You are on page 1of 11

Ideas for today and tomorrow

Precision Research and


Consulting Private Limited
iData Insights, which has been in the forefront in providing high quality
services in Research and Consulting Domains is a division of Precision
Research and Consulting Private Limited. Its efforts help companies to create
and improve products and services based on what the market desires. It
provides actionable recommendations and provide business expertise for
business success today and tomorrow.
Precision Research and Consulting Private Limited, the parent company of
iData Insights is an extensive developer of Power Plants in India. Its work
includes preparing of DPRs, Pre-feasibility Reports, Feasibility Reports,
Financial Modelling and developing Power Plants from scratch to running
condition in Indian Renewable Energy Sector (Solar, Wind, Biomass).
It also helps in Site Selection, Plant Design, Technology Selection, Permits
and Licensing, PV Technology, Financing of the Project. Its vision is to make
renewable energy most affordable and reliable for forward-thinking power
consumers.
About Us
Once after the project is finalized:
PRC Team will visit the Site for inspection
Do a Pre-Feasibility Study
Prepare a Feasibility Report highlighting all the parameters considered
Present you with a Financial Model
Get the Clearances done from the Government (On-Grid Project)
Apply for Loan (if any)
Get the EPC contractor finalized
Finalization of Equipment's required for the project
Finalization of PPAs
Training of the Plant Staff
How do we proceed with the work?
Executive Summary
Introduction about the project
Objectives of the project
Site Details
Technical Details & System Specification
Load Calculation
Block Diagram
Technical Details of the Power Pack
Technical Details of the Solar Panel
Technical Details of the Battery Bank
Our Sample DPR covers the following
topics:
Technical Details of the Charge Controller Unit
Technical Details of the Inverter
Technical Details of Mounting Structure and Accessories
Constructive Characteristics of Solar Panel
Civil Work
Bill of Material
Financial Aspects
Project Cost
Financial Implications
Contd
Introduction about the project
PV Technology
Project Development
Site Selection
Energy Yield Prediction
Plant Design
Permits and Licensing
Our Sample Feasibility Report covers
following topics:
Construction
Commissioning
Operation and Maintenance
Economics and Financial Model
Financing PV Projects
Conclusion
Contd
For setting up a 1 MW Solar Power Plant, it costs around INR 7 to 10 Cr.
(Approx.) [Land Costs are variable].
Our Services can be availed through 2 options:
1
st
Option:
We charge 5% of total project cost.
Out-of the pocket expenses will be billed on actual basis and paid
monthly.(On advance basis)
Travelling expenses have to be borne by the client and the means of
travelling will be done through A/c Volvo or by 2
nd
Class A/c Train.
The boarding and lodging expenses also have to be borne by the client. The
stay for the PRC team should be arranged in a 3-star hotel. If that is not
feasible an A/c roomshould be provided.
Cost parameters
The payment [5% of total project cost] should be made in four phases:
10% should be given in advance (kick off of the project)
20% after the feasibility study is done
30% before execution of the EPC
40% at the time of handing over of the plant
2
nd
Option:
We charge 7 Cr for an On-grid Project and 6 Cr for an Off-grid Project
exclusive of Land Costs.
If loan should be procured, an additional 15% is charged (out of office
expense) on the total Loan Amount.
This charge includes every amount from commissioning to operation of
the plant.
Contd..
The payment should be made in four phases:
20% should be given in advance
10% after the feasibility report is done
50% before execution of EPC
20% after the delivery of the project