You are on page 1of 2

: Transmittal Ref.

:
: Contract Ref. :
: Submission Date :
: Status :
Sl. No.
Ref. Cl. No.of NIT
Spec., Agreed
Deviation
UML/Deutek Response dated 23.07.2011 EPIL/TCE's Comments dated 17.08.2011
UML/Deutek Response
dated 19.09.2011
1.0 The min & max DC voltage is based on
manufacturer's design feature which varies
from manufacturer to manufacturer & can not
be changed
Noted. However the same shall be mentioned in the
document.
Noted & Mentioned.
2.0 Noted & battery sizing calculations is revised
considering various sizing factors like Ageing,
Design Margin, Temp derating factor (for 25
deg C minm temp) & State of Charge Factor.
1. Battery sizing shall be done considering minimum
ambient temperature i.e 10.9 deg. C as per contract
(Refer Section B, Cl. No. 9.1).
UML to confirm & revise the calculations accordingly.
2. UML shall clarify the basis of selecting the SOC to
be 0.95.
1.Noted & Battery sizing
calculations revised
considering minimum
ambient temperature i.e
10.9 deg. C
2. SOC seletion chart is
attached for your
reference.As per chart,
for 1.59V Battery
voltage/cell, SOC shall be
1.0.Battery sizing
calculation is revised
accordingly.
3.0 Noted & Catalogue attached. Noted. However,
1. HBL's NCPP single cells are available in three types
designated KPH, KPM & KPL based on performance
characteristics. UML to clarify the basis of selecting
the KPH cell type.
2. Idc is coming out to be 39 Amp from calculation.
As per catalogue the model no. selected has the
current rating of 39.1 Amps.
UML shall consider proper margin in the selected
cells.
1. As per manufacturer
standard KPH type cell
shall be used for 60
minutes back-up.Based
on same KPH type cells
are selected.
2. Please note that all
the factors & margins are
already considered in
Battery sizing.
5 x 270 MW AMRAVATI THERMAL POWER PROJECT (PHASE - I)
-
Nil
27.07.2011
CAT-C DTN No. -
UML to clarify the basis of selecting maximum dc voltage
& minimum dc voltage of the system.
UML Clause Ref./
Locating Grid / Zone No.
EPIL Comments dated 13.07.2011
For the sizing calculation the various factors like ageing
factor, design margin, temperature derating factor, state
of charge factor have not been considered.UML to clarify.
UML to submit the catalogue for the battery from which
the particular model is selected.
Drg. / Doc. No. P297-E-607
Battery sizing calculation for UPS
Rev. No. 01
Drg. / Doc. Title
4.0 Batteries details are enclosed. GA will be
submitted seperately with Doc.No.P297-E-603-
GA & Wiring diagram for UPS..
Noted. However the GTP for Nickel Cadmium Pocket
Plate Battery shall be provided as per the attached
format.
Please note that all the
parameters are indicated
in the furnished Battery
sizing calculation.In view
of same separate GTP Is
not required.
5.0 UML to submit the following docs regarding
UPS:
1. Datasheet of UPS- Noted & submitted with
Doc.No-P297-D-426.
2. GA & Wiring Diagram - UPS- The document
will be submitted seperately with Doc.No.P297-
E-603.
3. UPS schematic block diagram - The
document will be submitted seperately with
Doc.No.P297-E-603.
Noted
6.0 Exide & Amara Raja donot manufacture Ni Cd
batteries. As referred above; Ni Cd batteries are
manufactured by HBL Nife & AMCO. Pl confirm
your acceptance of AMCO make batteries also.
UML to supply the batteries of HBL make only. Noted & confirmed.
7.0 Noted & Confirmed. Noted
D : Disapproved. Refer accompanying letter/Attached comment Sheet
C : Correct original of the document to reflect our comments and resubmit for approval.
B : Approved subject to comments noted:proceed with fabrication/construction considering our comments.
NOTE FOR
STATUS:
A : Document approved as submitted; proceed with fabrication/construction.
UML to submit the GA showing the mounting
arrangement & datasheet of batteries.
UML to submit the following docs regarding UPS:
1. Datasheet of UPS
2. GA & Wiring Diagram - UPS
3. UPS schematic block diagram
UML to supply the batteries of following makes :
1. HBL Nife
2. Exide
3. Amara Raja
E : For Information & Record Only
Under no circumstances do any of the statements made
in this document waive the Contractors contractual
obligations to provide all services and materials
/equipment necessary for a proper functining of
equipment.