TABLE OF CONTENT NO CONTENT PAGES 1 1.0 ACKNOWLEDGMENT 2 2.0 PROJECT TITLE 3 3.0 LOCATION 4 4.0 BACKGROUND OF THE PROJECT 5 5.0 CONSULTANT AND THEIR ROLES 6 6.0 PRE-CONTRACT COST ESTIMATE .0 PREPARATION OF TENDER DOCUMENT ! !.0 TENDER REPORT !.1 T"PE OF TENDER !.2 NUMBER OF TENDER !.3 TENDER ANAL"SIS # #.0 T"PE OF CONTRACT 10 10.0 MAIN PROBLEMS ENCOUNTERED IN PRE-CONTRACT STAGE. 11 11.0 STUDENT$S ANAL"SIS 12 12.0 CONCLUSION UiTM SERI ISKANDAR, PERAK 29 REPORT A - PRE CONTRACT STAGE 1.0 ACKNOWLEDGMENT Assalamualaikum WBT Alhamdu Lillah, first of all thanks to Allah S.W.T for blessing, I able to finished my report with successful within my ractical Training for the past four months, work hard to understand the re!uirement about the topics gi"en. #irstly, thanks a lot especially for $r %aden $ohd u&aseti Asnawi and $r 'alim 'ashim, the principal of $IT( (roup Sdn Bhd for the opportunity gi"en to me to &oin this company for my practical training and my practical super"isor $r Adnan Suhot for his kind and guidance through the period of completing this report. A lot of thanks to each one for struggle to gi"e idea on this report done as smooth. #urthermore, I would like to con"ey my thousand appreciations to my super"isor )n. )sham $amat in super"ising me right from the beginning till the end of the practical was completed. Besides that, I would also like to thank to all lecturers in *uantity Sur"eying +epartment, #aculty of Architecture, lanning and Sur"eying for all their supports. #or all my friends, thank you for sharing the ideas and always gi"e your help when I am in trouble. ,ot forget to my practical staff, thanks for many kinds of helps and co- operation from all. I hope this report will satisfy all especially my courses lecturers. Thank you "ery much. $ay Allah S.W.T bless all of them. Insya Allah. UiTM SERI ISKANDAR, PERAK 29 REPORT A - PRE CONTRACT STAGE 2.0 PROJECT TITLE PROPOSED A DOUBLE STORE" BUNGALOW HOUSE AT NO.16% JALAN BERANANG 32&5#A% SEKS"EN 32% BUKIT RIMAU 40460 SHAH ALAM% SELANGOR DARUL EHSAN FOR ENCIK HASNOL BIN IBRAHIM DAN PUAN NIK BAINURA BINTI NIK JAAFAR TENDER NO' TD&B&32&HBI&2010 UiTM SERI ISKANDAR, PERAK 29 REPORT A - PRE CONTRACT STAGE 3.0 LOCATION OF THE PROJECT Location of this pro&ect is situated at lot ,o../, 0alan Beranang 12345a, Seksyen 12, Bukit %imau 676/7 Shah Alam, Selangor +arul )hsan. The location of this site is !uite strategic because it is near the main road, which is connected to the city. The distance of this location from Shah Alam town is about .4km and 8uala Lumpur is about 17km. Therefore, it is easy to obtain facilities such as bus stop or 8T$ as public transports. It is also strategic place because the location is near the federal highway about 9km and Shah Alam highway about . Besides that, this site is also e!uipped with basic facilities such as water supply, electric supply and telephone. This site is also located near other facilities such as the market, field, mos!ue, schools, industry area and etc. that are why it is suitable to become a housing area. This location is also located near education center such as Sekolah $enengah 8ebangsaan Bukit 8emuning, Sekolah 8ebangsaan Bukit 8emuning, Bukit %imau 8indergarten. This location also near with the shopping mall area such as :arrefour Bukit %imau and Aeon $a;"alu 8ota 8emuning. Besides, it also near to the :olumbia Asia 'ospital. That is why this pro&ect is successful and gain ama<ing respond from the client and that is the reason the client planned to construct to this location. UiTM SERI ISKANDAR, PERAK 29 REPORT A - PRE CONTRACT STAGE 4.0 BACKGROUND OF THE PROJECT The client for this pro&ect was )ncik 'asnol bin Ibrahim and constructed a double storey bungalow house at ,o../, 0alan Beranang 12345A, Seksyen 12, Bukit %imau 676/7 Shah Alam, Selangor +arul )hsan. The contractor that has been chosen from the tender report for this pro&ect was Alaf intar Sdn. Bhd. The contract sum of this pro&ect is %$ %$., 2.=, =62./4. The date of commencement of this pro&ect is on 27 $arch 2775>#riday? and the date of completion is on 21 0uly 27.7>#riday?. This pro&ect is a fi;ed construction period of twel"e >.2? months from the date of handling of site to the contractor. The type of tender that use in this pro&ect is Tender by In"itation. The contract that use is W+ 271 >without !uantities?. UiTM SERI ISKANDAR, PERAK 29 REPORT A - PRE CONTRACT STAGE BRIEF INFORMATION OF TENDER a? :onsultant re-Tender )stimate @ %$ .,765,5.2.== b? +ate of :losing of Tender @ .2th #ebruary 27.7 c? #i;ed :ompletion eriod of :ontract @ .2 months d? Tender Aalidity eriod @ /7 days e? );piry +ate of Tender Aalidity eriod @ .2th April 27.7 f? Type of Tender @ Tender by In"itation3 Selecti"e Tendering from ArchitectBs appro"ed g? Type of :ontract @ Lump sum 3 without !uantities #rom art of the :ontract h? Tender bond @ %$ .,477.77 i? L.A.+ @ %$ 177.773+ay S:C) C# WC%8S The Works let on this contract are as follows@ a? reliminaries and (eneral :onditions b? Building Works c? );ternal Works Within Lot Boundary d? $echanical D )lectrical Works UiTM SERI ISKANDAR, PERAK 29 REPORT A - PRE CONTRACT STAGE 5.0 CONSULTANTS AND THEIR ROLES 4.. :C,SELTA,TS #C% T'IS %C0):T a? Architect @ 'ASA Architect Sdn. Bhd. b? Structural )ngineer @ S,S :onsultant c? $echanical and )lectrical )ngineer @ F,AA D Associates d? *uantity Sur"eyor @ $IT( (roup Sdn. Bhd. 4.... A%:'IT):T Being a leader, Architect is the only person who can gi"e the order to the other consultants that been appointed in the pro&ect. Cften regarded as the building team, Architect is responsible to design a building from the beginning to the satisfaction of the client before super"ising the erection of the building until the completion and feedback stage of the pro&ect. Below are the scopes of work of an Architect. .. Inception Stage %ecei"ing :lientBs briefing. 2. #easibility Stage Endertake site in"estigations. :onsult with Town lanner and other Statutory Authorities. )"aluate and prepare in capital and re"enue terms feasible studies to form part of Cption Appraisal. repare or Epdate +e"elopment :ontrol lan. UiTM SERI ISKANDAR, PERAK 29 REPORT A - PRE CONTRACT STAGE 1. Cutline roposal %ecei"e Scheme Brief and prepare detail programmed for this stage. Agree and order site in"estigation. repare outline plans and pro"ide ser"ices in connection with en"ironmental studies. repare report on recommended site and constrains and opportunities. :onfirm +: including preparing of Block lan of scheme identifying main departments and showing relationships with any earlier de"elopment and possible future de"elopment. Assist in preparing of :ost lan. ro"ide information of Budget :ost Statement. 6. Scheme +esign repare detail plans and contributes to re"ision of cost plan. +efine means of escape and compartments. repare preliminary room layout ele"ation. :onsult #ire +epartment. Incorporate pro"isional ser"ice distribution and <oning layouts With $echanical D )lectrical )ngineer co-ordinate plans including Eser Cutlet and All terminals. UiTM SERI ISKANDAR, PERAK 29 REPORT A - PRE CONTRACT STAGE 4. +etail +esign +etail out co-ordination of construction, structure and ser"ices. repare final plans. repare final room layouts. Agree on final room layouts. /. roduction Information repare detail programme, production drawings, layout and sections. repare details, schedules and specifications. =. Bills of *uantity repare tender documents. ro"ide design certificate. ro"ide :ertificate of %eadiness to proceed to tender. 9. Tender Action repare tender list. In"itation to selected tenderers and agreed upon by the :lient. %ecommend tender to :lient. )stablish contract programme. UiTM SERI ISKANDAR, PERAK 29 REPORT A - PRE CONTRACT STAGE 4...2 :IAIL A,+ ST%E:TE%AL ),(I,))% :i"il and structural engineers are responsible to design all the structure of the building based on the drawing or layout that been prepared by the architect. The roles of the ci"il and structural engineers are @- .. Inception Stage %ecei"ing :lientBs briefing. 2. #easibility Stage )"aluate structural implications of site options and contribute to cost assessments. repare structural assessment of site and option. Assist in update of %eports to final to enable :lient to agree the Appro"al in rinciple Submission. 1. Cutline roposal Ad"ise on site constrains on structure foundations and site work. Ad"ise on layouts. ro"ide structural engineering information for incorporation into report to include outline of any specific unresol"ed problems and which shall demonstrate that scheme is cost effecti"e. 6. Scheme +esign +efine structural layouts and refine structural layout to accommodate compartmentation and ser"ices <oning. repare designs and co-ordinate with building elements. UiTM SERI ISKANDAR, PERAK 29 REPORT A - PRE CONTRACT STAGE 4. +etail +esign repare detail design and check designs against cost plan. /. roduction Information repare production drawings. =. Bills of *uantity ro"ide design certificate. ro"ide :ertificate of %eadiness to proceed to tender. 9. Tender Action :ontribute to tender list. );amine tenders recei"ed and make recommendations. Agree key dates for the contract. UiTM SERI ISKANDAR, PERAK 29 REPORT A - PRE CONTRACT STAGE 4...1 $):'A,I:AL A,+ )L):T%I:AL ),(I,))% $echanical and electrical engineer is responsible in design and in"ol"ed in electricity works. The roles of mechanical and electrical engineer are@- .. Inception Stage %ecei"ing :lientBs briefing.
2. #easibility Stage ropose strategies and cost implications against options. )"aluate feasibility studies in capital and re"enue terms, collaborate in e"aluation and recommendations. Assist in update of %eports to final agreed from to enable :lient to agree the Appro"al in rinciple Submission. 1. Cutline roposal Appraise site en"ironmental conditions and establish fuel policy. repare site strategy for ser"ice distribution. repare the )ngineering +: drawings. ro"ide structural engineering information for incorporation into report to include outline of any specific unresol"ed problems and which shall demonstrate that scheme is cost effecti"e. UiTM SERI ISKANDAR, PERAK 29 REPORT A - PRE CONTRACT STAGE 6. Scheme +esign repare detail plans in accordance with co-ordination policy. :ontribute to re"ision of cost plan. %efine ma&or plant areas and builder work re!uirements. With ArchitectBs co-ordinate plans including Eser Cutlets and All Terminals and si<e of ma&or elementsG prepare detail design for specific areas. 4. +etail +esign repare detail design and check designs against cost plan. /. roduction Information repare builderBs work detail input to cost checks. Ad"ise on contract conditions rele"ant to )ngineering work. #inali<e specification schedule. =. Bills of *uantity ro"ide design certificate. ro"ide :ertificate of %eadiness to proceed to tender. 9. Tender Action :ontribute to tender list. );amine tenders recei"ed and make recommendations. Agree key dates for the contract. UiTM SERI ISKANDAR, PERAK 29 REPORT A - PRE CONTRACT STAGE 4...6 *EA,TITH SE%A)HC% The principle task of *uantity Sur"eyor is to ad"ise on financial matters concerning the pro&ect and to achie"e "alue for money in the construction of the building. Also known as :ost :onsultant of the Building Industry, below is the scope of work done by *uantity Sur"eyor according to the construction stages. .. Inception Stage %esponsible in determining the method of finance for the pro&ect and clientBs financial standing. 2. #easibility Stage reparing feasibility report and setting a cost limit for the pro&ect. 1. Cutline roposal reparing gross cost plan according to the building elements. 6. Scheme +esign reparing detail cost plan according to each indi"idual element. 4. +etail +esign :arry out :ost check by comparing detailed cost plan with scheme design plan. UiTM SERI ISKANDAR, PERAK 29 REPORT A - PRE CONTRACT STAGE /. roduction Information :ost check will be continuously carried out especially if there is latest re!uirement. =. Bills of *uantity reparing Bill of *uantities and pre-tender estimates. 9. Tender Action :ontribute to tender list. );amine tenders recei"ed and make recommendations and ad"ised on contractor selection. UiTM SERI ISKANDAR, PERAK 29 REPORT A - PRE CONTRACT STAGE 6.0 PRE CONTRACT ESTIMATE The cost estimate is for the pro&ect entitle roposed a +ouble Storey Bungalow 'ouse at ,o../, 0alan Beranang 12345a, Seksyen 12, Bukit %imau 676/7 Shah Alam, Selangor +arul )hsan for )ncik 'asnol bin Ibrahim dan uan ,ik Bainura binti ,ik 0aafar used the @- i. reliminary estimate ii. )lemental :ost Analysis >):A? iii. re tender estimates 6.1 PRELIMINAR" COST ESTIMATE At this stage client will briefly tells the architect the criteria of the building and type of the building that he wants to construct. In this pro&ect, architect will draw the floor area drawings or perspecti"e drawings to the *S. *S will prepare preliminary cost estimate by using gross floor area>(#A? method. The purposes of the preliminary cost estimate@- o To show the total in"ol"ed for the pro&ect to the client on paper o To find out the o"erall cost for the proposed pro&ect o To show the element cost breakdown of the pro&ect o To show the profit that the client will get after the construction The method that used in preliminaries estimate is@- 6.1.1 G()** F+))( A(,- .GFA/ M,01)2 This method is easy for the client to understand. The !uantity sur"eyor likes this method because it is easy to get the cost data from the past pro&ect. :alculating the gross floor area does this method. This gross floor area then multiply with the cost per s!uare meter. UiTM SERI ISKANDAR, PERAK 29 REPORT A - PRE CONTRACT STAGE 6.2 ELEMENTAL COST ANAL"SIS .ECA/ After the client agrees in stage preliminary cost estimate, architect will draw the drawings in more detail for *S to estimate base on architect drawings. The drawings does not detail as pre-tender estimate. *S can make assumption on the estimate that not gi"en based on the similar past pro&ect. *s Will use )lemental :ost Analysis method to get the figure. This method is much better than any method because client will get to know the )lemental :ost Analysis. This easy to the client to prepare the pro&ect cost because client can see !uantity in more detail In this stage, *S also can gi"e ad"ice to the client about the material that use in this construction so that the cost for the pro&ect is reliable to the design and "alue for the client. 6.3 PRE TENDER ESTIMATES After the client agrees with the preliminaries cost estimate and )lemental :ost Analysis >):A? stage, *S will proceed the decision from pre"ious stages to pre-tender estimate stage. In this stage, the architect must pro"ide the specific and detail drawings for the *uantity Sur"eyor to prepare the Bills of *uantities >B*? and Tender +ocument After the Tender +ocument has been done, the in"itation to tendering started. *S also will fulfill the document tender sum after they fulfill the document tender and submit back to the *S. After the *S will make a tender report base on the tender documents that ha"e been submitted back by the contractors. *S Will suggest the best contractor to the client for this pro&ect. It depends to the client to choose the contractor for the pro&ect UiTM SERI ISKANDAR, PERAK 29 REPORT A - PRE CONTRACT STAGE .0 PREPARATION OF TENDER DOCUMENT .1 INTRODUCTION Tender document is a document that has to be prepared by *S for the contractor to fulfill it when tender process is going on. Tender document gi"e the information about the propose pro&ect such as location, title of pro&ect, specification, bills of !uantities, drawing and others information according to the pro&ect. *uantity sur"eyor has to make a report when choosing the best contractor that will handle the propose pro&ects base on the tender document before. Tender document is the process of offer and acceptance between the client and contractors. :ontractors will complete to offering the best price to the client to get the proposed pro&ect. .2 TENDER DOCUMENT RE3UIREMENT Tender document ha"e to fulfill all basic necessity re!uirement below@- i. The tender document must be fair to the both parties between the client and the contractor ii. %e!uirement in the tender document ha"e to follow the go"ernment policies and go"ernment appro"al iii. All works and goods to be proceeding must gi"e the proper definition and specification. Tender document must not ha"e any argument or uncertainty i". All re!uirement in the tender document are the basic of the contract which has to be proceeding by the contractor UiTM SERI ISKANDAR, PERAK 29 REPORT A - PRE CONTRACT STAGE .3 PURPOSE OF PREPARING THE TENDER DOCUMENT 4. Information about the client re!uest 44. To tell about the contractorBs !ualification to in"ol"e in the pro&ect 444. )asy for the client to choose the right contractor to handle the pro&ect 45. To in"ite the contractor to gi"e their price for the propose pro&ect and complete with other contractor to get and handle the propose pro&ect 5. To tell about the contractorBs !ualification to in"ol"e in the pro&ect 54. *S will use tender document as their reference during the construction 544. To tell the contractor all information according to the purpose pro&ect .4 POLICIES IN THE TENDER DOCUMENT i. Balance between time, physical problems and risk ii. Time taken to prepare the document must take !uite some time in order to ensure that the information gi"en is completed and low risk is put on the shoulder of the client iii. The *uantity Sur"eyor must choose the appropriate contract for the client and condition of contract that li"e up to their needs are made i". :ontents of tender document must be fair to both parties UiTM SERI ISKANDAR, PERAK 29 REPORT A - PRE CONTRACT STAGE .5 PREPARATION OF TENDER DOCUMENT There are few stages in the preparation of tender document. $iT( (roup Sdn Bhd is produce the tender document based on the clientBs re!uest. This tender document used for search and select the contractor for this pro&ect. 2 month has taken the time for complete this tender document begin from .4 T' September 2779 >$onday? and this tender document complete and a"ailable to tenderer on .5 th ,o"ember 2779 >Wednesday?. They are stages in preparing the tender document@- i. %ecei"ing the drawing ii. Taking off by element iii. +ouble check i". )diting ". +raft printing "i. $aster printing .5.1 R,6,45478 01, 2(-9478 *uantity Sur"eyor get the drawing from the architect or the engineer that ha"e been prepared by them. *S will study the drawing before going on the ne;t stage. *S will inform the Architect or )ngineer if there are any mistake. The Architect or engineer will re-do any mistake and produce the new drawings to the *S. UiTM SERI ISKANDAR, PERAK 29 REPORT A - PRE CONTRACT STAGE .5.2 T-:478 );; <= ,+,>,70 After studying the drawing, *S will take off element by element. In this pro&ect = staff and 1 practical students are in"ol"ed in this taking of. All the !uantity that has been taking off will be transferred into the Bills of *uantities >B*?. Bills of *uantities will stated into the tender document. .5.3 D)?<+, 61,6: *uantity Sur"eyor will double check the taking off to a"oid any mistake .5.4 E240478 After double checking, *uantity Sur"eyor will correct all mistakes that ha"e been done. This is to make sure that tender document does not ha"e any mistake. .5.5 D(-;0 @(470478 The first stage of printing is draft printing. Besides that, this stage is to ensure that the document is complete. *S will check the draft printing is correct before the master printing. .5.6 M-*0,( @(470478 After all stages ha"e done, final printing will be done. $IT( (roup Sdn Bhd are prepared = copies the document tender for this pro&ect based on the clientBs re!uest. UiTM SERI ISKANDAR, PERAK 29 REPORT A - PRE CONTRACT STAGE .5. F)(> ); T,72,( The form of tender is important for the tenderers. #or those contractors who want to enter the tender, they must fill up the form with contractorBs name, address and total amount of the tender as a main !ualification to get the propose pro&ect. The contractors must sign and seal with company seal. If the contractor failed to do so, the tender document in in"alid. .5.! I7*0(?604)7 0) T,72,(,( Instruction to tenderer is general instruction to all contractors about the tender re!uirement such as tender documentation fess, "isit to site and en!uiries, where to buy and submit the tender document. Instruction to tenderer is a guideline to the contractor on how to fill the form of tender. >);ample for instruction to tenderer attach at appendi;?. .5.# GENERAL SUMMAR" OF TENDER All prices in e"ery item from the bill of !uantities ha"e to be transferred to the final summary. The name of tenderer, the address of tenderer, name of witness with address ha"e to be fill by the contractor. .6.1 P(,-><+,* 0) A++ T(-2,* Trade preambles are a description according to all works that ha"e to be done in the purpose pro&ect. The contractor is not to price these trade preambles but to include any sum he considers, necessary in complying with such clauses in the "arious unit rates. >);ample for reambles to All Trades attach at appendi;?. UiTM SERI ISKANDAR, PERAK 29 REPORT A - PRE CONTRACT STAGE .6.2 S@,64;46-04)7* Specifications in tender document will show how should be done, material that will use in construction and etc. it is important to the contractor to follow the specifications during the construction. *S will refer to the specifications when dispute happen. Specifications will be a part of tender and contract document. >);ample for Specifications attach at appendi;? .6.3 A@@,7246,* 4./.=.. List of +rawing All drawing number has to be list under the list of drawing in appendi; 4./.=.2 Schedule of +ay work %ates The schedule of day work rates is pro"ided for the "aluation of works e;ecuted on a day work basic pursuant to the :ondition of :ontract. ,o works shall be carried out as day work e;cept on the instruction of the Architect or S.C 4./.=.1 rices of Basic $aterials :ontractor must put price for the basic material for construction like prices for concrete, reinforcement bar and etc. 4./.=.6 articular of Workers :ontractors must put in the worker profile in tender document. This is important for support the company profile. UiTM SERI ISKANDAR, PERAK 29 REPORT A - PRE CONTRACT STAGE 4./.=.4 #orm for :ontractor Background :ontractors must put in the companyBs background profile in tender document. This is important for *S to make a tender report base on the e;perience, suppliers for main materials, letter of reference from bank, financial statement for the last 1 months. 4./.=./ List of Aendor Anti Termite :ontractor must follow the client re!uest and accept the supplier chosen by the client. UiTM SERI ISKANDAR, PERAK 29 REPORT A - PRE CONTRACT STAGE !. 0 TENDER REPORT This tender report is based on submissions recei"ed from tenderers with regards to the roposed a +ouble Storey Bungalow 'ouse at ,o../, 0alan Beranang 12345a, Seksyen 12, Bukit %imau 676/7 Shah Alam, Selangor +arul )hsan for )ncik 'asnol bin Ibrahim dan uan ,ik Bainura binti ,ik 0aafar. !.1 T"PE OF TENDER The tender was based on Tender by In"itation3 Selecti"e Tendering from ArchitectBs appro"ed list. !.2 NO OF TENDER The documents were made a"ailable to tenderers commencing 25th 0anuary 27.7. Three >1? tenderers were responded to the tender document. All tenderers were re!uired to submit their tenders on the not later than .2 noon on .2th #ebruary 27.7 at the office of@- 'ASA Arkitek Sdn. Bhd. Cffice, .9-., 0alan Cpera L E232, Taman TT+I 0aya, 67.47 Shah Alam, Selangor +arul )hsan. :od e Tenderer Tender Sum >%$? osition - $IT( (roup Sdn Bhd. %$ .,765,5.2.== - 231 Imbang %akan Sdn. Bhd. %$ .,2=6,427.69 . 131 Alaf intar Sdn. Bhd. %$ .,126,45/.74 2 .31 ,oblehouse +esigner 'ome Sdn. Bhd. %$ .,6=6,.1/.77 1 UiTM SERI ISKANDAR, PERAK 29 REPORT A - PRE CONTRACT STAGE !.3 TENDER ANAL"SIS Arithmetical checks were carried out on all tenders. )rrors were found in two >2? of the tenders. The errors were due to mistakes in multiplying, addition and transfer. The errors subse!uently change the tendererBs position. The tenders, the corrected tender sum and their re"ised position are depicted below. :ode Tenderer Criginal Tender Sum > %$ ? Criginal osition :orrected Tender Sum > %$ ? Arithmetical :heck %e"ise d ositio n )rror >%$? I 231 Imbang %akan Sdn. Bhd. .,2=6,427.69 . - - - . 131 Alaf intar Sdn. Bhd. .,126,45/.74 2 .,126,46/.74 -47.77 -7.771I 2 .31 ,oblehouse +esigner 'ome Sdn. Bhd. .,6=6,.1/.77 1 .,664,/1/.77 -29,477.77 -..5=I 1 :orrected Tender Sum due to Arithmetical )rror The Tendered Sum shall be the basis of acceptance of tender and not the :orrected Total. Any error found, shall be rationali<ed prior to signing of :ontract. UiTM SERI ISKANDAR, PERAK 29 REPORT A - PRE CONTRACT STAGE !.4 ANAL"SIS AND EAALUATION OF TENDERS The tenders were e"aluated based on the financial or commercial proposal only. Since the tender was based on selecti"e tendering, tenderers selected were deemed to be capable in carrying out the proposed work to warrant in"itation. 'ence, $IT( (roup Sdn Bhd did not analyse the tendererBs capabilities in terms of e;perience and resources. The criteria of the e"aluation in descending order of importance are as follows@ i. Tender documents duly filled in and a formal offer made >Sufficiency of Tenders submitted?. ii. :ompetiti"eness and reasonableness of tender. iii. ricing all sections of the tender documents and Bills of *uantities. All tender documents are checked to ensure that tenderers had made "alid and proper offers. A full checklist3analysis is gi"en in the following appendices@ Appendi; A - Breakdown of Tender by Section Appendi; B - Breakdown of Building Works per Enit Appendi; : - )lemental :ost Breakdown for Building Works Appendi; + - :omparison of $a&or %ates )"aluation was based on comparati"e analysis between our re-Tender estimate and the TendererBs submission. UiTM SERI ISKANDAR, PERAK 29 REPORT A - PRE CONTRACT STAGE !.5 COMMENTS ON THE SUBMISSION 9.4.. Tenderer /3/ J 0ALL:C, >$? S+,. B'+. The tenderer made a "alid and proper offer and complied with all ma&or tender re!uirements. The tenderer submitted a complete tender. The tenderer 0ALL:C, >$? S+,. B'+ submitted the lowest offer and the arithmetical error are not found. The tendererBs o"erall offer is within the acceptable margin of .7I +escription Tenderer >%$? *s )stimate +ifference with estimate ercentage +ifference I Tenderer >%$? reliminaries .,47.,295..6 .,66=,777.77 46,295..6 1.=4 I .,47.,295..6 Building Works 26,629,417.55 22,195,79/./7 2,715,666.15 5... I 26,629,417.55 $echanical and )lectrical Works 4,=75,69..77 6,=1.,777.77 5=9,69..77 27./9 I 4,=75,69..77 );ternal Infrastructure .,/42,/7/.47 .,4/5,1/1.47 91,261.77 4.17 I .,/42,/7/.47 Street Lighting and Telephone 211,2=6.97 269,9.4.77 -.4,467.27 -/.24 I 211,2=6.97 Tender Sum 11,2=7,777.77 17,=99,==...2 2,69.,229.99 9.7/ I 11,2=7,777.77 9.7/I higher than the $IT( (%CE Sdn Bhd estimate. The pricing for reliminaries is generally acceptable 1.=4I higher than the *S estimate. The total building works is higher, 5...I higher than the *S estimate. The cost per m2 (#A for type A2a >main unit? is %$.=2.74 is higher than the *S estimate which is %$.65.46. The rates for Infrastructure Works is higher, 4.17I higher than the )ngineer estimate. The rates3pricing for );ternal Telephone Infra and Street Lighting Ser"ice /.24I lower than the )ngineer estimate. The pricing for $echanical and )lectrical works is 27./9I higher than the :onsultant estimate. 9.4.2 Tenderer 23/ J AI$A :C,ST%E:TIC, S+,. B'+. UiTM SERI ISKANDAR, PERAK Tender Sum >%$? :orrected Tender Sum >%$? )rror Criginal osition %e"ised osition 11,2=7,777.77 - - . 2 29 REPORT A - PRE CONTRACT STAGE The tenderer made a "alid and proper offer and complied with all ma&or tender re!uirements. The Tenderer submitted the second lowest offer and the arithmetical error found is small. +ue to the error, this tender will be the lowest bid recei"ed after correction. The tendererBs o"erall offer is within the acceptable margin of K3- .7I, i.e. 9.7=I higher than the *S estimate. The pricing for reliminaries is generally lower i.e. -17..=I lower than the *S estimate. +escription Tenderer >%$? *s )stimate +ifference with estimate ercentage +ifference I reliminaries .,7.7,477..6 .,66=,777.77 61/,477.77 -17..= I Building Works 22,45.,92..44 22,195,79/./7 272,=16.54 7.5. I $echanical and )lectrical Works =,./.,6//.77 6,=1.,777.77 2,617,6//.77 4..1= I );ternal Infrastructure 2,..4,9./..7 .,4/5,1/1.47 46/,642./7 16.92 I Street Lighting and Telephone 226,29/.77 269,9.4.77 -26,425.27 -5.9/ I Tender Sum 11,2=1,2.=.24 17,=99,==...2 2,696,66/..1 9.7= I The total building works is reasonable, 7.5.I higher than the *S estimate. The cost per m2 (#A for type A2a >main unit? is %$.4=.7. is higher than the *S estimate which is %$.65.46. The rates3pricing for Infrastructure Works are higher, 16.92I higher than the )ngineer estimate. The rates3pricing for );ternal Telephone Infra and Street Lighting Ser"ice 5.9/I lower than the )ngineer estimate. The pricing for $echanical and )lectrical works is "ery high, 4..1=I higher than the :onsultant estimate. 9.4.1 Tenderer 63/ J S%I $A,SA,( S+,. B'+ Tender Sum :orrected Tender Sum >%$? )rror Criginal %e"ised UiTM SERI ISKANDAR, PERAK Tender Sum >%$? :orrected Tender Sum >%$? )rror Criginal osition %e"ised osition 11,2=1,2.=.24 11,26/,61/./4 -2/,=97./7 >7.79I? 2 . 29 REPORT A - PRE CONTRACT STAGE >%$? osition osition 11,/57,777.77 - - 1 1 The tenderer made a "alid and proper offer and complied with all ma&or tender re!uirements. The tendererBs o"erall offer is within the acceptable margin of 5.62I higher than the *S estimate +escription Tenderer >%$? *s )stimate +ifference with estimate ercentage +ifference I reliminaries .,47/,91..49 .,66=,777.77 45,91..49 6..1 I Building Works 26,657,597.72 22,195,79/./7 2,.7.,951.62 5.15 I $echanical and )lectrical Works 4,=25,66/.77 6,=1.,777.77 559,66/.77 2...7 I );ternal Infrastructure .,//4,1.2.27 .,4/5,1/1.47 54,569.=7 /... I Street Lighting and Telephone 214,/1..77 269,9.4.77 -.1,.96.77 -4.17 I Tender Sum 11,/57,777.77 17,=99,==...2 2,57.,229.99 5.62 I The pricing for reliminaries is generally acceptable 6..1I higher than the *S estimate. The total building works is acceptable 5.15I higher than the *S estimate. The cost per m2 (#A for type A2a >main unit? is %$.=2.4. is higher than the *S estimate which is %$.65.46. The rates3pricing for Infrastructure Works is higher, /...I higher than the )ngineer estimate. The rates for );ternal Telephone Infra and Street Lighting Ser"ice 4.17I lower than the )ngineer estimate. The pricing for $echanical and )lectrical works is higher, 2...7I higher than the :onsultant estimate. !.6 OBSERAATIONS AND RECOMMENDATIONS UiTM SERI ISKANDAR, PERAK 29 REPORT A - PRE CONTRACT STAGE #or the phase 09A, $IT( (%CE Sdn Bhd propose the following three >1? options to be taken@ Cption . $IT( (%CE Sdn Bhd recommend to re-tender this phase because from our obser"ation, the contractor pricing for building works were not based on market price which we belie"e due of the following reasons@- i. The contractors speculate that the price of basic material would increase again in the ne;t 4 or / months which will coincide with work being done on site. ii. Speculati"e buying of ma&or item such as reinforcement bar. We strongly belie"e that the contractor has made forward order at a premium price in anticipation of the price going higher whereas in actual fact the price is lower at the current point of time. Cption 2 $IT( (%CE Sdn Bhd recommend for +ekon Sdn. Bhd to be gi"en the opportunities to price for this phase because@ i. Their price for phase 09B is fair, reasonable and competiti"e tender. ii. It is the lowest among the tenderers for the building works. iii. If the same 09B pricing for $ D ) and infrastructure are to be applied to 09A, we belie"e they will also be the lowest tender for this phase. Cption 1 If the abo"e options are not "iable, $IT( (%CE Sdn Bhd recommend for Aima :onstruction Sdn. Bhd to be called for an inter"iew to e;plain their pricing for $ D ) and infrastructure work which are high and they should be allowed to re-!uote these packages to reduce o"erall price. #.0 T"PE OF CONTRACT UiTM SERI ISKANDAR, PERAK 29 REPORT A - PRE CONTRACT STAGE In the construction, the contract is used as references between these parties if the are misunderstanding happen between them. The contract wills "alid if these two parties ha"e sign. ,ormally the client and contractor are the one who in"ol"ed in this agreement #.1 T"PE OF CONTRACT USED The contract that used by the client for this pro&ect is A$ :ontract 2771>with !uantities?. This type of contract is for the pro&ects that use !uantity and price to get the amount for the contract sum. The bills of *uantities in the contract will be come an agreement between client and contractor Se"eral factors why client choose to use this type of contract@- i. :lient can know the contract sum of the pro&ect in more detail ii. :lient also knows the price each element in the tender document iii. Suitable for the short and long construction period i". )asy for the *S to make an estimate when "ariation order is happen ". )asy the contractor and client to sol"e a problem when disputes happen "i. The contract document is more detail in many aspects "ii. Become a guideline to *S when the constructions ha"e any problems 10.0 MAIN PROBLEMS ENCOUNTERED IN PRE- CONTRACT STAGE UiTM SERI ISKANDAR, PERAK 29 REPORT A - PRE CONTRACT STAGE The pre contract stage is "ery important in construction industry. roblems that *S is facing in this stage would make the pre contract process running slower. #or this pro&ect, many problem encountered in pre contract stage 10.1 PREPARATION FOR PRELIMINAR" ESTIMATE B FEASIBILIT" STUD" In the early stage, *S has to prepare preliminary estimate and feasibility study report to pro"ide some indication of prior to construction. This report shall be re"ised once all drawings from other consultant are made a"ailable for more accurate costing and return for the purposed pro&ect. *S must prepare this report until client is satisfied with the proposal. This will take a lot of time to prepare this preliminary estimate and feasibility study 10.2 PREPARATION OF BILL OF 3UANTITIES .B3/ *S will face the problems in preparation of *B when they had the changes occur according to the clientBs needs. Therefore, *S must remeasure once again to get the new !uantity. This situation will make the preparation of tender documents become slower and late. 10.3 INSUFFICIENT INFORMATION IN DRAWINGS Insufficient information in drawings is one of problem that *S must face off. *S will not be able to taking off properly. *S must wait the information from the architect or engineer 10.4 DIFFERENCES IN DRAWINGS In some case, there is deference between the Architect and the )ngineer drawing. #or e;ample the architecture drawing is not related to the structural drawings. So the problems to the *S when make a taking off 10.5 PREPARATION OF TENDER DOCUMENT UiTM SERI ISKANDAR, PERAK 29 REPORT A - PRE CONTRACT STAGE Cne of the big problems faces by the *S in is when preparing the document tender. *uite often the *S ha"e other work on other pro&ect to do. Besides taking off work need se"eral numbers of people and cannot be done by only one person. And the abo"e factors make the *S take a lot of time to complete their work. #or this pro&ect, preparation of tender document taken the 2 month to complete. This is because many problems is happen 10.6 PREPARATION OF TENDER REPORT +uring the tender e"aluation process, too much arithmetical checking had been made and makes the process to prepare the tender report slower 11.0 STUDENT ANAL"SIS UiTM SERI ISKANDAR, PERAK 29 REPORT A - PRE CONTRACT STAGE As a student in +iploma *uantity Sur"eyor, after complete the pre-contract stage report, there are se"eral information that I get from my analysis. Analysis was made to this stages and analysis are@- 11.1 TEAMWORK$S +uring the pre-contract stage, all consultants sit together and discuss the @?(@)*, pro&ect. The information from this discussion will help to produce a good !uality of document tender. )ach one consultant has own task in this pro&ect and to make this propose pro&ect became smoother by work as teamwork. Teamwork also can pre"ent any dispute in the future in this purpose pro&ect 11.2 PROFESSIONALISM As a *uantity Sur"eyor, there are many tasks in the pre-contract stage. #rom the inspection until the preparation of contract document, *S has to work hard to make this document in good !uality for the client. In the pre-contract stage, the main task for *S in construction industry is to manage the financial of the client during the construction to make sure the work does not e;ceed the cost of propose pro&ect 11.3 TIME MANAGEMENT In the pre contract stage, the time management is "ery important. This is to make the propose pro&ect can be constructed as soon as possible without neglecting the !uality of work. It has to be planned well in other to sa"e cost in early pre contract stage. $ost of the pre"ious pro&ect failed to meet an agreement due to dispute between the consultants. Thus, it takes a long time in pre contract stage before it goes to the post contract stage 12.0 CONCLUSION UiTM SERI ISKANDAR, PERAK 29 REPORT A - PRE CONTRACT STAGE The pre-contract stage is a critical stage and important in the construction pro&ect where all the parties in"ol"ed ha"e to contribute their roles and fully responsibilities. This is to ensure that the pro&ect can run smoothly and complete in time. Interaction among the parties in this stage is the answer to this pro&ect either it will success or not. The difficulty with all the method used is in the selection of the appropriate rate to be applied. :onsiderable e;pertise on the pro&ect concerned is therefore desirable to obtain consistently reliable results. The ad"antage of using any of the methods in order to obtain an estimate of e;pected cost is speed of the process. UiTM SERI ISKANDAR, PERAK