This document outlines the tasks, locations, and contractors for two infrastructure projects in Indonesia. The first project involves constructing drainage in Kendari City, South Sulawesi and lists the types and quantities of drainage components to be installed. The second project involves building a water distribution network in Konawe Selatan Regency and provides details of the work items, including excavation, pipe installation, and construction of pump houses. It also lists the supervising consultants, contractor, and representatives from the provincial public works department that will oversee the projects.
This document outlines the tasks, locations, and contractors for two infrastructure projects in Indonesia. The first project involves constructing drainage in Kendari City, South Sulawesi and lists the types and quantities of drainage components to be installed. The second project involves building a water distribution network in Konawe Selatan Regency and provides details of the work items, including excavation, pipe installation, and construction of pump houses. It also lists the supervising consultants, contractor, and representatives from the provincial public works department that will oversee the projects.
This document outlines the tasks, locations, and contractors for two infrastructure projects in Indonesia. The first project involves constructing drainage in Kendari City, South Sulawesi and lists the types and quantities of drainage components to be installed. The second project involves building a water distribution network in Konawe Selatan Regency and provides details of the work items, including excavation, pipe installation, and construction of pump houses. It also lists the supervising consultants, contractor, and representatives from the provincial public works department that will oversee the projects.
Kontraktor Pelaksana : SITE DRAINASE BACKUP DATA Pembuatan Drainase Jl. Mekar Indah Lr II, Kel. Kadia, Kec. Kadia, Kota Kendari Type A Type B Type C Type D Type E Type F Type G Type H Type I Type J Type K Type L Type a Type b Pekerjaan : Lokasi : Kab, Konawe Selatan Kontraktor Pelaksana : CV. PELITA KONSEL I. PEKERJAAN PERSIAPAN 1. Pembersihan Site = 2. Administrasi, Dokumen, P3K = 3. Bangsal Kerja = 4. Papan Proyek = II. PEMBUATAN TOWER 1.. Pek. Galian Tanah V = x x = x x = x bh = x Unit = 2. Pek. Urugan Tanah Kembali V = x V galian = x = 3. Pek. Timbunan Pasir Alas Rabat V = x x = x x = x bh = x Unit = 4. Pek. Timbunan Tanah V = x x = x x = x bh = x Unit = 5. Plat Poor Beton Bertulang V = x x = x x = x bh = x Unit = 6. Pek. Kolom Beton Bertulang V = x x = x x = x bh = x Unit = 1.00 Ls 1.00 Ls 1.00 Ls 1.00 Ls 0.10 0.15 1.21 2.56 M3 BACKUP DATA Pembangunan Jaringa Air Minum Derah Rawan Air Tersebar Kab. Konsel 0.80 0.80 0.20 0.13 4.00 0.71 M3 36.73 P L T 1.21 1.21 1.02 M3 5.00 57.97 P L T 1.21 1.21 1.02 1.48 0.25 1.21 0.49 P 2.83 14.15 M3 L T 0.10 4.00 M3 5.00 4.00 11.59 M3 0.25 57.97 14.49 M3 1.21 0.15 0.33 M3 5.00 1.66 M3 M3 4.00 7.35 M3 5.00 M3 P L T 0.90 P L T 0.30 0.30 0.304 M3 0.51 M3 5.00 M3 0.80 0.15 0.90 0.08 M3 4.00 7. Pek. Sloef Beton Bertulang V = x x = x x = x bh = x Unit = 8. Pek. Rabat Beton V = x x = x x = = x Unit = 9. Pek. Menara V = x 5 Unit = Buah 10. Plesteran V = x 5 Unit = M2 11. Pengad. Bak Air Fiber V = x 5 Unit = Unit 12. Pipa PVC Dia. 25mm V = x 5 Unit = M1 13. Elbow PVC Dia. 40 mm V = x 5 Unit = Buah 14. Elbow PVC Dia. 25mm V = x 5 Unit = M1 15. Tee Stek. Dia. 40mm V = x 5 Unit = Buah 16. Tee Stek Dia. 16s/d 25mm V = x 5 Unit = Buah 17. Stop Kran Dia. 25mm V = x 5 Unit = Buah 18. Stop Kran Dia. 40mm V = x 5 Unit = Buah 19. Pek Tangga Tower V = x 5 Unit = Unit 5.00 2.00 10.00 2.00 10.00 2.00 10.00 4.00 20.00 1.00 1.00 5.00 12.80 64.00 2.00 10.00 30.00 150.00 10.00 50.00 6.00 30.00 3.00 P L T 14.00 0.25 0.25 0.88 M3 1.00 0.88 M3 5.00 4.38 M3 0.90 M3 5.00 4.50 M3 P L T 3.00 2.00 0.15 0.90 M3 Sloef 20/20 20. Pengad. Mesin Pompa V = x 5 Unit = Unit 21. Pengad./Pemas. Sumur Bor V = x 5 Unit = Unit 22. Pengad./Pemas. Pipa Dia. 4", 2,5", 1" V = x 4 5 = Ls 23. Pengad./Pemas. Pipa Jaringan Dist. V = x 5 Unit = M1 III. PEK. RUMAH POMPA 1.Pek. Galian Tanaha V = x x = x x = = x Unit = 2. Pek. Pasangan Bata V = x = x = = x Unit = 3. Pek. Plesteran V = x Pas. Bata = x = 4. Pengad/Pemas. Engsel Kupu-Kupu V = x 5 Unit = Buah 5. Pengad/Pemas. Grendel Kunci V = x 5 Unit = Buah 6. Pengad/Pemas. Plat Penutup V = x 5 Unit = Kg 7. Pek. Pembersihan Akhir V = Ls Mengetahui Konsultan Pengawas Kontraktor Pelaksana Pengawas Lapangan CV. KAISON KONSULTAN CV. PELITA KONSE DINAS PU PROV. SULTRA ASRUL AMRAD A.Md Ir. Bashri AL MIUN Nip. 19801124 201001 1 010 Koordinator Pengawas Direktur 1.00 1.00 5.00 1.00 5.00 1.00 4.00 31.00 155.00 1.00 5.00 64.80 324.00 P 0.80 4.00 2.00 10.00 2.00 2.00 7.00 14.00 M3 1.40 M3 1.40 M3 5.00 7.00 M3 L T 4.00 0.20 0.20 0.16 M3 0.16 M3 5.00 M3 P L 0.35