Checklist for Sample Distribution Board Status Remarks


After approval the materials of switch gear Contractor
must submit sample for final approval. Contractor
should be notified by the following:
1.
Ensure that IP rating as per the approved submittal
and color of enclosure should be approved by
Architect Engineer.
2. ype of hinge should be metallic.
!. Identification with ferrules for all wiring inside "#.
$.
Identification engraved label below %C# brea&ers
and %ain incomer' E(C#' Contractor timer' relay )
etc.
*.
All internal wiring should be si+ed according to
brea&ers rating and bear the 1,*-C.
..
Crimping for wires should be done properly for above
.mm wires and above.
/.
All components for "# from single manufacturer
according to 0pecification and approval of submittal
materials.
1.
0hort circuit rating of brea&er should be 1, &A as per
approved drawings and specification.
2.
0topper in both end of rows and blan& cover for all
space between brea&ers.
1,.
34 relay for all A5C e6uipment refer to Authority
re6uirement if 7window A5C or split unit5duct8 is
available.
11. (oad schedule to be included and fi9ed on the door.
12.
#e sure that the load between phases are balanced
before our approval on submittal.
1!.
:asher for all screw to be provided on the internal
cover of enclosure.
1$.
(evel of the pro;ection for brea&er and contactor
should be e6ual with %C#5E(C#.
1*.
Particular E(C# section with brea&er to be in one
row.
1.. <eutral bar should be separate for each section.
1 N.N. Group 4 (Updated as of 9 June 2011)
1/.
%inimum 2 nos. earth bars to be provided for each
"# and connected to the body.
11.
=ating of all brea&ers should as per approved load
schedule' ta&ing in consideration approved actual
mechanical load for >.C.3.5:.?.5coo&er5 and any
other appliances.
12.
#efore the approval of service "#s' ta&e in
consideration the mode of operation of the light in
service areas 7it will wor& though timer' Contractor
) etc.8 to provide the necessary' re6uirements inside
the "#s.
2,.
>or all services "#' wiring diagram should be inside
"# clearing all in and out wires' timer' contactor'
over ride switch ) etc.
21.
%a&e sure that the curves connected between incomer
7isolator8 of "# and other section are si+ed according
to the rating of the incomer and connected to the
sectors as the following:
a. 0hould be through the E(C# if the section has
more than one %C#.
b. 0hould be through the %C# if the section has
only one %C# and E(C#.
22.
All space bus bar for future brea&ers should be
protected by attention danger ferrules.
@ <umber of holes for circuit conduit should be
e6uals the number of circuits 7used circuits' spare and
space8 approved load schedule.
%ain Contractor %EP Contractor
<ame: <ame:
0ignature: 0ignature: