You are on page 1of 32

Headquartered & Subsea Technology Center in

Houston, TX USA
Privately Held Corporation
Manufacturing Facility in Manitowoc, WI USA
& Expansion under development on US GOM
Sales Office in Rio de Janeiro, Brazil
Sales Office/Representation in Kuala Lumpur,
Malaysia
Total workforce approximately 110 people,
growing to ~180 in U.S. by 2015
Only manufacturer of composite unbonded flexible
pipe for subsea (deep water) applications
Strong patent portfolio and leader in publication of
composite armor technology
Products in service for more than 6 years with
outstanding performance
Company Overview
About us
New plant capacity expansion on US GoM in progress
o Product line enhancement
o Over 300% capacity increase to 102 km/yr
Comprehensive product qualification program
completed with DNV Statement of Compliance to
API17J/B received
Awarded Phase II of Ultra Deep Water Qualification
project sponsored by TOTAL, Statoil, Shell, BG Group,
and the Research Partnership to Secure Energy for
America (RPSEA)
Petrobras Qualification Programs focusing on light
weight ultra-deepwater risers and flowlines
Company Overview
Recent Milestones
2.5 to 10 inch Internal Diameter
Up to 5,000 psi
Up to 60C
Up to 2500 m WD
Smooth Bore
Static and Dynamic Service
Sweet or Sour Service
Riser, Flowline and Topside Jumpers
Light well intervention
Ultra deep water service lines
Shallow water multiphase production
4 to 12 inch Internal Diameter
Up to 10,000 psi
Up to 120C
Up to 3000 m WD
Rough (Carcass) and Smooth Bore
Static and Dynamic Service
Sweet or Sour Service
Riser, Flowline and Topside Jumpers
Ultra deep water multiphase
production
Product Capabilities
FFRP and FHRP
All Composite FFRP Flexible Hybrid Reinforced Pipe


Anti-Extrusion Layer
Liner Extrusion
Hoop Reinforcement
Anti-Wear Layer/Permeated gas flowpath
Membrane Extrusion
Tensile Reinforcement
Anti-Wear Layer
Tensile Reinforcement
Jacket Extrusion
DeepFlex Products
Flexible Fiber Reinforced Pipe (FFRP)
All Composite/Smooth Bore
Applications
Low pressure production
Downlines
Export
Injection
Subsea mining
6+ year service history
Applications up to 2500 mwd
Composite FRP tapes stacked and bonded into helical laminates
DeepFlex Products
Flexible Hybrid Reinforced Pipe (FHRP)
Applications
Flowlines
Risers
Export Lines
Topside Jumpers
Subsea Jumpers
Applications up to 3000 mwd
DWP 10K psi & Temp up to 120 C
Composite FRP tapes
stacked and bonded into
helical laminates
Flexible Hybrid Reinforced Pipe
Stainless Steel Carcass
Steel and/or Composite Pressure Armor
Composite Tensile Armor
Value Proposition
Product & Installation
Optimize the floating production system cost through:
Reduced costs of new build FPSOs
Disconnectable turret optimization
Lower payloads on existing hubs allowing for more
production within tension capacity limits
Extended service life for dynamic applications
Expand the operating envelope of existing technologies
(FPSO, TLP, SPAR, semi-submersibles)
Expand the availability of installation vessels with the
required top tension capability
Field architecture flexibility
Value Proposition
More cost-efficient development of deepwater
reserves
Optimize the floating production system cost
Lowers installation costs and project schedule risk
Resistance to corrosive environments
Company Overview
Products-FFRP and FHRP
Current Product
FFRP
DFX Flowline 1
FHRP
PB Flowline Oil 1
FHRP
PB Flowline Oil 2
FHRP
RPSEA
FHRP
4 inch, 4200 psi, 1600
mwd, 60C
6 inch, 5000 psi, 1000 mwd,
60C, sweet
6 inch, 5000 psi, 2000
mwd, 90C, sour (5% CO2)
6 inch, 6000 psi, 2500 mwd,
90C, sour (25% CO2)
7 inch, 10000 psi, 3000
mwd, 120C, sour
Aramid Composite Anti
Extrusion, All glass
composite pressure and
tensile armours
SS Carcass, CS Z-interlock
pressure armour, Glass composite
tensile armour
SS Carcass, CS Z-interlock
pressure armour, Carbon
fiber composite tensile
armour
SS Carcass, CS Z-interlock
pressure armour, Carbon fiber
composite tensile armour
SS Carcass, CS Z-interlock
pressure armour, Carbon fiber
composite pressure backup
armour, Carbon fiber
composite tensile armour
Downline
Water injection
Surface jumper
Low pressure, shallow
water production
Multiphase production flowline
Extend qualification to dynamic
riser
Multiphase production
flowline
Multiphase production flowline
(Pre-salt field)
Multiphase production riser
Ultra Deep Water Qualification
Pipe Characteristics
Parameter Value
Inner Diameter 177.8 mm (7 inch)
Design Temperature 120 C
Water depth 3048 m
Design Pressure 68.9 MPa (10,000 psi)
Outer Diameter 348.4 mm (13.7 inch)
Weight Empty in Air 159.8 kg/m
Weight Empty in Seawater 62.0 kg/m
Storage Bend Radius 2.62 m
Operating Bend Radius 3.94 m
Burst/Design Ratio 2.0
Collapse/Design Ratio 2.1
Failure Tension 19879 kN
Ultra Deep Water Qualification
Design-Riser Structure and System
Governing Standards
API 17J
API 17B Annex H
DNV OS-C501
Agree
Design
Premise
Pipe
Design
Global
Analysis
Pipe wall
stress
analysis
Pipe
Design
Freeze
End Fitting
Design
Service Life
Analysis
Bend
Stiffener/
Bouyancy
Design
Design
Report
Permeation
/Venting
Analysis
Technology
Engineering & Qualification - Design Criteria
Products are designed to comply with offshore oil and gas industry
standards for unbonded flexible pipe and use of composites
API 17J Applies to polymer layers, carcass, steel pressure armor,
functional tapes, end fitting structural components, pipe response to
global loads
DNV OS-C501 Applies to composite armor and anti-extrusion layers
and composite armor anchoring in end fitting
API 17B DeepFlex led the development of a major revision to include
composite armored flexible pipe design, manufacture and qualification
(Annex H) which has been adopted by the API 17 Flexible Pipe Task
Group and will be published in the 2014 API Revision
Technology
Pipe Design Methodology
PipeDesigner
DeepFlex in-house design
tool
Base properties
Moduli
Strengths
Poissons ratios
Physical properties
Variation of Properties
Time
Environment
Temperature
Load duration
Cyclic loading
Material
qualification data
Steel
clamp
shaft
Right stand
Screwed to the
table
Bearing
Inclinometer Sensor
(Read out by
PC/DAQ)
Steel plate
Screwed to stand
Left stand
Screwed to the
table
Tape stack
Torque Sensors
(Readout by DAQ)
Or
Torque transducer
Table
Square plate
Torsion Test on Reinforcement Stack
Calibrate Model Property Model
Full Bend Back Simulation
Full Scale Test
Technology
End Fitting Design Methodology
Facilities
USA Houston - Subsea Technology Center
Ageing tanks
MTS with temperature control
Optical microscopy
Grinder/
Polisher
DSC
Facilities
USA Houston - Subsea Technology Center
Autoclave for 110C
Material Ageing
Creep Test Rigs
MTS Fatigue Test Machine
Facilities
USA - Full Scale Test Equipment
Burst test
Crush test
Collapse test
Axial compression and mid-scale pressure tests
Tension/combined bending with tension tests
Facilities
USA - Full Scale Test Equipment
Dynamic Fatigue Test Rig
Facilities
Manitowoc Plant - Current
Pipe Finishing
Reinforcement
Line
Extrusion
Line
Reinforcement
Tape
Conversion
Carousel 2
Carousel 1 Carousel 3
Current Product Range Capacity:
o 3 to 10 in ID; Up to 5,000 psi
o Smooth Bore Pipe
o Up to 25 Km per year, 9.2m Reel
Capability
Facilities
US Gulf of Mexico Plant
Facilities
US GoM Plant Main features
Capacity: 102 km/yr based on 6 in normalized hybrid pipe
Product Range:
o 2.5 to 12 ID Flexible Hybrid (FHRP) and All Composite (FFRP) Pipe
Manufacturing Capability
o Maximum pipe OD = 18
o Continuous length up to reel capacity (9.2 & 11.4 Reels)
Manufacturing Characteristics
o Near navigable water way
o Aproximately 60K m
2
Land
o Reel based manufacturing
o Capability for load out directly to installation vessel or barge
Product & Processes
o Close proximity to Houston Research Center
o Consolidation of qualification test rigs at manufacturing site
o Enhancement of robust process technology with product development teams
Facilities
US GoM Plant & Laboratories
Purchased New State of the Art Flexible Pipe Manufacturing Equipment
Stainless Steel Carcass
o 4 to 16 inch Internal Pipe Diameter
o 8 step profiling process, 6 spiraling/closing winding rolls
o Capable of all sweet and sour service materials
Super Duplex 2507
Duplex 2205
All grades of Stainless Steel
o Strip Size 24mm-144mm Width, 0.6mm-2.4mm Thick
Z Shape Pressure Armor Equipment
o 2 to 16 inch Internal Pipe Diameter
o Strip size
4.8 x 10.6 mm minimum
32.0 x 14 mm maximum
o Sweet (150 Ksi) and Sour (<110 Ksi) service materials
o Primary pressure interlock armor
o Secondary pressure back up armor
o Smooth bore capability
CARCASS S-SHAPED PROFILE
Pressure Armor Z-Shape Profile
Project History
Afren Riser/Flowlines 4, 6 & 8 inch
Worlds Shallowest FPSO (13m WD)
Three Risers (2 Prod and One Gas Lift)
Afren Project in 13
meters of water
Tensioner
Over-boarding Chute
Project History
Arthit Gas Export Riser 8 inch
Afren Project in 13
meters of water
Tensioner
Over-boarding Chute
EMAS Offshore Lewek Arunothai FPSO
Project History
PetroSA Oil Export Riser 4 inch
4 Oil Export Riser Flexible Replacement
PetroSA South Africa
Installation
Installation Complete
Paying out DFX Pipe
with Buoyancy Modules
3 inch ID, 1400 m WD, 200 bar (2900 psi),
1580 meter long downline
Deployed with powered reel and tensioner
Repeated use in extremely harsh
environments
o Urugua-Brazilian Winter- vessel lost DP
and weather vaned
o Usan-Offshore Nigeria
o Liwan-South China Sea-30 named storms
during campaign
Over 130 deployments to date over 4 years
Damaged with dropped spreader beam X2 and
repaired by DeepFlex patent pending repair
procedure (outer jacket and outer tensile
layer)
Project History
Saipem Deepwater Downline 3 inch
26
Project History
Saipem Deepwater Downline 3 inch
3 PreCommissiong Downline Deployment on Normand Cutter
Afren Project in 13
meters of water
Tensioner
Over-boarding Chute
18 Gas Export Pipeline approximately 174km long
Deepwater end: Urugu FPSO Cidade de Santos
1,279 meters WD, Block BS-500
Commissioning from deepwater end
3.5 inch ID, 1600 m WD, 4000 psi, 1800
meter long downline
Packaged on a 9.2 x 5m operational reel
System engineering including dynamic and
installation analysis, deck layout, subsea
configuration all performed by DeepFlex
Sold to IKM Testing Australia for pre
commissioning activities on the Allseas
installed gas export pipelines for the
Chevron Gorgon/Janz LNG project.
Shipped from DeepFlex to Houston by
barge and transloaded to ocean going
vessel for journey to Dampier, Australia
Currently Offshore
Project History
IKM Australia Deepwater Downline, 3.5 inch
28
Four 9 inch ID, 100 m WD, 2500 psi,
70C, 195 meter long downlines
Downlines for Oil Recovery from
Sunken Vessels
2 downlines for water flooding
sunken tanker hulls and 2
downlines for returning the
hydrocarbon/water mix to a oil
water separation spread based on a
support vessel
Shipped from DeepFlex to Oman by
Antonov heavy cargo air transport
airplane
Project History
E3 Energy-9 inch downlines for Oil Recovery
29
8 inch ID, 70 m WD, 2200 psi, 60C, 1500 meter
production riser/flowline/riser
Petronas Carigali Anjung Kecil (AJK) extended well
test (EWT) field development project in Block SK315,
approximately 200 km North-West offshore Bintulu
DeepFlex supplied the full well stream riser/flowline
engineering including global, local, service life, on
bottom stability and riser configuration analysis; bend
stiffeners, buoyancy and ballast modules; as well as
reel rental and transportation from the DeepFlex
factory to Singapore where the mobilization for
installation will occur
Project History
MTCE/Petronas Riser/Flowline 8 inch
30
Tarpon WHP Calm Buoy EWT Vessel Shuttle tanker
Project History
Worldwide Footprint
/ Marcessa
Supplied 2
flowlines
Supplied 4
replacement
riser
Repaired gas
export riser
Supplied 4
jumper
Supplied 8 gas
export riser for
FPSO
Supplied and installed 3
(4, 6 & 8) riser/
flowlines *
Supplied 1.6km 3
deepwater
downline
Supplied 7
topside Jumpers
Supplied 1
flowline
* In continuos production for over 5 years
Headquarters / Subsea Technology Center
Manufacturing Facility
Sales Offices
Future Manufacturing Facility
Major Offshore Basin
Supplied1.8km
3 deepwater
downline
Supplied 4 x 0.2km
9 downlines
Repairing gas
export riser
(2Q 2012)
Supplying 1.5km
8 riser/flowline
(4Q 2013 delivery)
Project History
Worldwide Footprint

You might also like