SULTANATE OF OMAN

MINISTRY OF TRANSPORT AND COMMUNICATIONS


Directorate General of Roads and Land Transport



Construction of Batinah Expressway Package 7

Part A: Link Roads 2, 4, 4A and Interchange No. 2 at
Batinah Expressway
Part B: Design and Construction of Interchange Nos. 4, 4A
& 5 on Batinah Highway




TENDER DOCUMENT

VOLUME 3 of 4


BILL OF QUANTITIES





Consulting Engineers:
PARSONS International & Company LLC
PO Box : 1151
Al Khuwair, Muscat
Sultanate of Oman

2 J une 2014

Construction of Batinah Expressway Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah
Highway



TENDER DOCUMENTS

INDEX



Volume 1 of 4: Prime Document
Part 1 Technical
Part 2 Financial (To be returned in the envelope with the
Tender)

Volume 2 of 4: Special Specification


Volume 3 of 4: Bill of Quantities (To be returned in the envelope with the
Tender)


Book 1 of 3
Volume 4 of 4: Tender Drawings Part A
Book 2 of 3

Part B Book 3 of 3
Page 1

BILL OF QUANTITIES

TABLE OF CONTENT

Preamble to Bill of Quantities 1 -1

Bill DESCRIPTION PAGES
No.
1 Preliminaries 1/1 to 1/7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway

2 Earthworks 2/1 to 2/6
3 Granular Sub Base, Aggregate Base Course and 3/1
Stabilized Base Courses
4 Bituminous Pavement 4/1
5 Concrete and Concrete Structures 5/1 to 5/13
6 Incidental Construction 6/1 to 6/16
7 Road Lighting and Electrical Installation 7/1 to 7/10
9 Utilities 9/1 to 9/28
11 Day works 11/1 to 11/13
Grand Summary - 1 GS-1
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway

2a Earthworks 2a/1 to 2a/6
3a Granular Sub Base, Aggregate Base Course and 3a/1
Stabilized Base Courses
4a Bituminous Pavement 4a/3
5a Concrete and Concrete Structures 5a/1 to 5a/13
6a Incidental Construction 6a/1 to 6a/18
7a Road Lighting and Electrical Installation 7a/1 to 7a/17
9a Utilities 9a/1 to 9a/23
10a Provisional Sum 10a/1
11a Day works 11a/1 to 11a/13
Grand Summary - 2 GS-2
General Summary GS-I
Construction of Batinah Expressway Package 7
Preamble to The Bill of Quantities
1
Add the following to the 20.1.2 Quantities

f) Amendment shall not be made to these Bills of Quantities without the authority, in
writing, of the Tender Board during the tender stage.

g) The Contractor is to ensure that identical items occurring in separate bills are not priced
at different rates unless this is the Contractors deliberate intention.

h) The prices and rates entered by the Contractor against items in the Bills of Quantities
shall apply throughout the duration of the Contract to the execution of these items in
any location and, except where otherwise provided for, to any additional work ordered
by the Engineer and/or the Employer.

i) A price or rate is to be entered against each item in the Bills of Quantities and the Day
work Schedules and any item left unpriced will be deemed to be included for elsewhere
in the Bills of Quantities for the Day work Schedules and hence the rate for that item will
be taken as NIL.

j) According to the General Conditions of Contract the Engineer may, if in his opinion it is
necessary or desirable, order in writing that any additional or substituted work shall be
executed on a day work basis. The Contractor shall be paid for such work at the rates
entered by him in this list. The rates entered herein shall include and be considered
compensation for the costs incurred for organization of work, overheads, profits, taxes,
royalties, fees, payment to third parties for land or the use of land, or for damage to
property, incidentals, haulage, tools and all other costs necessary for the performance
of the work on a day work basis.

k) Rates quoted under Day Works Schedule would not be used for evaluating cost of any
item of works not listed in the BOQ. The price payable for any new item of work
instructed to be executed shall be reasonable and appropriate and shall be calculated
on the following lines as may be applicable:
(a) Price of comparable item in the Contract
(b) Price quoted for similar works on other contracts
(c) Price based upon Rate Analysis utilizing actual cost of materials, labour and
equipment plus the profit margin
(d) Based upon quotation from qualified sub-contractors in case the work is of such a
nature that a sub-contractor has to be engaged plus the tendered margin.
(e) Based upon rates approved for nominated sub-contractor plus the tendered margin
Rates quoted under Day Works Schedule is meant to be utilized for executing an
activity of incidental nature and which is not susceptible to measurement. Amount
payable for works of such nature would be on the basis of hours actually worked. And
idle time or time for transportation of labour or equipment is not payable.

Add the following to the 20.1.3 Descriptions

e) xxiv) Damage to the surrounding properties by Contractors plant.

1/1 .
Construction of Batinah Expressway - Package 7
Page No.
BILL OF QUANTITIES
PRELIMINARIES (For Part A+ Part B) Bill No. 1

(in figures) (in words) R.O. Bzs.
1 PRELIMINARIES
CONDITIONS OF CONTRACT
The Contractor is deemed to have carefully studied
and understood and taken into account the provisions
and requirements of the General and Particular
Conditions of Contract. The rates and prices stated in
the Bill of Quantities shall include for all costs of
compliance with the Conditions except for the costs
Item No. Item Description Unit
Estimated
Quantity
Unit Rate (Rial Omani) Amount
p p
of the items given in this Section 1 and for which a
separate amount is stated herein.
1 General
1.3 Project Site
1.3.5(i)a Soil Investigation and report LS
1.3.5(i)b Confirmatory boreholes at location of Pier & Abutment nr. 12
foundation of bridge, for a minimum depth of 20m or
as directed by the Engineer
Carried to Summary
1/2 .
Construction of Batinah Expressway - Package 7
Page No.
BILL OF QUANTITIES
PRELIMINARIES (For Part A+ Part B) Bill No. 1

(in figures) (in words) R.O. Bzs.
Item No. Item Description Unit
Estimated
Quantity
Unit Rate (Rial Omani) Amount
1 PRELIMINARIES (Continued)
1.4 Contractor's Site Facilities
1.4.3(i) Mobilization and demobilization of Contractor's site LS
facilities
1.4.3(ii) Maintenance of Contractor's site facilities month 30
1.5 Engineer's Facilities g
1.5.13(i)a Provision of Engineer's Office as per Special month 33
Specifications (1 unit x 33 months) type-1
(RE + QS + AA)
1.5.13(i)b Provision of Engineer's Office as per Special month 30
Specifications (1 unit x 30 months) type-2
1.5.13(ii)a Maintenance of Engineer's Office as per Special month 33
Specifications (1 unit x 33 months) type-1
1.5.13(ii)b Maintenance of Engineer's Office as per month 30
Special Specifications (1 unit x 30 months) type-2
Carried to Summary
1/3 .
Construction of Batinah Expressway - Package 7
Page No.
BILL OF QUANTITIES
PRELIMINARIES (For Part A+ Part B) Bill No. 1

(in figures) (in words) R.O. Bzs.
Item No. Item Description Unit
Estimated
Quantity
Unit Rate (Rial Omani) Amount
1 PRELIMINARIES (Continued)
1.5 Engineer's Facilities (Continued)
1.5.13(iii)a Provision of Surveying equipments for the Engineer month 30
as per Specifications
1.5.13(iii)b Provision of One 3D Laser Scanner Surveying Device month 30
for Client including training
1.5.13(iv) Maintenance of Surveying equipments for the Engineer month 30
1.5.13(v)a Provision of Engineer's Accommodation as per month 33
Special Specifications (1 unit x 33 months) type-1 (RE)
1.5.13(v)b Provision of Engineer's Accommodation as per month 66
Special Specifications (2 unit x 33 months) type-2 (QS)
1.5.13(v)c Provision of Engineer's Accommodation as per month 120
Special Specifications (4 unit x 30 months) type-2
(CE, ME & UE,)
1.5.13(v)d Provision of Engineer's Accommodation as per month 300
Special Specifications (10 unit x 30 months) type-3
(SI, MI, LS & AA)
Carried to Summary
1/4 .
Construction of Batinah Expressway - Package 7
Page No.
BILL OF QUANTITIES
PRELIMINARIES (For Part A+ Part B) Bill No. 1

(in figures) (in words) R.O. Bzs.
Item No. Item Description Unit
Estimated
Quantity
Unit Rate (Rial Omani) Amount
1 PRELIMINARIES (Continued)
1.5 Engineer's Facilities (Continued)
1.5.13(v)e Provision of Engineer's Accommodation as per month 33
Special Specifications (1 unit x 33 months) type-4
1.5.13(vi)a Maintenance of Engineer's Accommodation as per month 33
Special Specifications (1 unit x 33 months) type-1
1.5.13(vi)b Maintenance of Engineer's Accommodation as per month 66
Special Specifications (2 unit x 33 months) type-2
1.5.13(vi)c Maintenance of Engineer's Accommodation as per month 120
Special Specifications (4 unit x 30 months) type-2
1.5.13(vi)d Maintenance of Engineer's Accommodation as per month 300
Special Specifications (10 unit x 30 months) type-3
1.5.13(vi)e Maintenance of Engineer's Accommodation as per month 33
Special Specifications (1 unit x 33 months) type-4
1.5.13(vii) Provision of Site Laboratory as detailed in the month 30
Specifications
Carried to Summary
1/5 .
Construction of Batinah Expressway - Package 7
Page No.
BILL OF QUANTITIES
PRELIMINARIES (For Part A+ Part B) Bill No. 1

(in figures) (in words) R.O. Bzs.
Item No. Item Description Unit
Estimated
Quantity
Unit Rate (Rial Omani) Amount
1 PRELIMINARIES (Continued)
1.5 Engineer's Facilities (Continued)
1.5.13(viii) Maintenance of Site Laboratory month 30
1.7 Control of Traffic and Access
1.7.6(i)a Maintenance and Protection of Traffic month 30
1.10 Management Procedures
1.10.6(i) Provision of 5 sets of photographs (294X210mm) month 30
1.10.6(ii) Provision of two sets of Video recordings as month 30
specified
1.11 Submittals
1.11.8(i) Provision of As-built drawings, record drawings, record LS
specifications and miscellaneous records as specified
Carried to Summary
1/6 .
Construction of Batinah Expressway - Package 7
Page No.
BILL OF QUANTITIES
PRELIMINARIES (For Part A+ Part B) Bill No. 1

(in figures) (in words) R.O. Bzs.
Item No. Item Description Unit
Estimated
Quantity
Unit Rate (Rial Omani) Amount
1 PRELIMINARIES (Continued)
1.14 Contractor's Temporary Works and Services
1.14.8(i) Provision, erection, relocation, maintenance and nr. 2
removal of project signboards (Alluminium)
1.15 Commemorative Plaque and Opening
Ceremony y
1.15.4(i) Supply and erection of commemorative plaque nr. 1
1.15.4(ii) Opening ceremony including all facilities LS
Carried to Summary
1/7 .
Construction of Batinah Expressway - Package 7
Page No.
BILL OF QUANTITIES
PRELIMINARIES (For Part A+ Part B) Bill No. 1

(in figures) (in words) R.O. Bzs.
Item No. Item Description Unit
Estimated
Quantity
Unit Rate (Rial Omani) Amount
SUMMARY
Page 1/1
Page 1/2
Page 1/3
Page 1/4
Page 1/5
Page 1/6
Carried to General Summary






BILL OF QUANTITIES
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway





2/1 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
EARTHWORKS Bill No. 2

(in figures) (in words) R.O. Bzs.
2 EARTHWORKS
2.1 Clearing and Grubbing
2.1.5(i) Clear site of all trees less than 300mm ,shrubs, sq.m. 1,050,000
vegetation including roots as necessary to
commence work
2.1.5(ii)a Removal and delivery of trees of 300mm trunk nr. 50
diameter or greater
Item No.
Estimated
Quantity
Unit Rate (Rial Omani) Amount
Item Description Unit
g
2.1.5(ii)b Removal and disposal of trees of 300mm trunk nr. 50
diameter or greater
2.2 Removal of Structures and Obstructions
2.2.5(i) Removal of existing building, single-storey area nr. 1
500sq.m.
2.2.5(ii) Removal of reinforced concrete (for box culverts) cu.m. 200
2.2.5(iii) Removal of mass concrete (200mm thick) cu.m. 150
Carried to Summary
2/2 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
EARTHWORKS Bill No. 2

(in figures) (in words) R.O. Bzs.
Item No.
Estimated
Quantity
Unit Rate (Rial Omani) Amount
Item Description Unit
2 EARTHWORKS (Continued)
2.2 Removal of Structures and Obstructions
(Continued)
2.2.5(v) Removal of Concrete Curbs lin.m. 1,000
2.2.5(vi) Removal of interlocking tiles in sidewalks and median sq.m. 500
2.2.5(vii) Removal of pipe culvert (900mm diameter) lin.m. 50
2.2.5(viii) Removal and disposal of bituminous pavement cu.m. 18,500
200mm max. thickness in carriageways and paved
areas
2.2.5(x) Removal of steel safety barrier including posts and lin.m. 1,500
foundation
2.2.5(xi) Removal of concrete barrier lin.m. 200
Carried to Summary
2/3 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
EARTHWORKS Bill No. 2

(in figures) (in words) R.O. Bzs.
Item No.
Estimated
Quantity
Unit Rate (Rial Omani) Amount
Item Description Unit
2 EARTHWORKS (Continued)
2.2 Removal of Structures and Obstructions
(Continued)
2.2.5(xii) Removal of sign boards (single post) nr. 20
2.2.5(xviii)a Removal of Mortared Riprap cu.m. 250
2.2.5(xviii)b Removal of Gabion Boxes cu.m. 200
2.2.5(xix) Removal and disposal of Existing Fence with gate lin.m. 50
(up to 2m high)
2.2.5(xx) Removal and disposal of Existing Masonry Wall cu.m. 50
(Block Type, up to 2m high)
2.2.5(xxvi)a Removal and delivery for re-use by others of Street nr. 10
Light Pole, to the MRMWR stores or as directed
by Engineer
Carried to Summary
2/4 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
EARTHWORKS Bill No. 2

(in figures) (in words) R.O. Bzs.
Item No.
Estimated
Quantity
Unit Rate (Rial Omani) Amount
Item Description Unit
2 EARTHWORKS (Continued)
2.2 Removal of Structures and Obstructions
(Continued)
2.2.5(xxvi)b Removal and delivery for re-use by others of Flag Pole, nr. 10
to the MRMWR stores or as directed by Engineer
2.3 Roadway Excavation
2.3.6(i) Unclassified excavation to Embankment & Dyke cu.m. 208,600
2.3.6(iii) Unclassified Excavation under water cu.m. 1,000
2.3.6(v) Leveling and Grading for Wadi Training Works cu.m. 329,800
Carried to Summary
2/5 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
EARTHWORKS Bill No. 2

(in figures) (in words) R.O. Bzs.
Item No.
Estimated
Quantity
Unit Rate (Rial Omani) Amount
Item Description Unit
2 EARTHWORKS (Continued)
2.4 Borrow Materials
2.4.6(i)a Borrow excavation to embankment & Dykes cu.m. 3,254,000
2.6 Sub-grade Construction
2.6.6(i) Sub grade preparation in cut sq.m. 352,580 ( ) g p p q ,
2.7 Excavation and Backfilling for structures
2.7.6(i) Unclassified structural excavation cu.m. 9,305
(depth 0m to 2.0m)
2.7.6(ii) Unclassified structural excavation cu.m. 6,240
(depth >2.0m to <4.0m)
2.7.6(iii) Unclassified structural excavation cu.m. 1,500
(depth 4.0m)
2.7.6(iv) Unclassified structural excavation (under water) cu.m. 500
Carried to Summary
2/6 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
EARTHWORKS Bill No. 2

(in figures) (in words) R.O. Bzs.
Item No.
Estimated
Quantity
Unit Rate (Rial Omani) Amount
Item Description Unit
SUMMARY
Page 2/1
Page 2/2
Page 2/3
Page 2/4
Page 2/5
Carried to Grand Summary - 1
3/1 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
GRANULAR SUB-BASE, AGREGATE BASE COURSE, AND STABILISED BASE COURSES Bill No. 3

(in figures) (in words) R.O. Bzs.
3 GRANULAR SUB-BASE, AGREGATE BASE
COURSE AND STABILISED BASE COURSES
3.2 Granular Sub-Base Course
3.2.6(ii) Granular Sub-Base Course (Class B) cu.m. 546,400
3.3 Aggregate Base Course
3.3.6(i) Crushed Aggregate Base Course (Class A) cu.m. 268,800
Item No.
Estimated
Quantity
Unit Rate (Rial Omani) Amount
Item Description Unit
( ) gg g ( ) ,
Carried to Grand Summary - 1
4/1 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
BITUMINOUS PAVEMENT Bill No. 4

(in figures) (in words) R.O. Bzs.
4 BITUMINOUS PAVEMENT
4.2 Bituminous Materials for Prime Coat
and Tack Coats
4.2.8(i) Bituminous Prime Coat kg. 1,185,400
4.2.8(ii) Bituminous Tack Coat kg. 882,200
4.4 Bituminous Base Course
Item No.
Estimated
Quantity
Unit Rate (Rial Omani) Amount
Item Description Unit
4.4.14(i) Bituminous Base Course cu.m. 120,500
4.5 Bituminous Binder and Wearing Courses
4.5.14(i) Bituminous Wearing Course cu.m. 59,650
4.9 Pavement Repairs and Reinstatement
4.9.10(i) Surface milling (up to 50mm thick) sq.m. 5,000
4.12 Surface Ride ability Measurement
4.12.10(i) International roughness index (IRI) for Asphalt lin.m. 235,000
pavement
Carried to Grand Summary - 1
5/1 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
CONCRETE AND CONCRETE STRUCTURES Bill No. 5

(in figures) (in words) R.O. Bzs.
5 CONCRETE AND CONCRETE STRUCTURES
5.1 Concrete Materials and Mixes
5.1.7(i)a Unreinforced Concrete Class 16/20 for Bridges, cu.m. 3,195
Retaining walls, Overpasses, Box Culverts and Drains
5.1.7(i)b Reinforced Concrete Class 30/20 MS7 for rectangular cu.m. 1,500
closed drains
5 1 7(i) C t Cl 37 5/20 MS7 i R i f d C t 26 600
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
5.1.7(i)c Concrete Class 37.5/20 MS7 in Reinforced Concrete cu.m. 26,600
Box Culvert including headwalls, wing walls, apron slabs
and cut-off walls
5.1.7(i)d Post-tensioned Concrete, Class 50/20 MS7 in Cast cu.m. 1,890
in-situ Post-tensioned Box Girders including Integral
Abutment, Hanging Back wall etc.for 12.26m deck width
(For Interchange Bridge )
5.1.7(i)e Reinforced Concrete, Class 45/20 MS7 in Bridge cu.m. 851
abutment, abutment cap and its foundation, Wing wall
etc. (For Interchange Bridge )
5.1.7(i)f Concrete Class 45/20 MS7 in Pile Caps & Footings cu.m. 252
(For Interchange Bridge)
Carried to Collection Page - 1
5/2 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
CONCRETE AND CONCRETE STRUCTURES Bill No. 5

(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
5 CONCRETE AND CONCRETE STRUCTURES
(Continued)
5.1 Concrete Materials and Mixes (Continued)
5.1.7(i)g Concrete Class 45/20 MS7 in Pier Columns & cu.m. 120
Pier Caps (For Interchange Bridge)
5.1.7(i)h Concrete Class 40/20 MS7 in Approach Slabs including cu.m. 95
all items as indicated on drawings
(For Interchange Bridge)
5.1.7(i)i GRP Cladding to cover space between superstructure sq.m. 11
and Pier column (color to match with Pier)
5.2 Reinforcing Steel
5.2.6(ii)a High tensile steel bar reinforcement, Grade 500, Type 2, t. 798
of any diameter for Interchange bridges
5.2.6(ii)b High tensile steel bar reinforcement of any diameter for t. 3,980
Retaining wall, Box culverts, Underpass and Drains
5.2.6(iii) Fabric wire mesh reinforcement of any size t. 5
Carried to Collection Page - 1
5/3 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
CONCRETE AND CONCRETE STRUCTURES Bill No. 5

(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
5 CONCRETE AND CONCRETE STRUCTURES
(Continued)
5.4 Prestressed Concrete Structures
5.4.6(i) Prestressing Cables - 0.6" Diameter Strands Grade 270 t. 95
5.10 Waterproofing for Structures
5.10.6(i) Bitumen Water Proofing Paint for surfaces in contact sq.m. 35,500
ith th i C l t d C t d i with earth in Culverts and Concrete drains
5.10.6(ii) Waterproofing Membrane including Protection board sq.m. 914
for Bridge Abutments, Pier and Pier Footing, Hanging
Back Wall etc.
5.10.7.7(i) Waterproofing for Bridge Decks sq.m. 2,069
(isocyanite amine based)
5.12 Load Testing of Bridges
5.12.7(i)a Bridge Loading Test - Testing by Static Load nr. 2
5.12.7(i)b Bridge Loading Test - Testing by Moving Load nr. 2
Carried to Collection Page - 1
5/4 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
CONCRETE AND CONCRETE STRUCTURES Bill No. 5

(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
6 STRUCTURAL STEEL AND OTHER METALWORK
6.6(i) Metal Access door for box girder bridges nr. 8
Carried to Collection Page - 1
5/5 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
CONCRETE AND CONCRETE STRUCTURES Bill No. 5

(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
8 DRAINAGE
8.1 Pipe Culverts
8.1.6(ii) Reinforced Precast Concrete Pipe Culvert lin.m. 200
(diameter 1000mm)
8.2 Storm Sewers
8.2.6(i)a Storm Sewer, HDPE Pipe (diameter 300mm) lin.m. 50
8.2.6(i)b Storm Sewer, HDPE Pipe (diameter 400mm) lin.m. 200
8.2.6(i)c Storm Sewer, HDPE Pipe (diameter 500mm) lin.m. 50
8.2.6(i)d Storm Sewer, HDPE Pipe (diameter 600mm) lin.m. 6,000
8.2.6(i)e Storm Sewer, HDPE Pipe (diameter 900mm) lin.m. 50
8.2.6(i)f Storm Sewer, HDPE Pipe (diameter 1000mm) lin.m. 50
Carried to Collection Page - 1
5/6 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
CONCRETE AND CONCRETE STRUCTURES Bill No. 5

(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
8 DRAINAGE (Continued)
8.2 Storm Sewers (Continued)
8.2.6(i)g Storm Sewer, RC Pipe (diameter 300mm) lin.m. 50
8.2.6(i)h Storm Sewer, RC Pipe (diameter 400mm) lin.m. 50
8 2 6(i)i St S RC Pi (di t 500 ) li 50 8.2.6(i)i Storm Sewer, RC Pipe (diameter 500mm) lin.m. 50
8.2.6(i)j Storm Sewer, RC Pipe (diameter 600mm) lin.m. 50
8.2.6(i)k Storm Sewer, RC Pipe (diameter 900mm) lin.m. 50
8.2.6(i)l Storm Sewer, RC Pipe (diameter 1000mm) lin.m. 450
8.3 Manholes Inlets and Chambers
8.3.6(ii)a Grated Inlet (600mm x 600mm) with DI grating and nr. 20
Locked frame
Carried to Collection Page - 1
5/7 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
CONCRETE AND CONCRETE STRUCTURES Bill No. 5

(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
8 DRAINAGE (Continued)
8.3 Manholes Inlets and Chambers (Continued)
8.3.6(ii)b Grated Inlet (1000mm x 1000mm) with DI grating and nr. 198
Locked frame
8.3.6(ii)c DI grating (1000mm x 1000mm) and Locked frame at nr. 32
Culvert for Median Drainage as shown on Dwg.
(on the top of box culvert)
8.3.6(iii) Curb Inlet (600mm x 600mm) as shown on Dwg. nr. 84
8.4 Drainage of Structures
8.4.6(ii)a Drainage pipe, 100mm uPVC in structure lin.m. 350
8.4.6(ii)b Drainage pipe, 200mm uPVC in structure lin.m. 200
8.4.6(ii)c 150 mm Dia. uPVC perforated pipe wrapped in lin.m. 300
Geotextile
8.4.6(iii) Permeable backing including Geotextile Membrane cu.m. 11,500
8.4.6(iv) Granular backfill cu.m. 3,560
Carried to Collection Page - 1
5/8 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
CONCRETE AND CONCRETE STRUCTURES Bill No. 5

(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
10 PILING
10.1 Piling General
10.1.6(i) Setting up at each 750mm diameter pile location nr. 90
10.1.6(ii)a Piling - Cast in place, 750mm diameter for Pier lin.m. 504
Foundation including reinforcement in piles (Boring piles)
10 1 6(ii)b Piling Cast in place 750mm diameter for Integral lin m 1 008 10.1.6(ii)b Piling - Cast in place, 750mm diameter for Integral lin.m. 1,008
Abutment or Abutment Foundation including
reinforcement in piles (Boring piles)
10.2 Pile Testing
10.2.6(i) Static Load Testing of 750mm diameter expendable nr. 2
piles (including all materials)
10.2.6(ii) Static Load Testing of 750mm diameter working piles nr. 2
10.2.6(iii) Non-destructive Integrity Test as per the Specifications. nr. 90
Carried to Collection Page - 1
5/9 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
CONCRETE AND CONCRETE STRUCTURES Bill No. 5

(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
11 BRIDGE ACCESSORIES
11.3 Bearings General
11.3.6(i)a Pot Bearing, (V= 16,000kN - 18,000kN & nr. 2
H =2,000kN - 4,000kN) , Fixed type including supply &
installation
11.3.6(i)b Pot Bearing, (V= 14,000kN - 16,000kN & nr. 2
H =2,000kN - 4,000kN), Guided type including supply &
i t ll ti installation
11.3.6(i)c Pot Bearing, (V= 4,000kN - 6,500kN & nr. 4
H =500kN - 1,500kN), Guided type including supply &
installation
11.3.6(i)d Pot Bearing, (V= 2,000kN - 4,000kN), nr. 4
Free type including supply & installation
11.3.6(i)e Pot Bearing, (V= 4,000kN - 6,000kN ), nr. 4
Free type including supply & installation
Carried to Collection Page - 2
5/10 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
CONCRETE AND CONCRETE STRUCTURES Bill No. 5

(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
11 BRIDGE ACCESSORIES (Continued)
11.4 Bridge Expansion Joint
11.4.6(vii) Provide Strip Seal Type Expansion Joint lin.m. 30
(Max. Opening = 60mm & Max. Closing = 30mm)
11.6 Bridge Parapets and Railings
11.6.6(i) Concrete Barrier for Bridge Parapet as shown on Dwg. lin.m. 410
Carried to Collection Page - 2
5/11 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
CONCRETE AND CONCRETE STRUCTURES Bill No. 5

(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
COLLECTION PAGE - 1
Page 5/1
Page 5/2
Page 5/3
Page 5/4
Page 5/5
Page 5/6
Page 5/7
Page 5/8
Carried to Summary
5/12 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
CONCRETE AND CONCRETE STRUCTURES Bill No. 5

(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
COLLECTION PAGE - 2
Page 5/9
Page 5/10
Carried to Summary
5/13 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
CONCRETE AND CONCRETE STRUCTURES Bill No. 5

(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
SUMMARY
COLLECTION PAGE 1 - 5/11
COLLECTION PAGE 2 - 5/12
Carried to Grand Summary - 1
6/1 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
INCIDENTAL CONSTRUCTION Bill No. 6

(in figures) (in words) R.O. Bzs.
9 SLOPE PROTECTION AND STABILIZATION
9.1 Riprap
9.1.6(i) Loose Stone Riprap (Class B) of varying thickness cu.m. 2,000
for Dyke and slope protection as shown in the Dwg.
9.1.6(ii)a Mortared Stone Riprap (Class A, Varying Thickness) cu.m. 220,000
for Slope Protection and Floodways including Stubs
as per dwg.
Item No.
Estimated
Quantity
Unit Rate (Rial Omani) Amount
Item Description Unit
9.1.6(ii)b Mortared Stone Riprap (Class A) for Culvert inlet cu.m. 11,000
& outlet
9.1.6(ii)c Mortared Stone Riprap (Class A) for Dyke as shown cu.m. 550
on dwg.
9.1.6(iv) Geotextile Fabric Filter sq.m. 2,250
9.2 Gabions
9.2.6(i) Gabion lining of varying thickness for wadi bed, slope cu.m. 42,000
protection, culvert inlet, outlet protection and
Floodways as per Dwg.
Carried to Collection Page - 1
6/2 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
INCIDENTAL CONSTRUCTION Bill No. 6

(in figures) (in words) R.O. Bzs.
Item No.
Estimated
Quantity
Unit Rate (Rial Omani) Amount
Item Description Unit
9 SLOPE PROTECTION AND STABILIZATION
(Continued)
9.9 Ditch Lining

9.9.6(i)a Concrete Ditch Lining (100mm Thick) with wire mesh sq.m. 200
(10mm dia @200mm c/c both ways)
9.9.6(i)b Reinforced Concrete Chute 100mm thick with wire mesh lin.m. 200
(10mm dia @150mm c/c both ways) as per Dwg.
9.9.6(ii) Grouted Stone Ditch lining (200mm thick) sq.m. 10,620
9.12 Mechanically Stabilized Earth Retaining Walls
9.12.7(i) Mechanically Stabilized Earth Retaining Walls sq.m. 1,200
(MSERWs)

9.12.7(ii) Standard Coping for MSERWs lin.m. 80

9.12.7(iii) Concrete Barrier Parapet on MSERWs lin.m. 100
Carried to Collection Page - 1
6/3 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
INCIDENTAL CONSTRUCTION Bill No. 6

(in figures) (in words) R.O. Bzs.
Item No.
Estimated
Quantity
Unit Rate (Rial Omani) Amount
Item Description Unit
12 SIDEWALKS, PAVED AREAS AND CURBS
12.1 Sidewalks, Paved areas and Curbs
12.1.7(ii)a Paving, concrete interlocking blocks 60mm thick sq.m. 35,200
for side walks and median
12.1.7(ii)b Paving, concrete interlocking blocks 80mm thick sq.m. 1,000
for Car parking
12 1 7( ) P t N M t bl C t C b T ''A'' li 18 500 12.1.7(v)a Precast Non-Mountable Concrete Curb Type ''A'' lin.m. 18,500
12.1.7(v)b Precast Mountable curb Type ''B'' lin.m. 1,200
12.1.7(v)c Precast flush curb Type ''D'' lin.m. 1,500
12.1.7(v)d Precast concrete edge curb Type ''E'' lin.m. 15,500
Carried to Collection Page - 1
6/4 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
INCIDENTAL CONSTRUCTION Bill No. 6

(in figures) (in words) R.O. Bzs.
Item No.
Estimated
Quantity
Unit Rate (Rial Omani) Amount
Item Description Unit
13 SAFETY BARRIERS AND FENCES
13.1 Roadside Barriers
13.1.7(i) W-Beam Guardrail (Strong post) including lin.m. 131,700
W150 x 13.5 Steel post, reflectors, accessories
and foundations
13.1.7(iii)a End anchorage for approach including post, reflectors, nr. 52
accessories and foundations
13.1.7(iii)b End anchorage for approach nr. 12
(Guard Rail-Concrete Barrier transition)
13.1.7(iii)c W-Beam Guardrail connection with Concrete barrier nr. 12
as indicated in the Drawing
13.1.7(iii)d W-Beam Guardrail Terminal section for Departure end nr. 52
including post, reflectors, accessories and foundations
13.1.7(vii)a Precast Concrete barrier, Single face as shown lin.m. 4,500
in the Dwg.
13.1.7(vii)b Heavy Duty Concrete barrier, Single face as shown lin.m. 180
in the Dwg.
Carried to Collection Page - 1
6/5 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
INCIDENTAL CONSTRUCTION Bill No. 6

(in figures) (in words) R.O. Bzs.
Item No.
Estimated
Quantity
Unit Rate (Rial Omani) Amount
Item Description Unit
13 SAFETY BARRIERS AND FENCES (Continued)
13.1 Roadside Barriers (Continued)
13.1.7(ix) Concrete barrier, transition section lin.m. 600
13.1.7(x) Impact attenuator, Quad Beam type, with expandable nr. 2
modules/cartridges, including new foundation, slab
with reflective studs and connection to the concrete
13.4 Delineators
13.4.6(i)a Floodway markers, painted white & red as shown on nr. 25
Dwg. Including anchor bolt
13.4.6(i)b Floodway water depth guage as shown on Dwg. nr. 8
Including anchor bolt
Carried to Collection Page - 1
6/6 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
INCIDENTAL CONSTRUCTION Bill No. 6

(in figures) (in words) R.O. Bzs.
Item No.
Estimated
Quantity
Unit Rate (Rial Omani) Amount
Item Description Unit
14 TRAFFIC SIGNS AND ROAD MARKINGS
14.1 Traffic Signs
14.1.7(i)a Highway sign, Triangular Side (750mm) nr. 15
14.1.7(i)b Highway sign, Triangular Side (900mm) nr. 33
14 1 7(i) Hi h i T i l Sid (1200 ) 4 14.1.7(i)c Highway sign, Triangular Side (1200mm) nr. 4
14.1.7(i)d Highway sign, Triangular Side (1500mm) nr. 2
14.1.7(ii)a Highway sign, Circular (Diameter 750mm) nr. 47
14.1.7(ii)b Highway sign, Circular (Diameter 900mm) nr. 10
14.1.7(ii)c Highway sign, Circular (Diameter 1200mm) nr. 2
Carried to Collection Page - 1
6/7 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
INCIDENTAL CONSTRUCTION Bill No. 6

(in figures) (in words) R.O. Bzs.
Item No.
Estimated
Quantity
Unit Rate (Rial Omani) Amount
Item Description Unit
14 TRAFFIC SIGNS AND ROAD MARKINGS
(Continued)
14.1 Traffic Signs (Continued)
14.1.7(iii)a Chevron Signs, rectangular [2100 mm x 600 mm] sq.m. 10
14.1.7(iii)b Chevron Signs, rectangular [2400 mm x 600 mm] sq.m. 10
14.1.7(iii)c Chevron Signs, rectangular [380 mm x 600 mm] sq.m. 50
14.1.7(iii)d Highway Signs, rectangular [750x1400] sq.m. 10
14.1.7(iii)e Highway Signs, rectangular [600x800] sq.m. 5
14.1.7(iii)f Supplementary plate, rectangular [1200 mm x 700 mm] sq.m. 5
14.1.7(iii)g Supplementary plate, rectangular [1500 mm x 700 mm] sq.m. 5
Carried to Collection Page - 1
6/8 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
INCIDENTAL CONSTRUCTION Bill No. 6

(in figures) (in words) R.O. Bzs.
Item No.
Estimated
Quantity
Unit Rate (Rial Omani) Amount
Item Description Unit
14 TRAFFIC SIGNS AND ROAD MARKINGS
(Continued)
14.1 Traffic Signs (Continued)
14.1.7(iii)h Rectangular or Polygonal Sign Face (Area 1-2 sq m) sq.m. 20
14.1.7(iii)i Rectangular or Polygonal Sign Face (Area 2-4 sq m) sq.m. 40
14.1.7(iii)j Rectangular Sign Face (Area 4-6 sq m) sq.m. 50
Carried to Collection Page - 1
6/9 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
INCIDENTAL CONSTRUCTION Bill No. 6

(in figures) (in words) R.O. Bzs.
Item No.
Estimated
Quantity
Unit Rate (Rial Omani) Amount
Item Description Unit
14 TRAFFIC SIGNS AND ROAD MARKINGS
(Continued)
14.1 Traffic Signs (Continued)
14.1.7(iv) Octagonal Road signs (Height 900mm) nr. 8
14.1.7(v)a Sign post support assembly G.I pipe 100mm Dia. nr. 121
Including foundation and painting of post
14.1.7(v)b Multi-post Sign Support Assembly, Type PI posts, nr. 22
complete including foundation, painting
(black and white) etc.
14.1.7(v)c Multi-post Sign Support Assembly, Type PII posts, nr. 4
complete including foundation, painting
(black and white) etc.
14.1.7(v)d Multi-post Sign Support Assembly, Type PIII posts, nr. 8
complete including foundation, painting
(black and white) etc.
14.1.7(v)e Multi-post Sign Support Assembly, Type PIV posts, nr. 4
complete including foundation, painting
(black and white) etc.
Carried to Collection Page - 2
6/10 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
INCIDENTAL CONSTRUCTION Bill No. 6

(in figures) (in words) R.O. Bzs.
Item No.
Estimated
Quantity
Unit Rate (Rial Omani) Amount
Item Description Unit
14 TRAFFIC SIGNS AND ROAD MARKINGS
(Continued)
14.2 Road Markings
14.2.6(i)a Traffic Lines, Type L1/2(120) White sq.m. 5,500
(Mechanical application)
14.2.6(i)b Traffic Lines, Type L1/3(120) White sq.m. 300
(Mechanical application)
14.2.6(i)c Traffic Lines, Type L2A(120) White sq.m. 900
(Mechanical application)
14.2.6(i)d Traffic Lines, Type L2/1(120) White sq.m. 4,000
(Mechanical application)
14.2.6(i)e Traffic Lines, Type L2/2(120) White sq.m. 600
(Mechanical application)
14.2.6(i)f Traffic Lines, Type L4/1(150) Yellow sq.m. 100
(Mechanical application)
14.2.6(i)g Traffic Lines, Type L4/2(120) Yellow sq.m. 28,500
(Mechanical application)
Carried to Collection Page - 2
6/11 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
INCIDENTAL CONSTRUCTION Bill No. 6

(in figures) (in words) R.O. Bzs.
Item No.
Estimated
Quantity
Unit Rate (Rial Omani) Amount
Item Description Unit
14 TRAFFIC SIGNS AND ROAD MARKINGS
(Continued)
14.2 Road Markings (Continued)
14.2.6(i)h Traffic Lines, Type L5/1(150) White sq.m. 50
(Mechanical application)
14.2.6(i)i Traffic Lines, Type L5/2(120) White sq.m. 900
(Mechanical application)
14.2.6(i)j Traffic Lines, Type L7(400) White sq.m. 50
(Mechanical application)
14.2.6(i)k Traffic Lines, Type L8(200) White sq.m. 300
(Mechanical application)
14.2.6(iii)a Special Marking , Pedestrian Crossing sq.m. 1,200
14.2.6(iii)b Special Marking , Chevrons Marking S9 sq.m. 2,200
14.2.6(iii)c Special Marking , Lane Selection Arrow White (S3/1) sq.m. 120
Carried to Collection Page - 2
6/12 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
INCIDENTAL CONSTRUCTION Bill No. 6

(in figures) (in words) R.O. Bzs.
Item No.
Estimated
Quantity
Unit Rate (Rial Omani) Amount
Item Description Unit
14 TRAFFIC SIGNS AND ROAD MARKINGS
(Continued)
14.2 Road Markings (Continued)
14.2.6(iii)d Special Marking , Lane Selection Arrow White (S4/1) sq.m. 120
14.2.6(iii)e Special Marking , Lane Selection Arrow White (S5/1) sq.m. 120
14.2.6(iii)f Special Marking , Lane Selection Arrow White (S7/1) sq.m. 120
14.2.6(iii)g Special Marking , Lane Selection Arrow White (S8/1) sq.m. 120
14.2.6(iv) Curb painting sq.m. 11,010
Carried to Collection Page - 2
6/13 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
INCIDENTAL CONSTRUCTION Bill No. 6

(in figures) (in words) R.O. Bzs.
Item No.
Estimated
Quantity
Unit Rate (Rial Omani) Amount
Item Description Unit
14 TRAFFIC SIGNS AND ROAD MARKINGS
(Continued)
14.3 Road Studs
14.3.6(i)a Reflecting Road Studs (Double face, Red color) nr. 1,200
14.3.6(i)b Reflecting Road Studs (Single face, Red color) nr. 7,800
14.3.6(i)c Reflecting Road Studs (Single face, White color) nr. 3,800
14.3.6(iii) Provide removable bollards in the median opening nr. 30
and one fixed bollard at each ends as shown in
the Dwg. for R.O.P. including chain and lock
Carried to Collection Page - 2
6/14 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
INCIDENTAL CONSTRUCTION Bill No. 6

(in figures) (in words) R.O. Bzs.
Item No.
Estimated
Quantity
Unit Rate (Rial Omani) Amount
Item Description Unit
COLLECTION PAGE - 1
Page 6/1
Page 6/2
Page 6/3
Page 6/4
Page 6/5
Page 6/6
Page 6/7
Page 6/8
Carried to Summary
6/15 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
INCIDENTAL CONSTRUCTION Bill No. 6

(in figures) (in words) R.O. Bzs.
Item No.
Estimated
Quantity
Unit Rate (Rial Omani) Amount
Item Description Unit
COLLECTION PAGE - 2
Page 6/9
Page 6/10
Page 6/11
Page 6/12
Page 6/13
Carried to Summary
6/16 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
INCIDENTAL CONSTRUCTION Bill No. 6

(in figures) (in words) R.O. Bzs.
Item No.
Estimated
Quantity
Unit Rate (Rial Omani) Amount
Item Description Unit
SUMMARY
COLLECTION PAGE 1 - 6/14
COLLECTION PAGE 2 - 6/15
Carried to Grand Summary - 1
7/1 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
ROAD LIGHTING AND ELECTRICAL INSTALLATION Bill No. 7

(in figures) (in words) R.O. Bzs.
15 ROAD LIGHTING AND ELECTRICAL
INSTALLATION
15.1 General
15.1.20(i) Power Supply connection to the feeder pillar nr. 53
15.1.20(ii) Spare Parts (5%) as per the approved list LS
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
15.3 Package Sub-stations
15.3.6(i)a Supply and installation of Electrical Sub-station with nr. 1
1Nr RMU,1Nr 500 KVA Transformer and 800 A feeder
pillar, including building, cable terminations, testing,
commissioning and all civil works and other
accessories necessary to complete the system
functional
15.3.6(i)b Supply and installation of Electrical Sub-station with nr. 1
1Nr RMU, 1Nr OLU, 1Nr 500 KVA Transformer and
800 A feeder pillar, including building, cable
terminations, testing, commissioning and all civil works
and other accessories necessary to complete the
system functional
Carried to Summary
7/2 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
ROAD LIGHTING AND ELECTRICAL INSTALLATION Bill No. 7

(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
15 ROAD LIGHTING AND ELECTRICAL
INSTALLATION (Continued)
15.5 33kV and 11kV Pole Mounted Transformer
Sub-stations
15.5.6(ii)a Supply and installation of 11kV pole mounted nr. 12
transformer sub-station, 100KVA with 1 way LV panel
including H-pole transformer mounting structure,
earthing, connections and other accessories g,
necessary to complete the system functional
15.5.6(ii)b Supply and installation of 11kV pole mounted nr. 1
transformer sub-station, 100KVA with 2 way LV panel
including H-pole transformer mounting structure,
earthing, connections and other accessories
necessary to complete the system functional
15.5.6(ii)c Supply and installation of 11kV pole mounted nr. 1
transformer sub-station, 200KVA with 2 way LV panel
including H-pole transformer mounting structure,
earthing, connections and other accessories
necessary to complete the system functional
Carried to Summary
7/3 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
ROAD LIGHTING AND ELECTRICAL INSTALLATION Bill No. 7

(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
15 ROAD LIGHTING AND ELECTRICAL
INSTALLATION (Continued)
15.5 33kV and 11kV Pole Mounted Transformer
Sub-Stations (Continued)
15.5.6(ii)d Supply and installation of 11kV pole mounted nr. 1
transformer sub-station, 200KVA with 1 way LV panel
including H-pole transformer mounting structure,
earthing, connections and other accessories g,
necessary to complete the system functional
15.6 Feeder Pillars
15.6.6(i)a Supply and install Mini Feeder Pillars, 400 A, 4way nr. 2
15.6.6(i)b Supply and install Street Lighting Feeder Pillars, 100 A nr. 51
Carried to Summary
7/4 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
ROAD LIGHTING AND ELECTRICAL INSTALLATION Bill No. 7

(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
15 ROAD LIGHTING AND ELECTRICAL
INSTALLATION (Continued)
15.7 Electrical Cables
Supply 4-Core cabling, copper conductor,
XLPE insulated, Steel Wire armoured,
PVC sheathed, 600/1000V rating, as follows:
15.7.6(i)a Nominal Conductor Area 25mm2 lin.m. 84,000 ( ) ,
15.7.6(i)b Nominal Conductor Area 95mm2 lin.m. 4,500
15.7.6(i)c Nominal Conductor Area 120mm2 lin.m. 2,500
15.7.6(i)d Nominal Conductor Area 240mm2 lin.m. 1,000
15.7.6(ii)a Termination on 25mm2 cabling nr. 115
Carried to Summary
7/5 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
ROAD LIGHTING AND ELECTRICAL INSTALLATION Bill No. 7

(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
15 ROAD LIGHTING AND ELECTRICAL
INSTALLATION (Continued)
15.7 Electrical Cables (Continued)
15.7.6(ii)b Termination on 95mm2 cabling nr. 30
15.7.6(ii)c Termination on 120mm2 cabling nr. 150
15.7.6(ii)d Termination on 240mm2 cabling nr. 10
15.8 Road Lighting Masts, Columns and Luminaries
15.8.6(i) Supply, install and commission Galvanized steel nr. 20
lighting column polygon (Mid hinged Type) 25m high
mast with 4 x 600 Watt HPSV luminaries fixed on
bracket complete with fused cut out, control gear,
wiring, connection etc
Carried to Summary
7/6 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
ROAD LIGHTING AND ELECTRICAL INSTALLATION Bill No. 7

(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
15 ROAD LIGHTING AND ELECTRICAL
INSTALLATION (Continued)
15.8 Road Lighting Masts, Columns and Luminaries
(Continued)
15.8.6(ii)a Supply, install and commission Galvanized steel nr. 1,354
lighting column polygon (Mid hinged Type) 14m high
pole/column with 1 x 400 Watt HPSV luminaries
fixed on bracket complete with fused cut out, p ,
control gear, wiring, connection etc
15.8.6(ii)b Supply, install and commission Galvanized steel nr. 676
lighting column polygon (Mid hinged Type) 14m high
pole/column with 2 x 400 Watt HPSV luminaries on
bracket complete with fused cut out, control gear,
wiring, connection etc
15.8.6(iii) Column / high mast testing LS
Carried to Summary
7/7 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
ROAD LIGHTING AND ELECTRICAL INSTALLATION Bill No. 7

(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
15 ROAD LIGHTING AND ELECTRICAL
INSTALLATION (Continued)
15.10 Under Bridge Lighting
15.10.6(i) Under bridge surface mounted lighting including nr. 32
Conduits, Cables, 150W High Pressure Sodium
Lanterns, Junction Boxes, including Supply,
Installation, Testing and Putting into service complete
15.15 Earthing
15.15.7(i) Supply and install Twin rod earthing installation at nr. 53
street lighting feeder pillars
15.15.7(ii) Supply and install Single rod earthing installation nr. 150
at the end of street lighting circuits
15.17 Civil Works for Electrical Installations
15.17.6(vi)a Supply and install Pre-cast concrete foundation for nr. 2
mini feeder pillars as per Dwg. including Bolts and
any other accessories required for installation.
Carried to Summary
7/8 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
ROAD LIGHTING AND ELECTRICAL INSTALLATION Bill No. 7

(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
15 ROAD LIGHTING AND ELECTRICAL
INSTALLATION (Continued)
15.17 Civil Works for Electrical Installations
(Continued)
15.17.6(vi)b Supply and install Pre-cast concrete foundation for nr. 51
street lighting feeder pillars as per Dwg. including
Bolts and any other accessories required for
installation.
15.17.6(vii)a Trench for low voltage cable for one cable lin.m. 84,000
15.17.6(vii)b Trench for low voltage cable for two cable lin.m. 4,500
15.17.6(vii)c Trench for low voltage cable for three cable lin.m. 3,500
15.17.6(ix) Supply and install Precast Concrete Foundation for nr. 2,030
columns 14m high pole/column as per Dwg. including
Base plate, Bolts, Hexagonal nuts, washers,
uPVC ducts and any other accessories required
for installation
Carried to Summary
7/9 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
ROAD LIGHTING AND ELECTRICAL INSTALLATION Bill No. 7

(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
15 ROAD LIGHTING AND ELECTRICAL
INSTALLATION (Continued)
15.17 Civil Works for Electrical Installations
(Continued)
15.17.6(x) Supply and install Precast Concrete Foundation for nr. 20
25m high mast as per Dwg. including Base plate,
Bolts, Hexagonal nuts, washers, uPVC ducts and
any other accessories required for installation y q
Road Crossing Ducts
15.17.6(xii)a 2Way 100 mm Upvc duct for street lighting with lin.m. 2,250
concrete encasement
15.17.6(xii)b 2Way 150 mm Upvc duct for 11kv cables for street lin.m. 1,600
lighting with concrete encasement
15.17.6(xii)c 4Way 100 mm Upvc duct for street lighting with lin.m. 1,600
concrete encasement
15.17.6(xii)d 6Way 150 mm Upvc duct for street lighting with lin.m. 500
concrete encasement
Carried to Summary
7/10 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
ROAD LIGHTING AND ELECTRICAL INSTALLATION Bill No. 7

(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
SUMMARY
Page 7/1
Page 7/2
Page 7/3
Page 7/4
Page 7/5
Page 7/6
Page 7/7
Page 7/8
Page 7/9
Carried to Grand Summary - 1

9/1 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
UTILITIES Bill No. 9

(in figures) (in words) R.O. Bzs.
18 UTILITIES
18.1 Locating and Protecting Existing Utilities
Water Utility
18.1.6(i)a Concrete protection slab for existing water lines/ducts lin.m. 100
300 mm dia (Class 25/20)
Gas Line Utility
18 1 6(i)b Utility culvert for protection of 24'' Gas line including lin m 70
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
18.1.6(i)b Utility culvert for protection of 24 Gas line including lin.m. 70
excavation, backfilling, concreting (Class 35/20),
reinforcement etc as per drawings but excluding any
roadway related items over the culvert, as per OGC
specification and requirements
18.1.6(i)c Utility culvert for protection of 16'' Gas line including lin.m. 145
excavation, backfilling, concreting (Class 35/20),
reinforcement etc as per drawings but excluding any
roadway related items over the culvert, as per OGC
specification and requirements
Carried to Collection Page - 1

9/2 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
UTILITIES Bill No. 9

(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
18 UTILITIES (Continued)
18.1 Locating and Protecting Existing Utilities (Continued)
Oil Line Utility
18.1.6(i)d Utility culvert for protection for 24'' oil line including lin.m. 75
excavation, backfilling, concreting (Class 35/20),
reinforcement etc as per drawings but excluding
embankment for roadway over the culvert as per
ORPC (Oman Refineries & Petroleum Chemicals)
Specification and requirements Specification and requirements
Electrical Utility
18.1.6(i)e Supply and Install proposed 2way 200mm dia Upvc lin.m. 110
and 2way 50mm Split duct to protect the existing
underground 33kv electrical cables complete with
concrete protection (class 25/20) including excavation,
backfilling, compaction, end caps, draw ropes and
duct markers etc. at locations shown in the drawings
or as directed by the Engineer
Carried to Collection Page - 1

9/3 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
UTILITIES Bill No. 9

(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
18 UTILITIES (Continued)
18.1 Locating and Protecting Existing Utilities (Continued)
18.1.6(i)f Supply and Install proposed 2way 150mm and 2way lin.m. 50
50mm dia uPVC Split duct to protect the existing
underground 11kv electrical cables complete with
concrete protection (class 25/20) including excavation,
backfilling, compaction, end caps, draw ropes and
duct markers etc. at locations shown in the drawings
or as directed by the Engineer
Telephone Utility
18.1.6(i)g Supply and install 4way 100mm dia Upvc Split duct lin.m. 60
to protect existing Omantel / Nawras / MOD cables
complete with concrete protection (class 25/20)
including excavation, backfilling, duct marker and
compaction etc. at locations shown in the drawings
or as directed by the Engineer as per Omantel /
Nawras / MOD Standards and Specifications
Carried to Collection Page - 1

9/4 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
UTILITIES Bill No. 9

(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
18 UTILITIES (Continued)
18.1 Locating and Protecting Existing Utilities (Continued)
18.1.6(i)h Supply and install 2way 100mm dia and 2way 100mm lin.m. 50
dia Upvc Split duct to protect existing Omantel /
Nawras / MOD cables complete with concrete protection
(class 25/20) including excavation, backfilling, duct
marker and compaction etc. at locations shown in the
drawings or as directed by the Engineer as per Omantel/
Nawras / MOD Standards and Specifications
18.2 Removing and Disposing or Relocating
Existing Utilities
Electrical Utility
18.2.6(i)a Carefully disconnect and remove existing LV overhead lin.m. 1,040
electrical Cable any size including poles stay
insulators and any other accessories existing wires,
and dispose of same to the locations as directed
by the Engineer
18.2.6(i)b Carefully disconnect and remove existing LV lin.m. 1,300
underground electrical cables and any other
accessories existing and dispose of same to the
locations as directed by the Engineer
Carried to Collection Page - 1

9/5 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
UTILITIES Bill No. 9

(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
18 UTILITIES (Continued)
18.2 Removing and Disposing or Relocating
Existing Utilities (Continued)
18.2.6(i)c Carefully disconnect and remove existing 11KV lin.m. 11,100
overhead electrical conductors including poles stay
wires, insulators and any other accessories existing
and dispose of same to the locations as directed
by the Engineer
18 2 6(i)d Carefully disconnect and remove existing 11KV lin m 370 18.2.6(i)d Carefully disconnect and remove existing 11KV lin.m. 370
underground electrical cables and any other
accessories existing and dispose of same to the
locations as directed by the Engineer
18.2.6(i)e Carefully disconnect and remove existing 33KV lin.m. 1,520
overhead electrical conductors including poles stay
wires, insulators and any other accessories existing
and dispose of same to the locations as directed
by the Engineer
18.2.6(i)f Carefully disconnect and remove existing 33KV lin.m. 220
underground electrical cables and any other
accessories existing and dispose of same to the
locations as directed by the Engineer
Carried to Collection Page - 1

9/6 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
UTILITIES Bill No. 9

(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
18 UTILITIES (Continued)
18.2 Removing and Disposing or Relocating
Existing Utilities (Continued)
18.2.6(i)g Carefully disconnect and remove existing 132KV lin.m. 800
overhead electrical conductors, Double Circuit
(6 conductor together) including insulatorsand other
accessories existing and dispose of same to the
locations as directed by the Engineer (Quantity
measured as Route length).
18.2.6(i)h Carefully disconnect and remove existing 132KV nr. 3
electricity pylons including foundation, excavation,
backfilling and any other accessories existing and
dispose of same (except foundation) to the locations
as directed by the Engineer
18.2.6(i)i Carefully disconnect and remove existing 220KV lin.m. 1,500
overhead electrical conductors, Double Circuit
(6 conductor together) including insulatorsand other
accessories existing and dispose of same to the
locations asdirected by the Engineer (Quantity
measured as Route length).
Carried to Collection Page - 1

9/7 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
UTILITIES Bill No. 9

(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
18 UTILITIES (Continued)
18.2 Removing and Disposing or Relocating
Existing Utilities (Continued)
18.2.6(i)j Carefully disconnect and remove existing 220KV nr. 2
electricity pylons including foundation, excavation,
backfilling and any other accessories existing and
dispose of same (except foundation) to the locations
as directed by the Engineer
Water Utility Water Utility
18.2.6(i)k Locate excavate down to and remove the existing lin.m. 300
110mm diameter AC/DI pipe including but not limited
to valve chambers, Fire hydrants and all other
accessories complete and dispose of same to the
locations as directed by the Engineer including
excavation, backfill, disposal, disconnection ,etc
18.2.6(i)l Locate excavate down to and remove the existing lin.m. 300
800mm diameter CS pipe including but not limited
to valve chambers, Fire hydrants and all other
accessories complete and dispose of same to the
locations as directed by the Engineer including
excavation, backfill, disposal, disconnection ,etc
Carried to Collection Page - 1

9/8 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
UTILITIES Bill No. 9

(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
18 UTILITIES (Continued)
18.2 Removing and Disposing or Relocating
Existing Utilities (Continued)
Telephone Utility
18.2.6(i)m Locate, excavate down, disconnect and remove lin.m. 600
existing telephone cables and ducts, chambers and
dispose of same (except chambers) to the locations
as directed by the Engineer including excavation,
backfilling disposal etc backfilling, disposal etc.
For Electrical: All LV, 11KV/33KV Electrical
Relocation work including materials shall be as
per MEDC/Mazoon/Majan Electricity Distribution
Company Standards and Specifications.
18.2.6(ii)a Carefully disconnect and Relocate existing 11KV nr. 2
substation with 500KVA TX+ 1 No. and 800 A Feeder
pillar locations as directed by the Engineer including
foundation, jointing, excavation & connecting to the
existing supply, testing, commissioning, all civil works
and other accessories necessary to complete the
system functional
Carried to Collection Page - 1

9/9 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
UTILITIES Bill No. 9

(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
18 UTILITIES (Continued)
18.2 Removing and Disposing or Relocating
Existing Utilities (Continued)
18.2.6(ii)b Carefully disconnect and Relocate existing 11KV nr. 1
substation with 500KVA TX+ 1 No. RMU+1 No. OLU
and 1000 A Feeder pillar locations as directed by
the Engineer including foundation, jointing, excavation
& connecting to the existing supply, testing,
commissioning, all civil works and other accessories
necessary to complete the system functional necessary to complete the system functional
18.2.6(ii)c Remove and Relocate Underground MRM&WR Borewell nr. 2
with existing equipment complete with new structure,
pipe work, all electro mechanical work and necessary
work to complete system to make functional
18.2.6(ii)d Remove and Relocate Rain Water Monitoring Station nr. 1
(MRM&WR) existing equipment complete with new
structure, pipe work, all electro mechanical work and
necessary work to complete system to make functional
Carried to Collection Page - 2

9/10 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
UTILITIES Bill No. 9

(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
18 UTILITIES (Continued)
18.2 Removing and Disposing or Relocating
Existing Utilities (Continued)
Provide and install new utilities
18.2.6(iii)a Supply and installation of overhead LV electrical lin.m. 1,650
Cable including poles, stay wires, insulators,
jumpers, stringing, jointing, excavation & backfilling
of poles, connecting to the existing supply, testing,
commissioning carting spoil to tips as directed all commissioning, carting spoil to tips as directed, all
necessary labor, operation, materials, accessories,
earthing.
18.2.6(iii)b Supply and installation of underground proposed LV lin.m. 1,095
cable (4C x 240 Sq.mm) complete including excavation,
backfilling, cable covering tiles, warning tapes, joints,
connecting to the existing supply, testing,
commissioning, carting spoil to tips as directed, all
necessary labor, operation, materials and any other
accessories including earthing, etc
Carried to Collection Page - 2

9/11 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
UTILITIES Bill No. 9

(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
18 UTILITIES (Continued)
18.2 Removing and Disposing or Relocating
Existing Utilities (Continued)
18.2.6(iii)c Supply and installation of overhead 11 KV electrical lin.m. 5,500
conductors (3 conductors together) for Street Lighting
complete including poles, stay wires, insulators, AB
switches, lightning arrestors, jumpers, stringing,
jointing, excavation & backfilling of poles, connecting
to the existing supply, testing, commissioning,
carting spoil to tips as directed all necessary labor carting spoil to tips as directed, all necessary labor,
operation, materials, accessories, earthing and any
special protection to the poles (Wadi Area).
(Quantity measured as Route length).
18.2.6(iii)d Supply and installation of underground proposed lin.m. 1,000
11KV Electrical cable for Street Lighting complete
including excavation, backfilling, cable covering tiles,
warning tapes, route markers, joints, connecting to
the existing supply, testing, commissioning, carting
spoil to tips as directed, all necessary labor,
operation, materials and any other accessories
including earthing, etc.
Carried to Collection Page - 2

9/12 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
UTILITIES Bill No. 9

(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
18 UTILITIES (Continued)
18.2 Removing and Disposing or Relocating
Existing Utilities (Continued)
18.2.6(iii)e Supply and installation of overhead 11 KV electrical lin.m. 7,350
conductors (3 conductors together) complete
including poles, stay wires, insulators, AB
switches, lightning arrestors, jumpers, stringing,
jointing, excavation & backfilling of poles, connecting
to the existing supply, testing, commissioning,
carting spoil to tips as directed all necessary labor carting spoil to tips as directed, all necessary labor,
operation, materials, accessories, earthing and any
special protection to the poles (Wadi Area).
(Quantity measured as Route length).
18.2.6(iii)f Supply and installation of underground proposed lin.m. 5,220
11KV Electrical cable complete including
excavation, backfilling, cable covering tiles,
warning tapes, route markers, joints, connecting to
the existing supply, testing, commissioning, carting
spoil to tips as directed, all necessary labor,
operation, materials and any other accessories
including earthing, etc.
Carried to Collection Page - 2

9/13 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
UTILITIES Bill No. 9

(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
18 UTILITIES (Continued)
18.2 Removing and Disposing or Relocating
Existing Utilities (Continued)
18.2.6(iii)g Supply and installation of underground proposed lin.m. 2,000
33KV Electrical cable complete including excavation,
backfilling, cable covering tiles, warning tapes, joints,
connecting to the existing supply, testing,
commissioning, carting spoil to tips as directed, all
necessary labor, operation, materials and any other
accessories including earthing etc accessories including earthing, etc.
18.2.6(iii)h Supply and installation of proposed overhead 132KV lin.m. 900
Electrical AAAC Twin YEW Conductors, Double
Circuit (6 conductor together) including insulators,
warning lights, ground wire, connecting to the existing
supply, testing, commissioning, carting spoil to tips
as directed, all necessary labor, operation, materials
and any other accessories including earthing, etc.
complete as per OETC Standards & Specifications
(Quantity measured as Route length).
18.2.6(iii)i Design, Supply, Install, Testing and Commissioning nr. 2
132KV electricity pylons (Tension Type) including
concrete foundations, all other accessories, fittings,
design calculations and shop drawings etc. complete
as per OETC Standards & Specifications
Carried to Collection Page - 2

9/14 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
UTILITIES Bill No. 9

(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
18 UTILITIES (Continued)
18.2 Removing and Disposing or Relocating
Existing Utilities (Continued)
18.2.6(iii)j Design, Supply, Install, Testing and Commissioning nr. 2
132KV electricity pylons (Suspension Type) including
concrete foundations, all other accessories, fittings,
design calculations and shop drawings etc. complete
as per OETC Standards & Specifications
18 2 6(iii)k Supply and installation of proposed overhead 220KV lin m 1 500 18.2.6(iii)k Supply and installation of proposed overhead 220KV lin.m. 1,500
Electrical AAAC Twin YEW Conductors, Double
Circuit (6 conductor together) including insulators,
warning lights, ground wire, connecting to the existing
supply, testing, commissioning, carting spoil to tips
as directed, all necessary labor, operation, materials
and any other accessories including earthing, etc.
complete as per OETC Standards & Specifications
(Quantity measured as Route length).
Carried to Collection Page - 2

9/15 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
UTILITIES Bill No. 9

(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
18 UTILITIES (Continued)
18.2 Removing and Disposing or Relocating
Existing Utilities (Continued)
18.2.6(iii)l Supply and installation of underground proposed lin.m. 300
220KV Electrical cables (Double Circuit, 12nr. Single
core cable) complete including
excavation, backfilling, cable covering tiles,
warning tapes, joints, connecting to the existing
supply, testing, commissioning, carting spoil to tips
as directed all necessary labor operation materials as directed, all necessary labor, operation, materials
and any other accessories including earthing, etc.
18.2.6(iii)m Design, Supply, Install, Testing and Commissioning nr. 1
220KV electricity pylons (Tension Type) including
concrete foundations, all other accessories, fittings,
design calculations and shop drawings etc. complete
as per OETC Standards & Specifications
18.2.6(iii)n Design, Supply, Install, Testing and Commissioning nr. 1
220KV electricity pylons (Suspension Type) including
concrete foundations, all other accessories, fittings,
design calculations and shop drawings etc. complete
as per OETC Standards & Specifications
Carried to Collection Page - 2

9/16 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
UTILITIES Bill No. 9

(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
18 UTILITIES (Continued)
18.2 Removing and Disposing or Relocating
Existing Utilities (Continued)
Supply & Installation of New Water Lines: The
New Pipe lines installed to replace affected pipe
lines should have all the fittings, accessories,
Valves (Gate valves, Drain valves, Air Valves, etc),
Fire Hydrants, any other specials and related
Chambers complete necessary to reinstate the
network functional as that of the existing as shown network functional as that of the existing as shown
on the Drawings
18.2.6(iii)o Supply and install 110mm HDPE Water pipes (PN16) lin.m. 500
complete with all the specials, fittings, and chambers
including but not limited to tees, bends, shut off valves,
air valves, washout valves, Fire hydrants, thrust blocks
etc and also excavation, backfilling, warning tape,
bedding and surrounding, jointing to existing water pipe
and jointing material, Flushing, Disinfecting, pressure
testing and any other items necessary to complete
the work
Carried to Collection Page - 2

9/17 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
UTILITIES Bill No. 9

(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
18 UTILITIES (Continued)
18.2 Removing and Disposing or Relocating
Existing Utilities (Continued)
18.2.6(iii)p Supply and install 800mm CS Water pipes lin.m. 300
complete with all the specials, fittings, and chambers
including but not limited to tees, bends, shut off valves,
air valves, washout valves, Fire hydrants, thrust blocks
etc and also excavation, backfilling, warning tape,
bedding and surrounding, jointing to existing water pipe
and jointing material Flushing Disinfecting pressure and jointing material, Flushing, Disinfecting, pressure
testing and any other items necessary to complete
the work
18.2.6(iii)q Supply and install 4Way uPVC duct for telephone lin.m. 50
cables, including but not limited to excavation,
backfilling, warning tape, bedding and surrounding,
jointing and jointing material, manholes, handholes,
junction boxes and any other items necessary to
complete the work
18.2.6(iii)r Supply and install 2Way uPVC duct for telephone lin.m. 420
cables, including but not limited to excavation,
backfilling, warning tape, bedding and surrounding,
jointing and jointing material, manholes, handholes,
junction boxes and any other items necessary to
complete the work
Carried to Collection Page - 3

9/18 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
UTILITIES Bill No. 9

(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
18 UTILITIES (Continued)
18.2 Removing and Disposing or Relocating
Existing Utilities (Continued)
18.2.6(iii)s Supply and install 1Way uPVC duct for telephone lin.m. 50
cables, including but not limited to excavation,
backfilling, warning tape, bedding and surrounding,
jointing and jointing material, manholes, handholes,
junction boxes and any other items necessary to
complete the work
18.2.6(iii)t Supply, install and laying EEF 100x0.65 telephone lin.m. 210
cable including jointing, jointing material and any
other items necessary to complete and commission
the work
18.2.6(iii)u Supply, install and laying EEF 200x0.65 telephone lin.m. 210
cable including jointing, jointing material and any
other items necessary to complete and commission
the work
Carried to Collection Page - 3

9/19 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
UTILITIES Bill No. 9

(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
18 UTILITIES (Continued)
18.3 Service / Future Utility Road Crossing Ducts
18.3.6(i)a Supply and Install proposed 9way 200mm and 2way lin.m. 150
100mm dia uPVC duct for 132kv electrical cables with
concrete protection (class 25/20), laid and jointed in
trenches beneath carriageway including excavation,
backfilling, compaction, end caps, draw ropes and
duct markers etc. complete at locations shown in
the drawings or as directed by the Engineer
18.3.6(i)b Supply and Install proposed 9way 200mm and 2way lin.m. 150
100mm dia uPVC duct for 220kv electrical cables with
concrete protection (class 25/20), laid and jointed in
trenches beneath carriageway including excavation,
backfilling, compaction, end caps, draw ropes and
duct markers etc. complete at locations shown in
the drawings or as directed by the Engineer
18.3.6(i)c Supply and Install proposed 2way 100mm dia lin.m. 200
uPVC duct for electrical cables with concrete
surround (class 25/20), laid and jointed in trenches
beneath carriageway including excavation, backfilling,
compaction, end caps, draw ropes and duct markers
etc. complete at locations shown in the drawings or
as directed by the Engineer
Carried to Collection Page - 3

9/20 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
UTILITIES Bill No. 9

(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
18 UTILITIES (Continued)
18.3 Service / Future Utility Road Crossing Ducts
(Continued)
18.3.6(i)d Supply and Install proposed 2way 150mm dia lin.m. 1,100
uPVC duct for electrical cables with concrete
surround (class 25/20), laid and jointed in trenches
beneath carriageway including excavation, backfilling,
compaction, end caps, draw ropes and duct markers
etc. complete at locations shown in the drawings or
as directed by the Engineer as directed by the Engineer
18.3.6(i)e Supply and Install proposed 2way 200mm and 2way lin.m. 100
50mm dia uPVC duct for electrical cables with
concrete surround (class 25/20), laid and jointed in
trenches beneath carriageway including excavation,
backfilling, compaction, end caps, draw ropes and
duct markers etc. complete at locations shown in the
drawings or as directed by the Engineer
18.3.6(i)f Supply and Install proposed 4way 200mm and 2way lin.m. 100
50mm dia uPVC duct for electrical cables with
concrete surround (class 25/20), laid and jointed in
trenches beneath carriageway including excavation,
backfilling, compaction, end caps, draw ropes and
duct markers etc. complete at locations shown in
the drawings or as directed by the Engineer
Carried to Collection Page - 3

9/21 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
UTILITIES Bill No. 9

(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
18 UTILITIES (Continued)
18.3 Service / Future Utility Road Crossing Ducts
(Continued)
18.3.6(i)g Supply and install 2way 200mm dia uPVC duct for lin.m. 100
proposed Omantel / Nawras / MOD cables complete
with concrete protection (class 25/20) including
excavation, backfilling, compaction, end caps and
draw ropes etc. at locations shown in the drawings or
as directed by the Engineer as per Omantel / Nawras /
MOD Standards and Specifications MOD Standards and Specifications
18.3.6(i)h Supply and install 2way 100mm dia uPVC duct for lin.m. 230
proposed Omantel / Nawras / MOD cables complete
with concrete protection (class 25/20) including
excavation, backfilling, compaction, end caps and
draw ropes etc. at locations shown in the drawings or
as directed by the Engineer as per Omantel / Nawras /
MOD Standards and Specifications
18.3.6(i)i Supply and install 4way 150mm dia uPVC duct for lin.m. 210
proposed Omantel / Nawras / MOD cables complete
with concrete protection (class 25/20) including
excavation, backfilling, compaction, end caps and
draw ropes etc. at locations shown in the drawings or
as directed by the Engineer as per Omantel / Nawras /
MOD Standards and Specifications
Carried to Collection Page - 3

9/22 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
UTILITIES Bill No. 9

(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
18 UTILITIES (Continued)
18.3 Service / Future Utility Road Crossing Ducts
(Continued)
Future Ducts
18.3.6(i)j Supply and Install proposed 9way 200mm and 2way lin.m. 100
100mm dia uPVC duct for 132kv electrical cables with
concrete protection (class 25/20), laid and jointed in
trenches beneath carriageway including excavation,
backfilling compaction end caps draw ropes and backfilling, compaction, end caps, draw ropes and
duct markers etc. complete at locations shown in
the drawings or as directed by the Engineer
18.3.6(i)k Supply and Install proposed 2way 200mm dia lin.m. 100
uPVC duct for 33kv electrical cables with concrete
protection (class 25/20), laid and jointed in trenches
beneath carriageway including excavation, backfilling,
compaction, end caps, draw ropes and duct markers
etc. complete at locations shown in the drawings or
as directed by the Engineer
Carried to Collection Page - 3

9/23 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
UTILITIES Bill No. 9

(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
18 UTILITIES (Continued)
18.3 Service / Future Utility Road Crossing Ducts
(Continued)
18.3.6(i)l Supply and Install proposed 4way 150mm dia uPVC lin.m. 200
duct for 11kv electrical cables with concrete
protection (class 25/20), laid and jointed in trenches
beneath carriageway including excavation, backfilling,
compaction, end caps, draw ropes and duct markers
etc. complete at locations shown in the drawings or
as directed by the Engineer as directed by the Engineer
18.3.6(i)m Supply and Install proposed 2way 100mm dia uPVC lin.m. 200
duct for LV cables with concrete protection
(class 25/20), laid and jointed in trenches beneath
carriageway including excavation, backfilling,
compaction, end caps, draw ropes and duct markers
etc. complete at locations shown in the drawings or
as directed by the Engineer
18.3.6(i)n Supply and Install proposed 2way 100mm dia lin.m. 200
uPVC duct for Street Lighting cables with concrete
protection (class 25/20), laid and jointed in trenches
beneath carriageway including excavation, backfilling,
compaction, end caps, draw ropes and duct markers
etc. complete at locations shown in the drawings or
as directed by the Engineer
Carried to Collection Page - 3

9/24 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
UTILITIES Bill No. 9

(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
18 UTILITIES (Continued)
18.3 Service / Future Utility Road Crossing Ducts
(Continued)
18.3.6(i)o Supply and Install proposed 2way 300mm dia lin.m. 200
uPVC duct for Irrigation Line with concrete protection
(class 25/20), laid and jointed in trenches beneath
carriageway including excavation, backfilling,
compaction, end caps, draw ropes and duct markers
etc. complete at locations shown in the drawings or
as directed by the Engineer as directed by the Engineer
18.3.6(i)p Supply and Install proposed 4way 100mm dia lin.m. 200
uPVC duct for Telephone Line with concrete
protection (class 25/20), laid and jointed in trenches
beneath carriageway including excavation, backfilling,
compaction, end caps, draw ropes and duct markers
etc. complete at locations shown in the drawings or
as directed by the Engineer
Carried to Collection Page - 3

9/25 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
UTILITIES Bill No. 9

(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
COLLECTION PAGE - 1
Page 9/1
Page 9/2
Page 9/3
Page 9/4 Page 9/4
Page 9/5
Page 9/6
Page 9/7
Page 9/8
Carried to Summary

9/26 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
UTILITIES Bill No. 9

(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
COLLECTION PAGE - 2
Page 9/9
Page 9/10
Page 9/11
Page 9/12 Page 9/12
Page 9/13
Page 9/14
Page 9/15
Page 9/16
Carried to Summary

9/27 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
UTILITIES Bill No. 9

(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
COLLECTION PAGE - 3
Page 9/17
Page 9/18
Page 9/19
Page 9/20 Page 9/20
Page 9/21
Page 9/22
Page 9/23
Page 9/24
Carried to Summary

9/28 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
UTILITIES Bill No. 9

(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
SUMMARY
COLLECTION PAGE 1 - 9/25
COLLECTION PAGE 2 - 9/26
COLLECTION PAGE 3 - 9/27
Carried to Grand Summary - 1
11/1 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
DAYWORKS Bill No. 11

(in figures) (in words) R.O. Bzs.
19 DAYWORKS
19.1 Wages
These include proper wages, all used allowance,
medical expenses and all other charges provided for
by local laws.
19.1a Labourer - Skilled (Omani) hour 10
Item No. Item Description Unit
Estimated
Quantity
Unit Rate (Rial Omani) Amount
19.1b Labourer - Skilled (Expatriate) hour 10
19.1c Labourer - Unskilled (Omani) hour 10
19.1d Labourer - Unskilled (Expatriate) hour 10
19.1e Carpenter hour 10
19.1f Mason/Concrete finisher hour 10
19.1g Driver: Heavy Duty hour 10
19.1h Driver: Light Duty hour 10
Carried to Collection Page - 1
11/2 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
DAYWORKS Bill No. 11

(in figures) (in words) R.O. Bzs.
Item No. Item Description Unit
Estimated
Quantity
Unit Rate (Rial Omani) Amount
19.1i Pipe fitter hour 10
19.1j Plant Operator: Heavy hour 10
19.1k Plant Operator: Light hour 10
19.1l Steel Fixer hour 10
19.1m Welder hour 10
19.1n Painter hour 10
19.1o Electrician hour 10
19.1p Plumber hour 10
19.1q Driller hour 10
19.1r Gangers hour 10
19.1s Plasterers hour 10
19.1t Scaffolders hour 10
Carried to Collection Page - 1
11/3 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
DAYWORKS Bill No. 11

(in figures) (in words) R.O. Bzs.
Item No. Item Description Unit
Estimated
Quantity
Unit Rate (Rial Omani) Amount
19.1u ..
19.1v ..
19.1w ..
19.1x ..
19.2 Operating Equipment on Site
The rates inserted by the tenderer shall be deemed to
include for the use of the plant inclusive of all fuel and
consumable stores, overhauls, repairs and
replacements, spare parts, tyres, insurance and all
other charges relating to plant including haulage to and
from the site but exclusive of driver and attendants who
shall be paid as laid down in the Labour Schedule.
Payments for working plants shall be for the hours
worked only. No allowance for standing time will be
made.
19.2a Bulldozer up to 100HP hour 5
19.2b Bulldozer 100 to 200HP hour 5
Carried to Collection Page - 1
11/4 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
DAYWORKS Bill No. 11

(in figures) (in words) R.O. Bzs.
Item No. Item Description Unit
Estimated
Quantity
Unit Rate (Rial Omani) Amount
19.2c Bulldozer over 200HP hour 5
19.2d Motor grader up to 140 HP hour 5
19.2e Motor grader over 140 HP hour 5
19.2f Vibratory roller up to 3 tones hour 5
19.2g Vibratory roller above 3 tones hour 5
19.2h Pneumatic roller over 10 tones hour 5
19.2i Tandem roller up to 10 tones hour 5
19.2j Tandem roller over 10 tones hour 5
19.2k Wheel loader up to 3 cu.m. hour 5
19.2l Wheel loader above 3 cu.m. hour 5
19.2m Excavator up to 1 cu.m. hour 5
19.2n Excavator over 1 cu.m. hour 5
Carried to Collection Page - 1
11/5 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
DAYWORKS Bill No. 11

(in figures) (in words) R.O. Bzs.
Item No. Item Description Unit
Estimated
Quantity
Unit Rate (Rial Omani) Amount
19.2o Water tanker, Minimum 6 cu.m. hour 5
19.2p Concrete vibrator (poker/screed) up to dia 50mm hour 5
19.2q Dump Truck up to 5 tones hour 5
19.2r Dump Truck from 5 to 10 tones hour 5
19.2s Dump truck over 10 tones hour 5
19.2t Water pump 2 inch hour 5
19.2u Water pump 3 inch hour 5
19.2v Air compressor up to 6000 liters capacity hour 5
19.2w Air compressor over 6000 liters capacity hour 5
19.2x Bituminous mixing plant with batching apparatus from hour 5
80t/hto 150 t/h
19.2y Finisher up to 80t./h hour 5
19.2z Finisher from 80t./h to 120t./h hour 5
Carried to Collection Page - 1
11/6 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
DAYWORKS Bill No. 11

(in figures) (in words) R.O. Bzs.
Item No. Item Description Unit
Estimated
Quantity
Unit Rate (Rial Omani) Amount
19.2aa Bituminous sprayer up to 6 tones hour 5
19.2ab Crane, with boom and jib 5 to 10 tones hour 5
19.2ac Crane with boom and jib over 10 tones hour 5
19.2ad Generator 60 kW hour 5
19.2ae Low Bed hour 5
19.2af Hiab hour 5
19.2ag Generator 75 kW hour 5
19.2ah Generator 100 kW hour 5
19.2ai Generator 150 kW hour 5
19.2aj Generator 200 kW hour 5
19.2ak Welding plant hour 5
19.2al Concrete mixer up to 0.5 cu.m. hour 5
19.2am Concrete mixer over 0.5 cu.m. hour 5
Carried to Collection Page - 1
11/7 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
DAYWORKS Bill No. 11

(in figures) (in words) R.O. Bzs.
Item No. Item Description Unit
Estimated
Quantity
Unit Rate (Rial Omani) Amount
19.2an Automatic concrete batching plant hour 5
19.2ao Pick up truck up to 3 tones hour 5
19.2ap Pick up truck over 3 tones hour 5
19.2aq Van or Utility Vehicle hour 5
19.2ar Welding set, 300A, including electrodes hour 5
19.2as ..
19.2at ..
19.2au ..
Carried to Collection Page - 1
11/8 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
DAYWORKS Bill No. 11

(in figures) (in words) R.O. Bzs.
Item No. Item Description Unit
Estimated
Quantity
Unit Rate (Rial Omani) Amount
19.3 MATERIALS
These rates includes all the charges for the supply of the
materials, loading, transportation to site, unloading and
stores as well as the charges provided in the General
and Special Specification and in the Contract.
19.3a Aggregates for granular sub base course in accordance cu.m. 30
with the General and Special Specification, in place as
specified. p
19.3b Aggregates for aggregate base course in accordance cu.m. 30
with the General and Special Specification, in place as
specified.
19.3c Aggregates for bituminous base course in accordance cu.m. 30
with the General and Special Specification, near the
asphalt plant, in bulk
19.3d Fine aggregate for concrete in accordance with the cu.m. 30
General and Special Specification, in place, in bulk
19.3e Course aggregate for concrete in accordance with the cu.m. 50
General and Special Specification, in place, in bulk
Carried to Collection Page - 2
11/9 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
DAYWORKS Bill No. 11

(in figures) (in words) R.O. Bzs.
Item No. Item Description Unit
Estimated
Quantity
Unit Rate (Rial Omani) Amount
19.3f Stone for Drainage masonry and slope protection in cu.m. 50
accordance with the General and Special Specification,
in place, in bulk
19.3g Asphalt cement, grade 60-70 on site t. 10
19.3h Asphalt cement, grade 50-60 on site t. 10
19.3i Emulsion asphalt, grade RS-1, on site t. 10
19.3j Cutback asphalt, MC and RC type, on site t. 10
19.3k Portland Cement, on site t. 10
19.3l Deformed billet steel bars AASHTO M31 grade 60 t. 10
(High yield) of any dia.
19.3m Highway signs sq.m. 10
19.3n Highway signs Supports - 1 post nr. 10
19.3o Highway signs Supports - 2 post nr. 10
19.3p W -Beam type Guardrail lin.m. 10
Carried to Collection Page - 2
11/10 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
DAYWORKS Bill No. 11

(in figures) (in words) R.O. Bzs.
Item No. Item Description Unit
Estimated
Quantity
Unit Rate (Rial Omani) Amount
19.3q End anchorage for W -beam type Guardrails nr. 10
19.3r Water depth gauges nr. 10
19.3s Wire mesh Gabions on site t. 10
19.3t Gasoline on site liter 100
19.3u Lubricant Kg. 100
19.3v ..
19.3w ..
19.3x ..
Carried to Collection Page - 2
11/11 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
DAYWORKS Bill No. 11

(in figures) (in words) R.O. Bzs.
Item No. Item Description Unit
Estimated
Quantity
Unit Rate (Rial Omani) Amount
COLLECTION PAGE - 1
Page 11/1
Page 11/2
Page 11/3 g
Page 11/4
Page 11/5
Page 11/6
Page 11/7
Carried to Summary
11/12 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
DAYWORKS Bill No. 11

(in figures) (in words) R.O. Bzs.
Item No. Item Description Unit
Estimated
Quantity
Unit Rate (Rial Omani) Amount
COLLECTION PAGE - 2
Page 11/8
Page 11/9
Page 11/10
Carried to Summary
11/13 .
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
DAYWORKS Bill No. 11

(in figures) (in words) R.O. Bzs.
Item No. Item Description Unit
Estimated
Quantity
Unit Rate (Rial Omani) Amount
SUMMARY
COLLECTION PAGE 1 - 11/11
COLLECTION PAGE 2 - 11/12
Carried to Grand Summary - 1
Construction of Batinah Expressway - Package 7
Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No.
BILL OF QUANTITIES
GRAND SUMMARY - 1 GS 1

R.O Bzs.
GRAND SUMMARY - 1
2 EARTHWORKS 2/6
3 GRANULAR SUB-BASE, AGGREGATE BASE COURSE, AND STABILISED BASE COURSES 3/1
4 BITUMINOUS PAVEMENT 4/1
5 CONCRETE AND CONCRETE STRUCTURES 5/13
BILL No. ITEM DESCRIPTION Page No.
Amount
6 INCIDENTAL CONSTRUCTION 6/16
7 ROAD LIGHTING AND ELECTRICAL INSTALLATION 7/10
9 UTILITIES 9/28
11 DAY WORKS 11/13
ADD CONTINGENCIES @ 10% OF SUB-TOTAL EXCLUDING BILL 11
TOTAL VALUE CARRIED TO GENERAL SUMMARY





BILL OF QUANTITIES
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway

2a/1 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 2a
EARTHWORKS
(in figures) (in words) R.O. Bzs.
2 EARTHWORKS
2.1 Clearing and Grubbing
2.1.5(i) Clear site of all trees less than 300mm ,shrubs, sq.m. 795,900
vegetation including roots as necessary to
commence work
2.1.5(ii)a Removal and delivery of trees of 300mm trunk nr. 140
diameter or greater
Item No.
Estimated
Quantity
Unit Rate (Rial Omani) Amount
Item Description Unit
diameter or greater
2.1.5(ii)b Removal and disposal of trees of 300mm trunk nr. 100
diameter or greater
2.2 Removal of Structures and Obstructions
2.2.5(i)a Removal of existing building, single-storey area upto nr. 1
500sq.m.
2.2.5(i)b Removal of existing bus shed nr. 6
2.2.5(ii) Removal of reinforced concrete (for box culverts) cu.m. 800
2.2.5(iii) Removal of mass concrete (200mm thick) cu.m. 400
Carried to Summary
2a/2 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 2a
EARTHWORKS
(in figures) (in words) R.O. Bzs.
Item No.
Estimated
Quantity
Unit Rate (Rial Omani) Amount
Item Description Unit
2 EARTHWORKS (Continued)
2.2 Removal of Structures and Obstructions
(Continued)
2.2.5(v) Removal of Concrete Curbs lin.m. 1,800
2.2.5(vi) Removal of interlocking tiles in sidewalks and median sq.m. 1,500
2.2.5(vii) Removal of pipe culvert (900mm diameter) lin.m. 100
2.2.5(viii) Removal and disposal of bituminous pavement cu.m. 28,000
200mm max. thickness in carriageways and paved
areas
2.2.5(x) Removal of steel safety barrier including posts and lin.m. 16,000
foundation
2.2.5(xi) Removal of concrete barrier lin.m. 500
Carried to Summary
2a/3 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 2a
EARTHWORKS
(in figures) (in words) R.O. Bzs.
Item No.
Estimated
Quantity
Unit Rate (Rial Omani) Amount
Item Description Unit
2 EARTHWORKS (Continued)
2.2 Removal of Structures and Obstructions
(Continued)
2.2.5(xii)a Removal of sign boards (single post) nr. 80
2.2.5(xii)b Removal of sign boards (multi post) nr. 40
2.2.5(xviii)a Removal of Mortared Riprap cu.m. 2,500
2.2.5(xviii)b Removal of Gabion Boxes cu.m. 1,500
2.2.5(xix) Removal and disposal of Existing Fence with gate lin.m. 2,060
(up to 2m high)
2.2.5(xx) Removal and disposal of Existing Masonry Wall cu.m. 500
(Block Type, up to 2m high)
Carried to Summary
2a/4 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 2a
EARTHWORKS
(in figures) (in words) R.O. Bzs.
Item No.
Estimated
Quantity
Unit Rate (Rial Omani) Amount
Item Description Unit
2 EARTHWORKS (Continued)
2.2 Removal of Structures and Obstructions
(Continued)
2.2.5(xxvi)a Removal and delivery for re-use by others of Street nr. 200
Light Pole, to the MRMWR stores or as directed
by Engineer
2 2 5(xxvi)b Removal and delivery for re use by others of Flag Pole nr 50 2.2.5(xxvi)b Removal and delivery for re-use by others of Flag Pole, nr. 50
to the MRMWR stores or as directed by Engineer
2.3 Roadway Excavation
2.3.6(i) Unclassified excavation to Embankment & Dyke cu.m. 225,000
2.3.6(iii) Unclassified Excavation under water cu.m. 500
2.3.6(v) Leveling and Grading for Wadi Training Works cu.m. 12,000
Carried to Summary
2a/5 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 2a
EARTHWORKS
(in figures) (in words) R.O. Bzs.
Item No.
Estimated
Quantity
Unit Rate (Rial Omani) Amount
Item Description Unit
2 EARTHWORKS (Continued)
2.4 Borrow Materials
2.4.6(i)a Borrow excavation to embankment & Dykes cu.m. 1,252,000
2.6 Sub-grade Construction
2.6.6(i) Sub grade preparation in cut sq.m. 350,000
2.7 Excavation and Backfilling for structures
2.7.6(i) Unclassified structural excavation cu.m. 20,690
(depth 0m to 2.0m)
2.7.6(ii) Unclassified structural excavation cu.m. 18,631
(depth >2.0m to <4.0m)
2.7.6(iii) Unclassified structural excavation cu.m. 9,450
(depth 4.0m)
2.7.6(iv) Unclassified structural excavation (under water) cu.m. 1,250
Carried to Summary
2a/6 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 2a
EARTHWORKS
(in figures) (in words) R.O. Bzs.
Item No.
Estimated
Quantity
Unit Rate (Rial Omani) Amount
Item Description Unit
SUMMARY
Page 2a/1
Page 2a/2
Page 2a/3
Page 2a/4
Page 2a/5
Carried to Grand Summary - 2
3a/1 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 3a
GRANULAR SUB-BASE, AGREGATE BASE COURSE, AND STABILISED BASE COURSES
(in figures) (in words) R.O. Bzs.
3 GRANULAR SUB-BASE, AGREGATE BASE
COURSE AND STABILISED BASE COURSES
3.2 Granular Sub-Base Course
3.2.6(ii) Granular Sub-Base Course (Class B) cu.m. 347,400
3.3 Aggregate Base Course
3 3 6(i) Crushed Aggregate Base Course (Class A) cu m 209 600
Item No.
Estimated
Quantity
Unit Rate (Rial Omani) Amount
Item Description Unit
3.3.6(i) Crushed Aggregate Base Course (Class A) cu.m. 209,600
Carried to Grand Summary - 2
4a/1 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 4a
BITUMINOUS PAVEMENT
(in figures) (in words) R.O. Bzs.
4 BITUMINOUS PAVEMENT
4.2 Bituminous Materials for Prime Coat
and Tack Coats
4.2.8(i) Bituminous Prime Coat kg. 819,300
4.2.8(ii) Bituminous Tack Coat kg. 471,710
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
4.2.8(iii) Polymer modified Tack Coat kg. 112,900
4.4 Bituminous Base Course
4.4.14(i) Bituminous Base Course cu.m. 110,700
4.5 Bituminous Binder and Wearing Courses
4.5.14(i) Bituminous Wearing Course cu.m. 38,100
4.5.14(iv) Polymer Modified Bituminous Wearing Course cu.m. 6,000
Carried to Summary
4a/2 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 4a
BITUMINOUS PAVEMENT
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
4 BITUMINOUS PAVEMENT (Continued)
4.5 Bituminous Binder and Wearing Courses
(Continued)
4.5.14(v) Double twisted hexagonal galvanized steel mesh with Sq.m. 32,500
transverse steel bars and with opening note more
than 100mm in any direction
4 9 Pavement Repairs and Reinstatement 4.9 Pavement Repairs and Reinstatement
4.9.10(i) Surface milling (up to 50mm thick) sq.m. 8,000
4.9.10(vi) Making saw cut into asphalt pavement lin.m. 3,000
4.12 Surface Ride ability Measurement
4.12.10(i) International roughness index (IRI) for Asphalt lin.m. 95,000
pavement
Carried to Summary
4a/3 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 4a
BITUMINOUS PAVEMENT
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
SUMMARY
Page 4a/1
Page 4a/2
Carried to Grand Summary - 2
5a/1 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 5a
CONCRETE AND CONCRETE STRUCTURES
(in figures) (in words) R.O. Bzs.
5 CONCRETE AND CONCRETE STRUCTURES
5.1 Concrete Materials and Mixes
5.1.7(i)a Unreinforced Concrete Class 16/20 for Bridges, cu.m. 3,215
Box Culverts, Drains and Pedestrian underpasses
5.1.7(i)b Reinforced Concrete Class 30/20 MS7 for rectangular cu.m. 2,500
closed drains
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
5.1.7(i)c Concrete Class 37.5/20 MS7 in Reinforced Concrete cu.m. 14,900
Box Culvert including headwalls, wing walls, apron slabs
and cut-off walls
5.1.7(i)d Post-tensioned Concrete, Class 50/20 MS7 in Cast cu.m. 17,231
in-situ Post-tensioned Box Girders including Integral
Abutment, Hanging Back wall etc. for 16.560m deck
width (For Interchange Bridges)
5.1.7(i)e Concrete Class 40/20 MS7 in Pedestrian underpasses cu.m. 4,400
including barrel, headwalls and Ramps
5.1.7(i)f Reinforced Concrete, Class 45/20 MS7 in Bridge cu.m. 4,442
abutment, abutment cap and its foundation, Wing wall
etc. (For Interchange Bridges)
Carried to Collection Page - 1
5a/2 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 5a
CONCRETE AND CONCRETE STRUCTURES
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
5 CONCRETE AND CONCRETE STRUCTURES
(Continued)
5.1 Concrete Materials and Mixes (Continued)
5.1.7(i)g Concrete Class 45/20 MS7 in Pile Caps & Footings cu.m. 1,670
(For Interchange Bridges)
5.1.7(i)h Concrete Class 45/20 MS7 in Pier Columns & cu.m. 662
Pier Caps (For Interchange Bridges)
5.1.7(i)i Concrete Class 40/20 MS7 in Approach Slabs including cu.m. 320
all items as indicated on drawings (for Interchange
Bridges)
5.1.7(i)j GRP Cladding to cover space between superstructure sq.m. 160
and Pier column (color to match with Pier)
5.2 Reinforcing Steel
5.2.6(ii)a High tensile steel bar reinforcement, Grade 500, Type 2, t. 6,900
of any diameter for Interchange Bridges and
Pedestrian underpasses
5.2.6(ii)b High tensile steel bar reinforcement of any diameter for t. 2,520
Retaining wall, Box culverts and Drains
Carried to Collection Page - 1
5a/3 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 5a
CONCRETE AND CONCRETE STRUCTURES
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
5 CONCRETE AND CONCRETE STRUCTURES
(Continued)
5.2 Reinforcing Steel (Continued)
5.2.6(iii) Fabric wire mesh reinforcement of any size t. 40
5.4 Prestressed Concrete Structures
5.4.6(i) Prestressing Cables - 0.6" Diameter Strands Grade 270 t. 890
5.7 Cement Concrete Pavement
5.7.6(ii) Reinforced Cement Concrete (Class 28/20) Pavement cu.m. 2,500
at Floodways Locations as shown on Dwg.
5.10 Waterproofing for Structures
5.10.6(i) Bitumen Water Proofing Paint for surfaces in contact sq.m. 30,260
with earth in Culverts, rectangular drains and
Pedestrian underpasses
5.10.6(ii) Waterproofing Membrane including Protection board sq.m. 8,600
for Bridge Abutments, Pier and Pier Footing and
Hanging Back Wall etc.
Carried to Collection Page - 1
5a/4 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 5a
CONCRETE AND CONCRETE STRUCTURES
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
5 CONCRETE AND CONCRETE STRUCTURES
(Continued)
5.10 Waterproofing for Structures (Continued)
5.10.7.7 (i) Waterproofing for Bridge Decks (isocyanite amine sq.m. 16,900
based)
5.12 Load Testing of Bridges
5.12.7(i)a Bridge Loading Test - Testing by Static Load nr. 6
5.12.7(i)b Bridge Loading Test - Testing by Moving Load nr. 6
6 STRUCTURAL STEEL AND OTHER METALWORK
6.6(i) Metal Access door for box girder bridges nr. 36
6.6(ii)a Hand Rails for Pedestrian Underpasses lin.m. 880
as shown on Dwg.
6.6(ii)b Railing for Pedestrian Underpass as shown on Dwg. lin.m. 180
Carried to Collection Page - 1
5a/5 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 5a
CONCRETE AND CONCRETE STRUCTURES
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
8 DRAINAGE
8.1 Pipe Culverts
8.1.6(ii) Reinforced Precast Concrete Pipe Culvert lin.m. 350
(diameter 1000mm)
8.2 Storm Sewers
8.2.6(i)a Storm Sewer, HDPE Pipe (diameter 300mm) lin.m. 50
8.2.6(i)b Storm Sewer, HDPE Pipe (diameter 400mm) lin.m. 17,200
8.2.6(i)c Storm Sewer, HDPE Pipe (diameter 500mm) lin.m. 4,620
8.2.6(i)d Storm Sewer, HDPE Pipe (diameter 600mm) lin.m. 110
8.2.6(i)e Storm Sewer, HDPE Pipe (diameter 900mm) lin.m. 50
8.2.6(i)f Storm Sewer, HDPE Pipe (diameter 1000mm) lin.m. 50
Carried to Collection Page - 1
5a/6 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 5a
CONCRETE AND CONCRETE STRUCTURES
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
8 DRAINAGE (Continued)
8.2 Storm Sewers (Continued)
8.2.6(i)g Storm Sewer, RC Pipe (diameter 300mm) lin.m. 50
8.2.6(i)h Storm Sewer, RC Pipe (diameter 400mm) lin.m. 50
8.2.6(i)i Storm Sewer, RC Pipe (diameter 500mm) lin.m. 50
8.2.6(i)j Storm Sewer, RC Pipe (diameter 600mm) lin.m. 50
8.2.6(i)k Storm Sewer, RC Pipe (diameter 900mm) lin.m. 50
8.2.6(i)l Storm Sewer, RC Pipe (diameter 1000mm) lin.m. 50
8.3 Manholes Inlets and Chambers
8.3.6(ii)a Grated Inlet (600mm x 600mm) with DI grating and nr. 604
Locked frame
Carried to Collection Page - 1
5a/7 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 5a
CONCRETE AND CONCRETE STRUCTURES
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
8 DRAINAGE (Continued)
8.3 Manholes Inlets and Chambers (Continued)
8.3.6(ii)b Grated Inlet (1000mm x 1000mm) with DI grating and nr. 198
Locked frame
8.3.6(ii)c DI grating (1000mm x 1000mm) and Locked frame at nr. 5
Culvert for Median Drainage as shown on Dwg.
(on the top of box culvert)
8.3.6(iii) Curb Inlet (600mm x 600mm) as shown on Dwg. nr. 24
8.4 Drainage of Structures
8.4.6(ii)a Drainage pipe, 100mm uPVC in structure lin.m. 3,500
8.4.6(ii)b Drainage pipe, 200mm uPVC in structure lin.m. 250
8.4.6(ii)c 150 mm Dia. uPVC perforated pipe wrapped in lin.m. 300
Geotextile
8.4.6(iii) Permeable backing including Geotextile Membrane cu.m. 4,750
8.4.6(iv) Granular backfill cu.m. 4,620
Carried to Collection Page - 1
5a/8 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 5a
CONCRETE AND CONCRETE STRUCTURES
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
10 PILING
10.1 Piling General
10.1.6(i) Setting up at each 750mm diameter pile location nr. 504
10.1.6(ii)a Piling - Cast in place, 750mm diameter for Pier lin.m. 4,505
Foundation including reinforcement in piles (Boring piles)
10.1.6(ii)b Piling - Cast in place, 750mm diameter for Integral lin.m. 4,505
Abutment or Abutment Foundation including
reinforcement in piles (Boring piles)
10.2 Pile Testing
10.2.6(i) Static Load Testing of 750mm diameter expendable nr. 12
piles (including all materials)
10.2.6(ii) Static Load Testing of 750mm diameter working piles nr. 24
10.2.6(iii) Non-destructive Integrity Test as per the Specifications. nr. 504
Carried to Collection Page - 1
5a/9 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 5a
CONCRETE AND CONCRETE STRUCTURES
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
11 BRIDGE ACCESSORIES
11.3 Bearings General
11.3.6(i)a Pot Bearing, (V= 14,600kN - 16,600kN & nr. 6
H= 2,000kN - 4,000kN), Fixed type including supply &
installation
11.3.6(i)b Pot Bearing, (V= 14,600kN - 16,600kN & nr. 12
H =1,000kN - 3,000kN), Guided type including supply &
installation
11.3.6(i)c Pot Bearing, (V= 14,600kN - 15,600kN & nr. 6
H =1,500kN - 3,500kN), Guided type including supply &
installation
11.3.6(i)d Pot Bearing, (V= 4,600kN - 6,600kN & nr. 12
H =500kN - 1,500kN), Guided type including supply &
installation
11.3.6(i)e Pot Bearing, (V= 14,600kN - 16,600kN ), nr. 12
Free type including supply & installation
11.3.6(i)g Pot Bearing, (V= 4,600kN - 6,600kN ), nr. 24
Free type including supply & installation
Carried to Collection Page - 2
5a/10 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 5a
CONCRETE AND CONCRETE STRUCTURES
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
11 BRIDGE ACCESSORIES (Continued)
11.4 Bridge Expansion Joint
11.4.6(vii)a Provide Strip Seal Type Expansion Joint lin.m. 130
(Max. Opening = 40mm, Max. Closing = 15mm)
11.4.6(vii)b Provide Strip Seal Type Expansion joint lin.m. 130
(Max. Opening = 90mm, Max. Closing = 35mm)
11.6 Bridge Parapets and Railings
11.6.6(i) Concrete Barrier for Bridge Parapet as shown on Dwg. lin.m. 2,300
Carried to Collection Page - 2
5a/11 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 5a
CONCRETE AND CONCRETE STRUCTURES
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
COLLECTION PAGE - 1
Page 5a/1
Page 5a/2
Page 5a/3
Page 5a/4
Page 5a/5
Page 5a/6
Page 5a/7
Page 5a/8
Carried to Summary
5a/12 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 5a
CONCRETE AND CONCRETE STRUCTURES
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
COLLECTION PAGE - 2
Page 5a/9
Page 5a/10
Carried to Summary
5a/13 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 5a
CONCRETE AND CONCRETE STRUCTURES
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
SUMMARY
COLLECTION PAGE 1 - 5a/11
COLLECTION PAGE 2 - 5a/12
Carried to Grand Summary - 2
6a/1 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 6a
INCIDENTAL CONSTRUCTION
(in figures) (in words) R.O. Bzs.
9 SLOPE PROTECTION AND STABILIZATION
9.1 Riprap
9.1.6(i) Loose Stone Riprap (Class B) of varying thickness cu.m. 2,000
for Dyke and slope protection as shown in the Dwg.
9.1.6(ii)a Mortared Stone Riprap (Class A, Varying Thickness) cu.m. 26,333
for Slope Protection including Stubs as per dwg.
Item No.
Estimated
Quantity
Unit Rate (Rial Omani) Amount
Item Description Unit
9.1.6(ii)b Mortared Stone Riprap (Class A) for Culvert inlet cu.m. 3,080
& outlet
9.1.6(ii)c Mortared Stone Riprap (Class A) for Dyke as shown cu.m. 200
on dwg.
9.1.6(iv) Geotextile Fabric Filter sq.m. 1,200
9.2 Gabions
9.2.6(i) Gabion lining of varying thickness for wadi bed, slope cu.m. 4,900
protection, floodways, culvert inlet & outlet protection
as per Dwg.
Carried to Collection Page - 1
6a/2 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 6a
INCIDENTAL CONSTRUCTION
(in figures) (in words) R.O. Bzs.
Item No.
Estimated
Quantity
Unit Rate (Rial Omani) Amount
Item Description Unit
9 SLOPE PROTECTION AND STABILIZATION
(Continued)
9.9 Ditch Lining

9.9.6(i)a Concrete Ditch Lining (100mm Thick) with wire mesh sq.m. 79,500
(10mm dia @200mm c/c both ways)
9.9.6(i)b Reinforced Concrete Chute 100mm thick with wire mesh lin.m. 200
(10mm dia @150mm c/c both ways) as per Dwg. ( @ y ) p g
9.9.6(ii) Grouted Stone Ditch lining (200mm thick) sq.m. 13,340
9.12 Mechanically Stabilized Earth Retaining Walls
9.12.7(i) Mechanically Stabilized Earth Retaining Walls sq.m. 40,500
(MSERWs)

9.12.7(ii) Standard Coping for MSERWs lin.m. 250

9.12.7(iii) Concrete Barrier Parapet on MSERWs lin.m. 5,900
Carried to Collection Page - 1
6a/3 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 6a
INCIDENTAL CONSTRUCTION
(in figures) (in words) R.O. Bzs.
Item No.
Estimated
Quantity
Unit Rate (Rial Omani) Amount
Item Description Unit
12 SIDEWALKS, PAVED AREAS AND CURBS
12.1 Sidewalks, Paved areas and Curbs
12.1.7(ii)a Paving, concrete interlocking blocks 60mm thick sq.m. 52,300
for side walks and median
12.1.7(ii)b Paving, concrete interlocking blocks 80mm thick sq.m. 1,000
for Car parking
12.1.7(v)a Precast Non-Mountable Concrete Curb Type ''A'' lin.m. 28,500
12.1.7(v)b Precast Mountable curb Type ''B'' lin.m. 1,500
12.1.7(v)c Precast flush curb Type ''D'' lin.m. 1,600
12.1.7(v)d Precast concrete edge curb Type ''E'' lin.m. 19,500
Carried to Collection Page - 1
6a/4 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 6a
INCIDENTAL CONSTRUCTION
(in figures) (in words) R.O. Bzs.
Item No.
Estimated
Quantity
Unit Rate (Rial Omani) Amount
Item Description Unit
13 SAFETY BARRIERS AND FENCES
13.1 Roadside Barriers
13.1.7(i) W-Beam Guardrail (Strong post) including lin.m. 24,600
W150 x 13.5 Steel post, reflectors, accessories
and foundations
13.1.7(iii)a End anchorage for approach including post, reflectors, nr. 24
accessories and foundations
13.1.7(iii)b End anchorage for approach nr. 14
(Guard Rail-Concrete Barrier transition)
13.1.7(iii)c W-Beam Guardrail connection with Concrete barrier nr. 14
as indicated in the Drawing
13.1.7(iii)d W-Beam Guardrail Terminal section for Departure end nr. 24
including post, reflectors, accessories and foundations
13.1.7(vii)a Precast Concrete barrier, Single face as shown lin.m. 2,250
in the Dwg.
13.1.7(vii)b Heavy Duty Concrete barrier, Single face as shown lin.m. 100
in the Dwg.
Carried to Collection Page - 1
6a/5 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 6a
INCIDENTAL CONSTRUCTION
(in figures) (in words) R.O. Bzs.
Item No.
Estimated
Quantity
Unit Rate (Rial Omani) Amount
Item Description Unit
13 SAFETY BARRIERS AND FENCES (Continued)
13.1 Roadside Barriers (Continued)
13.1.7(ix) Concrete barrier, transition section lin.m. 300
13.1.7(x) Impact attenuator, Quad Beam type, with expandable nr. 6
modules/cartridges, including new foundation, slab
with reflective studs and connection to the concrete
13.4 Delineators
13.4.6(i)a Floodway markers, painted white & red as shown on nr. 250
Dwg. Including anchor bolt
13.4.6(i)b Floodway water depth guage as shown on Dwg. nr. 12
Including anchor bolt
Carried to Collection Page - 1
6a/6 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 6a
INCIDENTAL CONSTRUCTION
(in figures) (in words) R.O. Bzs.
Item No.
Estimated
Quantity
Unit Rate (Rial Omani) Amount
Item Description Unit
14 TRAFFIC SIGNS AND ROAD MARKINGS
14.1 Traffic Signs
14.1.7(i)a Highway sign, Triangular Side (750mm) nr. 90
14.1.7(i)b Highway sign, Triangular Side (900mm) nr. 30
14.1.7(i)c Highway sign, Triangular Side (1200mm) nr. 10
14.1.7(i)d Highway sign, Triangular Side (1500mm) nr. 10
14.1.7(ii)a Highway sign, Circular (Diameter 750mm) nr. 180
14.1.7(ii)b Highway sign, Circular (Diameter 900mm) nr. 14
14.1.7(ii)c Highway sign, Circular (Diameter 1200mm) nr. 20
Carried to Collection Page - 1
6a/7 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 6a
INCIDENTAL CONSTRUCTION
(in figures) (in words) R.O. Bzs.
Item No.
Estimated
Quantity
Unit Rate (Rial Omani) Amount
Item Description Unit
14 TRAFFIC SIGNS AND ROAD MARKINGS
(Continued)
14.1 Traffic Signs (Continued)
14.1.7(iii)a Chevron Signs, rectangular [2100 mm x 600 mm] sq.m. 50
14.1.7(iii)b Chevron Signs, rectangular [2400 mm x 600 mm] sq.m. 50
14.1.7(iii)c Chevron Signs, rectangular [380 mm x 600 mm] sq.m. 40
14.1.7(iii)d Highway Signs, rectangular [750x1400] sq.m. 80
14.1.7(iii)e Highway Signs, rectangular [600x800] sq.m. 10
14.1.7(iii)f Supplementary plate, rectangular [1200 mm x 700 mm] sq.m. 10
14.1.7(iii)g Supplementary plate, rectangular [1500 mm x 700 mm] sq.m. 8
Carried to Collection Page - 1
6a/8 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 6a
INCIDENTAL CONSTRUCTION
(in figures) (in words) R.O. Bzs.
Item No.
Estimated
Quantity
Unit Rate (Rial Omani) Amount
Item Description Unit
14 TRAFFIC SIGNS AND ROAD MARKINGS
(Continued)
14.1 Traffic Signs (Continued)
14.1.7(iii)h Rectangular or Polygonal Sign Face (Area 1-2 sq m) sq.m. 20
14.1.7(iii)i Rectangular or Polygonal Sign Face (Area 2-4 sq m) sq.m. 30
14.1.7(iii)j Rectangular Sign Face (Area 4-6 sq m) sq.m. 40
14.1.7(iii)k Rectangular Sign Face (Area 9-11 sq m) sq.m. 40
14.1.7(iii)l Rectangular Sign Face (Area 14-17 sq m) sq.m. 50
14.1.7(iii)m Rectangular Sign Face (Area 19-24 sq m) sq.m. 100
14.1.7(iii)n Rectangular Sign Face (Area 44-50 sq m) sq.m. 150
Carried to Collection Page - 1
6a/9 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 6a
INCIDENTAL CONSTRUCTION
(in figures) (in words) R.O. Bzs.
Item No.
Estimated
Quantity
Unit Rate (Rial Omani) Amount
Item Description Unit
14 TRAFFIC SIGNS AND ROAD MARKINGS
(Continued)
14.1 Traffic Signs (Continued)
14.1.7(iv) Octagonal Road signs (Height 900mm) nr. 12
14.1.7(v)a Sign post support assembly G.I pipe 100mm Dia. nr. 366
Including foundation and painting of post g p g p
14.1.7(v)b Multi-post Sign Support Assembly, Type PI posts, nr. 9
complete including foundation, painting
(black and white) etc.
14.1.7(v)c Multi-post Sign Support Assembly, Type PII posts, nr. 12
complete including foundation, painting
(black and white) etc.
14.1.7(v)d Multi-post Sign Support Assembly, Type PIII posts, nr. 8
complete including foundation, painting
(black and white) etc.
14.1.7(v)e Multi-post Sign Support Assembly, Type PIV posts, nr. 4
complete including foundation, painting
(black and white) etc.
Carried to Collection Page - 2
6a/10 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 6a
INCIDENTAL CONSTRUCTION
(in figures) (in words) R.O. Bzs.
Item No.
Estimated
Quantity
Unit Rate (Rial Omani) Amount
Item Description Unit
14 TRAFFIC SIGNS AND ROAD MARKINGS
(Continued)
14.1 Traffic Signs (Continued)
14.1.7(v)f Multi-post Sign Support Assembly, Type PV posts, nr. 4
complete including foundation, painting
(black and white) etc.
14.1.7(vi) Breakaway multi-post sign post support assembly nr. 8 ( ) y p g p pp y
for Exit Signs including foundations and painting of
post as shown on Dwg.
14.1.7(vii)a Overhead Gantry Sign Support with foundation nr. 4
including Bracing, Catwalk Assembly, Type G1
as per Drawing
14.1.7(vii)b Overhead Gantry Sign Support with foundation nr. 4
including Bracing, Catwalk Assembly, Type G2
as per Drawing
14.1.7(vii)c Overhead Gantry Sign Support with foundation nr. 3
including Bracing, Catwalk Assembly, Type G3
as per Drawing
Carried to Collection Page - 2
6a/11 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 6a
INCIDENTAL CONSTRUCTION
(in figures) (in words) R.O. Bzs.
Item No.
Estimated
Quantity
Unit Rate (Rial Omani) Amount
Item Description Unit
14 TRAFFIC SIGNS AND ROAD MARKINGS
(Continued)
14.1 Traffic Signs (Continued)
14.1.7(vii)d Overhead Cantilever Sign Support including Bracing nr. 8
foundation, Catwalk Assembly, Type C1 as per Drawing
14.1.7(vii)e Overhead Cantilever Sign Support including Bracing nr. 6
foundation, Catwalk Assembly, Type C2 as per Drawing y yp p g
14.1.7(vii)f Overhead Cantilever Sign Support including Bracing nr. 2
foundation, Catwalk Assembly, Type C3 as per Drawing
14.1.7(viii)a Supply and erect new flag poles including foundation nr. 110
as per Special Specification.
14.1.7(viii)b Supply and install Precast Concrete Foundation with nr. 12
pole for R.O.P. Speed Control Camera
(600x600x1000mm) including Base plate, Bolts,
Hexagonal nuts, washers, uPVC ducts and any other
accessories required for installation.
Carried to Collection Page - 2
6a/12 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 6a
INCIDENTAL CONSTRUCTION
(in figures) (in words) R.O. Bzs.
Item No.
Estimated
Quantity
Unit Rate (Rial Omani) Amount
Item Description Unit
14 TRAFFIC SIGNS AND ROAD MARKINGS
(Continued)
14.2 Road Markings
14.2.6(i)a Traffic Lines, Type L1/2(120) White sq.m. 200
(Mechanical application)
14.2.6(i)b Traffic Lines, Type L1/3(120) White sq.m. 6,800
(Mechanical application) ( pp )
14.2.6(i)c Traffic Lines, Type L2A(120) White sq.m. 400
(Mechanical application)
14.2.6(i)d Traffic Lines, Type L2/1(120) White sq.m. 50
(Mechanical application)
14.2.6(i)e Traffic Lines, Type L2/2(120) White sq.m. 100
(Mechanical application)
14.2.6(i)f Traffic Lines, Type L4/1(150) Yellow sq.m. 4,500
(Mechanical application)
14.2.6(i)g Traffic Lines, Type L4/2(120) Yellow sq.m. 9,500
(Mechanical application)
Carried to Collection Page - 2
6a/13 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 6a
INCIDENTAL CONSTRUCTION
(in figures) (in words) R.O. Bzs.
Item No.
Estimated
Quantity
Unit Rate (Rial Omani) Amount
Item Description Unit
14 TRAFFIC SIGNS AND ROAD MARKINGS
(Continued)
14.1 Road Markings (Continued)
14.2.6(i)h Traffic Lines, Type L5/1(150) White sq.m. 600
(Mechanical application)
14.2.6(i)i Traffic Lines, Type L5/2(120) White sq.m. 100
(Mechanical application) ( pp )
14.2.6(i)j Traffic Lines, Type L7(400) White sq.m. 50
(Mechanical application)
14.2.6(i)k Traffic Lines, Type L8(200) White sq.m. 120
(Mechanical application)
14.2.6(iii)a Special Marking, Pedestrian Crossing sq.m. 1,200
14.2.6(iii)b Special Marking, Chevrons Marking S9 sq.m. 2,500
14.2.6(iii)c Special Marking, Lane Selection Arrow White (S3/1) sq.m. 300
Carried to Collection Page - 2
6a/14 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 6a
INCIDENTAL CONSTRUCTION
(in figures) (in words) R.O. Bzs.
Item No.
Estimated
Quantity
Unit Rate (Rial Omani) Amount
Item Description Unit
14 TRAFFIC SIGNS AND ROAD MARKINGS
(Continued)
14.1 Road Markings (Continued)
14.2.6(iii)d Special Marking, Lane Selection Arrow White (S4/1) sq.m. 250
14.2.6(iii)e Special Marking, Lane Selection Arrow White (S5/1) sq.m. 250
14.2.6(iii)f Special Marking, Lane Selection Arrow White (S7/1) sq.m. 250
14.2.6(iii)g Special Marking, Lane Selection Arrow White (S8/1) sq.m. 280
14.2.6(iv) Curb painting sq.m. 15,400
Carried to Collection Page - 2
6a/15 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 6a
INCIDENTAL CONSTRUCTION
(in figures) (in words) R.O. Bzs.
Item No.
Estimated
Quantity
Unit Rate (Rial Omani) Amount
Item Description Unit
14 TRAFFIC SIGNS AND ROAD MARKINGS
(Continued)
14.3 Road Studs
14.3.6(i)a Reflecting Road Studs (Double face, Red color) nr. 500
14.3.6(i)b Reflecting Road Studs (Single face, Red color) nr. 900
14.3.6(i)c Reflecting Road Studs (Single face, White color) nr. 800
14.3.6(iii) Provide removable bollards in the median opening nr. 90
and one fixed bollard at each ends as shown in
the Dwg. for R.O.P. including chain and lock
Carried to Collection Page - 2
6a/16 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 6a
INCIDENTAL CONSTRUCTION
(in figures) (in words) R.O. Bzs.
Item No.
Estimated
Quantity
Unit Rate (Rial Omani) Amount
Item Description Unit
COLLECTION PAGE - 1
Page 6a/1
Page 6a/2
Page 6a/3
Page 6a/4
Page 6a/5
Page 6a/6
Page 6a/7
Page 6a/8
Carried to Summary
6a/17 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 6a
INCIDENTAL CONSTRUCTION
(in figures) (in words) R.O. Bzs.
Item No.
Estimated
Quantity
Unit Rate (Rial Omani) Amount
Item Description Unit
COLLECTION PAGE - 2
Page 6a/9
Page 6a/10
Page 6a/11
Page 6a/12
Page 6a/13
Page 6a/14
Page 6a/15
Carried to Summary
6a/18 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 6a
INCIDENTAL CONSTRUCTION
(in figures) (in words) R.O. Bzs.
Item No.
Estimated
Quantity
Unit Rate (Rial Omani) Amount
Item Description Unit
SUMMARY
COLLECTION PAGE 1 - 6a/16
COLLECTION PAGE 2 - 6a/17
Carried to Grand Summary - 2
7a/1 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 7a
ROAD LIGHTING AND ELECTRICAL INSTALLATION
(in figures) (in words) R.O. Bzs.
15 ROAD LIGHTING AND ELECTRICAL
INSTALLATION
15.1 General
15.1.20(i) Power Supply connection to the feeder pillar nr. 15
15.1.20(ii) Spare Parts (5%) as per the approved list LS
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
15.3 Package Sub-stations
15.3.6(i)a Supply and installation of Electrical Sub-station with nr. 1
1Nr RMU,1Nr 500 KVA Transformer and 800 A feeder
pillar, including building, cable terminations, testing,
commissioning and all civil works and other
accessories necessary to complete the system
functional
15.3.6(i)b Supply and installation of Electrical Sub-station with nr. 1
1Nr RMU, 1Nr OLU, 1Nr 500 KVA Transformer and
800 A feeder pillar, including building, cable
terminations, testing, commissioning and all civil works
and other accessories necessary to complete the
system functional
Carried to Collection Page - 1
7a/2 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 7a
ROAD LIGHTING AND ELECTRICAL INSTALLATION
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
15 ROAD LIGHTING AND ELECTRICAL
INSTALLATION (Continued)
15.5 33kV and 11kV Pole Mounted Transformer
Sub-stations
15.5.6(ii)a Supply and installation of 11kV pole mounted nr. 10
transformer sub-station, 100KVA with 1 way LV panel
including H-pole transformer mounting structure,
earthing connections and other accessories earthing, connections and other accessories
necessary to complete the system functional
15.5.6(ii)b Supply and installation of 11kV pole mounted nr. 2
transformer sub-station, 100KVA with 2 way LV panel
including H-pole transformer mounting structure,
earthing, connections and other accessories
necessary to complete the system functional
15.6 Feeder Pillars
15.6.6(i)a Supply and install Mini Feeder Pillars, 400 A, 4way nr. 3
15.6.6(i)b Supply and install Street Lighting Feeder Pillars, 100 A nr. 12
Carried to Collection Page - 1
7a/3 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 7a
ROAD LIGHTING AND ELECTRICAL INSTALLATION
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
15 ROAD LIGHTING AND ELECTRICAL
INSTALLATION (Continued)
15.7 Electrical Cables
Supply 4-Core cabling, copper conductor,
XLPE insulated, Steel Wire armoured,
PVC sheathed, 600/1000V rating, as follows:
15 7 6(i)a Nominal Conductor Area 25mm2 lin m 59 300 15.7.6(i)a Nominal Conductor Area 25mm2 lin.m. 59,300
15.7.6(i)b Nominal Conductor Area 95mm2 lin.m. 2,500
15.7.6(i)c Nominal Conductor Area 120mm2 lin.m. 1,500
15.7.6(i)d Nominal Conductor Area 240mm2 lin.m. 100
15.7.6(ii)a Termination on 25mm2 cabling nr. 35
Carried to Collection Page - 1
7a/4 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 7a
ROAD LIGHTING AND ELECTRICAL INSTALLATION
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
15 ROAD LIGHTING AND ELECTRICAL
INSTALLATION (Continued)
15.7 Electrical Cables (Continued)
15.7.6(ii)b Termination on 95mm2 cabling nr. 12
15.7.6(ii)c Termination on 120mm2 cabling nr. 6
15.7.6(ii)d Termination on 240mm2 cabling nr. 4
15.8 Road Lighting Masts, Columns and Luminaries
15.8.6(i) Supply, install and commission Galvanized steel nr. 126
lighting column polygon (Mid hinged Type) 25m high
mast with 4 x 600 Watt HPSV luminaries fixed on
bracket complete with fused cut out, control gear,
wiring, connection etc
Carried to Collection Page - 1
7a/5 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 7a
ROAD LIGHTING AND ELECTRICAL INSTALLATION
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
15 ROAD LIGHTING AND ELECTRICAL
INSTALLATION (Continued)
15.8 Road Lighting Masts, Columns and Luminaries
(Continued)
15.8.6(ii)a Supply, install and commission Galvanized steel nr. 785
lighting column polygon (Mid hinged Type) 14m high
pole/column with 1 x 400 Watt HPSV luminaries
fixed on bracket complete with fused cut out,
control gear wiring connection etc control gear, wiring, connection etc
15.8.6(ii)b Supply, install and commission Galvanized steel nr. 150
lighting column polygon (Mid hinged Type) 14m high
pole/column with 2 x 400 Watt HPSV luminaries on
bracket complete with fused cut out, control gear,
wiring, connection etc
15.8.6(iii) Column / high mast testing LS
15.10 Under Bridge Lighting
15.10.6(i)a Under bridge surface mounted lighting including nr. 60
Conduits, Cables, 150W High Pressure Sodium
Lanterns, Junction Boxes, including Supply,
Installation, Testing and Putting into service complete
Carried to Collection Page - 1
7a/6 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 7a
ROAD LIGHTING AND ELECTRICAL INSTALLATION
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
15 ROAD LIGHTING AND ELECTRICAL
INSTALLATION (Continued)
15.10 Under Bridge Lighting (Continued)
15.10.6(i)b Pedestrian underpasses Wall Luminar LED Light nr. 140
Including Cables, Junction Boxes, Supply, Installation,
Testing and Putting into service complete
15 11 Traffic Signals 15.11 Traffic Signals
Installation of Signal posts /poles
15.11.6(i)a Supply, install and commission cantilever traffic signal nr. 3
all accessories, cabling, foundations etc. complete;
span for 4 signal heads
15.11.6(i)b Supply, install and commission cantilever traffic signal nr. 3
all accessories, cabling, foundations etc. complete;
span for 3 signal heads
15.11.6(i)c Supply, install and commission cantilever traffic signal nr. 18
all accessories, cabling, foundations etc. complete;
span for 2 signal heads
Carried to Collection Page - 1
7a/7 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 7a
ROAD LIGHTING AND ELECTRICAL INSTALLATION
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
15 ROAD LIGHTING AND ELECTRICAL
INSTALLATION (Continued)
15.11 Traffic Signals (Continued)
15.11.6(i)d Supply, install and commission cantilever traffic signal nr. 3
all accessories, cabling, foundations etc. complete;
span for 1 signal heads
15 11 6(ii)a Supply install and commission vehicular and nr 36 15.11.6(ii)a Supply, install and commission vehicular and nr. 36
pedestrian combination traffic signal posts including
accessories, cabling and foundations etc.
15.11.6(ii)b Supply, install and commission pedestrian traffic nr. 24
signal posts including accessories, cabling and
foundations etc.
15.11.6(ii)c Supply and install Pedestrian signal with amber nr. 36
flasher signal post including foundations
Signal heads, arrow masks and signs
15.11.6(iii)a Supply, install and commission 3 aspect, 300 mm dia nr. 90
lens, traffic signal head including backing boards
and arrow marks
Carried to Collection Page - 1
7a/8 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 7a
ROAD LIGHTING AND ELECTRICAL INSTALLATION
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
15 ROAD LIGHTING AND ELECTRICAL
INSTALLATION (Continued)
15.11 Traffic Signals (Continued)
15.11.6(iii)b Supply,install and commission 2 aspect, pedestrian nr. 60
traffic signal head including backing boards
15.11.6(iii)c Supply, install and commissioning 1 aspect,200 mm nr. 36
dia lens, amber Flasher
15.11.6(iii)d Supply, install and commissioning 3 aspect,100 mm nr. 36
dia lens, repeater signal
Inspection chambers complete including cover
and frames, water proofing works ,finishes etc
15.11.6(iv)a 1200 x 1200mm reinforced concrete traffic signal nr. 3
inspection chamber, type 1 depth not exceeding 1.5m
Carried to Collection Page - 1
7a/9 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 7a
ROAD LIGHTING AND ELECTRICAL INSTALLATION
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
15 ROAD LIGHTING AND ELECTRICAL
INSTALLATION (Continued)
15.11 Traffic Signals (Continued)
15.11.6(iv)b 600 x 600mm mass concrete bypass chamber, depth nr. 72
not exceeding 1.0m
15.11.6(iv)c 300 x 300mm mass concrete bypass chamber nr. 18
Installation of feeder pillar and traffic signal controller
15.11.6(v) Supply and install feeder pillar on foundation including nr. 3
all accessories, termination of cables etc. complete
15.11.6(vi) Supply install and commission of a micro processor nr. 3
traffic signal controller on foundation, capable of
handling thirty two (32) signal groups, complete with
hardware and software modules as per the operational
An approved engineer representing the manufacturer
must be present on site at the time of commissioning
the traffic signals
Carried to Collection Page - 2
7a/10 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 7a
ROAD LIGHTING AND ELECTRICAL INSTALLATION
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
15 ROAD LIGHTING AND ELECTRICAL
INSTALLATION (Continued)
15.15 Earthing
15.15.7(i)a Supply and install Twin rod earthing installation at nr. 15
street lighting feeder pillars
15.15.7(i)b Supply and install Twin rod earthing installation at nr. 3
Traffic Signal feeder pillars Traffic Signal feeder pillars
15.15.7(ii) Supply and install Single rod earthing installation nr. 35
at the end of street lighting circuits
15.17 Civil Works for Electrical Installations
15.17.6(vi)a Supply and install Pre-cast concrete foundation for nr. 3
mini feeder pillars as per Dwg. including Bolts and
any other accessories required for installation.
15.17.6(vi)b Supply and install Pre-cast concrete foundation for nr. 12
street lighting feeder pillars as per Dwg. including
Bolts and any other accessories required for
installation.
Carried to Collection Page - 2
7a/11 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 7a
ROAD LIGHTING AND ELECTRICAL INSTALLATION
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
15 ROAD LIGHTING AND ELECTRICAL
INSTALLATION (Continued)
15.17 Civil Works for Electrical Installations
(Continued)
15.17.6(vi)c Supply and install Pre-cast concrete foundation for nr. 3
Traffic Signal feeder pillars as per Dwg. including Bolts
and any other accessories required for installation.
15.17.6(vi)d Precast concrete foundation for traffic signal controller nr. 3
excavation, backfilling, compaction, formwork,
concrete, PVC conduit, re-bars, holding down bolts,
protection of holding down bolts, nuts and washers
with denso tape, etc
15.17.6(vii)a Trench for low voltage cable for one cable lin.m. 59,300
15.17.6(vii)b Trench for low voltage cable for two cable lin.m. 2,500
15.17.6(vii)c Trench for low voltage cable for three cable lin.m. 1,600
Carried to Collection Page - 2
7a/12 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 7a
ROAD LIGHTING AND ELECTRICAL INSTALLATION
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
15 ROAD LIGHTING AND ELECTRICAL
INSTALLATION (Continued)
15.17 Civil Works for Electrical Installations
(Continued)
15.17.6(ix) Supply and install Precast Concrete Foundation for nr. 935
columns 14m high pole/column as per Dwg. including
Base plate, Bolts, Hexagonal nuts, washers,
uPVC ducts and any other accessories required uPVC ducts and any other accessories required
for installation
15.17.6(x) Supply and install Precast Concrete Foundation for nr. 126
25m high mast as per Dwg. including Base plate,
Bolts, Hexagonal nuts, washers, uPVC ducts and
any other accessories required for installation
Road Crossing Ducts
15.17.6(xii)a 2Way 100 mm Upvc duct for street lighting with lin.m. 400
concrete encasement
15.17.6(xii)b 2Way 150 mm Upvc duct for 11kv cables for street lin.m. 300
lighting with concrete encasement
Carried to Collection Page - 2
7a/13 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 7a
ROAD LIGHTING AND ELECTRICAL INSTALLATION
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
15 ROAD LIGHTING AND ELECTRICAL
INSTALLATION (Continued)
15.17 Civil Works for Electrical Installations
(Continued)
15.17.6(xii)c 4Way 100 mm Upvc duct for street lighting with lin.m. 250
concrete encasement
15 17 6(xii)d 4Way 150 mm Upvc duct for street lighting with lin m 400 15.17.6(xii)d 4Way 150 mm Upvc duct for street lighting with lin.m. 400
concrete encasement
15.17.6(xii)e 2Way 100 mm Upvc duct for traffic signal with lin.m. 485
concrete encasement
15.17.6(xii)f 2Way 150 mm Upvc duct for traffic signal with lin.m. 350
concrete encasement
15.17.6(xii)g 4Way 100 mm Upvc duct for traffic signal with lin.m. 450
concrete encasement
15.17.6(xii)h 4Way 150 mm Upvc duct for traffic signal with lin.m. 450
concrete encasement
Carried to Collection Page - 2
7a/14 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 7a
ROAD LIGHTING AND ELECTRICAL INSTALLATION
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
15 ROAD LIGHTING AND ELECTRICAL
INSTALLATION (Continued)
Traffic Lights Control System
15.18.3 Design, supply, installation, commissioning and nr. 3
testing of the traffic light control system including but
not limited to Grid Smart Cameras, hardware &
softwares, civil works etc. for loop detection, incident
detection, stop bar detection, traffic counts including , p , g
turn movements count and vehicle classification
Red Light Violation Camera
15.19.3 Design, supply, installation, commissioning and nr. 3
testing of Red Light Violation camera system including
but not limited to cameras, hardware & software, civil
works etc. for fulfilling the Royal Oman Polices Safety
Enforcement requirements
Carried to Collection Page - 2
7a/15 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 7a
ROAD LIGHTING AND ELECTRICAL INSTALLATION
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
COLLECTION PAGE - 1
Page 7a/1
Page 7a/2
Page 7a/3
Page 7a/4
Page 7a/5
Page 7a/6
Page 7a/7
Page 7a/8
Carried to Summary
7a/16 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 7a
ROAD LIGHTING AND ELECTRICAL INSTALLATION
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
COLLECTION PAGE - 2
Page 7a/9
Page 7a/10
Page 7a/11
Page 7a/12
Page 7a/13
Page 7a/14
Carried to Summary
7a/17 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 7a
ROAD LIGHTING AND ELECTRICAL INSTALLATION
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
SUMMARY
COLLECTION PAGE 1 - 7a/15
COLLECTION PAGE 2 - 7a/16
Carried to Grand Summary - 2

9a/1 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 9a
UTILITIES
(in figures) (in words) R.O. Bzs.
18 UTILITIES
18.1 Locating and Protecting Existing Utilities
Water Utility
18.1.6(i)a Concrete protection slab for existing water lines/ducts lin.m. 200
300 mm dia (Class 25/20)
Electrical Utility
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
Electrical Utility
18.1.6(i)b Supply and Install proposed 2way 200mm dia Upvc lin.m. 100
and 2way 50mm Split duct to protect the existing
underground 33kv electrical cables complete with
concrete protection (class 25/20) including excavation,
backfilling, compaction, end caps, draw ropes and
duct markers etc. at locations shown in the drawings
or as directed by the Engineer
Carried to Collection Page - 1

9a/2 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 9a
UTILITIES
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
18 UTILITIES (Continued)
18.1 Locating and Protecting Existing Utilities (Continued)
18.1.6(i)c Supply and Install proposed 2way 150mm and 2way lin.m. 100
50mm dia uPVC Split duct to protect the existing
underground 11kv electrical cables complete with
concrete protection (class 25/20) including excavation,
backfilling, compaction, end caps, draw ropes and
duct markers etc at locations shown in the drawings duct markers etc. at locations shown in the drawings
or as directed by the Engineer
Telephone Utility
18.1.6(i)d Supply and install 4way 100mm dia Upvc Split duct lin.m. 100
to protect existing Omantel / Nawras / MOD cables
complete with concrete protection (class 25/20)
including excavation, backfilling, duct marker and
compaction etc. at locations shown in the drawings
or as directed by the Engineer as per Omantel /
Nawras / MOD Standards and Specifications
Carried to Collection Page - 1

9a/3 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 9a
UTILITIES
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
18 UTILITIES (Continued)
18.1 Locating and Protecting Existing Utilities (Continued)
18.1.6(i)e Supply and install 2way 100mm dia and 2way 100mm lin.m. 240
dia Upvc Split duct to protect existing Omantel /
Nawras / MOD cables complete with concrete protection
(class 25/20) including excavation, backfilling, duct
marker and compaction etc. at locations shown in the
drawings or as directed by the Engineer as per Omantel/ drawings or as directed by the Engineer as per Omantel/
Nawras / MOD Standards and Specifications
18.2 Removing and Disposing or Relocating
Existing Utilities
Electrical Utility
18.2.6(i)a Carefully disconnect and remove existing 11KV lin.m. 7,000
overhead electrical conductors including poles stay
wires, insulators and any other accessories existing
and dispose of same to the locations as directed
by the Engineer
Carried to Collection Page - 1

9a/4 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 9a
UTILITIES
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
18 UTILITIES (Continued)
18.2 Removing and Disposing or Relocating
Existing Utilities (Continued)
Electrical Utility
18.2.6(i)b Carefully disconnect and remove existing 11KV lin.m. 1,600
underground electrical cables and any other
accessories existing and dispose of same to the accessories existing and dispose of same to the
locations as directed by the Engineer
18.2.6(i)c Carefully disconnect and remove existing 33KV lin.m. 1,000
overhead electrical conductors including poles stay
wires, insulators and any other accessories existing
and dispose of same to the locations as directed
by the Engineer
18.2.6(i)d Carefully disconnect and remove existing 33KV lin.m. 200
underground electrical cables and any other
accessories existing and dispose of same to the
locations as directed by the Engineer
Carried to Collection Page - 1

9a/5 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 9a
UTILITIES
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
18 UTILITIES (Continued)
18.2 Removing and Disposing or Relocating
Existing Utilities (Continued)
Water Utility
18.2.6(i)e Locate excavate down to and remove the existing lin.m. 3,200
300mm diameter AC/DI pipe including but not limited
to valve chambers Fire hydrants and all other to valve chambers, Fire hydrants and all other
accessories complete and dispose of same to the
locations as directed by the Engineer including
excavation, backfill, disposal, disconnection,etc
18.2.6(i)f Locate excavate down to and remove the existing lin.m. 2,000
400mm diameter AC/DI pipe including but not limited
to valve chambers, Fire hydrants and all other
accessories complete and dispose of same to the
locations as directed by the Engineer including
excavation, backfill, disposal, disconnection,etc
Carried to Collection Page - 1

9a/6 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 9a
UTILITIES
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
18 UTILITIES (Continued)
18.2 Removing and Disposing or Relocating
Existing Utilities (Continued)
Telephone Utility
18.2.6(i)g Locate, excavate down, disconnect and remove lin.m. 3,900
existing telephone cables and ducts, chambers and
dispose of same (except chambers) to the locations p ( p )
as directed by the Engineer including excavation,
backfilling, disposal etc.
18.2.6(i)h Locate, excavate down, disconnect and remove lin.m. 2,000
and ducts, chambers and dispose of same (except
chambers) to the locations as directed by the Engineer
including excavation, backfilling, disposal etc
Carried to Collection Page - 1

9a/7 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 9a
UTILITIES
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
18 UTILITIES (Continued)
18.2 Removing and Disposing or Relocating
Existing Utilities (Continued)
For Electrical: All LV, 11KV/33KV Electrical
Relocation work including materials shall be as
per MEDC/Mazoon/Majan Electricity Distribution
Company Standards and Specifications.
18.2.6(iii)a Supply and installation of overhead 11 KV electrical lin.m. 400
conductors (3 conductors together)
complete including poles, stay wires, insulators, AB
switches, lightning arrestors, jumpers, stringing,
jointing, excavation & backfilling of poles, connecting
to the existing supply, testing, commissioning,
carting spoil to tips as directed, all necessary labor,
operation, materials, accessories, earthing and any
special protection to the poles (Wadi Area).
(Quantity measured as Route length).
Carried to Collection Page - 1

9a/8 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 9a
UTILITIES
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
18 UTILITIES (Continued)
18.2 Removing and Disposing or Relocating
Existing Utilities (Continued)
18.2.6(iii)b Supply and installation of overhead 33 KV electrical lin.m. 200
conductors (3 conductors together)
complete including poles, stay wires, insulators, AB
switches, lightning arrestors, jumpers, stringing,
jointing excavation & backfilling of poles connecting jointing, excavation & backfilling of poles, connecting
to the existing supply, testing, commissioning,
carting spoil to tips as directed, all necessary labor,
operation, materials, accessories, earthing and any
special protection to the poles (Wadi Area).
(Quantity measured as Route length).
18.2.6(iii)c Supply and installation of underground proposed lin.m. 8,400
11KV Electrical cable complete
including excavation, backfilling, cable covering tiles,
warning tapes, route markers, joints, connecting to
the existing supply, testing, commissioning, carting
spoil to tips as directed, all necessary labor,
operation, materials and any other accessories
including earthing, etc.
Carried to Collection Page - 1

9a/9 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 9a
UTILITIES
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
18 UTILITIES (Continued)
18.2 Removing and Disposing or Relocating
Existing Utilities (Continued)
18.2.6(iii)d Supply and installation of underground proposed lin.m. 900
33KV Electrical cable complete including excavation,
backfilling, cable covering tiles, warning tapes, joints,
connecting to the existing supply, testing,
commissioning carting spoil to tips as directed all commissioning, carting spoil to tips as directed, all
necessary labor, operation, materials and any other
accessories including earthing, etc.
18.2.6(iii)e Supply and installation of underground proposed pilot lin.m. 9,000
cable, (12 fiber FOC) for R.O.P. Speed Control
Camera complete including joints, connecting to the
controller, testing, commissioning, carting spoil to
tips as directed, all necessary labor, operation,
materials and any other accessories etc.
Carried to Collection Page - 2

9a/10 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 9a
UTILITIES
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
18 UTILITIES (Continued)
18.2 Removing and Disposing or Relocating
Existing Utilities (Continued)
Supply & Installation of New Water Lines: The
New Pipe lines installed to replace affected pipe
lines should have all the fittings, accessories,
Valves (Gate valves, Drain valves, Air Valves, etc),
Fire Hydrants any other specials and related Fire Hydrants, any other specials and related
Chambers complete necessary to reinstate the
network functional as that of the existing as shown
on the Drawings
18.2.6(iii)f Supply and install 300mm HDPE Water pipes (PN16) lin.m. 3,200
complete with all the specials, fittings, and chambers
including but not limited to tees, bends, shut off valves,
air valves, washout valves, Fire hydrants, thrust blocks
etc and also excavation, backfilling, warning tape,
bedding and surrounding, jointing to existing water pipe
and jointing material, Flushing, Disinfecting, pressure
testing and any other items necessary to complete
the work
Carried to Collection Page - 2

9a/11 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 9a
UTILITIES
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
18 UTILITIES (Continued)
18.2 Removing and Disposing or Relocating
Existing Utilities (Continued)
18.2.6(iii)g Supply and install 400mm DI Water pipes (PN24,DN400) lin.m. 2,000
complete with all the specials, fittings, and chambers
including but not limited to tees, bends, shut off valves,
air valves, washout valves, Fire hydrants, thrust blocks
etc and also excavation backfilling warning tape etc and also excavation, backfilling, warning tape,
bedding and surrounding, jointing to existing water pipe
and jointing material, Flushing, Disinfecting, pressure
testing and any other items necessary to complete
the work
18.2.6(iii)h Supply and install 4Way uPVC duct for telephone lin.m. 400
cables, including but not limited to excavation,
backfilling, warning tape, bedding and surrounding,
jointing and jointing material, manholes, handholes,
junction boxes and any other items necessary to
complete the work
Carried to Collection Page - 2

9a/12 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 9a
UTILITIES
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
18 UTILITIES (Continued)
18.2 Removing and Disposing or Relocating
Existing Utilities (Continued)
18.2.6(iii)i Supply and install 2Way uPVC duct for telephone lin.m. 2,400
cables, including but not limited to excavation,
backfilling, warning tape, bedding and surrounding,
jointing and jointing material, manholes, handholes,
junction boxes and any other items necessary to junction boxes and any other items necessary to
complete the work
18.2.6(iii)j Supply and install 1Way uPVC duct for telephone lin.m. 200
cables, including but not limited to excavation,
backfilling, warning tape, bedding and surrounding,
jointing and jointing material, manholes, handholes,
junction boxes and any other items necessary to
complete the work
18.2.6(iii)k Supply, install and laying EEF 30x0.65 telephone lin.m. 1,000
cable including jointing, jointing material and any
other items necessary to complete and commission
the work
Carried to Collection Page - 2

9a/13 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 9a
UTILITIES
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
18 UTILITIES (Continued)
18.2 Removing and Disposing or Relocating
Existing Utilities (Continued)
18.2.6(iii)l Supply, install and laying EEF 50x0.5 telephone lin.m. 400
cable including jointing, jointing material and any
other items necessary to complete and commission
the work
18.2.6(iii)m Supply, install and laying EEF 10x0.9 telephone lin.m. 1,000
cable including jointing, jointing material and any
other items necessary to complete and commission
the work
18.2.6(iii)n Supply, install and laying 72 FOC (for Nawras) cable lin.m. 1,000
including jointing, jointing material and any other items
necessary to complete and commission the work
18.2.6(iii)o Supply, install and laying 36 FOC (for Nawras) cable lin.m. 1,000
including jointing, jointing material and any other items
necessary to complete and commission the work
Carried to Collection Page - 2

9a/14 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 9a
UTILITIES
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
18 UTILITIES (Continued)
18.3 Service / Future Utility Road Crossing Ducts
18.3.6(i)a Supply and Install proposed 2way 100mm dia lin.m. 200
uPVC duct for electrical cables with concrete
surround (class 25/20), laid and jointed in trenches
beneath carriageway including excavation, backfilling,
compaction end caps draw ropes and duct markers compaction, end caps, draw ropes and duct markers
etc. complete at locations shown in the drawings or
as directed by the Engineer
18.3.6(i)b Supply and Install proposed 2way 150mm dia lin.m. 200
uPVC duct for electrical cables with concrete
surround (class 25/20), laid and jointed in trenches
beneath carriageway including excavation, backfilling,
compaction, end caps, draw ropes and duct markers
etc. complete at locations shown in the drawings or
as directed by the Engineer
Carried to Collection Page - 2

9a/15 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 9a
UTILITIES
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
18 UTILITIES (Continued)
18.3 Service / Future Utility Road Crossing Ducts
(Continued)
18.3.6(i)c Supply and Install proposed 4way 150mm and 2way lin.m. 200
50mm dia uPVC duct for electrical cables with
concrete surround (class 25/20), laid and jointed in
trenches beneath carriageway including excavation,
backfilling compaction end caps draw ropes and backfilling, compaction, end caps, draw ropes and
duct markers etc. complete at locations shown in
the drawings or as directed by the Engineer
18.3.6(i)d Supply and install 2way 200mm dia uPVC duct for lin.m. 200
proposed Omantel / Nawras / MOD cables complete
with concrete protection (class 25/20) including
excavation, backfilling, compaction, end caps and
draw ropes etc. at locations shown in the drawings or
as directed by the Engineer as per Omantel / Nawras /
MOD Standards and Specifications
Carried to Collection Page - 2

9a/16 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 9a
UTILITIES
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
18 UTILITIES (Continued)
18.3 Service / Future Utility Road Crossing Ducts
(Continued)
18.3.6(i)e Supply and install 2way 100mm dia uPVC duct for lin.m. 200
proposed Omantel / Nawras / MOD cables complete
with concrete protection (class 25/20) including
excavation, backfilling, compaction, end caps and
draw ropes etc at locations shown in the drawings or draw ropes etc. at locations shown in the drawings or
as directed by the Engineer as per Omantel / Nawras /
MOD Standards and Specifications
Future Ducts
18.3.6(i)f Supply and Install proposed 2way 200mm dia lin.m. 200
uPVC duct for 33kv electrical cables with concrete
protection (class 25/20), laid and jointed in trenches
beneath carriageway including excavation, backfilling,
compaction, end caps, draw ropes and duct markers
etc. complete at locations shown in the drawings or
as directed by the Engineer
Carried to Collection Page - 2

9a/17 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 9a
UTILITIES
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
18 UTILITIES (Continued)
18.3 Service / Future Utility Road Crossing Ducts
(Continued)
18.3.6(i)g Supply and Install proposed 4way 150mm dia uPVC lin.m. 200
duct for 11kv electrical cables with concrete
protection (class 25/20), laid and jointed in trenches
beneath carriageway including excavation, backfilling,
compaction end caps draw ropes and duct markers compaction, end caps, draw ropes and duct markers
etc. complete at locations shown in the drawings or
as directed by the Engineer
18.3.6(i)h Supply and Install proposed 2way 100mm dia uPVC lin.m. 300
duct for LV cables with concrete protection
(class 25/20), laid and jointed in trenches beneath
carriageway including excavation, backfilling,
compaction, end caps, draw ropes and duct markers
etc. complete at locations shown in the drawings or
as directed by the Engineer
Carried to Collection Page - 3

9a/18 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 9a
UTILITIES
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
18 UTILITIES (Continued)
18.3 Service / Future Utility Road Crossing Ducts
(Continued)
18.3.6(i)i Supply and Install proposed 2way 100mm dia lin.m. 400
uPVC duct for Street Lighting cables with concrete
protection (class 25/20), laid and jointed in trenches
beneath carriageway including excavation, backfilling,
compaction, end caps, draw ropes and duct markers p , p , p
etc. complete at locations shown in the drawings or
as directed by the Engineer
18.3.6(i)j Supply and Install proposed 2way 300mm dia lin.m. 400
uPVC duct for Irrigation Line with concrete protection
(class 25/20), laid and jointed in trenches beneath
carriageway including excavation, backfilling,
compaction, end caps, draw ropes and duct markers
etc. complete at locations shown in the drawings or
as directed by the Engineer
Carried to Collection Page - 3

9a/19 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 9a
UTILITIES
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
18 UTILITIES (Continued)
18.3 Service / Future Utility Road Crossing Ducts
(Continued)
18.3.6(i)k Supply and Install proposed 4way 100mm dia lin.m. 300
uPVC duct for Telephone Line with concrete
protection (class 25/20), laid and jointed in trenches
beneath carriageway including excavation, backfilling,
compaction, end caps, draw ropes and duct markers p , p , p
etc. complete at locations shown in the drawings or
as directed by the Engineer
Carried to Collection Page - 3

9a/20 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 9a
UTILITIES
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
COLLECTION PAGE - 1
Page 9a/1
Page 9a/2
Page 9a/3
Page 9a/4
Page 9a/5
Page 9a/6
Page 9a/7
Page 9a/8
Carried to Summary

9a/21 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 9a
UTILITIES
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
COLLECTION PAGE - 2
Page 9a/9
Page 9a/10
Page 9a/11
Page 9a/12
Page 9a/13
Page 9a/14
Page 9a/15
Page 9a/16
Carried to Summary

9a/22 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 9a
UTILITIES
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
COLLECTION PAGE - 3
Page 9a/17
Page 9a/18
Page 9a/19
Carried to Summary

9a/23 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 9a
UTILITIES
(in figures) (in words) R.O. Bzs.
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
Estimated
Quantity
SUMMARY
COLLECTION PAGE 1 - 9a/20
COLLECTION PAGE 2 - 9a/21
COLLECTION PAGE 3 - 9a/22
Carried to Grand Summary - 2
10a/1 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 10a
PROVISIONAL SUM
(in figures) (in words) R.O. Bzs.
PROVISIONAL SUM
A Design of three Interchanges No. 4, 4A, 5 and Two PS 800,000 000
Pedestrian Underpasses (including topo survey)
B Design Fee for Design of Landscaping Works PS 180,000 000
C Construction of Landscaping Works PS 2,820,000 000
D Geotechnical Investigation complete with Report for PS 45 000 000
Unit Rate (Rial Omani) Amount
Item No. Item Description Unit
D Geotechnical Investigation complete with Report for PS 45,000 000
three Interchanges and Two Pedestrian Underpasses
E Unforeseen utility relocation / protection PS 600,000 000
Carried to Grand Summary - 2 4,445,000 000
11a/1 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 11a
DAYWORKS
(in figures) (in words) R.O. Bzs.
19 DAYWORKS
19.1 Wages
These include proper wages, all used allowance,
medical expenses and all other charges provided for
by local laws.
19.1a Labourer - Skilled (Omani) hour 10
Item No. Item Description Unit
Estimated
Quantity
Unit Rate (Rial Omani) Amount
19.1b Labourer - Skilled (Expatriate) hour 10
19.1c Labourer - Unskilled (Omani) hour 10
19.1d Labourer - Unskilled (Expatriate) hour 10
19.1e Carpenter hour 10
19.1f Mason/Concrete finisher hour 10
19.1g Driver: Heavy Duty hour 10
19.1h Driver: Light Duty hour 10
Carried to Collection Page - 1
11a/2 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 11a
DAYWORKS
(in figures) (in words) R.O. Bzs.
Item No. Item Description Unit
Estimated
Quantity
Unit Rate (Rial Omani) Amount
19.1i Pipe fitter hour 10
19.1j Plant Operator: Heavy hour 10
19.1k Plant Operator: Light hour 10
19.1l Steel Fixer hour 10
19.1m Welder hour 10
19.1n Painter hour 10
19.1o Electrician hour 10
19.1p Plumber hour 10
19.1q Driller hour 10
19.1r Gangers hour 10
19.1s Plasterers hour 10
19.1t Scaffolders hour 10
Carried to Collection Page - 1
11a/3 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 11a
DAYWORKS
(in figures) (in words) R.O. Bzs.
Item No. Item Description Unit
Estimated
Quantity
Unit Rate (Rial Omani) Amount
19.1u ..
19.1v ..
19.1w ..
19.1x ..
19.2 Operating Equipment on Site
The rates inserted by the tenderer shall be deemed to
include for the use of the plant inclusive of all fuel and
consumable stores, overhauls, repairs and
replacements, spare parts, tyres, insurance and all
other charges relating to plant including haulage to and
from the site but exclusive of driver and attendants who
shall be paid as laid down in the Labour Schedule.
Payments for working plants shall be for the hours
worked only. No allowance for standing time will be
made.
19.2a Bulldozer up to 100HP hour 5
19.2b Bulldozer 100 to 200HP hour 5
Carried to Collection Page - 1
11a/4 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 11a
DAYWORKS
(in figures) (in words) R.O. Bzs.
Item No. Item Description Unit
Estimated
Quantity
Unit Rate (Rial Omani) Amount
19.2c Bulldozer over 200HP hour 5
19.2d Motor grader up to 140 HP hour 5
19.2e Motor grader over 140 HP hour 5
19.2f Vibratory roller up to 3 tones hour 5
19.2g Vibratory roller above 3 tones hour 5
19.2h Pneumatic roller over 10 tones hour 5
19.2i Tandem roller up to 10 tones hour 5
19.2j Tandem roller over 10 tones hour 5
19.2k Wheel loader up to 3 cu.m. hour 5
19.2l Wheel loader above 3 cu.m. hour 5
19.2m Excavator up to 1 cu.m. hour 5
19.2n Excavator over 1 cu.m. hour 5
Carried to Collection Page - 1
11a/5 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 11a
DAYWORKS
(in figures) (in words) R.O. Bzs.
Item No. Item Description Unit
Estimated
Quantity
Unit Rate (Rial Omani) Amount
19.2o Water tanker, Minimum 6 cu.m. hour 5
19.2p Concrete vibrator (poker/screed) up to dia 50mm hour 5
19.2q Dump Truck up to 5 tones hour 5
19.2r Dump Truck from 5 to 10 tones hour 5
19.2s Dump truck over 10 tones hour 5
19.2t Water pump 2 inch hour 5
19.2u Water pump 3 inch hour 5
19.2v Air compressor up to 6000 liters capacity hour 5
19.2w Air compressor over 6000 liters capacity hour 5
19.2x Bituminous mixing plant with batching apparatus from hour 5
80t/hto 150 t/h
19.2y Finisher up to 80t./h hour 5
19.2z Finisher from 80t./h to 120t./h hour 5
Carried to Collection Page - 1
11a/6 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 11a
DAYWORKS
(in figures) (in words) R.O. Bzs.
Item No. Item Description Unit
Estimated
Quantity
Unit Rate (Rial Omani) Amount
19.2aa Bituminous sprayer up to 6 tones hour 5
19.2ab Crane, with boom and jib 5 to 10 tones hour 5
19.2ac Crane with boom and jib over 10 tones hour 5
19.2ad Generator 60 kW hour 5
19.2ae Low Bed hour 5
19 2af Hiab hour 5 19.2af Hiab hour 5
19.2ag Generator 75 kW hour 5
19.2ah Generator 100 kW hour 5
19.2ai Generator 150 kW hour 5
19.2aj Generator 200 kW hour 5
19.2ak Welding plant hour 5
19.2al Concrete mixer up to 0.5 cu.m. hour 5
19.2am Concrete mixer over 0.5 cu.m. hour 5
Carried to Collection Page - 1
11a/7 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 11a
DAYWORKS
(in figures) (in words) R.O. Bzs.
Item No. Item Description Unit
Estimated
Quantity
Unit Rate (Rial Omani) Amount
19.2an Automatic concrete batching plant hour 5
19.2ao Pick up truck up to 3 tones hour 5
19.2ap Pick up truck over 3 tones hour 5
19.2aq Van or Utility Vehicle hour 5
19.2ar Welding set, 300A, including electrodes hour 5
19.2as ..
19.2at ..
19.2au ..
Carried to Collection Page - 1
11a/8 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 11a
DAYWORKS
(in figures) (in words) R.O. Bzs.
Item No. Item Description Unit
Estimated
Quantity
Unit Rate (Rial Omani) Amount
19.3 MATERIALS
These rates includes all the charges for the supply of the
materials, loading, transportation to site, unloading and
stores as well as the charges provided in the General
and Special Specification and in the Contract.
19.3a Aggregates for granular sub base course in accordance cu.m. 30
with the General and Special Specification, in place as
specified specified.
19.3b Aggregates for aggregate base course in accordance cu.m. 30
with the General and Special Specification, in place as
specified.
19.3c Aggregates for bituminous base course in accordance cu.m. 30
with the General and Special Specification, near the
asphalt plant, in bulk
19.3d Fine aggregate for concrete in accordance with the cu.m. 30
General and Special Specification, in place, in bulk
19.3e Course aggregate for concrete in accordance with the cu.m. 50
General and Special Specification, in place, in bulk
Carried to Collection Page - 2
11a/9 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 11a
DAYWORKS
(in figures) (in words) R.O. Bzs.
Item No. Item Description Unit
Estimated
Quantity
Unit Rate (Rial Omani) Amount
19.3f Stone for Drainage masonry and slope protection in cu.m. 50
accordance with the General and Special Specification,
in place, in bulk
19.3g Asphalt cement, grade 60-70 on site t. 10
19.3h Asphalt cement, grade 50-60 on site t. 10
19.3i Emulsion asphalt, grade RS-1, on site t. 10
19.3j Cutback asphalt, MC and RC type, on site t. 10
19.3k Portland Cement, on site t. 10
19.3l Deformed billet steel bars AASHTO M31 grade 60 t. 10
(High yield) of any dia.
19.3m Highway signs sq.m. 10
19.3n Highway signs Supports - 1 post nr. 10
19.3o Highway signs Supports - 2 post nr. 10
19.3p W -Beam type Guardrail lin.m. 10
Carried to Collection Page - 2
11a/10 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 11a
DAYWORKS
(in figures) (in words) R.O. Bzs.
Item No. Item Description Unit
Estimated
Quantity
Unit Rate (Rial Omani) Amount
19.3q End anchorage for W -beam type Guardrails nr. 10
19.3r Water depth gauges nr. 10
19.3s Wire mesh Gabions on site t. 10
19.3t Gasoline on site liter 100
19.3u Lubricant Kg. 100
19.3v ..
19.3w ..
19.3x ..
Carried to Collection Page - 2
11a/11 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 11a
DAYWORKS
(in figures) (in words) R.O. Bzs.
Item No. Item Description Unit
Estimated
Quantity
Unit Rate (Rial Omani) Amount
COLLECTION PAGE - 1
Page 11a/1
Page 11a/2
Page 11a/3 Page 11a/3
Page 11a/4
Page 11a/5
Page 11a/6
Page 11a/7
Carried to Summary
11a/12 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 11a
DAYWORKS
(in figures) (in words) R.O. Bzs.
Item No. Item Description Unit
Estimated
Quantity
Unit Rate (Rial Omani) Amount
COLLECTION PAGE - 2
Page 11a/8
Page 11a/9
Page 11a/10
Carried to Summary
11a/13 .
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES Bill No. 11a
DAYWORKS
(in figures) (in words) R.O. Bzs.
Item No. Item Description Unit
Estimated
Quantity
Unit Rate (Rial Omani) Amount
SUMMARY
COLLECTION PAGE 1 - 11a/11
COLLECTION PAGE 2 - 11a/12
Carried to Grand Summary - 2
Construction of Batinah Expressway - Package 7
Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No.
BILL OF QUANTITIES GS 2
GRAND SUMMARY - 2
R.O Bzs.
GRAND SUMMARY - 2
2a EARTHWORKS 2a/6
3a GRANULAR SUB-BASE, AGGREGATE BASE COURSE, AND STABILISED BASE COURSES 3a/1
4a BITUMINOUS PAVEMENT 4a/3
5a CONCRETE AND CONCRETE STRUCTURES 5a/13
BILL No. ITEM DESCRIPTION Page No.
Amount
6a INCIDENTAL CONSTRUCTION 6a/18
7a ROAD LIGHTING AND ELECTRICAL INSTALLATION 7a/17
9a UTILITIES 9a/23
10a PROVISIONAL SUM 10a/1 4,445,000 000
11a DAY WORKS 11a/13
ADD CONTINGENCIES @ 10% OF SUB-TOTAL EXCLUDING BILLS 10a & 11a
TOTAL VALUE CARRIED TO GENERAL SUMMARY
Construction of Batinah Expressway - Package 7
Page No.
BILL OF QUANTITIES
GENERAL SUMMARY GS I

R.O Bzs.
GENERAL SUMMARY
1 PRELIMINARIES (For Part A+Part B) 1/7
2 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway GS-1
3 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway GS-2
BILL No. ITEM DESCRIPTION Page No.
Amount
TOTAL TENDER VALUE CARRIED TO FORM OF TENDER
In Words, the total Tender Value carried to the Form of Tender in Rials Omani