILAVATI A PATEL 585 4/19/2014
LILAVATI A PATEL 113 4/29/2014
LILAVATI A PATEL 4/29/2014
Cash Memo 5/6/2014
Finishing Department
Bobst Vision Fold J K industrial Componet T024 4/25/2014
Cash Memo 7/1/2014
Bobst India 1411131 6/20/2014
Packtek
I K Belting 515 4/22/2014
Cash Memo 4/17/2014
SKF bearing 30 5/18/2014
CASH MEMO 5/3/2014
CASH MEMO 5/22/2014
Jay Ambe Service 5/22/2014
CASH MEMO 5/22/2014
Bhavna Enteprise 5/22/2014
J K Industrial Componet T-3 4/27/2014
Ravi Bearing 743 5/6/2014
Lilavat A patel 212 5/20/2014
J K Industrial Componet R8 5/20/2014
J K Industrial Componet T-6 5/21/2014
Cash Memo 4/10/2014
Cash Memo 4/17/2014
Cash Memo 4/17/2014
Belt & Belt T0085 6/14/2014
Belt & Belt T95 6/20/2014
Lilavat A patel 521 6/24/2014
Window Patching
J K Industrial Components R-62 4/17/2014
Cash Memo 5/18/2014
J K Industrial Components 1 4/24/2014
Deev Offset 62 5/5/2014
Ravi Bearing 791 6/9/2014
Cash Memo 6/22/2014
I K Belting 122 6/1/2014
Solid India 6/22/2014
Subba Solution 90 6/23/2014
Bobst Expert Fold
Bailing Machine Shree Rameshwar Eng. Works L-002 6/2/2014
Arbuda
Auto Strapping 1
Auto Strapping 2 Dipen Enteprise 12 4/18/2014
Simer Enteprise 20 4/18/2014
Cash Memo 4/17/2014
manilal 355 5/6/2014
Cash Memo 6/9/2014
Manual Strapping 1
Manual Strapping 2
Shrinking
Strapex
Striching Manilal Pack Plast Pvt. Ltd. 14-45/1 4/3/2014
Cash Memo 5/22/2014
Stretching
Hydraulic West Baling Cash Memo 4/5/2014
Cash Memo 4/5/2014
Embos Bloking
Esko Sample Table
Machine General Cash Memo 4/5/2014 4/5/2014
Cash Memo 4/5/2014 4/5/2014
Cash Memo 4/5/2014 4/5/2014
Cash Memo 4/9/2014 4/5/2014
Cash Memo 4/10/2014
Cash Memo 4/10/2014 4/10/2014
Cash Memo 4/10/2014
Cash Memo 4/10/2014
Cash Memo 4/10/2014
Cash Memo 4/10/2014
Cash Memo 4/10/2014
Cash Memo 4/10/2014
Cash Memo 4/17/2014
Cash Memo 4/17/2014
Cash Memo 4/17/2014
Cash Memo 4/17/2014
Cash Memo 4/17/2014
Cash Memo 4/17/2014
Cash Memo 4/17/2014
Cash Memo 4/17/2014
Cash Memo 4/17/2014
Cash Memo 5/5/2014
Jay Corporation 4/3/2014
Jay Corporation T-92 4/29/2014
Raj Stationery 5/15/2014
Sensotronic System 154 6/13/2014
Cash Memo 6/3/2014
Cash Memo 6/3/2014
Cash Memo 6/13/2014
Cash Memo 6/17/2014
Cash Memo 6/30/2014
Cash Memo 6/30/2014
Sensotronic System 6/20/2014
Lift BR Equipments pvt. Ltd. 4/22/2014
BR Equipments pvt. Ltd. 6 4/22/2014
Deepak Petroluei 6/18/2014
Compressor Patsan Enteprise 25 4/16/2014
Patsan Enteprise 80 6/9/2014
Patsan Enteprise 116 6/9/2014
Patsan Enteprise 115 6/9/2014
Cash Memo 6/9/2014
General Electric
Cash memo 6/13/2014
Ink Room Hari Enteprise 5/3/2014
Stablizer Protek Enteprise 259 4/24/2014
Protek Enteprise 260 4/24/2014
IT Dept.
Other General
Manual Lamination Machine Cash Memo 4/17/2014
Cash Memo 4/17/2014
Cash Memo 6/24/2014
DG Set Supernova Systems pvt. Ltd. 159 5/28/2014
Supernova Systems pvt. Ltd. 160 6/2/2014
Cash Memo 5/28/2014
Stablizer Industrial Electrical Corporation T--6 6/5/2014
Store Crane Hiking Engineers 3 6/5/2014
AMOUNT
5950 Nylon Stick 35 nos 5950
340 Belt 340
766 Polar Safety Bolt - 04 Nos 766
440 Polar Safety Bolt - 02 Nos 440
200 Service Charge 200
8960 polat stick 8960
6250 Grinding Stone 6250
3601 Oil 3601
600 Sensor 600
571 timing Belts 571
40 Spring 40
150 Sucker Assembply Piston 150
5500 Glue Stopper 5500
4400 Suckerassembply 4400
1450 Glue Seal 1450
550 Timing Belt Qty.1
660 Needle Bearing
2800 Stinemaan roller Gridning 2800
100 Silicon Rubber 100
446 Timing Belt 446
70 Parts Bolt Removed 70
44 Slitter Blade - 1 Pkt 44
4625 Oil 4625
100 Silicon Rubber 100
446 Timing Belt 446
SUPPLIER'S DETAILS
DETAILS SPARE PARTS OIL AND LUBRICANTS
13724 Support Rail - 1 Nos 13724
10680 2148 Temperature (Techno Trans) 10680
80 Brazing of Rechet Tools 80
2745 Ink Roller 2745
1000 Brush Hard 1000
78447 Blower 78447
41234 Ink Roller 41234
1270 Sandwich Belt 1270
1650 Paper Separator 1650
190 Tool Repair 190
22290 Protective , 22290
150 Heidelberg - Switch Bulb 1 Nos 150
65631 UV Lamp 65631
24538 Oil 24538
1250 Tray 1250
480 Ice for Chiller 480
195 for Coolent for Engine 195
1102.5 Oil Seals Pneumatic 1102.5
320 Socket Gas Welding with Materials 320
550 Sheet Septeraor 550
1200 Calibration 1200
850 Woode patty for Pallet
190 Ball Valve 190
720 Brass Connector 720
318586 UV Lamp 381586
8250 Motor Testing 8250
1795 Contractor Kits 1795
86648 86648
403 Heidelberg Oil Seal - 2 Nos
41175 41175
262.5 Air Pipe Fitting 262.5
192 Air Pipe Fitting 192
6260 Gripper Upper Plate 6260
192 Nose Pliers 01 Nos 192
132000 Bobst Parts 132000
1935 Belts 1935
650 Needel Bearing 650
160 Pin Bar 160
14633 Belts 14633
992 Belts 992
800 sheet seperator 800
7000 Machine Shifting 2 days Engineer 7000
240 Copper Carbon Brush - 4 Nos 240
120 Carbon Brush 120
3500 Service Charge 3500
1405 Gripper Stoper 1405
4964 Brush Holder 4964
4908 carbon brush , Belt, 4908
240 Carbon Brush , Spring 240
120 Carbon Brush 2 - Maxima Die Punching 120
90 Carbon Brush 90
21600 Bush, Stud, pressing Pars 21600
90 Carbon Brush 90
10000 SS Plate 10000
300 Spring for Gripper 300
500 Freight Charge for
117 Drill, Bolt 117
420 Paper Roll 420
1000 Paper Rooll Cutting 1000
650 Allen Key 650
192 Long Pliers 192
550 Encoder 550
350 washer 350
2100 Blade Gridning 2100
80 Key Shaft 80
655 Figner Joint 0 3 Nos 655
588 Champion Machine V-Belt 2 Nos 588
80 O Ring 80
655 Lacking Clip 655
750 Sensor 750
50 Welding Tray 50
770 Bearing 770
3800 Roller Repair 3800
210 Sucket Piston 210
50 Gum Tray Repair
210 Sucker Piston 210
400 Spring 400
2250 Mobery - 1 Nos 2250
5300 Chemcial for Boiler Wate 5300
3750 Chemcial for Boiler Wate 3750
2000 Creasing Roller 2000
4964 Limit Switch, Belt, Spring 4964
399 V Belts 399
Limit Switch 380
500 Machine Repair to Engineer
180 Cutting Plate 180
580 Parts 580
2299 parts 2299
180 Push Bolt 180
120 Shaft Repair 120
126380 Bob parts 126380
240 Remote Controll Cell 240
8716 Interconnection box 8716
12756 12756
150 Hole & Welding
375 6203 Bearing 0 3 Nos 375
100 Counter Cylinder Repair 100
100 Support Belt Welding 100
1500 Vacuum Pump Repair 1500
50 Bearing & Circlip 50
372 FRL 372
5200 Gum Wheel 5200
2680 Bearing with Pedestal 2680
250 Roller 250
2730 Bearing & Repair 2730
6850 Gum Wheel 6850
536 Bearing and seal 536
60 Oil Seal 60
375 Bearing 375
6590 Belt 6590
480 belt 480
1250 handles 1250
700 Gear Chakkar Repair 700
100 Shaft Alluminium Shaft Repair
600 Bracket Repair 600
4500 ` 4500
1400 Bearing 1400
75 Bolt Remover 75
9880 Belt for Feeder 9880
75 Bolt Break 75
37820 Feeder Belt 37820
7500 Bailing Machine Repair 7500
399 V Belt 02 Nos 399
380 Limit Switch 380
90 Plug 90
1376 Limit Switch 1376
30 Gas Welding 30
2500 PCB Card Repairing
130 V Belt 130
420 Bailing machine rod 420
225 Nut Bolt 225
15 Washer Nut 15
70 Clamp Wire 70
80 Outer Circlip 80
157 Drill Bit 157
390 MCB for 390
100 Sealing Fan Welding 100
800 Welding in Plant 800
90 Teste4 90
90 Sealing fan Fitting 90
110 Bolt, RCC Drill Bit 110
693 Sealing m/c Pipe Fitting 110
50 Shaft Hole & Drilling 50
120 Ceilling fan angle 120
126 Telfon Tape 126
200 Hand Trlly Repair 200
400 High Speed Drill Bit 400
380 Multimeter Wire 380
322 Sealing Fan C Angel 322
50 Fevi Quick 50
500 UGCL Engineerir 500
656 L N Key Set 656
80 Circlip for General 80
2400 WD 40 2400
2400 WD 40 2400
360 Scoth Tape 360
3000 Machine Thermometer 3000
322 Sheet Protecor 322
Oil Seal 120
100 Pneumatic Fitting 100
40 Welding 50
240 Scoth Tape 240
320 Bearing 320
2250 Thermometer 2250
31821.55 Lift Door 4 31821.6
3000 Labour Charge 3000
7000 Hy oil 68 7000
6007 CTP - Compressor Unloader Valve 6007
18573 Air Filter, Oil Filter, Oil Separateror 18573
6644 V Belt 6644
13288 V Belt 13288
750 Relay 750
50 Soldering wire 50
650 Ink Room Tube
20000 Electric Audit 20000
4000 65 KVA Servo Stablizer 4000
200 Manual Lamination Machine cutter Repair
50 Shaft Bolt Removed 50
70 Bolt Remove 70
1174 Fuel Filter Core and Oil Filter 1174
2400 Coolant 2400
150 DG Set Generator Raditor Cap 150 150
1250 Carbon Brush 1250
2500 Crane Repairing 2500
5950
6250
550
660
REPAIRING CONSUMBALE PARTS OTHERS REMARKS SERVICE CONTRACT/AMC
150
850
403
7000
240
120
3500
120
500
50
2250
500
12756
150
375
100
700
100
2500
650
200