Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway
TENDER DOCUMENT
VOLUME 3 of 4
BILL OF QUANTITIES
Consulting Engineers: PARSONS International & Company LLC PO Box : 1151 Al Khuwair, Muscat Sultanate of Oman
2 J une 2014
Construction of Batinah Expressway Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway
TENDER DOCUMENTS
INDEX
Volume 1 of 4: Prime Document Part 1 Technical Part 2 Financial (To be returned in the envelope with the Tender)
Volume 2 of 4: Special Specification
Volume 3 of 4: Bill of Quantities (To be returned in the envelope with the Tender)
Book 1 of 3 Volume 4 of 4: Tender Drawings Part A Book 2 of 3
Part B Book 3 of 3 Page 1
BILL OF QUANTITIES
TABLE OF CONTENT
Preamble to Bill of Quantities 1 -1
Bill DESCRIPTION PAGES No. 1 Preliminaries 1/1 to 1/7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway
2 Earthworks 2/1 to 2/6 3 Granular Sub Base, Aggregate Base Course and 3/1 Stabilized Base Courses 4 Bituminous Pavement 4/1 5 Concrete and Concrete Structures 5/1 to 5/13 6 Incidental Construction 6/1 to 6/16 7 Road Lighting and Electrical Installation 7/1 to 7/10 9 Utilities 9/1 to 9/28 11 Day works 11/1 to 11/13 Grand Summary - 1 GS-1 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway
2a Earthworks 2a/1 to 2a/6 3a Granular Sub Base, Aggregate Base Course and 3a/1 Stabilized Base Courses 4a Bituminous Pavement 4a/3 5a Concrete and Concrete Structures 5a/1 to 5a/13 6a Incidental Construction 6a/1 to 6a/18 7a Road Lighting and Electrical Installation 7a/1 to 7a/17 9a Utilities 9a/1 to 9a/23 10a Provisional Sum 10a/1 11a Day works 11a/1 to 11a/13 Grand Summary - 2 GS-2 General Summary GS-I Construction of Batinah Expressway Package 7 Preamble to The Bill of Quantities 1 Add the following to the 20.1.2 Quantities
f) Amendment shall not be made to these Bills of Quantities without the authority, in writing, of the Tender Board during the tender stage.
g) The Contractor is to ensure that identical items occurring in separate bills are not priced at different rates unless this is the Contractors deliberate intention.
h) The prices and rates entered by the Contractor against items in the Bills of Quantities shall apply throughout the duration of the Contract to the execution of these items in any location and, except where otherwise provided for, to any additional work ordered by the Engineer and/or the Employer.
i) A price or rate is to be entered against each item in the Bills of Quantities and the Day work Schedules and any item left unpriced will be deemed to be included for elsewhere in the Bills of Quantities for the Day work Schedules and hence the rate for that item will be taken as NIL.
j) According to the General Conditions of Contract the Engineer may, if in his opinion it is necessary or desirable, order in writing that any additional or substituted work shall be executed on a day work basis. The Contractor shall be paid for such work at the rates entered by him in this list. The rates entered herein shall include and be considered compensation for the costs incurred for organization of work, overheads, profits, taxes, royalties, fees, payment to third parties for land or the use of land, or for damage to property, incidentals, haulage, tools and all other costs necessary for the performance of the work on a day work basis.
k) Rates quoted under Day Works Schedule would not be used for evaluating cost of any item of works not listed in the BOQ. The price payable for any new item of work instructed to be executed shall be reasonable and appropriate and shall be calculated on the following lines as may be applicable: (a) Price of comparable item in the Contract (b) Price quoted for similar works on other contracts (c) Price based upon Rate Analysis utilizing actual cost of materials, labour and equipment plus the profit margin (d) Based upon quotation from qualified sub-contractors in case the work is of such a nature that a sub-contractor has to be engaged plus the tendered margin. (e) Based upon rates approved for nominated sub-contractor plus the tendered margin Rates quoted under Day Works Schedule is meant to be utilized for executing an activity of incidental nature and which is not susceptible to measurement. Amount payable for works of such nature would be on the basis of hours actually worked. And idle time or time for transportation of labour or equipment is not payable.
Add the following to the 20.1.3 Descriptions
e) xxiv) Damage to the surrounding properties by Contractors plant.
1/1 . Construction of Batinah Expressway - Package 7 Page No. BILL OF QUANTITIES PRELIMINARIES (For Part A+ Part B) Bill No. 1
(in figures) (in words) R.O. Bzs. 1 PRELIMINARIES CONDITIONS OF CONTRACT The Contractor is deemed to have carefully studied and understood and taken into account the provisions and requirements of the General and Particular Conditions of Contract. The rates and prices stated in the Bill of Quantities shall include for all costs of compliance with the Conditions except for the costs Item No. Item Description Unit Estimated Quantity Unit Rate (Rial Omani) Amount p p of the items given in this Section 1 and for which a separate amount is stated herein. 1 General 1.3 Project Site 1.3.5(i)a Soil Investigation and report LS 1.3.5(i)b Confirmatory boreholes at location of Pier & Abutment nr. 12 foundation of bridge, for a minimum depth of 20m or as directed by the Engineer Carried to Summary 1/2 . Construction of Batinah Expressway - Package 7 Page No. BILL OF QUANTITIES PRELIMINARIES (For Part A+ Part B) Bill No. 1
(in figures) (in words) R.O. Bzs. Item No. Item Description Unit Estimated Quantity Unit Rate (Rial Omani) Amount 1 PRELIMINARIES (Continued) 1.4 Contractor's Site Facilities 1.4.3(i) Mobilization and demobilization of Contractor's site LS facilities 1.4.3(ii) Maintenance of Contractor's site facilities month 30 1.5 Engineer's Facilities g 1.5.13(i)a Provision of Engineer's Office as per Special month 33 Specifications (1 unit x 33 months) type-1 (RE + QS + AA) 1.5.13(i)b Provision of Engineer's Office as per Special month 30 Specifications (1 unit x 30 months) type-2 1.5.13(ii)a Maintenance of Engineer's Office as per Special month 33 Specifications (1 unit x 33 months) type-1 1.5.13(ii)b Maintenance of Engineer's Office as per month 30 Special Specifications (1 unit x 30 months) type-2 Carried to Summary 1/3 . Construction of Batinah Expressway - Package 7 Page No. BILL OF QUANTITIES PRELIMINARIES (For Part A+ Part B) Bill No. 1
(in figures) (in words) R.O. Bzs. Item No. Item Description Unit Estimated Quantity Unit Rate (Rial Omani) Amount 1 PRELIMINARIES (Continued) 1.5 Engineer's Facilities (Continued) 1.5.13(iii)a Provision of Surveying equipments for the Engineer month 30 as per Specifications 1.5.13(iii)b Provision of One 3D Laser Scanner Surveying Device month 30 for Client including training 1.5.13(iv) Maintenance of Surveying equipments for the Engineer month 30 1.5.13(v)a Provision of Engineer's Accommodation as per month 33 Special Specifications (1 unit x 33 months) type-1 (RE) 1.5.13(v)b Provision of Engineer's Accommodation as per month 66 Special Specifications (2 unit x 33 months) type-2 (QS) 1.5.13(v)c Provision of Engineer's Accommodation as per month 120 Special Specifications (4 unit x 30 months) type-2 (CE, ME & UE,) 1.5.13(v)d Provision of Engineer's Accommodation as per month 300 Special Specifications (10 unit x 30 months) type-3 (SI, MI, LS & AA) Carried to Summary 1/4 . Construction of Batinah Expressway - Package 7 Page No. BILL OF QUANTITIES PRELIMINARIES (For Part A+ Part B) Bill No. 1
(in figures) (in words) R.O. Bzs. Item No. Item Description Unit Estimated Quantity Unit Rate (Rial Omani) Amount 1 PRELIMINARIES (Continued) 1.5 Engineer's Facilities (Continued) 1.5.13(v)e Provision of Engineer's Accommodation as per month 33 Special Specifications (1 unit x 33 months) type-4 1.5.13(vi)a Maintenance of Engineer's Accommodation as per month 33 Special Specifications (1 unit x 33 months) type-1 1.5.13(vi)b Maintenance of Engineer's Accommodation as per month 66 Special Specifications (2 unit x 33 months) type-2 1.5.13(vi)c Maintenance of Engineer's Accommodation as per month 120 Special Specifications (4 unit x 30 months) type-2 1.5.13(vi)d Maintenance of Engineer's Accommodation as per month 300 Special Specifications (10 unit x 30 months) type-3 1.5.13(vi)e Maintenance of Engineer's Accommodation as per month 33 Special Specifications (1 unit x 33 months) type-4 1.5.13(vii) Provision of Site Laboratory as detailed in the month 30 Specifications Carried to Summary 1/5 . Construction of Batinah Expressway - Package 7 Page No. BILL OF QUANTITIES PRELIMINARIES (For Part A+ Part B) Bill No. 1
(in figures) (in words) R.O. Bzs. Item No. Item Description Unit Estimated Quantity Unit Rate (Rial Omani) Amount 1 PRELIMINARIES (Continued) 1.5 Engineer's Facilities (Continued) 1.5.13(viii) Maintenance of Site Laboratory month 30 1.7 Control of Traffic and Access 1.7.6(i)a Maintenance and Protection of Traffic month 30 1.10 Management Procedures 1.10.6(i) Provision of 5 sets of photographs (294X210mm) month 30 1.10.6(ii) Provision of two sets of Video recordings as month 30 specified 1.11 Submittals 1.11.8(i) Provision of As-built drawings, record drawings, record LS specifications and miscellaneous records as specified Carried to Summary 1/6 . Construction of Batinah Expressway - Package 7 Page No. BILL OF QUANTITIES PRELIMINARIES (For Part A+ Part B) Bill No. 1
(in figures) (in words) R.O. Bzs. Item No. Item Description Unit Estimated Quantity Unit Rate (Rial Omani) Amount 1 PRELIMINARIES (Continued) 1.14 Contractor's Temporary Works and Services 1.14.8(i) Provision, erection, relocation, maintenance and nr. 2 removal of project signboards (Alluminium) 1.15 Commemorative Plaque and Opening Ceremony y 1.15.4(i) Supply and erection of commemorative plaque nr. 1 1.15.4(ii) Opening ceremony including all facilities LS Carried to Summary 1/7 . Construction of Batinah Expressway - Package 7 Page No. BILL OF QUANTITIES PRELIMINARIES (For Part A+ Part B) Bill No. 1
(in figures) (in words) R.O. Bzs. Item No. Item Description Unit Estimated Quantity Unit Rate (Rial Omani) Amount SUMMARY Page 1/1 Page 1/2 Page 1/3 Page 1/4 Page 1/5 Page 1/6 Carried to General Summary
BILL OF QUANTITIES Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway
2/1 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES EARTHWORKS Bill No. 2
(in figures) (in words) R.O. Bzs. 2 EARTHWORKS 2.1 Clearing and Grubbing 2.1.5(i) Clear site of all trees less than 300mm ,shrubs, sq.m. 1,050,000 vegetation including roots as necessary to commence work 2.1.5(ii)a Removal and delivery of trees of 300mm trunk nr. 50 diameter or greater Item No. Estimated Quantity Unit Rate (Rial Omani) Amount Item Description Unit g 2.1.5(ii)b Removal and disposal of trees of 300mm trunk nr. 50 diameter or greater 2.2 Removal of Structures and Obstructions 2.2.5(i) Removal of existing building, single-storey area nr. 1 500sq.m. 2.2.5(ii) Removal of reinforced concrete (for box culverts) cu.m. 200 2.2.5(iii) Removal of mass concrete (200mm thick) cu.m. 150 Carried to Summary 2/2 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES EARTHWORKS Bill No. 2
(in figures) (in words) R.O. Bzs. Item No. Estimated Quantity Unit Rate (Rial Omani) Amount Item Description Unit 2 EARTHWORKS (Continued) 2.2 Removal of Structures and Obstructions (Continued) 2.2.5(v) Removal of Concrete Curbs lin.m. 1,000 2.2.5(vi) Removal of interlocking tiles in sidewalks and median sq.m. 500 2.2.5(vii) Removal of pipe culvert (900mm diameter) lin.m. 50 2.2.5(viii) Removal and disposal of bituminous pavement cu.m. 18,500 200mm max. thickness in carriageways and paved areas 2.2.5(x) Removal of steel safety barrier including posts and lin.m. 1,500 foundation 2.2.5(xi) Removal of concrete barrier lin.m. 200 Carried to Summary 2/3 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES EARTHWORKS Bill No. 2
(in figures) (in words) R.O. Bzs. Item No. Estimated Quantity Unit Rate (Rial Omani) Amount Item Description Unit 2 EARTHWORKS (Continued) 2.2 Removal of Structures and Obstructions (Continued) 2.2.5(xii) Removal of sign boards (single post) nr. 20 2.2.5(xviii)a Removal of Mortared Riprap cu.m. 250 2.2.5(xviii)b Removal of Gabion Boxes cu.m. 200 2.2.5(xix) Removal and disposal of Existing Fence with gate lin.m. 50 (up to 2m high) 2.2.5(xx) Removal and disposal of Existing Masonry Wall cu.m. 50 (Block Type, up to 2m high) 2.2.5(xxvi)a Removal and delivery for re-use by others of Street nr. 10 Light Pole, to the MRMWR stores or as directed by Engineer Carried to Summary 2/4 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES EARTHWORKS Bill No. 2
(in figures) (in words) R.O. Bzs. Item No. Estimated Quantity Unit Rate (Rial Omani) Amount Item Description Unit 2 EARTHWORKS (Continued) 2.2 Removal of Structures and Obstructions (Continued) 2.2.5(xxvi)b Removal and delivery for re-use by others of Flag Pole, nr. 10 to the MRMWR stores or as directed by Engineer 2.3 Roadway Excavation 2.3.6(i) Unclassified excavation to Embankment & Dyke cu.m. 208,600 2.3.6(iii) Unclassified Excavation under water cu.m. 1,000 2.3.6(v) Leveling and Grading for Wadi Training Works cu.m. 329,800 Carried to Summary 2/5 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES EARTHWORKS Bill No. 2
(in figures) (in words) R.O. Bzs. Item No. Estimated Quantity Unit Rate (Rial Omani) Amount Item Description Unit 2 EARTHWORKS (Continued) 2.4 Borrow Materials 2.4.6(i)a Borrow excavation to embankment & Dykes cu.m. 3,254,000 2.6 Sub-grade Construction 2.6.6(i) Sub grade preparation in cut sq.m. 352,580 ( ) g p p q , 2.7 Excavation and Backfilling for structures 2.7.6(i) Unclassified structural excavation cu.m. 9,305 (depth 0m to 2.0m) 2.7.6(ii) Unclassified structural excavation cu.m. 6,240 (depth >2.0m to <4.0m) 2.7.6(iii) Unclassified structural excavation cu.m. 1,500 (depth 4.0m) 2.7.6(iv) Unclassified structural excavation (under water) cu.m. 500 Carried to Summary 2/6 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES EARTHWORKS Bill No. 2
(in figures) (in words) R.O. Bzs. Item No. Estimated Quantity Unit Rate (Rial Omani) Amount Item Description Unit SUMMARY Page 2/1 Page 2/2 Page 2/3 Page 2/4 Page 2/5 Carried to Grand Summary - 1 3/1 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES GRANULAR SUB-BASE, AGREGATE BASE COURSE, AND STABILISED BASE COURSES Bill No. 3
(in figures) (in words) R.O. Bzs. 3 GRANULAR SUB-BASE, AGREGATE BASE COURSE AND STABILISED BASE COURSES 3.2 Granular Sub-Base Course 3.2.6(ii) Granular Sub-Base Course (Class B) cu.m. 546,400 3.3 Aggregate Base Course 3.3.6(i) Crushed Aggregate Base Course (Class A) cu.m. 268,800 Item No. Estimated Quantity Unit Rate (Rial Omani) Amount Item Description Unit ( ) gg g ( ) , Carried to Grand Summary - 1 4/1 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES BITUMINOUS PAVEMENT Bill No. 4
(in figures) (in words) R.O. Bzs. 4 BITUMINOUS PAVEMENT 4.2 Bituminous Materials for Prime Coat and Tack Coats 4.2.8(i) Bituminous Prime Coat kg. 1,185,400 4.2.8(ii) Bituminous Tack Coat kg. 882,200 4.4 Bituminous Base Course Item No. Estimated Quantity Unit Rate (Rial Omani) Amount Item Description Unit 4.4.14(i) Bituminous Base Course cu.m. 120,500 4.5 Bituminous Binder and Wearing Courses 4.5.14(i) Bituminous Wearing Course cu.m. 59,650 4.9 Pavement Repairs and Reinstatement 4.9.10(i) Surface milling (up to 50mm thick) sq.m. 5,000 4.12 Surface Ride ability Measurement 4.12.10(i) International roughness index (IRI) for Asphalt lin.m. 235,000 pavement Carried to Grand Summary - 1 5/1 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES CONCRETE AND CONCRETE STRUCTURES Bill No. 5
(in figures) (in words) R.O. Bzs. 5 CONCRETE AND CONCRETE STRUCTURES 5.1 Concrete Materials and Mixes 5.1.7(i)a Unreinforced Concrete Class 16/20 for Bridges, cu.m. 3,195 Retaining walls, Overpasses, Box Culverts and Drains 5.1.7(i)b Reinforced Concrete Class 30/20 MS7 for rectangular cu.m. 1,500 closed drains 5 1 7(i) C t Cl 37 5/20 MS7 i R i f d C t 26 600 Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 5.1.7(i)c Concrete Class 37.5/20 MS7 in Reinforced Concrete cu.m. 26,600 Box Culvert including headwalls, wing walls, apron slabs and cut-off walls 5.1.7(i)d Post-tensioned Concrete, Class 50/20 MS7 in Cast cu.m. 1,890 in-situ Post-tensioned Box Girders including Integral Abutment, Hanging Back wall etc.for 12.26m deck width (For Interchange Bridge ) 5.1.7(i)e Reinforced Concrete, Class 45/20 MS7 in Bridge cu.m. 851 abutment, abutment cap and its foundation, Wing wall etc. (For Interchange Bridge ) 5.1.7(i)f Concrete Class 45/20 MS7 in Pile Caps & Footings cu.m. 252 (For Interchange Bridge) Carried to Collection Page - 1 5/2 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES CONCRETE AND CONCRETE STRUCTURES Bill No. 5
(in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 5 CONCRETE AND CONCRETE STRUCTURES (Continued) 5.1 Concrete Materials and Mixes (Continued) 5.1.7(i)g Concrete Class 45/20 MS7 in Pier Columns & cu.m. 120 Pier Caps (For Interchange Bridge) 5.1.7(i)h Concrete Class 40/20 MS7 in Approach Slabs including cu.m. 95 all items as indicated on drawings (For Interchange Bridge) 5.1.7(i)i GRP Cladding to cover space between superstructure sq.m. 11 and Pier column (color to match with Pier) 5.2 Reinforcing Steel 5.2.6(ii)a High tensile steel bar reinforcement, Grade 500, Type 2, t. 798 of any diameter for Interchange bridges 5.2.6(ii)b High tensile steel bar reinforcement of any diameter for t. 3,980 Retaining wall, Box culverts, Underpass and Drains 5.2.6(iii) Fabric wire mesh reinforcement of any size t. 5 Carried to Collection Page - 1 5/3 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES CONCRETE AND CONCRETE STRUCTURES Bill No. 5
(in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 5 CONCRETE AND CONCRETE STRUCTURES (Continued) 5.4 Prestressed Concrete Structures 5.4.6(i) Prestressing Cables - 0.6" Diameter Strands Grade 270 t. 95 5.10 Waterproofing for Structures 5.10.6(i) Bitumen Water Proofing Paint for surfaces in contact sq.m. 35,500 ith th i C l t d C t d i with earth in Culverts and Concrete drains 5.10.6(ii) Waterproofing Membrane including Protection board sq.m. 914 for Bridge Abutments, Pier and Pier Footing, Hanging Back Wall etc. 5.10.7.7(i) Waterproofing for Bridge Decks sq.m. 2,069 (isocyanite amine based) 5.12 Load Testing of Bridges 5.12.7(i)a Bridge Loading Test - Testing by Static Load nr. 2 5.12.7(i)b Bridge Loading Test - Testing by Moving Load nr. 2 Carried to Collection Page - 1 5/4 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES CONCRETE AND CONCRETE STRUCTURES Bill No. 5
(in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 6 STRUCTURAL STEEL AND OTHER METALWORK 6.6(i) Metal Access door for box girder bridges nr. 8 Carried to Collection Page - 1 5/5 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES CONCRETE AND CONCRETE STRUCTURES Bill No. 5
(in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 8 DRAINAGE 8.1 Pipe Culverts 8.1.6(ii) Reinforced Precast Concrete Pipe Culvert lin.m. 200 (diameter 1000mm) 8.2 Storm Sewers 8.2.6(i)a Storm Sewer, HDPE Pipe (diameter 300mm) lin.m. 50 8.2.6(i)b Storm Sewer, HDPE Pipe (diameter 400mm) lin.m. 200 8.2.6(i)c Storm Sewer, HDPE Pipe (diameter 500mm) lin.m. 50 8.2.6(i)d Storm Sewer, HDPE Pipe (diameter 600mm) lin.m. 6,000 8.2.6(i)e Storm Sewer, HDPE Pipe (diameter 900mm) lin.m. 50 8.2.6(i)f Storm Sewer, HDPE Pipe (diameter 1000mm) lin.m. 50 Carried to Collection Page - 1 5/6 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES CONCRETE AND CONCRETE STRUCTURES Bill No. 5
(in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 8 DRAINAGE (Continued) 8.2 Storm Sewers (Continued) 8.2.6(i)g Storm Sewer, RC Pipe (diameter 300mm) lin.m. 50 8.2.6(i)h Storm Sewer, RC Pipe (diameter 400mm) lin.m. 50 8 2 6(i)i St S RC Pi (di t 500 ) li 50 8.2.6(i)i Storm Sewer, RC Pipe (diameter 500mm) lin.m. 50 8.2.6(i)j Storm Sewer, RC Pipe (diameter 600mm) lin.m. 50 8.2.6(i)k Storm Sewer, RC Pipe (diameter 900mm) lin.m. 50 8.2.6(i)l Storm Sewer, RC Pipe (diameter 1000mm) lin.m. 450 8.3 Manholes Inlets and Chambers 8.3.6(ii)a Grated Inlet (600mm x 600mm) with DI grating and nr. 20 Locked frame Carried to Collection Page - 1 5/7 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES CONCRETE AND CONCRETE STRUCTURES Bill No. 5
(in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 8 DRAINAGE (Continued) 8.3 Manholes Inlets and Chambers (Continued) 8.3.6(ii)b Grated Inlet (1000mm x 1000mm) with DI grating and nr. 198 Locked frame 8.3.6(ii)c DI grating (1000mm x 1000mm) and Locked frame at nr. 32 Culvert for Median Drainage as shown on Dwg. (on the top of box culvert) 8.3.6(iii) Curb Inlet (600mm x 600mm) as shown on Dwg. nr. 84 8.4 Drainage of Structures 8.4.6(ii)a Drainage pipe, 100mm uPVC in structure lin.m. 350 8.4.6(ii)b Drainage pipe, 200mm uPVC in structure lin.m. 200 8.4.6(ii)c 150 mm Dia. uPVC perforated pipe wrapped in lin.m. 300 Geotextile 8.4.6(iii) Permeable backing including Geotextile Membrane cu.m. 11,500 8.4.6(iv) Granular backfill cu.m. 3,560 Carried to Collection Page - 1 5/8 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES CONCRETE AND CONCRETE STRUCTURES Bill No. 5
(in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 10 PILING 10.1 Piling General 10.1.6(i) Setting up at each 750mm diameter pile location nr. 90 10.1.6(ii)a Piling - Cast in place, 750mm diameter for Pier lin.m. 504 Foundation including reinforcement in piles (Boring piles) 10 1 6(ii)b Piling Cast in place 750mm diameter for Integral lin m 1 008 10.1.6(ii)b Piling - Cast in place, 750mm diameter for Integral lin.m. 1,008 Abutment or Abutment Foundation including reinforcement in piles (Boring piles) 10.2 Pile Testing 10.2.6(i) Static Load Testing of 750mm diameter expendable nr. 2 piles (including all materials) 10.2.6(ii) Static Load Testing of 750mm diameter working piles nr. 2 10.2.6(iii) Non-destructive Integrity Test as per the Specifications. nr. 90 Carried to Collection Page - 1 5/9 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES CONCRETE AND CONCRETE STRUCTURES Bill No. 5
(in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 11 BRIDGE ACCESSORIES 11.3 Bearings General 11.3.6(i)a Pot Bearing, (V= 16,000kN - 18,000kN & nr. 2 H =2,000kN - 4,000kN) , Fixed type including supply & installation 11.3.6(i)b Pot Bearing, (V= 14,000kN - 16,000kN & nr. 2 H =2,000kN - 4,000kN), Guided type including supply & i t ll ti installation 11.3.6(i)c Pot Bearing, (V= 4,000kN - 6,500kN & nr. 4 H =500kN - 1,500kN), Guided type including supply & installation 11.3.6(i)d Pot Bearing, (V= 2,000kN - 4,000kN), nr. 4 Free type including supply & installation 11.3.6(i)e Pot Bearing, (V= 4,000kN - 6,000kN ), nr. 4 Free type including supply & installation Carried to Collection Page - 2 5/10 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES CONCRETE AND CONCRETE STRUCTURES Bill No. 5
(in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 11 BRIDGE ACCESSORIES (Continued) 11.4 Bridge Expansion Joint 11.4.6(vii) Provide Strip Seal Type Expansion Joint lin.m. 30 (Max. Opening = 60mm & Max. Closing = 30mm) 11.6 Bridge Parapets and Railings 11.6.6(i) Concrete Barrier for Bridge Parapet as shown on Dwg. lin.m. 410 Carried to Collection Page - 2 5/11 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES CONCRETE AND CONCRETE STRUCTURES Bill No. 5
(in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity COLLECTION PAGE - 1 Page 5/1 Page 5/2 Page 5/3 Page 5/4 Page 5/5 Page 5/6 Page 5/7 Page 5/8 Carried to Summary 5/12 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES CONCRETE AND CONCRETE STRUCTURES Bill No. 5
(in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity COLLECTION PAGE - 2 Page 5/9 Page 5/10 Carried to Summary 5/13 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES CONCRETE AND CONCRETE STRUCTURES Bill No. 5
(in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity SUMMARY COLLECTION PAGE 1 - 5/11 COLLECTION PAGE 2 - 5/12 Carried to Grand Summary - 1 6/1 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES INCIDENTAL CONSTRUCTION Bill No. 6
(in figures) (in words) R.O. Bzs. 9 SLOPE PROTECTION AND STABILIZATION 9.1 Riprap 9.1.6(i) Loose Stone Riprap (Class B) of varying thickness cu.m. 2,000 for Dyke and slope protection as shown in the Dwg. 9.1.6(ii)a Mortared Stone Riprap (Class A, Varying Thickness) cu.m. 220,000 for Slope Protection and Floodways including Stubs as per dwg. Item No. Estimated Quantity Unit Rate (Rial Omani) Amount Item Description Unit 9.1.6(ii)b Mortared Stone Riprap (Class A) for Culvert inlet cu.m. 11,000 & outlet 9.1.6(ii)c Mortared Stone Riprap (Class A) for Dyke as shown cu.m. 550 on dwg. 9.1.6(iv) Geotextile Fabric Filter sq.m. 2,250 9.2 Gabions 9.2.6(i) Gabion lining of varying thickness for wadi bed, slope cu.m. 42,000 protection, culvert inlet, outlet protection and Floodways as per Dwg. Carried to Collection Page - 1 6/2 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES INCIDENTAL CONSTRUCTION Bill No. 6
(in figures) (in words) R.O. Bzs. Item No. Estimated Quantity Unit Rate (Rial Omani) Amount Item Description Unit 9 SLOPE PROTECTION AND STABILIZATION (Continued) 9.9 Ditch Lining
9.9.6(i)a Concrete Ditch Lining (100mm Thick) with wire mesh sq.m. 200 (10mm dia @200mm c/c both ways) 9.9.6(i)b Reinforced Concrete Chute 100mm thick with wire mesh lin.m. 200 (10mm dia @150mm c/c both ways) as per Dwg. 9.9.6(ii) Grouted Stone Ditch lining (200mm thick) sq.m. 10,620 9.12 Mechanically Stabilized Earth Retaining Walls 9.12.7(i) Mechanically Stabilized Earth Retaining Walls sq.m. 1,200 (MSERWs)
9.12.7(ii) Standard Coping for MSERWs lin.m. 80
9.12.7(iii) Concrete Barrier Parapet on MSERWs lin.m. 100 Carried to Collection Page - 1 6/3 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES INCIDENTAL CONSTRUCTION Bill No. 6
(in figures) (in words) R.O. Bzs. Item No. Estimated Quantity Unit Rate (Rial Omani) Amount Item Description Unit 12 SIDEWALKS, PAVED AREAS AND CURBS 12.1 Sidewalks, Paved areas and Curbs 12.1.7(ii)a Paving, concrete interlocking blocks 60mm thick sq.m. 35,200 for side walks and median 12.1.7(ii)b Paving, concrete interlocking blocks 80mm thick sq.m. 1,000 for Car parking 12 1 7( ) P t N M t bl C t C b T ''A'' li 18 500 12.1.7(v)a Precast Non-Mountable Concrete Curb Type ''A'' lin.m. 18,500 12.1.7(v)b Precast Mountable curb Type ''B'' lin.m. 1,200 12.1.7(v)c Precast flush curb Type ''D'' lin.m. 1,500 12.1.7(v)d Precast concrete edge curb Type ''E'' lin.m. 15,500 Carried to Collection Page - 1 6/4 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES INCIDENTAL CONSTRUCTION Bill No. 6
(in figures) (in words) R.O. Bzs. Item No. Estimated Quantity Unit Rate (Rial Omani) Amount Item Description Unit 13 SAFETY BARRIERS AND FENCES 13.1 Roadside Barriers 13.1.7(i) W-Beam Guardrail (Strong post) including lin.m. 131,700 W150 x 13.5 Steel post, reflectors, accessories and foundations 13.1.7(iii)a End anchorage for approach including post, reflectors, nr. 52 accessories and foundations 13.1.7(iii)b End anchorage for approach nr. 12 (Guard Rail-Concrete Barrier transition) 13.1.7(iii)c W-Beam Guardrail connection with Concrete barrier nr. 12 as indicated in the Drawing 13.1.7(iii)d W-Beam Guardrail Terminal section for Departure end nr. 52 including post, reflectors, accessories and foundations 13.1.7(vii)a Precast Concrete barrier, Single face as shown lin.m. 4,500 in the Dwg. 13.1.7(vii)b Heavy Duty Concrete barrier, Single face as shown lin.m. 180 in the Dwg. Carried to Collection Page - 1 6/5 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES INCIDENTAL CONSTRUCTION Bill No. 6
(in figures) (in words) R.O. Bzs. Item No. Estimated Quantity Unit Rate (Rial Omani) Amount Item Description Unit 13 SAFETY BARRIERS AND FENCES (Continued) 13.1 Roadside Barriers (Continued) 13.1.7(ix) Concrete barrier, transition section lin.m. 600 13.1.7(x) Impact attenuator, Quad Beam type, with expandable nr. 2 modules/cartridges, including new foundation, slab with reflective studs and connection to the concrete 13.4 Delineators 13.4.6(i)a Floodway markers, painted white & red as shown on nr. 25 Dwg. Including anchor bolt 13.4.6(i)b Floodway water depth guage as shown on Dwg. nr. 8 Including anchor bolt Carried to Collection Page - 1 6/6 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES INCIDENTAL CONSTRUCTION Bill No. 6
(in figures) (in words) R.O. Bzs. Item No. Estimated Quantity Unit Rate (Rial Omani) Amount Item Description Unit 14 TRAFFIC SIGNS AND ROAD MARKINGS 14.1 Traffic Signs 14.1.7(i)a Highway sign, Triangular Side (750mm) nr. 15 14.1.7(i)b Highway sign, Triangular Side (900mm) nr. 33 14 1 7(i) Hi h i T i l Sid (1200 ) 4 14.1.7(i)c Highway sign, Triangular Side (1200mm) nr. 4 14.1.7(i)d Highway sign, Triangular Side (1500mm) nr. 2 14.1.7(ii)a Highway sign, Circular (Diameter 750mm) nr. 47 14.1.7(ii)b Highway sign, Circular (Diameter 900mm) nr. 10 14.1.7(ii)c Highway sign, Circular (Diameter 1200mm) nr. 2 Carried to Collection Page - 1 6/7 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES INCIDENTAL CONSTRUCTION Bill No. 6
(in figures) (in words) R.O. Bzs. Item No. Estimated Quantity Unit Rate (Rial Omani) Amount Item Description Unit 14 TRAFFIC SIGNS AND ROAD MARKINGS (Continued) 14.1 Traffic Signs (Continued) 14.1.7(iii)a Chevron Signs, rectangular [2100 mm x 600 mm] sq.m. 10 14.1.7(iii)b Chevron Signs, rectangular [2400 mm x 600 mm] sq.m. 10 14.1.7(iii)c Chevron Signs, rectangular [380 mm x 600 mm] sq.m. 50 14.1.7(iii)d Highway Signs, rectangular [750x1400] sq.m. 10 14.1.7(iii)e Highway Signs, rectangular [600x800] sq.m. 5 14.1.7(iii)f Supplementary plate, rectangular [1200 mm x 700 mm] sq.m. 5 14.1.7(iii)g Supplementary plate, rectangular [1500 mm x 700 mm] sq.m. 5 Carried to Collection Page - 1 6/8 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES INCIDENTAL CONSTRUCTION Bill No. 6
(in figures) (in words) R.O. Bzs. Item No. Estimated Quantity Unit Rate (Rial Omani) Amount Item Description Unit 14 TRAFFIC SIGNS AND ROAD MARKINGS (Continued) 14.1 Traffic Signs (Continued) 14.1.7(iii)h Rectangular or Polygonal Sign Face (Area 1-2 sq m) sq.m. 20 14.1.7(iii)i Rectangular or Polygonal Sign Face (Area 2-4 sq m) sq.m. 40 14.1.7(iii)j Rectangular Sign Face (Area 4-6 sq m) sq.m. 50 Carried to Collection Page - 1 6/9 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES INCIDENTAL CONSTRUCTION Bill No. 6
(in figures) (in words) R.O. Bzs. Item No. Estimated Quantity Unit Rate (Rial Omani) Amount Item Description Unit 14 TRAFFIC SIGNS AND ROAD MARKINGS (Continued) 14.1 Traffic Signs (Continued) 14.1.7(iv) Octagonal Road signs (Height 900mm) nr. 8 14.1.7(v)a Sign post support assembly G.I pipe 100mm Dia. nr. 121 Including foundation and painting of post 14.1.7(v)b Multi-post Sign Support Assembly, Type PI posts, nr. 22 complete including foundation, painting (black and white) etc. 14.1.7(v)c Multi-post Sign Support Assembly, Type PII posts, nr. 4 complete including foundation, painting (black and white) etc. 14.1.7(v)d Multi-post Sign Support Assembly, Type PIII posts, nr. 8 complete including foundation, painting (black and white) etc. 14.1.7(v)e Multi-post Sign Support Assembly, Type PIV posts, nr. 4 complete including foundation, painting (black and white) etc. Carried to Collection Page - 2 6/10 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES INCIDENTAL CONSTRUCTION Bill No. 6
(in figures) (in words) R.O. Bzs. Item No. Estimated Quantity Unit Rate (Rial Omani) Amount Item Description Unit 14 TRAFFIC SIGNS AND ROAD MARKINGS (Continued) 14.2 Road Markings 14.2.6(i)a Traffic Lines, Type L1/2(120) White sq.m. 5,500 (Mechanical application) 14.2.6(i)b Traffic Lines, Type L1/3(120) White sq.m. 300 (Mechanical application) 14.2.6(i)c Traffic Lines, Type L2A(120) White sq.m. 900 (Mechanical application) 14.2.6(i)d Traffic Lines, Type L2/1(120) White sq.m. 4,000 (Mechanical application) 14.2.6(i)e Traffic Lines, Type L2/2(120) White sq.m. 600 (Mechanical application) 14.2.6(i)f Traffic Lines, Type L4/1(150) Yellow sq.m. 100 (Mechanical application) 14.2.6(i)g Traffic Lines, Type L4/2(120) Yellow sq.m. 28,500 (Mechanical application) Carried to Collection Page - 2 6/11 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES INCIDENTAL CONSTRUCTION Bill No. 6
(in figures) (in words) R.O. Bzs. Item No. Estimated Quantity Unit Rate (Rial Omani) Amount Item Description Unit 14 TRAFFIC SIGNS AND ROAD MARKINGS (Continued) 14.2 Road Markings (Continued) 14.2.6(i)h Traffic Lines, Type L5/1(150) White sq.m. 50 (Mechanical application) 14.2.6(i)i Traffic Lines, Type L5/2(120) White sq.m. 900 (Mechanical application) 14.2.6(i)j Traffic Lines, Type L7(400) White sq.m. 50 (Mechanical application) 14.2.6(i)k Traffic Lines, Type L8(200) White sq.m. 300 (Mechanical application) 14.2.6(iii)a Special Marking , Pedestrian Crossing sq.m. 1,200 14.2.6(iii)b Special Marking , Chevrons Marking S9 sq.m. 2,200 14.2.6(iii)c Special Marking , Lane Selection Arrow White (S3/1) sq.m. 120 Carried to Collection Page - 2 6/12 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES INCIDENTAL CONSTRUCTION Bill No. 6
(in figures) (in words) R.O. Bzs. Item No. Estimated Quantity Unit Rate (Rial Omani) Amount Item Description Unit 14 TRAFFIC SIGNS AND ROAD MARKINGS (Continued) 14.2 Road Markings (Continued) 14.2.6(iii)d Special Marking , Lane Selection Arrow White (S4/1) sq.m. 120 14.2.6(iii)e Special Marking , Lane Selection Arrow White (S5/1) sq.m. 120 14.2.6(iii)f Special Marking , Lane Selection Arrow White (S7/1) sq.m. 120 14.2.6(iii)g Special Marking , Lane Selection Arrow White (S8/1) sq.m. 120 14.2.6(iv) Curb painting sq.m. 11,010 Carried to Collection Page - 2 6/13 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES INCIDENTAL CONSTRUCTION Bill No. 6
(in figures) (in words) R.O. Bzs. Item No. Estimated Quantity Unit Rate (Rial Omani) Amount Item Description Unit 14 TRAFFIC SIGNS AND ROAD MARKINGS (Continued) 14.3 Road Studs 14.3.6(i)a Reflecting Road Studs (Double face, Red color) nr. 1,200 14.3.6(i)b Reflecting Road Studs (Single face, Red color) nr. 7,800 14.3.6(i)c Reflecting Road Studs (Single face, White color) nr. 3,800 14.3.6(iii) Provide removable bollards in the median opening nr. 30 and one fixed bollard at each ends as shown in the Dwg. for R.O.P. including chain and lock Carried to Collection Page - 2 6/14 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES INCIDENTAL CONSTRUCTION Bill No. 6
(in figures) (in words) R.O. Bzs. Item No. Estimated Quantity Unit Rate (Rial Omani) Amount Item Description Unit COLLECTION PAGE - 1 Page 6/1 Page 6/2 Page 6/3 Page 6/4 Page 6/5 Page 6/6 Page 6/7 Page 6/8 Carried to Summary 6/15 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES INCIDENTAL CONSTRUCTION Bill No. 6
(in figures) (in words) R.O. Bzs. Item No. Estimated Quantity Unit Rate (Rial Omani) Amount Item Description Unit COLLECTION PAGE - 2 Page 6/9 Page 6/10 Page 6/11 Page 6/12 Page 6/13 Carried to Summary 6/16 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES INCIDENTAL CONSTRUCTION Bill No. 6
(in figures) (in words) R.O. Bzs. Item No. Estimated Quantity Unit Rate (Rial Omani) Amount Item Description Unit SUMMARY COLLECTION PAGE 1 - 6/14 COLLECTION PAGE 2 - 6/15 Carried to Grand Summary - 1 7/1 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES ROAD LIGHTING AND ELECTRICAL INSTALLATION Bill No. 7
(in figures) (in words) R.O. Bzs. 15 ROAD LIGHTING AND ELECTRICAL INSTALLATION 15.1 General 15.1.20(i) Power Supply connection to the feeder pillar nr. 53 15.1.20(ii) Spare Parts (5%) as per the approved list LS Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 15.3 Package Sub-stations 15.3.6(i)a Supply and installation of Electrical Sub-station with nr. 1 1Nr RMU,1Nr 500 KVA Transformer and 800 A feeder pillar, including building, cable terminations, testing, commissioning and all civil works and other accessories necessary to complete the system functional 15.3.6(i)b Supply and installation of Electrical Sub-station with nr. 1 1Nr RMU, 1Nr OLU, 1Nr 500 KVA Transformer and 800 A feeder pillar, including building, cable terminations, testing, commissioning and all civil works and other accessories necessary to complete the system functional Carried to Summary 7/2 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES ROAD LIGHTING AND ELECTRICAL INSTALLATION Bill No. 7
(in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 15 ROAD LIGHTING AND ELECTRICAL INSTALLATION (Continued) 15.5 33kV and 11kV Pole Mounted Transformer Sub-stations 15.5.6(ii)a Supply and installation of 11kV pole mounted nr. 12 transformer sub-station, 100KVA with 1 way LV panel including H-pole transformer mounting structure, earthing, connections and other accessories g, necessary to complete the system functional 15.5.6(ii)b Supply and installation of 11kV pole mounted nr. 1 transformer sub-station, 100KVA with 2 way LV panel including H-pole transformer mounting structure, earthing, connections and other accessories necessary to complete the system functional 15.5.6(ii)c Supply and installation of 11kV pole mounted nr. 1 transformer sub-station, 200KVA with 2 way LV panel including H-pole transformer mounting structure, earthing, connections and other accessories necessary to complete the system functional Carried to Summary 7/3 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES ROAD LIGHTING AND ELECTRICAL INSTALLATION Bill No. 7
(in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 15 ROAD LIGHTING AND ELECTRICAL INSTALLATION (Continued) 15.5 33kV and 11kV Pole Mounted Transformer Sub-Stations (Continued) 15.5.6(ii)d Supply and installation of 11kV pole mounted nr. 1 transformer sub-station, 200KVA with 1 way LV panel including H-pole transformer mounting structure, earthing, connections and other accessories g, necessary to complete the system functional 15.6 Feeder Pillars 15.6.6(i)a Supply and install Mini Feeder Pillars, 400 A, 4way nr. 2 15.6.6(i)b Supply and install Street Lighting Feeder Pillars, 100 A nr. 51 Carried to Summary 7/4 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES ROAD LIGHTING AND ELECTRICAL INSTALLATION Bill No. 7
(in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 15 ROAD LIGHTING AND ELECTRICAL INSTALLATION (Continued) 15.7 Electrical Cables Supply 4-Core cabling, copper conductor, XLPE insulated, Steel Wire armoured, PVC sheathed, 600/1000V rating, as follows: 15.7.6(i)a Nominal Conductor Area 25mm2 lin.m. 84,000 ( ) , 15.7.6(i)b Nominal Conductor Area 95mm2 lin.m. 4,500 15.7.6(i)c Nominal Conductor Area 120mm2 lin.m. 2,500 15.7.6(i)d Nominal Conductor Area 240mm2 lin.m. 1,000 15.7.6(ii)a Termination on 25mm2 cabling nr. 115 Carried to Summary 7/5 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES ROAD LIGHTING AND ELECTRICAL INSTALLATION Bill No. 7
(in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 15 ROAD LIGHTING AND ELECTRICAL INSTALLATION (Continued) 15.7 Electrical Cables (Continued) 15.7.6(ii)b Termination on 95mm2 cabling nr. 30 15.7.6(ii)c Termination on 120mm2 cabling nr. 150 15.7.6(ii)d Termination on 240mm2 cabling nr. 10 15.8 Road Lighting Masts, Columns and Luminaries 15.8.6(i) Supply, install and commission Galvanized steel nr. 20 lighting column polygon (Mid hinged Type) 25m high mast with 4 x 600 Watt HPSV luminaries fixed on bracket complete with fused cut out, control gear, wiring, connection etc Carried to Summary 7/6 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES ROAD LIGHTING AND ELECTRICAL INSTALLATION Bill No. 7
(in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 15 ROAD LIGHTING AND ELECTRICAL INSTALLATION (Continued) 15.8 Road Lighting Masts, Columns and Luminaries (Continued) 15.8.6(ii)a Supply, install and commission Galvanized steel nr. 1,354 lighting column polygon (Mid hinged Type) 14m high pole/column with 1 x 400 Watt HPSV luminaries fixed on bracket complete with fused cut out, p , control gear, wiring, connection etc 15.8.6(ii)b Supply, install and commission Galvanized steel nr. 676 lighting column polygon (Mid hinged Type) 14m high pole/column with 2 x 400 Watt HPSV luminaries on bracket complete with fused cut out, control gear, wiring, connection etc 15.8.6(iii) Column / high mast testing LS Carried to Summary 7/7 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES ROAD LIGHTING AND ELECTRICAL INSTALLATION Bill No. 7
(in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 15 ROAD LIGHTING AND ELECTRICAL INSTALLATION (Continued) 15.10 Under Bridge Lighting 15.10.6(i) Under bridge surface mounted lighting including nr. 32 Conduits, Cables, 150W High Pressure Sodium Lanterns, Junction Boxes, including Supply, Installation, Testing and Putting into service complete 15.15 Earthing 15.15.7(i) Supply and install Twin rod earthing installation at nr. 53 street lighting feeder pillars 15.15.7(ii) Supply and install Single rod earthing installation nr. 150 at the end of street lighting circuits 15.17 Civil Works for Electrical Installations 15.17.6(vi)a Supply and install Pre-cast concrete foundation for nr. 2 mini feeder pillars as per Dwg. including Bolts and any other accessories required for installation. Carried to Summary 7/8 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES ROAD LIGHTING AND ELECTRICAL INSTALLATION Bill No. 7
(in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 15 ROAD LIGHTING AND ELECTRICAL INSTALLATION (Continued) 15.17 Civil Works for Electrical Installations (Continued) 15.17.6(vi)b Supply and install Pre-cast concrete foundation for nr. 51 street lighting feeder pillars as per Dwg. including Bolts and any other accessories required for installation. 15.17.6(vii)a Trench for low voltage cable for one cable lin.m. 84,000 15.17.6(vii)b Trench for low voltage cable for two cable lin.m. 4,500 15.17.6(vii)c Trench for low voltage cable for three cable lin.m. 3,500 15.17.6(ix) Supply and install Precast Concrete Foundation for nr. 2,030 columns 14m high pole/column as per Dwg. including Base plate, Bolts, Hexagonal nuts, washers, uPVC ducts and any other accessories required for installation Carried to Summary 7/9 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES ROAD LIGHTING AND ELECTRICAL INSTALLATION Bill No. 7
(in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 15 ROAD LIGHTING AND ELECTRICAL INSTALLATION (Continued) 15.17 Civil Works for Electrical Installations (Continued) 15.17.6(x) Supply and install Precast Concrete Foundation for nr. 20 25m high mast as per Dwg. including Base plate, Bolts, Hexagonal nuts, washers, uPVC ducts and any other accessories required for installation y q Road Crossing Ducts 15.17.6(xii)a 2Way 100 mm Upvc duct for street lighting with lin.m. 2,250 concrete encasement 15.17.6(xii)b 2Way 150 mm Upvc duct for 11kv cables for street lin.m. 1,600 lighting with concrete encasement 15.17.6(xii)c 4Way 100 mm Upvc duct for street lighting with lin.m. 1,600 concrete encasement 15.17.6(xii)d 6Way 150 mm Upvc duct for street lighting with lin.m. 500 concrete encasement Carried to Summary 7/10 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES ROAD LIGHTING AND ELECTRICAL INSTALLATION Bill No. 7
(in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity SUMMARY Page 7/1 Page 7/2 Page 7/3 Page 7/4 Page 7/5 Page 7/6 Page 7/7 Page 7/8 Page 7/9 Carried to Grand Summary - 1
9/1 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES UTILITIES Bill No. 9
(in figures) (in words) R.O. Bzs. 18 UTILITIES 18.1 Locating and Protecting Existing Utilities Water Utility 18.1.6(i)a Concrete protection slab for existing water lines/ducts lin.m. 100 300 mm dia (Class 25/20) Gas Line Utility 18 1 6(i)b Utility culvert for protection of 24'' Gas line including lin m 70 Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 18.1.6(i)b Utility culvert for protection of 24 Gas line including lin.m. 70 excavation, backfilling, concreting (Class 35/20), reinforcement etc as per drawings but excluding any roadway related items over the culvert, as per OGC specification and requirements 18.1.6(i)c Utility culvert for protection of 16'' Gas line including lin.m. 145 excavation, backfilling, concreting (Class 35/20), reinforcement etc as per drawings but excluding any roadway related items over the culvert, as per OGC specification and requirements Carried to Collection Page - 1
9/2 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES UTILITIES Bill No. 9
(in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 18 UTILITIES (Continued) 18.1 Locating and Protecting Existing Utilities (Continued) Oil Line Utility 18.1.6(i)d Utility culvert for protection for 24'' oil line including lin.m. 75 excavation, backfilling, concreting (Class 35/20), reinforcement etc as per drawings but excluding embankment for roadway over the culvert as per ORPC (Oman Refineries & Petroleum Chemicals) Specification and requirements Specification and requirements Electrical Utility 18.1.6(i)e Supply and Install proposed 2way 200mm dia Upvc lin.m. 110 and 2way 50mm Split duct to protect the existing underground 33kv electrical cables complete with concrete protection (class 25/20) including excavation, backfilling, compaction, end caps, draw ropes and duct markers etc. at locations shown in the drawings or as directed by the Engineer Carried to Collection Page - 1
9/3 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES UTILITIES Bill No. 9
(in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 18 UTILITIES (Continued) 18.1 Locating and Protecting Existing Utilities (Continued) 18.1.6(i)f Supply and Install proposed 2way 150mm and 2way lin.m. 50 50mm dia uPVC Split duct to protect the existing underground 11kv electrical cables complete with concrete protection (class 25/20) including excavation, backfilling, compaction, end caps, draw ropes and duct markers etc. at locations shown in the drawings or as directed by the Engineer Telephone Utility 18.1.6(i)g Supply and install 4way 100mm dia Upvc Split duct lin.m. 60 to protect existing Omantel / Nawras / MOD cables complete with concrete protection (class 25/20) including excavation, backfilling, duct marker and compaction etc. at locations shown in the drawings or as directed by the Engineer as per Omantel / Nawras / MOD Standards and Specifications Carried to Collection Page - 1
9/4 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES UTILITIES Bill No. 9
(in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 18 UTILITIES (Continued) 18.1 Locating and Protecting Existing Utilities (Continued) 18.1.6(i)h Supply and install 2way 100mm dia and 2way 100mm lin.m. 50 dia Upvc Split duct to protect existing Omantel / Nawras / MOD cables complete with concrete protection (class 25/20) including excavation, backfilling, duct marker and compaction etc. at locations shown in the drawings or as directed by the Engineer as per Omantel/ Nawras / MOD Standards and Specifications 18.2 Removing and Disposing or Relocating Existing Utilities Electrical Utility 18.2.6(i)a Carefully disconnect and remove existing LV overhead lin.m. 1,040 electrical Cable any size including poles stay insulators and any other accessories existing wires, and dispose of same to the locations as directed by the Engineer 18.2.6(i)b Carefully disconnect and remove existing LV lin.m. 1,300 underground electrical cables and any other accessories existing and dispose of same to the locations as directed by the Engineer Carried to Collection Page - 1
9/5 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES UTILITIES Bill No. 9
(in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 18 UTILITIES (Continued) 18.2 Removing and Disposing or Relocating Existing Utilities (Continued) 18.2.6(i)c Carefully disconnect and remove existing 11KV lin.m. 11,100 overhead electrical conductors including poles stay wires, insulators and any other accessories existing and dispose of same to the locations as directed by the Engineer 18 2 6(i)d Carefully disconnect and remove existing 11KV lin m 370 18.2.6(i)d Carefully disconnect and remove existing 11KV lin.m. 370 underground electrical cables and any other accessories existing and dispose of same to the locations as directed by the Engineer 18.2.6(i)e Carefully disconnect and remove existing 33KV lin.m. 1,520 overhead electrical conductors including poles stay wires, insulators and any other accessories existing and dispose of same to the locations as directed by the Engineer 18.2.6(i)f Carefully disconnect and remove existing 33KV lin.m. 220 underground electrical cables and any other accessories existing and dispose of same to the locations as directed by the Engineer Carried to Collection Page - 1
9/6 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES UTILITIES Bill No. 9
(in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 18 UTILITIES (Continued) 18.2 Removing and Disposing or Relocating Existing Utilities (Continued) 18.2.6(i)g Carefully disconnect and remove existing 132KV lin.m. 800 overhead electrical conductors, Double Circuit (6 conductor together) including insulatorsand other accessories existing and dispose of same to the locations as directed by the Engineer (Quantity measured as Route length). 18.2.6(i)h Carefully disconnect and remove existing 132KV nr. 3 electricity pylons including foundation, excavation, backfilling and any other accessories existing and dispose of same (except foundation) to the locations as directed by the Engineer 18.2.6(i)i Carefully disconnect and remove existing 220KV lin.m. 1,500 overhead electrical conductors, Double Circuit (6 conductor together) including insulatorsand other accessories existing and dispose of same to the locations asdirected by the Engineer (Quantity measured as Route length). Carried to Collection Page - 1
9/7 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES UTILITIES Bill No. 9
(in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 18 UTILITIES (Continued) 18.2 Removing and Disposing or Relocating Existing Utilities (Continued) 18.2.6(i)j Carefully disconnect and remove existing 220KV nr. 2 electricity pylons including foundation, excavation, backfilling and any other accessories existing and dispose of same (except foundation) to the locations as directed by the Engineer Water Utility Water Utility 18.2.6(i)k Locate excavate down to and remove the existing lin.m. 300 110mm diameter AC/DI pipe including but not limited to valve chambers, Fire hydrants and all other accessories complete and dispose of same to the locations as directed by the Engineer including excavation, backfill, disposal, disconnection ,etc 18.2.6(i)l Locate excavate down to and remove the existing lin.m. 300 800mm diameter CS pipe including but not limited to valve chambers, Fire hydrants and all other accessories complete and dispose of same to the locations as directed by the Engineer including excavation, backfill, disposal, disconnection ,etc Carried to Collection Page - 1
9/8 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES UTILITIES Bill No. 9
(in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 18 UTILITIES (Continued) 18.2 Removing and Disposing or Relocating Existing Utilities (Continued) Telephone Utility 18.2.6(i)m Locate, excavate down, disconnect and remove lin.m. 600 existing telephone cables and ducts, chambers and dispose of same (except chambers) to the locations as directed by the Engineer including excavation, backfilling disposal etc backfilling, disposal etc. For Electrical: All LV, 11KV/33KV Electrical Relocation work including materials shall be as per MEDC/Mazoon/Majan Electricity Distribution Company Standards and Specifications. 18.2.6(ii)a Carefully disconnect and Relocate existing 11KV nr. 2 substation with 500KVA TX+ 1 No. and 800 A Feeder pillar locations as directed by the Engineer including foundation, jointing, excavation & connecting to the existing supply, testing, commissioning, all civil works and other accessories necessary to complete the system functional Carried to Collection Page - 1
9/9 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES UTILITIES Bill No. 9
(in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 18 UTILITIES (Continued) 18.2 Removing and Disposing or Relocating Existing Utilities (Continued) 18.2.6(ii)b Carefully disconnect and Relocate existing 11KV nr. 1 substation with 500KVA TX+ 1 No. RMU+1 No. OLU and 1000 A Feeder pillar locations as directed by the Engineer including foundation, jointing, excavation & connecting to the existing supply, testing, commissioning, all civil works and other accessories necessary to complete the system functional necessary to complete the system functional 18.2.6(ii)c Remove and Relocate Underground MRM&WR Borewell nr. 2 with existing equipment complete with new structure, pipe work, all electro mechanical work and necessary work to complete system to make functional 18.2.6(ii)d Remove and Relocate Rain Water Monitoring Station nr. 1 (MRM&WR) existing equipment complete with new structure, pipe work, all electro mechanical work and necessary work to complete system to make functional Carried to Collection Page - 2
9/10 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES UTILITIES Bill No. 9
(in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 18 UTILITIES (Continued) 18.2 Removing and Disposing or Relocating Existing Utilities (Continued) Provide and install new utilities 18.2.6(iii)a Supply and installation of overhead LV electrical lin.m. 1,650 Cable including poles, stay wires, insulators, jumpers, stringing, jointing, excavation & backfilling of poles, connecting to the existing supply, testing, commissioning carting spoil to tips as directed all commissioning, carting spoil to tips as directed, all necessary labor, operation, materials, accessories, earthing. 18.2.6(iii)b Supply and installation of underground proposed LV lin.m. 1,095 cable (4C x 240 Sq.mm) complete including excavation, backfilling, cable covering tiles, warning tapes, joints, connecting to the existing supply, testing, commissioning, carting spoil to tips as directed, all necessary labor, operation, materials and any other accessories including earthing, etc Carried to Collection Page - 2
9/11 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES UTILITIES Bill No. 9
(in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 18 UTILITIES (Continued) 18.2 Removing and Disposing or Relocating Existing Utilities (Continued) 18.2.6(iii)c Supply and installation of overhead 11 KV electrical lin.m. 5,500 conductors (3 conductors together) for Street Lighting complete including poles, stay wires, insulators, AB switches, lightning arrestors, jumpers, stringing, jointing, excavation & backfilling of poles, connecting to the existing supply, testing, commissioning, carting spoil to tips as directed all necessary labor carting spoil to tips as directed, all necessary labor, operation, materials, accessories, earthing and any special protection to the poles (Wadi Area). (Quantity measured as Route length). 18.2.6(iii)d Supply and installation of underground proposed lin.m. 1,000 11KV Electrical cable for Street Lighting complete including excavation, backfilling, cable covering tiles, warning tapes, route markers, joints, connecting to the existing supply, testing, commissioning, carting spoil to tips as directed, all necessary labor, operation, materials and any other accessories including earthing, etc. Carried to Collection Page - 2
9/12 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES UTILITIES Bill No. 9
(in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 18 UTILITIES (Continued) 18.2 Removing and Disposing or Relocating Existing Utilities (Continued) 18.2.6(iii)e Supply and installation of overhead 11 KV electrical lin.m. 7,350 conductors (3 conductors together) complete including poles, stay wires, insulators, AB switches, lightning arrestors, jumpers, stringing, jointing, excavation & backfilling of poles, connecting to the existing supply, testing, commissioning, carting spoil to tips as directed all necessary labor carting spoil to tips as directed, all necessary labor, operation, materials, accessories, earthing and any special protection to the poles (Wadi Area). (Quantity measured as Route length). 18.2.6(iii)f Supply and installation of underground proposed lin.m. 5,220 11KV Electrical cable complete including excavation, backfilling, cable covering tiles, warning tapes, route markers, joints, connecting to the existing supply, testing, commissioning, carting spoil to tips as directed, all necessary labor, operation, materials and any other accessories including earthing, etc. Carried to Collection Page - 2
9/13 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES UTILITIES Bill No. 9
(in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 18 UTILITIES (Continued) 18.2 Removing and Disposing or Relocating Existing Utilities (Continued) 18.2.6(iii)g Supply and installation of underground proposed lin.m. 2,000 33KV Electrical cable complete including excavation, backfilling, cable covering tiles, warning tapes, joints, connecting to the existing supply, testing, commissioning, carting spoil to tips as directed, all necessary labor, operation, materials and any other accessories including earthing etc accessories including earthing, etc. 18.2.6(iii)h Supply and installation of proposed overhead 132KV lin.m. 900 Electrical AAAC Twin YEW Conductors, Double Circuit (6 conductor together) including insulators, warning lights, ground wire, connecting to the existing supply, testing, commissioning, carting spoil to tips as directed, all necessary labor, operation, materials and any other accessories including earthing, etc. complete as per OETC Standards & Specifications (Quantity measured as Route length). 18.2.6(iii)i Design, Supply, Install, Testing and Commissioning nr. 2 132KV electricity pylons (Tension Type) including concrete foundations, all other accessories, fittings, design calculations and shop drawings etc. complete as per OETC Standards & Specifications Carried to Collection Page - 2
9/14 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES UTILITIES Bill No. 9
(in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 18 UTILITIES (Continued) 18.2 Removing and Disposing or Relocating Existing Utilities (Continued) 18.2.6(iii)j Design, Supply, Install, Testing and Commissioning nr. 2 132KV electricity pylons (Suspension Type) including concrete foundations, all other accessories, fittings, design calculations and shop drawings etc. complete as per OETC Standards & Specifications 18 2 6(iii)k Supply and installation of proposed overhead 220KV lin m 1 500 18.2.6(iii)k Supply and installation of proposed overhead 220KV lin.m. 1,500 Electrical AAAC Twin YEW Conductors, Double Circuit (6 conductor together) including insulators, warning lights, ground wire, connecting to the existing supply, testing, commissioning, carting spoil to tips as directed, all necessary labor, operation, materials and any other accessories including earthing, etc. complete as per OETC Standards & Specifications (Quantity measured as Route length). Carried to Collection Page - 2
9/15 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES UTILITIES Bill No. 9
(in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 18 UTILITIES (Continued) 18.2 Removing and Disposing or Relocating Existing Utilities (Continued) 18.2.6(iii)l Supply and installation of underground proposed lin.m. 300 220KV Electrical cables (Double Circuit, 12nr. Single core cable) complete including excavation, backfilling, cable covering tiles, warning tapes, joints, connecting to the existing supply, testing, commissioning, carting spoil to tips as directed all necessary labor operation materials as directed, all necessary labor, operation, materials and any other accessories including earthing, etc. 18.2.6(iii)m Design, Supply, Install, Testing and Commissioning nr. 1 220KV electricity pylons (Tension Type) including concrete foundations, all other accessories, fittings, design calculations and shop drawings etc. complete as per OETC Standards & Specifications 18.2.6(iii)n Design, Supply, Install, Testing and Commissioning nr. 1 220KV electricity pylons (Suspension Type) including concrete foundations, all other accessories, fittings, design calculations and shop drawings etc. complete as per OETC Standards & Specifications Carried to Collection Page - 2
9/16 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES UTILITIES Bill No. 9
(in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 18 UTILITIES (Continued) 18.2 Removing and Disposing or Relocating Existing Utilities (Continued) Supply & Installation of New Water Lines: The New Pipe lines installed to replace affected pipe lines should have all the fittings, accessories, Valves (Gate valves, Drain valves, Air Valves, etc), Fire Hydrants, any other specials and related Chambers complete necessary to reinstate the network functional as that of the existing as shown network functional as that of the existing as shown on the Drawings 18.2.6(iii)o Supply and install 110mm HDPE Water pipes (PN16) lin.m. 500 complete with all the specials, fittings, and chambers including but not limited to tees, bends, shut off valves, air valves, washout valves, Fire hydrants, thrust blocks etc and also excavation, backfilling, warning tape, bedding and surrounding, jointing to existing water pipe and jointing material, Flushing, Disinfecting, pressure testing and any other items necessary to complete the work Carried to Collection Page - 2
9/17 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES UTILITIES Bill No. 9
(in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 18 UTILITIES (Continued) 18.2 Removing and Disposing or Relocating Existing Utilities (Continued) 18.2.6(iii)p Supply and install 800mm CS Water pipes lin.m. 300 complete with all the specials, fittings, and chambers including but not limited to tees, bends, shut off valves, air valves, washout valves, Fire hydrants, thrust blocks etc and also excavation, backfilling, warning tape, bedding and surrounding, jointing to existing water pipe and jointing material Flushing Disinfecting pressure and jointing material, Flushing, Disinfecting, pressure testing and any other items necessary to complete the work 18.2.6(iii)q Supply and install 4Way uPVC duct for telephone lin.m. 50 cables, including but not limited to excavation, backfilling, warning tape, bedding and surrounding, jointing and jointing material, manholes, handholes, junction boxes and any other items necessary to complete the work 18.2.6(iii)r Supply and install 2Way uPVC duct for telephone lin.m. 420 cables, including but not limited to excavation, backfilling, warning tape, bedding and surrounding, jointing and jointing material, manholes, handholes, junction boxes and any other items necessary to complete the work Carried to Collection Page - 3
9/18 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES UTILITIES Bill No. 9
(in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 18 UTILITIES (Continued) 18.2 Removing and Disposing or Relocating Existing Utilities (Continued) 18.2.6(iii)s Supply and install 1Way uPVC duct for telephone lin.m. 50 cables, including but not limited to excavation, backfilling, warning tape, bedding and surrounding, jointing and jointing material, manholes, handholes, junction boxes and any other items necessary to complete the work 18.2.6(iii)t Supply, install and laying EEF 100x0.65 telephone lin.m. 210 cable including jointing, jointing material and any other items necessary to complete and commission the work 18.2.6(iii)u Supply, install and laying EEF 200x0.65 telephone lin.m. 210 cable including jointing, jointing material and any other items necessary to complete and commission the work Carried to Collection Page - 3
9/19 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES UTILITIES Bill No. 9
(in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 18 UTILITIES (Continued) 18.3 Service / Future Utility Road Crossing Ducts 18.3.6(i)a Supply and Install proposed 9way 200mm and 2way lin.m. 150 100mm dia uPVC duct for 132kv electrical cables with concrete protection (class 25/20), laid and jointed in trenches beneath carriageway including excavation, backfilling, compaction, end caps, draw ropes and duct markers etc. complete at locations shown in the drawings or as directed by the Engineer 18.3.6(i)b Supply and Install proposed 9way 200mm and 2way lin.m. 150 100mm dia uPVC duct for 220kv electrical cables with concrete protection (class 25/20), laid and jointed in trenches beneath carriageway including excavation, backfilling, compaction, end caps, draw ropes and duct markers etc. complete at locations shown in the drawings or as directed by the Engineer 18.3.6(i)c Supply and Install proposed 2way 100mm dia lin.m. 200 uPVC duct for electrical cables with concrete surround (class 25/20), laid and jointed in trenches beneath carriageway including excavation, backfilling, compaction, end caps, draw ropes and duct markers etc. complete at locations shown in the drawings or as directed by the Engineer Carried to Collection Page - 3
9/20 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES UTILITIES Bill No. 9
(in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 18 UTILITIES (Continued) 18.3 Service / Future Utility Road Crossing Ducts (Continued) 18.3.6(i)d Supply and Install proposed 2way 150mm dia lin.m. 1,100 uPVC duct for electrical cables with concrete surround (class 25/20), laid and jointed in trenches beneath carriageway including excavation, backfilling, compaction, end caps, draw ropes and duct markers etc. complete at locations shown in the drawings or as directed by the Engineer as directed by the Engineer 18.3.6(i)e Supply and Install proposed 2way 200mm and 2way lin.m. 100 50mm dia uPVC duct for electrical cables with concrete surround (class 25/20), laid and jointed in trenches beneath carriageway including excavation, backfilling, compaction, end caps, draw ropes and duct markers etc. complete at locations shown in the drawings or as directed by the Engineer 18.3.6(i)f Supply and Install proposed 4way 200mm and 2way lin.m. 100 50mm dia uPVC duct for electrical cables with concrete surround (class 25/20), laid and jointed in trenches beneath carriageway including excavation, backfilling, compaction, end caps, draw ropes and duct markers etc. complete at locations shown in the drawings or as directed by the Engineer Carried to Collection Page - 3
9/21 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES UTILITIES Bill No. 9
(in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 18 UTILITIES (Continued) 18.3 Service / Future Utility Road Crossing Ducts (Continued) 18.3.6(i)g Supply and install 2way 200mm dia uPVC duct for lin.m. 100 proposed Omantel / Nawras / MOD cables complete with concrete protection (class 25/20) including excavation, backfilling, compaction, end caps and draw ropes etc. at locations shown in the drawings or as directed by the Engineer as per Omantel / Nawras / MOD Standards and Specifications MOD Standards and Specifications 18.3.6(i)h Supply and install 2way 100mm dia uPVC duct for lin.m. 230 proposed Omantel / Nawras / MOD cables complete with concrete protection (class 25/20) including excavation, backfilling, compaction, end caps and draw ropes etc. at locations shown in the drawings or as directed by the Engineer as per Omantel / Nawras / MOD Standards and Specifications 18.3.6(i)i Supply and install 4way 150mm dia uPVC duct for lin.m. 210 proposed Omantel / Nawras / MOD cables complete with concrete protection (class 25/20) including excavation, backfilling, compaction, end caps and draw ropes etc. at locations shown in the drawings or as directed by the Engineer as per Omantel / Nawras / MOD Standards and Specifications Carried to Collection Page - 3
9/22 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES UTILITIES Bill No. 9
(in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 18 UTILITIES (Continued) 18.3 Service / Future Utility Road Crossing Ducts (Continued) Future Ducts 18.3.6(i)j Supply and Install proposed 9way 200mm and 2way lin.m. 100 100mm dia uPVC duct for 132kv electrical cables with concrete protection (class 25/20), laid and jointed in trenches beneath carriageway including excavation, backfilling compaction end caps draw ropes and backfilling, compaction, end caps, draw ropes and duct markers etc. complete at locations shown in the drawings or as directed by the Engineer 18.3.6(i)k Supply and Install proposed 2way 200mm dia lin.m. 100 uPVC duct for 33kv electrical cables with concrete protection (class 25/20), laid and jointed in trenches beneath carriageway including excavation, backfilling, compaction, end caps, draw ropes and duct markers etc. complete at locations shown in the drawings or as directed by the Engineer Carried to Collection Page - 3
9/23 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES UTILITIES Bill No. 9
(in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 18 UTILITIES (Continued) 18.3 Service / Future Utility Road Crossing Ducts (Continued) 18.3.6(i)l Supply and Install proposed 4way 150mm dia uPVC lin.m. 200 duct for 11kv electrical cables with concrete protection (class 25/20), laid and jointed in trenches beneath carriageway including excavation, backfilling, compaction, end caps, draw ropes and duct markers etc. complete at locations shown in the drawings or as directed by the Engineer as directed by the Engineer 18.3.6(i)m Supply and Install proposed 2way 100mm dia uPVC lin.m. 200 duct for LV cables with concrete protection (class 25/20), laid and jointed in trenches beneath carriageway including excavation, backfilling, compaction, end caps, draw ropes and duct markers etc. complete at locations shown in the drawings or as directed by the Engineer 18.3.6(i)n Supply and Install proposed 2way 100mm dia lin.m. 200 uPVC duct for Street Lighting cables with concrete protection (class 25/20), laid and jointed in trenches beneath carriageway including excavation, backfilling, compaction, end caps, draw ropes and duct markers etc. complete at locations shown in the drawings or as directed by the Engineer Carried to Collection Page - 3
9/24 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES UTILITIES Bill No. 9
(in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 18 UTILITIES (Continued) 18.3 Service / Future Utility Road Crossing Ducts (Continued) 18.3.6(i)o Supply and Install proposed 2way 300mm dia lin.m. 200 uPVC duct for Irrigation Line with concrete protection (class 25/20), laid and jointed in trenches beneath carriageway including excavation, backfilling, compaction, end caps, draw ropes and duct markers etc. complete at locations shown in the drawings or as directed by the Engineer as directed by the Engineer 18.3.6(i)p Supply and Install proposed 4way 100mm dia lin.m. 200 uPVC duct for Telephone Line with concrete protection (class 25/20), laid and jointed in trenches beneath carriageway including excavation, backfilling, compaction, end caps, draw ropes and duct markers etc. complete at locations shown in the drawings or as directed by the Engineer Carried to Collection Page - 3
9/25 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES UTILITIES Bill No. 9
(in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity COLLECTION PAGE - 1 Page 9/1 Page 9/2 Page 9/3 Page 9/4 Page 9/4 Page 9/5 Page 9/6 Page 9/7 Page 9/8 Carried to Summary
9/26 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES UTILITIES Bill No. 9
(in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity COLLECTION PAGE - 2 Page 9/9 Page 9/10 Page 9/11 Page 9/12 Page 9/12 Page 9/13 Page 9/14 Page 9/15 Page 9/16 Carried to Summary
9/27 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES UTILITIES Bill No. 9
(in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity COLLECTION PAGE - 3 Page 9/17 Page 9/18 Page 9/19 Page 9/20 Page 9/20 Page 9/21 Page 9/22 Page 9/23 Page 9/24 Carried to Summary
9/28 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES UTILITIES Bill No. 9
(in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity SUMMARY COLLECTION PAGE 1 - 9/25 COLLECTION PAGE 2 - 9/26 COLLECTION PAGE 3 - 9/27 Carried to Grand Summary - 1 11/1 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES DAYWORKS Bill No. 11
(in figures) (in words) R.O. Bzs. 19 DAYWORKS 19.1 Wages These include proper wages, all used allowance, medical expenses and all other charges provided for by local laws. 19.1a Labourer - Skilled (Omani) hour 10 Item No. Item Description Unit Estimated Quantity Unit Rate (Rial Omani) Amount 19.1b Labourer - Skilled (Expatriate) hour 10 19.1c Labourer - Unskilled (Omani) hour 10 19.1d Labourer - Unskilled (Expatriate) hour 10 19.1e Carpenter hour 10 19.1f Mason/Concrete finisher hour 10 19.1g Driver: Heavy Duty hour 10 19.1h Driver: Light Duty hour 10 Carried to Collection Page - 1 11/2 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES DAYWORKS Bill No. 11
(in figures) (in words) R.O. Bzs. Item No. Item Description Unit Estimated Quantity Unit Rate (Rial Omani) Amount 19.1i Pipe fitter hour 10 19.1j Plant Operator: Heavy hour 10 19.1k Plant Operator: Light hour 10 19.1l Steel Fixer hour 10 19.1m Welder hour 10 19.1n Painter hour 10 19.1o Electrician hour 10 19.1p Plumber hour 10 19.1q Driller hour 10 19.1r Gangers hour 10 19.1s Plasterers hour 10 19.1t Scaffolders hour 10 Carried to Collection Page - 1 11/3 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES DAYWORKS Bill No. 11
(in figures) (in words) R.O. Bzs. Item No. Item Description Unit Estimated Quantity Unit Rate (Rial Omani) Amount 19.1u .. 19.1v .. 19.1w .. 19.1x .. 19.2 Operating Equipment on Site The rates inserted by the tenderer shall be deemed to include for the use of the plant inclusive of all fuel and consumable stores, overhauls, repairs and replacements, spare parts, tyres, insurance and all other charges relating to plant including haulage to and from the site but exclusive of driver and attendants who shall be paid as laid down in the Labour Schedule. Payments for working plants shall be for the hours worked only. No allowance for standing time will be made. 19.2a Bulldozer up to 100HP hour 5 19.2b Bulldozer 100 to 200HP hour 5 Carried to Collection Page - 1 11/4 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES DAYWORKS Bill No. 11
(in figures) (in words) R.O. Bzs. Item No. Item Description Unit Estimated Quantity Unit Rate (Rial Omani) Amount 19.2c Bulldozer over 200HP hour 5 19.2d Motor grader up to 140 HP hour 5 19.2e Motor grader over 140 HP hour 5 19.2f Vibratory roller up to 3 tones hour 5 19.2g Vibratory roller above 3 tones hour 5 19.2h Pneumatic roller over 10 tones hour 5 19.2i Tandem roller up to 10 tones hour 5 19.2j Tandem roller over 10 tones hour 5 19.2k Wheel loader up to 3 cu.m. hour 5 19.2l Wheel loader above 3 cu.m. hour 5 19.2m Excavator up to 1 cu.m. hour 5 19.2n Excavator over 1 cu.m. hour 5 Carried to Collection Page - 1 11/5 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES DAYWORKS Bill No. 11
(in figures) (in words) R.O. Bzs. Item No. Item Description Unit Estimated Quantity Unit Rate (Rial Omani) Amount 19.2o Water tanker, Minimum 6 cu.m. hour 5 19.2p Concrete vibrator (poker/screed) up to dia 50mm hour 5 19.2q Dump Truck up to 5 tones hour 5 19.2r Dump Truck from 5 to 10 tones hour 5 19.2s Dump truck over 10 tones hour 5 19.2t Water pump 2 inch hour 5 19.2u Water pump 3 inch hour 5 19.2v Air compressor up to 6000 liters capacity hour 5 19.2w Air compressor over 6000 liters capacity hour 5 19.2x Bituminous mixing plant with batching apparatus from hour 5 80t/hto 150 t/h 19.2y Finisher up to 80t./h hour 5 19.2z Finisher from 80t./h to 120t./h hour 5 Carried to Collection Page - 1 11/6 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES DAYWORKS Bill No. 11
(in figures) (in words) R.O. Bzs. Item No. Item Description Unit Estimated Quantity Unit Rate (Rial Omani) Amount 19.2aa Bituminous sprayer up to 6 tones hour 5 19.2ab Crane, with boom and jib 5 to 10 tones hour 5 19.2ac Crane with boom and jib over 10 tones hour 5 19.2ad Generator 60 kW hour 5 19.2ae Low Bed hour 5 19.2af Hiab hour 5 19.2ag Generator 75 kW hour 5 19.2ah Generator 100 kW hour 5 19.2ai Generator 150 kW hour 5 19.2aj Generator 200 kW hour 5 19.2ak Welding plant hour 5 19.2al Concrete mixer up to 0.5 cu.m. hour 5 19.2am Concrete mixer over 0.5 cu.m. hour 5 Carried to Collection Page - 1 11/7 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES DAYWORKS Bill No. 11
(in figures) (in words) R.O. Bzs. Item No. Item Description Unit Estimated Quantity Unit Rate (Rial Omani) Amount 19.2an Automatic concrete batching plant hour 5 19.2ao Pick up truck up to 3 tones hour 5 19.2ap Pick up truck over 3 tones hour 5 19.2aq Van or Utility Vehicle hour 5 19.2ar Welding set, 300A, including electrodes hour 5 19.2as .. 19.2at .. 19.2au .. Carried to Collection Page - 1 11/8 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES DAYWORKS Bill No. 11
(in figures) (in words) R.O. Bzs. Item No. Item Description Unit Estimated Quantity Unit Rate (Rial Omani) Amount 19.3 MATERIALS These rates includes all the charges for the supply of the materials, loading, transportation to site, unloading and stores as well as the charges provided in the General and Special Specification and in the Contract. 19.3a Aggregates for granular sub base course in accordance cu.m. 30 with the General and Special Specification, in place as specified. p 19.3b Aggregates for aggregate base course in accordance cu.m. 30 with the General and Special Specification, in place as specified. 19.3c Aggregates for bituminous base course in accordance cu.m. 30 with the General and Special Specification, near the asphalt plant, in bulk 19.3d Fine aggregate for concrete in accordance with the cu.m. 30 General and Special Specification, in place, in bulk 19.3e Course aggregate for concrete in accordance with the cu.m. 50 General and Special Specification, in place, in bulk Carried to Collection Page - 2 11/9 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES DAYWORKS Bill No. 11
(in figures) (in words) R.O. Bzs. Item No. Item Description Unit Estimated Quantity Unit Rate (Rial Omani) Amount 19.3f Stone for Drainage masonry and slope protection in cu.m. 50 accordance with the General and Special Specification, in place, in bulk 19.3g Asphalt cement, grade 60-70 on site t. 10 19.3h Asphalt cement, grade 50-60 on site t. 10 19.3i Emulsion asphalt, grade RS-1, on site t. 10 19.3j Cutback asphalt, MC and RC type, on site t. 10 19.3k Portland Cement, on site t. 10 19.3l Deformed billet steel bars AASHTO M31 grade 60 t. 10 (High yield) of any dia. 19.3m Highway signs sq.m. 10 19.3n Highway signs Supports - 1 post nr. 10 19.3o Highway signs Supports - 2 post nr. 10 19.3p W -Beam type Guardrail lin.m. 10 Carried to Collection Page - 2 11/10 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES DAYWORKS Bill No. 11
(in figures) (in words) R.O. Bzs. Item No. Item Description Unit Estimated Quantity Unit Rate (Rial Omani) Amount 19.3q End anchorage for W -beam type Guardrails nr. 10 19.3r Water depth gauges nr. 10 19.3s Wire mesh Gabions on site t. 10 19.3t Gasoline on site liter 100 19.3u Lubricant Kg. 100 19.3v .. 19.3w .. 19.3x .. Carried to Collection Page - 2 11/11 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES DAYWORKS Bill No. 11
(in figures) (in words) R.O. Bzs. Item No. Item Description Unit Estimated Quantity Unit Rate (Rial Omani) Amount COLLECTION PAGE - 1 Page 11/1 Page 11/2 Page 11/3 g Page 11/4 Page 11/5 Page 11/6 Page 11/7 Carried to Summary 11/12 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES DAYWORKS Bill No. 11
(in figures) (in words) R.O. Bzs. Item No. Item Description Unit Estimated Quantity Unit Rate (Rial Omani) Amount COLLECTION PAGE - 2 Page 11/8 Page 11/9 Page 11/10 Carried to Summary 11/13 . Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES DAYWORKS Bill No. 11
(in figures) (in words) R.O. Bzs. Item No. Item Description Unit Estimated Quantity Unit Rate (Rial Omani) Amount SUMMARY COLLECTION PAGE 1 - 11/11 COLLECTION PAGE 2 - 11/12 Carried to Grand Summary - 1 Construction of Batinah Expressway - Package 7 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway Page No. BILL OF QUANTITIES GRAND SUMMARY - 1 GS 1
R.O Bzs. GRAND SUMMARY - 1 2 EARTHWORKS 2/6 3 GRANULAR SUB-BASE, AGGREGATE BASE COURSE, AND STABILISED BASE COURSES 3/1 4 BITUMINOUS PAVEMENT 4/1 5 CONCRETE AND CONCRETE STRUCTURES 5/13 BILL No. ITEM DESCRIPTION Page No. Amount 6 INCIDENTAL CONSTRUCTION 6/16 7 ROAD LIGHTING AND ELECTRICAL INSTALLATION 7/10 9 UTILITIES 9/28 11 DAY WORKS 11/13 ADD CONTINGENCIES @ 10% OF SUB-TOTAL EXCLUDING BILL 11 TOTAL VALUE CARRIED TO GENERAL SUMMARY
BILL OF QUANTITIES Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway
2a/1 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 2a EARTHWORKS (in figures) (in words) R.O. Bzs. 2 EARTHWORKS 2.1 Clearing and Grubbing 2.1.5(i) Clear site of all trees less than 300mm ,shrubs, sq.m. 795,900 vegetation including roots as necessary to commence work 2.1.5(ii)a Removal and delivery of trees of 300mm trunk nr. 140 diameter or greater Item No. Estimated Quantity Unit Rate (Rial Omani) Amount Item Description Unit diameter or greater 2.1.5(ii)b Removal and disposal of trees of 300mm trunk nr. 100 diameter or greater 2.2 Removal of Structures and Obstructions 2.2.5(i)a Removal of existing building, single-storey area upto nr. 1 500sq.m. 2.2.5(i)b Removal of existing bus shed nr. 6 2.2.5(ii) Removal of reinforced concrete (for box culverts) cu.m. 800 2.2.5(iii) Removal of mass concrete (200mm thick) cu.m. 400 Carried to Summary 2a/2 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 2a EARTHWORKS (in figures) (in words) R.O. Bzs. Item No. Estimated Quantity Unit Rate (Rial Omani) Amount Item Description Unit 2 EARTHWORKS (Continued) 2.2 Removal of Structures and Obstructions (Continued) 2.2.5(v) Removal of Concrete Curbs lin.m. 1,800 2.2.5(vi) Removal of interlocking tiles in sidewalks and median sq.m. 1,500 2.2.5(vii) Removal of pipe culvert (900mm diameter) lin.m. 100 2.2.5(viii) Removal and disposal of bituminous pavement cu.m. 28,000 200mm max. thickness in carriageways and paved areas 2.2.5(x) Removal of steel safety barrier including posts and lin.m. 16,000 foundation 2.2.5(xi) Removal of concrete barrier lin.m. 500 Carried to Summary 2a/3 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 2a EARTHWORKS (in figures) (in words) R.O. Bzs. Item No. Estimated Quantity Unit Rate (Rial Omani) Amount Item Description Unit 2 EARTHWORKS (Continued) 2.2 Removal of Structures and Obstructions (Continued) 2.2.5(xii)a Removal of sign boards (single post) nr. 80 2.2.5(xii)b Removal of sign boards (multi post) nr. 40 2.2.5(xviii)a Removal of Mortared Riprap cu.m. 2,500 2.2.5(xviii)b Removal of Gabion Boxes cu.m. 1,500 2.2.5(xix) Removal and disposal of Existing Fence with gate lin.m. 2,060 (up to 2m high) 2.2.5(xx) Removal and disposal of Existing Masonry Wall cu.m. 500 (Block Type, up to 2m high) Carried to Summary 2a/4 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 2a EARTHWORKS (in figures) (in words) R.O. Bzs. Item No. Estimated Quantity Unit Rate (Rial Omani) Amount Item Description Unit 2 EARTHWORKS (Continued) 2.2 Removal of Structures and Obstructions (Continued) 2.2.5(xxvi)a Removal and delivery for re-use by others of Street nr. 200 Light Pole, to the MRMWR stores or as directed by Engineer 2 2 5(xxvi)b Removal and delivery for re use by others of Flag Pole nr 50 2.2.5(xxvi)b Removal and delivery for re-use by others of Flag Pole, nr. 50 to the MRMWR stores or as directed by Engineer 2.3 Roadway Excavation 2.3.6(i) Unclassified excavation to Embankment & Dyke cu.m. 225,000 2.3.6(iii) Unclassified Excavation under water cu.m. 500 2.3.6(v) Leveling and Grading for Wadi Training Works cu.m. 12,000 Carried to Summary 2a/5 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 2a EARTHWORKS (in figures) (in words) R.O. Bzs. Item No. Estimated Quantity Unit Rate (Rial Omani) Amount Item Description Unit 2 EARTHWORKS (Continued) 2.4 Borrow Materials 2.4.6(i)a Borrow excavation to embankment & Dykes cu.m. 1,252,000 2.6 Sub-grade Construction 2.6.6(i) Sub grade preparation in cut sq.m. 350,000 2.7 Excavation and Backfilling for structures 2.7.6(i) Unclassified structural excavation cu.m. 20,690 (depth 0m to 2.0m) 2.7.6(ii) Unclassified structural excavation cu.m. 18,631 (depth >2.0m to <4.0m) 2.7.6(iii) Unclassified structural excavation cu.m. 9,450 (depth 4.0m) 2.7.6(iv) Unclassified structural excavation (under water) cu.m. 1,250 Carried to Summary 2a/6 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 2a EARTHWORKS (in figures) (in words) R.O. Bzs. Item No. Estimated Quantity Unit Rate (Rial Omani) Amount Item Description Unit SUMMARY Page 2a/1 Page 2a/2 Page 2a/3 Page 2a/4 Page 2a/5 Carried to Grand Summary - 2 3a/1 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 3a GRANULAR SUB-BASE, AGREGATE BASE COURSE, AND STABILISED BASE COURSES (in figures) (in words) R.O. Bzs. 3 GRANULAR SUB-BASE, AGREGATE BASE COURSE AND STABILISED BASE COURSES 3.2 Granular Sub-Base Course 3.2.6(ii) Granular Sub-Base Course (Class B) cu.m. 347,400 3.3 Aggregate Base Course 3 3 6(i) Crushed Aggregate Base Course (Class A) cu m 209 600 Item No. Estimated Quantity Unit Rate (Rial Omani) Amount Item Description Unit 3.3.6(i) Crushed Aggregate Base Course (Class A) cu.m. 209,600 Carried to Grand Summary - 2 4a/1 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 4a BITUMINOUS PAVEMENT (in figures) (in words) R.O. Bzs. 4 BITUMINOUS PAVEMENT 4.2 Bituminous Materials for Prime Coat and Tack Coats 4.2.8(i) Bituminous Prime Coat kg. 819,300 4.2.8(ii) Bituminous Tack Coat kg. 471,710 Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 4.2.8(iii) Polymer modified Tack Coat kg. 112,900 4.4 Bituminous Base Course 4.4.14(i) Bituminous Base Course cu.m. 110,700 4.5 Bituminous Binder and Wearing Courses 4.5.14(i) Bituminous Wearing Course cu.m. 38,100 4.5.14(iv) Polymer Modified Bituminous Wearing Course cu.m. 6,000 Carried to Summary 4a/2 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 4a BITUMINOUS PAVEMENT (in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 4 BITUMINOUS PAVEMENT (Continued) 4.5 Bituminous Binder and Wearing Courses (Continued) 4.5.14(v) Double twisted hexagonal galvanized steel mesh with Sq.m. 32,500 transverse steel bars and with opening note more than 100mm in any direction 4 9 Pavement Repairs and Reinstatement 4.9 Pavement Repairs and Reinstatement 4.9.10(i) Surface milling (up to 50mm thick) sq.m. 8,000 4.9.10(vi) Making saw cut into asphalt pavement lin.m. 3,000 4.12 Surface Ride ability Measurement 4.12.10(i) International roughness index (IRI) for Asphalt lin.m. 95,000 pavement Carried to Summary 4a/3 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 4a BITUMINOUS PAVEMENT (in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity SUMMARY Page 4a/1 Page 4a/2 Carried to Grand Summary - 2 5a/1 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 5a CONCRETE AND CONCRETE STRUCTURES (in figures) (in words) R.O. Bzs. 5 CONCRETE AND CONCRETE STRUCTURES 5.1 Concrete Materials and Mixes 5.1.7(i)a Unreinforced Concrete Class 16/20 for Bridges, cu.m. 3,215 Box Culverts, Drains and Pedestrian underpasses 5.1.7(i)b Reinforced Concrete Class 30/20 MS7 for rectangular cu.m. 2,500 closed drains Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 5.1.7(i)c Concrete Class 37.5/20 MS7 in Reinforced Concrete cu.m. 14,900 Box Culvert including headwalls, wing walls, apron slabs and cut-off walls 5.1.7(i)d Post-tensioned Concrete, Class 50/20 MS7 in Cast cu.m. 17,231 in-situ Post-tensioned Box Girders including Integral Abutment, Hanging Back wall etc. for 16.560m deck width (For Interchange Bridges) 5.1.7(i)e Concrete Class 40/20 MS7 in Pedestrian underpasses cu.m. 4,400 including barrel, headwalls and Ramps 5.1.7(i)f Reinforced Concrete, Class 45/20 MS7 in Bridge cu.m. 4,442 abutment, abutment cap and its foundation, Wing wall etc. (For Interchange Bridges) Carried to Collection Page - 1 5a/2 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 5a CONCRETE AND CONCRETE STRUCTURES (in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 5 CONCRETE AND CONCRETE STRUCTURES (Continued) 5.1 Concrete Materials and Mixes (Continued) 5.1.7(i)g Concrete Class 45/20 MS7 in Pile Caps & Footings cu.m. 1,670 (For Interchange Bridges) 5.1.7(i)h Concrete Class 45/20 MS7 in Pier Columns & cu.m. 662 Pier Caps (For Interchange Bridges) 5.1.7(i)i Concrete Class 40/20 MS7 in Approach Slabs including cu.m. 320 all items as indicated on drawings (for Interchange Bridges) 5.1.7(i)j GRP Cladding to cover space between superstructure sq.m. 160 and Pier column (color to match with Pier) 5.2 Reinforcing Steel 5.2.6(ii)a High tensile steel bar reinforcement, Grade 500, Type 2, t. 6,900 of any diameter for Interchange Bridges and Pedestrian underpasses 5.2.6(ii)b High tensile steel bar reinforcement of any diameter for t. 2,520 Retaining wall, Box culverts and Drains Carried to Collection Page - 1 5a/3 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 5a CONCRETE AND CONCRETE STRUCTURES (in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 5 CONCRETE AND CONCRETE STRUCTURES (Continued) 5.2 Reinforcing Steel (Continued) 5.2.6(iii) Fabric wire mesh reinforcement of any size t. 40 5.4 Prestressed Concrete Structures 5.4.6(i) Prestressing Cables - 0.6" Diameter Strands Grade 270 t. 890 5.7 Cement Concrete Pavement 5.7.6(ii) Reinforced Cement Concrete (Class 28/20) Pavement cu.m. 2,500 at Floodways Locations as shown on Dwg. 5.10 Waterproofing for Structures 5.10.6(i) Bitumen Water Proofing Paint for surfaces in contact sq.m. 30,260 with earth in Culverts, rectangular drains and Pedestrian underpasses 5.10.6(ii) Waterproofing Membrane including Protection board sq.m. 8,600 for Bridge Abutments, Pier and Pier Footing and Hanging Back Wall etc. Carried to Collection Page - 1 5a/4 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 5a CONCRETE AND CONCRETE STRUCTURES (in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 5 CONCRETE AND CONCRETE STRUCTURES (Continued) 5.10 Waterproofing for Structures (Continued) 5.10.7.7 (i) Waterproofing for Bridge Decks (isocyanite amine sq.m. 16,900 based) 5.12 Load Testing of Bridges 5.12.7(i)a Bridge Loading Test - Testing by Static Load nr. 6 5.12.7(i)b Bridge Loading Test - Testing by Moving Load nr. 6 6 STRUCTURAL STEEL AND OTHER METALWORK 6.6(i) Metal Access door for box girder bridges nr. 36 6.6(ii)a Hand Rails for Pedestrian Underpasses lin.m. 880 as shown on Dwg. 6.6(ii)b Railing for Pedestrian Underpass as shown on Dwg. lin.m. 180 Carried to Collection Page - 1 5a/5 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 5a CONCRETE AND CONCRETE STRUCTURES (in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 8 DRAINAGE 8.1 Pipe Culverts 8.1.6(ii) Reinforced Precast Concrete Pipe Culvert lin.m. 350 (diameter 1000mm) 8.2 Storm Sewers 8.2.6(i)a Storm Sewer, HDPE Pipe (diameter 300mm) lin.m. 50 8.2.6(i)b Storm Sewer, HDPE Pipe (diameter 400mm) lin.m. 17,200 8.2.6(i)c Storm Sewer, HDPE Pipe (diameter 500mm) lin.m. 4,620 8.2.6(i)d Storm Sewer, HDPE Pipe (diameter 600mm) lin.m. 110 8.2.6(i)e Storm Sewer, HDPE Pipe (diameter 900mm) lin.m. 50 8.2.6(i)f Storm Sewer, HDPE Pipe (diameter 1000mm) lin.m. 50 Carried to Collection Page - 1 5a/6 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 5a CONCRETE AND CONCRETE STRUCTURES (in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 8 DRAINAGE (Continued) 8.2 Storm Sewers (Continued) 8.2.6(i)g Storm Sewer, RC Pipe (diameter 300mm) lin.m. 50 8.2.6(i)h Storm Sewer, RC Pipe (diameter 400mm) lin.m. 50 8.2.6(i)i Storm Sewer, RC Pipe (diameter 500mm) lin.m. 50 8.2.6(i)j Storm Sewer, RC Pipe (diameter 600mm) lin.m. 50 8.2.6(i)k Storm Sewer, RC Pipe (diameter 900mm) lin.m. 50 8.2.6(i)l Storm Sewer, RC Pipe (diameter 1000mm) lin.m. 50 8.3 Manholes Inlets and Chambers 8.3.6(ii)a Grated Inlet (600mm x 600mm) with DI grating and nr. 604 Locked frame Carried to Collection Page - 1 5a/7 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 5a CONCRETE AND CONCRETE STRUCTURES (in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 8 DRAINAGE (Continued) 8.3 Manholes Inlets and Chambers (Continued) 8.3.6(ii)b Grated Inlet (1000mm x 1000mm) with DI grating and nr. 198 Locked frame 8.3.6(ii)c DI grating (1000mm x 1000mm) and Locked frame at nr. 5 Culvert for Median Drainage as shown on Dwg. (on the top of box culvert) 8.3.6(iii) Curb Inlet (600mm x 600mm) as shown on Dwg. nr. 24 8.4 Drainage of Structures 8.4.6(ii)a Drainage pipe, 100mm uPVC in structure lin.m. 3,500 8.4.6(ii)b Drainage pipe, 200mm uPVC in structure lin.m. 250 8.4.6(ii)c 150 mm Dia. uPVC perforated pipe wrapped in lin.m. 300 Geotextile 8.4.6(iii) Permeable backing including Geotextile Membrane cu.m. 4,750 8.4.6(iv) Granular backfill cu.m. 4,620 Carried to Collection Page - 1 5a/8 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 5a CONCRETE AND CONCRETE STRUCTURES (in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 10 PILING 10.1 Piling General 10.1.6(i) Setting up at each 750mm diameter pile location nr. 504 10.1.6(ii)a Piling - Cast in place, 750mm diameter for Pier lin.m. 4,505 Foundation including reinforcement in piles (Boring piles) 10.1.6(ii)b Piling - Cast in place, 750mm diameter for Integral lin.m. 4,505 Abutment or Abutment Foundation including reinforcement in piles (Boring piles) 10.2 Pile Testing 10.2.6(i) Static Load Testing of 750mm diameter expendable nr. 12 piles (including all materials) 10.2.6(ii) Static Load Testing of 750mm diameter working piles nr. 24 10.2.6(iii) Non-destructive Integrity Test as per the Specifications. nr. 504 Carried to Collection Page - 1 5a/9 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 5a CONCRETE AND CONCRETE STRUCTURES (in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 11 BRIDGE ACCESSORIES 11.3 Bearings General 11.3.6(i)a Pot Bearing, (V= 14,600kN - 16,600kN & nr. 6 H= 2,000kN - 4,000kN), Fixed type including supply & installation 11.3.6(i)b Pot Bearing, (V= 14,600kN - 16,600kN & nr. 12 H =1,000kN - 3,000kN), Guided type including supply & installation 11.3.6(i)c Pot Bearing, (V= 14,600kN - 15,600kN & nr. 6 H =1,500kN - 3,500kN), Guided type including supply & installation 11.3.6(i)d Pot Bearing, (V= 4,600kN - 6,600kN & nr. 12 H =500kN - 1,500kN), Guided type including supply & installation 11.3.6(i)e Pot Bearing, (V= 14,600kN - 16,600kN ), nr. 12 Free type including supply & installation 11.3.6(i)g Pot Bearing, (V= 4,600kN - 6,600kN ), nr. 24 Free type including supply & installation Carried to Collection Page - 2 5a/10 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 5a CONCRETE AND CONCRETE STRUCTURES (in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 11 BRIDGE ACCESSORIES (Continued) 11.4 Bridge Expansion Joint 11.4.6(vii)a Provide Strip Seal Type Expansion Joint lin.m. 130 (Max. Opening = 40mm, Max. Closing = 15mm) 11.4.6(vii)b Provide Strip Seal Type Expansion joint lin.m. 130 (Max. Opening = 90mm, Max. Closing = 35mm) 11.6 Bridge Parapets and Railings 11.6.6(i) Concrete Barrier for Bridge Parapet as shown on Dwg. lin.m. 2,300 Carried to Collection Page - 2 5a/11 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 5a CONCRETE AND CONCRETE STRUCTURES (in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity COLLECTION PAGE - 1 Page 5a/1 Page 5a/2 Page 5a/3 Page 5a/4 Page 5a/5 Page 5a/6 Page 5a/7 Page 5a/8 Carried to Summary 5a/12 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 5a CONCRETE AND CONCRETE STRUCTURES (in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity COLLECTION PAGE - 2 Page 5a/9 Page 5a/10 Carried to Summary 5a/13 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 5a CONCRETE AND CONCRETE STRUCTURES (in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity SUMMARY COLLECTION PAGE 1 - 5a/11 COLLECTION PAGE 2 - 5a/12 Carried to Grand Summary - 2 6a/1 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 6a INCIDENTAL CONSTRUCTION (in figures) (in words) R.O. Bzs. 9 SLOPE PROTECTION AND STABILIZATION 9.1 Riprap 9.1.6(i) Loose Stone Riprap (Class B) of varying thickness cu.m. 2,000 for Dyke and slope protection as shown in the Dwg. 9.1.6(ii)a Mortared Stone Riprap (Class A, Varying Thickness) cu.m. 26,333 for Slope Protection including Stubs as per dwg. Item No. Estimated Quantity Unit Rate (Rial Omani) Amount Item Description Unit 9.1.6(ii)b Mortared Stone Riprap (Class A) for Culvert inlet cu.m. 3,080 & outlet 9.1.6(ii)c Mortared Stone Riprap (Class A) for Dyke as shown cu.m. 200 on dwg. 9.1.6(iv) Geotextile Fabric Filter sq.m. 1,200 9.2 Gabions 9.2.6(i) Gabion lining of varying thickness for wadi bed, slope cu.m. 4,900 protection, floodways, culvert inlet & outlet protection as per Dwg. Carried to Collection Page - 1 6a/2 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 6a INCIDENTAL CONSTRUCTION (in figures) (in words) R.O. Bzs. Item No. Estimated Quantity Unit Rate (Rial Omani) Amount Item Description Unit 9 SLOPE PROTECTION AND STABILIZATION (Continued) 9.9 Ditch Lining
9.9.6(i)a Concrete Ditch Lining (100mm Thick) with wire mesh sq.m. 79,500 (10mm dia @200mm c/c both ways) 9.9.6(i)b Reinforced Concrete Chute 100mm thick with wire mesh lin.m. 200 (10mm dia @150mm c/c both ways) as per Dwg. ( @ y ) p g 9.9.6(ii) Grouted Stone Ditch lining (200mm thick) sq.m. 13,340 9.12 Mechanically Stabilized Earth Retaining Walls 9.12.7(i) Mechanically Stabilized Earth Retaining Walls sq.m. 40,500 (MSERWs)
9.12.7(ii) Standard Coping for MSERWs lin.m. 250
9.12.7(iii) Concrete Barrier Parapet on MSERWs lin.m. 5,900 Carried to Collection Page - 1 6a/3 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 6a INCIDENTAL CONSTRUCTION (in figures) (in words) R.O. Bzs. Item No. Estimated Quantity Unit Rate (Rial Omani) Amount Item Description Unit 12 SIDEWALKS, PAVED AREAS AND CURBS 12.1 Sidewalks, Paved areas and Curbs 12.1.7(ii)a Paving, concrete interlocking blocks 60mm thick sq.m. 52,300 for side walks and median 12.1.7(ii)b Paving, concrete interlocking blocks 80mm thick sq.m. 1,000 for Car parking 12.1.7(v)a Precast Non-Mountable Concrete Curb Type ''A'' lin.m. 28,500 12.1.7(v)b Precast Mountable curb Type ''B'' lin.m. 1,500 12.1.7(v)c Precast flush curb Type ''D'' lin.m. 1,600 12.1.7(v)d Precast concrete edge curb Type ''E'' lin.m. 19,500 Carried to Collection Page - 1 6a/4 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 6a INCIDENTAL CONSTRUCTION (in figures) (in words) R.O. Bzs. Item No. Estimated Quantity Unit Rate (Rial Omani) Amount Item Description Unit 13 SAFETY BARRIERS AND FENCES 13.1 Roadside Barriers 13.1.7(i) W-Beam Guardrail (Strong post) including lin.m. 24,600 W150 x 13.5 Steel post, reflectors, accessories and foundations 13.1.7(iii)a End anchorage for approach including post, reflectors, nr. 24 accessories and foundations 13.1.7(iii)b End anchorage for approach nr. 14 (Guard Rail-Concrete Barrier transition) 13.1.7(iii)c W-Beam Guardrail connection with Concrete barrier nr. 14 as indicated in the Drawing 13.1.7(iii)d W-Beam Guardrail Terminal section for Departure end nr. 24 including post, reflectors, accessories and foundations 13.1.7(vii)a Precast Concrete barrier, Single face as shown lin.m. 2,250 in the Dwg. 13.1.7(vii)b Heavy Duty Concrete barrier, Single face as shown lin.m. 100 in the Dwg. Carried to Collection Page - 1 6a/5 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 6a INCIDENTAL CONSTRUCTION (in figures) (in words) R.O. Bzs. Item No. Estimated Quantity Unit Rate (Rial Omani) Amount Item Description Unit 13 SAFETY BARRIERS AND FENCES (Continued) 13.1 Roadside Barriers (Continued) 13.1.7(ix) Concrete barrier, transition section lin.m. 300 13.1.7(x) Impact attenuator, Quad Beam type, with expandable nr. 6 modules/cartridges, including new foundation, slab with reflective studs and connection to the concrete 13.4 Delineators 13.4.6(i)a Floodway markers, painted white & red as shown on nr. 250 Dwg. Including anchor bolt 13.4.6(i)b Floodway water depth guage as shown on Dwg. nr. 12 Including anchor bolt Carried to Collection Page - 1 6a/6 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 6a INCIDENTAL CONSTRUCTION (in figures) (in words) R.O. Bzs. Item No. Estimated Quantity Unit Rate (Rial Omani) Amount Item Description Unit 14 TRAFFIC SIGNS AND ROAD MARKINGS 14.1 Traffic Signs 14.1.7(i)a Highway sign, Triangular Side (750mm) nr. 90 14.1.7(i)b Highway sign, Triangular Side (900mm) nr. 30 14.1.7(i)c Highway sign, Triangular Side (1200mm) nr. 10 14.1.7(i)d Highway sign, Triangular Side (1500mm) nr. 10 14.1.7(ii)a Highway sign, Circular (Diameter 750mm) nr. 180 14.1.7(ii)b Highway sign, Circular (Diameter 900mm) nr. 14 14.1.7(ii)c Highway sign, Circular (Diameter 1200mm) nr. 20 Carried to Collection Page - 1 6a/7 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 6a INCIDENTAL CONSTRUCTION (in figures) (in words) R.O. Bzs. Item No. Estimated Quantity Unit Rate (Rial Omani) Amount Item Description Unit 14 TRAFFIC SIGNS AND ROAD MARKINGS (Continued) 14.1 Traffic Signs (Continued) 14.1.7(iii)a Chevron Signs, rectangular [2100 mm x 600 mm] sq.m. 50 14.1.7(iii)b Chevron Signs, rectangular [2400 mm x 600 mm] sq.m. 50 14.1.7(iii)c Chevron Signs, rectangular [380 mm x 600 mm] sq.m. 40 14.1.7(iii)d Highway Signs, rectangular [750x1400] sq.m. 80 14.1.7(iii)e Highway Signs, rectangular [600x800] sq.m. 10 14.1.7(iii)f Supplementary plate, rectangular [1200 mm x 700 mm] sq.m. 10 14.1.7(iii)g Supplementary plate, rectangular [1500 mm x 700 mm] sq.m. 8 Carried to Collection Page - 1 6a/8 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 6a INCIDENTAL CONSTRUCTION (in figures) (in words) R.O. Bzs. Item No. Estimated Quantity Unit Rate (Rial Omani) Amount Item Description Unit 14 TRAFFIC SIGNS AND ROAD MARKINGS (Continued) 14.1 Traffic Signs (Continued) 14.1.7(iii)h Rectangular or Polygonal Sign Face (Area 1-2 sq m) sq.m. 20 14.1.7(iii)i Rectangular or Polygonal Sign Face (Area 2-4 sq m) sq.m. 30 14.1.7(iii)j Rectangular Sign Face (Area 4-6 sq m) sq.m. 40 14.1.7(iii)k Rectangular Sign Face (Area 9-11 sq m) sq.m. 40 14.1.7(iii)l Rectangular Sign Face (Area 14-17 sq m) sq.m. 50 14.1.7(iii)m Rectangular Sign Face (Area 19-24 sq m) sq.m. 100 14.1.7(iii)n Rectangular Sign Face (Area 44-50 sq m) sq.m. 150 Carried to Collection Page - 1 6a/9 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 6a INCIDENTAL CONSTRUCTION (in figures) (in words) R.O. Bzs. Item No. Estimated Quantity Unit Rate (Rial Omani) Amount Item Description Unit 14 TRAFFIC SIGNS AND ROAD MARKINGS (Continued) 14.1 Traffic Signs (Continued) 14.1.7(iv) Octagonal Road signs (Height 900mm) nr. 12 14.1.7(v)a Sign post support assembly G.I pipe 100mm Dia. nr. 366 Including foundation and painting of post g p g p 14.1.7(v)b Multi-post Sign Support Assembly, Type PI posts, nr. 9 complete including foundation, painting (black and white) etc. 14.1.7(v)c Multi-post Sign Support Assembly, Type PII posts, nr. 12 complete including foundation, painting (black and white) etc. 14.1.7(v)d Multi-post Sign Support Assembly, Type PIII posts, nr. 8 complete including foundation, painting (black and white) etc. 14.1.7(v)e Multi-post Sign Support Assembly, Type PIV posts, nr. 4 complete including foundation, painting (black and white) etc. Carried to Collection Page - 2 6a/10 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 6a INCIDENTAL CONSTRUCTION (in figures) (in words) R.O. Bzs. Item No. Estimated Quantity Unit Rate (Rial Omani) Amount Item Description Unit 14 TRAFFIC SIGNS AND ROAD MARKINGS (Continued) 14.1 Traffic Signs (Continued) 14.1.7(v)f Multi-post Sign Support Assembly, Type PV posts, nr. 4 complete including foundation, painting (black and white) etc. 14.1.7(vi) Breakaway multi-post sign post support assembly nr. 8 ( ) y p g p pp y for Exit Signs including foundations and painting of post as shown on Dwg. 14.1.7(vii)a Overhead Gantry Sign Support with foundation nr. 4 including Bracing, Catwalk Assembly, Type G1 as per Drawing 14.1.7(vii)b Overhead Gantry Sign Support with foundation nr. 4 including Bracing, Catwalk Assembly, Type G2 as per Drawing 14.1.7(vii)c Overhead Gantry Sign Support with foundation nr. 3 including Bracing, Catwalk Assembly, Type G3 as per Drawing Carried to Collection Page - 2 6a/11 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 6a INCIDENTAL CONSTRUCTION (in figures) (in words) R.O. Bzs. Item No. Estimated Quantity Unit Rate (Rial Omani) Amount Item Description Unit 14 TRAFFIC SIGNS AND ROAD MARKINGS (Continued) 14.1 Traffic Signs (Continued) 14.1.7(vii)d Overhead Cantilever Sign Support including Bracing nr. 8 foundation, Catwalk Assembly, Type C1 as per Drawing 14.1.7(vii)e Overhead Cantilever Sign Support including Bracing nr. 6 foundation, Catwalk Assembly, Type C2 as per Drawing y yp p g 14.1.7(vii)f Overhead Cantilever Sign Support including Bracing nr. 2 foundation, Catwalk Assembly, Type C3 as per Drawing 14.1.7(viii)a Supply and erect new flag poles including foundation nr. 110 as per Special Specification. 14.1.7(viii)b Supply and install Precast Concrete Foundation with nr. 12 pole for R.O.P. Speed Control Camera (600x600x1000mm) including Base plate, Bolts, Hexagonal nuts, washers, uPVC ducts and any other accessories required for installation. Carried to Collection Page - 2 6a/12 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 6a INCIDENTAL CONSTRUCTION (in figures) (in words) R.O. Bzs. Item No. Estimated Quantity Unit Rate (Rial Omani) Amount Item Description Unit 14 TRAFFIC SIGNS AND ROAD MARKINGS (Continued) 14.2 Road Markings 14.2.6(i)a Traffic Lines, Type L1/2(120) White sq.m. 200 (Mechanical application) 14.2.6(i)b Traffic Lines, Type L1/3(120) White sq.m. 6,800 (Mechanical application) ( pp ) 14.2.6(i)c Traffic Lines, Type L2A(120) White sq.m. 400 (Mechanical application) 14.2.6(i)d Traffic Lines, Type L2/1(120) White sq.m. 50 (Mechanical application) 14.2.6(i)e Traffic Lines, Type L2/2(120) White sq.m. 100 (Mechanical application) 14.2.6(i)f Traffic Lines, Type L4/1(150) Yellow sq.m. 4,500 (Mechanical application) 14.2.6(i)g Traffic Lines, Type L4/2(120) Yellow sq.m. 9,500 (Mechanical application) Carried to Collection Page - 2 6a/13 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 6a INCIDENTAL CONSTRUCTION (in figures) (in words) R.O. Bzs. Item No. Estimated Quantity Unit Rate (Rial Omani) Amount Item Description Unit 14 TRAFFIC SIGNS AND ROAD MARKINGS (Continued) 14.1 Road Markings (Continued) 14.2.6(i)h Traffic Lines, Type L5/1(150) White sq.m. 600 (Mechanical application) 14.2.6(i)i Traffic Lines, Type L5/2(120) White sq.m. 100 (Mechanical application) ( pp ) 14.2.6(i)j Traffic Lines, Type L7(400) White sq.m. 50 (Mechanical application) 14.2.6(i)k Traffic Lines, Type L8(200) White sq.m. 120 (Mechanical application) 14.2.6(iii)a Special Marking, Pedestrian Crossing sq.m. 1,200 14.2.6(iii)b Special Marking, Chevrons Marking S9 sq.m. 2,500 14.2.6(iii)c Special Marking, Lane Selection Arrow White (S3/1) sq.m. 300 Carried to Collection Page - 2 6a/14 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 6a INCIDENTAL CONSTRUCTION (in figures) (in words) R.O. Bzs. Item No. Estimated Quantity Unit Rate (Rial Omani) Amount Item Description Unit 14 TRAFFIC SIGNS AND ROAD MARKINGS (Continued) 14.1 Road Markings (Continued) 14.2.6(iii)d Special Marking, Lane Selection Arrow White (S4/1) sq.m. 250 14.2.6(iii)e Special Marking, Lane Selection Arrow White (S5/1) sq.m. 250 14.2.6(iii)f Special Marking, Lane Selection Arrow White (S7/1) sq.m. 250 14.2.6(iii)g Special Marking, Lane Selection Arrow White (S8/1) sq.m. 280 14.2.6(iv) Curb painting sq.m. 15,400 Carried to Collection Page - 2 6a/15 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 6a INCIDENTAL CONSTRUCTION (in figures) (in words) R.O. Bzs. Item No. Estimated Quantity Unit Rate (Rial Omani) Amount Item Description Unit 14 TRAFFIC SIGNS AND ROAD MARKINGS (Continued) 14.3 Road Studs 14.3.6(i)a Reflecting Road Studs (Double face, Red color) nr. 500 14.3.6(i)b Reflecting Road Studs (Single face, Red color) nr. 900 14.3.6(i)c Reflecting Road Studs (Single face, White color) nr. 800 14.3.6(iii) Provide removable bollards in the median opening nr. 90 and one fixed bollard at each ends as shown in the Dwg. for R.O.P. including chain and lock Carried to Collection Page - 2 6a/16 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 6a INCIDENTAL CONSTRUCTION (in figures) (in words) R.O. Bzs. Item No. Estimated Quantity Unit Rate (Rial Omani) Amount Item Description Unit COLLECTION PAGE - 1 Page 6a/1 Page 6a/2 Page 6a/3 Page 6a/4 Page 6a/5 Page 6a/6 Page 6a/7 Page 6a/8 Carried to Summary 6a/17 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 6a INCIDENTAL CONSTRUCTION (in figures) (in words) R.O. Bzs. Item No. Estimated Quantity Unit Rate (Rial Omani) Amount Item Description Unit COLLECTION PAGE - 2 Page 6a/9 Page 6a/10 Page 6a/11 Page 6a/12 Page 6a/13 Page 6a/14 Page 6a/15 Carried to Summary 6a/18 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 6a INCIDENTAL CONSTRUCTION (in figures) (in words) R.O. Bzs. Item No. Estimated Quantity Unit Rate (Rial Omani) Amount Item Description Unit SUMMARY COLLECTION PAGE 1 - 6a/16 COLLECTION PAGE 2 - 6a/17 Carried to Grand Summary - 2 7a/1 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 7a ROAD LIGHTING AND ELECTRICAL INSTALLATION (in figures) (in words) R.O. Bzs. 15 ROAD LIGHTING AND ELECTRICAL INSTALLATION 15.1 General 15.1.20(i) Power Supply connection to the feeder pillar nr. 15 15.1.20(ii) Spare Parts (5%) as per the approved list LS Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 15.3 Package Sub-stations 15.3.6(i)a Supply and installation of Electrical Sub-station with nr. 1 1Nr RMU,1Nr 500 KVA Transformer and 800 A feeder pillar, including building, cable terminations, testing, commissioning and all civil works and other accessories necessary to complete the system functional 15.3.6(i)b Supply and installation of Electrical Sub-station with nr. 1 1Nr RMU, 1Nr OLU, 1Nr 500 KVA Transformer and 800 A feeder pillar, including building, cable terminations, testing, commissioning and all civil works and other accessories necessary to complete the system functional Carried to Collection Page - 1 7a/2 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 7a ROAD LIGHTING AND ELECTRICAL INSTALLATION (in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 15 ROAD LIGHTING AND ELECTRICAL INSTALLATION (Continued) 15.5 33kV and 11kV Pole Mounted Transformer Sub-stations 15.5.6(ii)a Supply and installation of 11kV pole mounted nr. 10 transformer sub-station, 100KVA with 1 way LV panel including H-pole transformer mounting structure, earthing connections and other accessories earthing, connections and other accessories necessary to complete the system functional 15.5.6(ii)b Supply and installation of 11kV pole mounted nr. 2 transformer sub-station, 100KVA with 2 way LV panel including H-pole transformer mounting structure, earthing, connections and other accessories necessary to complete the system functional 15.6 Feeder Pillars 15.6.6(i)a Supply and install Mini Feeder Pillars, 400 A, 4way nr. 3 15.6.6(i)b Supply and install Street Lighting Feeder Pillars, 100 A nr. 12 Carried to Collection Page - 1 7a/3 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 7a ROAD LIGHTING AND ELECTRICAL INSTALLATION (in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 15 ROAD LIGHTING AND ELECTRICAL INSTALLATION (Continued) 15.7 Electrical Cables Supply 4-Core cabling, copper conductor, XLPE insulated, Steel Wire armoured, PVC sheathed, 600/1000V rating, as follows: 15 7 6(i)a Nominal Conductor Area 25mm2 lin m 59 300 15.7.6(i)a Nominal Conductor Area 25mm2 lin.m. 59,300 15.7.6(i)b Nominal Conductor Area 95mm2 lin.m. 2,500 15.7.6(i)c Nominal Conductor Area 120mm2 lin.m. 1,500 15.7.6(i)d Nominal Conductor Area 240mm2 lin.m. 100 15.7.6(ii)a Termination on 25mm2 cabling nr. 35 Carried to Collection Page - 1 7a/4 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 7a ROAD LIGHTING AND ELECTRICAL INSTALLATION (in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 15 ROAD LIGHTING AND ELECTRICAL INSTALLATION (Continued) 15.7 Electrical Cables (Continued) 15.7.6(ii)b Termination on 95mm2 cabling nr. 12 15.7.6(ii)c Termination on 120mm2 cabling nr. 6 15.7.6(ii)d Termination on 240mm2 cabling nr. 4 15.8 Road Lighting Masts, Columns and Luminaries 15.8.6(i) Supply, install and commission Galvanized steel nr. 126 lighting column polygon (Mid hinged Type) 25m high mast with 4 x 600 Watt HPSV luminaries fixed on bracket complete with fused cut out, control gear, wiring, connection etc Carried to Collection Page - 1 7a/5 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 7a ROAD LIGHTING AND ELECTRICAL INSTALLATION (in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 15 ROAD LIGHTING AND ELECTRICAL INSTALLATION (Continued) 15.8 Road Lighting Masts, Columns and Luminaries (Continued) 15.8.6(ii)a Supply, install and commission Galvanized steel nr. 785 lighting column polygon (Mid hinged Type) 14m high pole/column with 1 x 400 Watt HPSV luminaries fixed on bracket complete with fused cut out, control gear wiring connection etc control gear, wiring, connection etc 15.8.6(ii)b Supply, install and commission Galvanized steel nr. 150 lighting column polygon (Mid hinged Type) 14m high pole/column with 2 x 400 Watt HPSV luminaries on bracket complete with fused cut out, control gear, wiring, connection etc 15.8.6(iii) Column / high mast testing LS 15.10 Under Bridge Lighting 15.10.6(i)a Under bridge surface mounted lighting including nr. 60 Conduits, Cables, 150W High Pressure Sodium Lanterns, Junction Boxes, including Supply, Installation, Testing and Putting into service complete Carried to Collection Page - 1 7a/6 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 7a ROAD LIGHTING AND ELECTRICAL INSTALLATION (in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 15 ROAD LIGHTING AND ELECTRICAL INSTALLATION (Continued) 15.10 Under Bridge Lighting (Continued) 15.10.6(i)b Pedestrian underpasses Wall Luminar LED Light nr. 140 Including Cables, Junction Boxes, Supply, Installation, Testing and Putting into service complete 15 11 Traffic Signals 15.11 Traffic Signals Installation of Signal posts /poles 15.11.6(i)a Supply, install and commission cantilever traffic signal nr. 3 all accessories, cabling, foundations etc. complete; span for 4 signal heads 15.11.6(i)b Supply, install and commission cantilever traffic signal nr. 3 all accessories, cabling, foundations etc. complete; span for 3 signal heads 15.11.6(i)c Supply, install and commission cantilever traffic signal nr. 18 all accessories, cabling, foundations etc. complete; span for 2 signal heads Carried to Collection Page - 1 7a/7 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 7a ROAD LIGHTING AND ELECTRICAL INSTALLATION (in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 15 ROAD LIGHTING AND ELECTRICAL INSTALLATION (Continued) 15.11 Traffic Signals (Continued) 15.11.6(i)d Supply, install and commission cantilever traffic signal nr. 3 all accessories, cabling, foundations etc. complete; span for 1 signal heads 15 11 6(ii)a Supply install and commission vehicular and nr 36 15.11.6(ii)a Supply, install and commission vehicular and nr. 36 pedestrian combination traffic signal posts including accessories, cabling and foundations etc. 15.11.6(ii)b Supply, install and commission pedestrian traffic nr. 24 signal posts including accessories, cabling and foundations etc. 15.11.6(ii)c Supply and install Pedestrian signal with amber nr. 36 flasher signal post including foundations Signal heads, arrow masks and signs 15.11.6(iii)a Supply, install and commission 3 aspect, 300 mm dia nr. 90 lens, traffic signal head including backing boards and arrow marks Carried to Collection Page - 1 7a/8 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 7a ROAD LIGHTING AND ELECTRICAL INSTALLATION (in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 15 ROAD LIGHTING AND ELECTRICAL INSTALLATION (Continued) 15.11 Traffic Signals (Continued) 15.11.6(iii)b Supply,install and commission 2 aspect, pedestrian nr. 60 traffic signal head including backing boards 15.11.6(iii)c Supply, install and commissioning 1 aspect,200 mm nr. 36 dia lens, amber Flasher 15.11.6(iii)d Supply, install and commissioning 3 aspect,100 mm nr. 36 dia lens, repeater signal Inspection chambers complete including cover and frames, water proofing works ,finishes etc 15.11.6(iv)a 1200 x 1200mm reinforced concrete traffic signal nr. 3 inspection chamber, type 1 depth not exceeding 1.5m Carried to Collection Page - 1 7a/9 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 7a ROAD LIGHTING AND ELECTRICAL INSTALLATION (in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 15 ROAD LIGHTING AND ELECTRICAL INSTALLATION (Continued) 15.11 Traffic Signals (Continued) 15.11.6(iv)b 600 x 600mm mass concrete bypass chamber, depth nr. 72 not exceeding 1.0m 15.11.6(iv)c 300 x 300mm mass concrete bypass chamber nr. 18 Installation of feeder pillar and traffic signal controller 15.11.6(v) Supply and install feeder pillar on foundation including nr. 3 all accessories, termination of cables etc. complete 15.11.6(vi) Supply install and commission of a micro processor nr. 3 traffic signal controller on foundation, capable of handling thirty two (32) signal groups, complete with hardware and software modules as per the operational An approved engineer representing the manufacturer must be present on site at the time of commissioning the traffic signals Carried to Collection Page - 2 7a/10 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 7a ROAD LIGHTING AND ELECTRICAL INSTALLATION (in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 15 ROAD LIGHTING AND ELECTRICAL INSTALLATION (Continued) 15.15 Earthing 15.15.7(i)a Supply and install Twin rod earthing installation at nr. 15 street lighting feeder pillars 15.15.7(i)b Supply and install Twin rod earthing installation at nr. 3 Traffic Signal feeder pillars Traffic Signal feeder pillars 15.15.7(ii) Supply and install Single rod earthing installation nr. 35 at the end of street lighting circuits 15.17 Civil Works for Electrical Installations 15.17.6(vi)a Supply and install Pre-cast concrete foundation for nr. 3 mini feeder pillars as per Dwg. including Bolts and any other accessories required for installation. 15.17.6(vi)b Supply and install Pre-cast concrete foundation for nr. 12 street lighting feeder pillars as per Dwg. including Bolts and any other accessories required for installation. Carried to Collection Page - 2 7a/11 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 7a ROAD LIGHTING AND ELECTRICAL INSTALLATION (in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 15 ROAD LIGHTING AND ELECTRICAL INSTALLATION (Continued) 15.17 Civil Works for Electrical Installations (Continued) 15.17.6(vi)c Supply and install Pre-cast concrete foundation for nr. 3 Traffic Signal feeder pillars as per Dwg. including Bolts and any other accessories required for installation. 15.17.6(vi)d Precast concrete foundation for traffic signal controller nr. 3 excavation, backfilling, compaction, formwork, concrete, PVC conduit, re-bars, holding down bolts, protection of holding down bolts, nuts and washers with denso tape, etc 15.17.6(vii)a Trench for low voltage cable for one cable lin.m. 59,300 15.17.6(vii)b Trench for low voltage cable for two cable lin.m. 2,500 15.17.6(vii)c Trench for low voltage cable for three cable lin.m. 1,600 Carried to Collection Page - 2 7a/12 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 7a ROAD LIGHTING AND ELECTRICAL INSTALLATION (in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 15 ROAD LIGHTING AND ELECTRICAL INSTALLATION (Continued) 15.17 Civil Works for Electrical Installations (Continued) 15.17.6(ix) Supply and install Precast Concrete Foundation for nr. 935 columns 14m high pole/column as per Dwg. including Base plate, Bolts, Hexagonal nuts, washers, uPVC ducts and any other accessories required uPVC ducts and any other accessories required for installation 15.17.6(x) Supply and install Precast Concrete Foundation for nr. 126 25m high mast as per Dwg. including Base plate, Bolts, Hexagonal nuts, washers, uPVC ducts and any other accessories required for installation Road Crossing Ducts 15.17.6(xii)a 2Way 100 mm Upvc duct for street lighting with lin.m. 400 concrete encasement 15.17.6(xii)b 2Way 150 mm Upvc duct for 11kv cables for street lin.m. 300 lighting with concrete encasement Carried to Collection Page - 2 7a/13 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 7a ROAD LIGHTING AND ELECTRICAL INSTALLATION (in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 15 ROAD LIGHTING AND ELECTRICAL INSTALLATION (Continued) 15.17 Civil Works for Electrical Installations (Continued) 15.17.6(xii)c 4Way 100 mm Upvc duct for street lighting with lin.m. 250 concrete encasement 15 17 6(xii)d 4Way 150 mm Upvc duct for street lighting with lin m 400 15.17.6(xii)d 4Way 150 mm Upvc duct for street lighting with lin.m. 400 concrete encasement 15.17.6(xii)e 2Way 100 mm Upvc duct for traffic signal with lin.m. 485 concrete encasement 15.17.6(xii)f 2Way 150 mm Upvc duct for traffic signal with lin.m. 350 concrete encasement 15.17.6(xii)g 4Way 100 mm Upvc duct for traffic signal with lin.m. 450 concrete encasement 15.17.6(xii)h 4Way 150 mm Upvc duct for traffic signal with lin.m. 450 concrete encasement Carried to Collection Page - 2 7a/14 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 7a ROAD LIGHTING AND ELECTRICAL INSTALLATION (in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 15 ROAD LIGHTING AND ELECTRICAL INSTALLATION (Continued) Traffic Lights Control System 15.18.3 Design, supply, installation, commissioning and nr. 3 testing of the traffic light control system including but not limited to Grid Smart Cameras, hardware & softwares, civil works etc. for loop detection, incident detection, stop bar detection, traffic counts including , p , g turn movements count and vehicle classification Red Light Violation Camera 15.19.3 Design, supply, installation, commissioning and nr. 3 testing of Red Light Violation camera system including but not limited to cameras, hardware & software, civil works etc. for fulfilling the Royal Oman Polices Safety Enforcement requirements Carried to Collection Page - 2 7a/15 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 7a ROAD LIGHTING AND ELECTRICAL INSTALLATION (in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity COLLECTION PAGE - 1 Page 7a/1 Page 7a/2 Page 7a/3 Page 7a/4 Page 7a/5 Page 7a/6 Page 7a/7 Page 7a/8 Carried to Summary 7a/16 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 7a ROAD LIGHTING AND ELECTRICAL INSTALLATION (in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity COLLECTION PAGE - 2 Page 7a/9 Page 7a/10 Page 7a/11 Page 7a/12 Page 7a/13 Page 7a/14 Carried to Summary 7a/17 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 7a ROAD LIGHTING AND ELECTRICAL INSTALLATION (in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity SUMMARY COLLECTION PAGE 1 - 7a/15 COLLECTION PAGE 2 - 7a/16 Carried to Grand Summary - 2
9a/1 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 9a UTILITIES (in figures) (in words) R.O. Bzs. 18 UTILITIES 18.1 Locating and Protecting Existing Utilities Water Utility 18.1.6(i)a Concrete protection slab for existing water lines/ducts lin.m. 200 300 mm dia (Class 25/20) Electrical Utility Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity Electrical Utility 18.1.6(i)b Supply and Install proposed 2way 200mm dia Upvc lin.m. 100 and 2way 50mm Split duct to protect the existing underground 33kv electrical cables complete with concrete protection (class 25/20) including excavation, backfilling, compaction, end caps, draw ropes and duct markers etc. at locations shown in the drawings or as directed by the Engineer Carried to Collection Page - 1
9a/2 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 9a UTILITIES (in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 18 UTILITIES (Continued) 18.1 Locating and Protecting Existing Utilities (Continued) 18.1.6(i)c Supply and Install proposed 2way 150mm and 2way lin.m. 100 50mm dia uPVC Split duct to protect the existing underground 11kv electrical cables complete with concrete protection (class 25/20) including excavation, backfilling, compaction, end caps, draw ropes and duct markers etc at locations shown in the drawings duct markers etc. at locations shown in the drawings or as directed by the Engineer Telephone Utility 18.1.6(i)d Supply and install 4way 100mm dia Upvc Split duct lin.m. 100 to protect existing Omantel / Nawras / MOD cables complete with concrete protection (class 25/20) including excavation, backfilling, duct marker and compaction etc. at locations shown in the drawings or as directed by the Engineer as per Omantel / Nawras / MOD Standards and Specifications Carried to Collection Page - 1
9a/3 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 9a UTILITIES (in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 18 UTILITIES (Continued) 18.1 Locating and Protecting Existing Utilities (Continued) 18.1.6(i)e Supply and install 2way 100mm dia and 2way 100mm lin.m. 240 dia Upvc Split duct to protect existing Omantel / Nawras / MOD cables complete with concrete protection (class 25/20) including excavation, backfilling, duct marker and compaction etc. at locations shown in the drawings or as directed by the Engineer as per Omantel/ drawings or as directed by the Engineer as per Omantel/ Nawras / MOD Standards and Specifications 18.2 Removing and Disposing or Relocating Existing Utilities Electrical Utility 18.2.6(i)a Carefully disconnect and remove existing 11KV lin.m. 7,000 overhead electrical conductors including poles stay wires, insulators and any other accessories existing and dispose of same to the locations as directed by the Engineer Carried to Collection Page - 1
9a/4 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 9a UTILITIES (in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 18 UTILITIES (Continued) 18.2 Removing and Disposing or Relocating Existing Utilities (Continued) Electrical Utility 18.2.6(i)b Carefully disconnect and remove existing 11KV lin.m. 1,600 underground electrical cables and any other accessories existing and dispose of same to the accessories existing and dispose of same to the locations as directed by the Engineer 18.2.6(i)c Carefully disconnect and remove existing 33KV lin.m. 1,000 overhead electrical conductors including poles stay wires, insulators and any other accessories existing and dispose of same to the locations as directed by the Engineer 18.2.6(i)d Carefully disconnect and remove existing 33KV lin.m. 200 underground electrical cables and any other accessories existing and dispose of same to the locations as directed by the Engineer Carried to Collection Page - 1
9a/5 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 9a UTILITIES (in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 18 UTILITIES (Continued) 18.2 Removing and Disposing or Relocating Existing Utilities (Continued) Water Utility 18.2.6(i)e Locate excavate down to and remove the existing lin.m. 3,200 300mm diameter AC/DI pipe including but not limited to valve chambers Fire hydrants and all other to valve chambers, Fire hydrants and all other accessories complete and dispose of same to the locations as directed by the Engineer including excavation, backfill, disposal, disconnection,etc 18.2.6(i)f Locate excavate down to and remove the existing lin.m. 2,000 400mm diameter AC/DI pipe including but not limited to valve chambers, Fire hydrants and all other accessories complete and dispose of same to the locations as directed by the Engineer including excavation, backfill, disposal, disconnection,etc Carried to Collection Page - 1
9a/6 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 9a UTILITIES (in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 18 UTILITIES (Continued) 18.2 Removing and Disposing or Relocating Existing Utilities (Continued) Telephone Utility 18.2.6(i)g Locate, excavate down, disconnect and remove lin.m. 3,900 existing telephone cables and ducts, chambers and dispose of same (except chambers) to the locations p ( p ) as directed by the Engineer including excavation, backfilling, disposal etc. 18.2.6(i)h Locate, excavate down, disconnect and remove lin.m. 2,000 and ducts, chambers and dispose of same (except chambers) to the locations as directed by the Engineer including excavation, backfilling, disposal etc Carried to Collection Page - 1
9a/7 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 9a UTILITIES (in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 18 UTILITIES (Continued) 18.2 Removing and Disposing or Relocating Existing Utilities (Continued) For Electrical: All LV, 11KV/33KV Electrical Relocation work including materials shall be as per MEDC/Mazoon/Majan Electricity Distribution Company Standards and Specifications. 18.2.6(iii)a Supply and installation of overhead 11 KV electrical lin.m. 400 conductors (3 conductors together) complete including poles, stay wires, insulators, AB switches, lightning arrestors, jumpers, stringing, jointing, excavation & backfilling of poles, connecting to the existing supply, testing, commissioning, carting spoil to tips as directed, all necessary labor, operation, materials, accessories, earthing and any special protection to the poles (Wadi Area). (Quantity measured as Route length). Carried to Collection Page - 1
9a/8 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 9a UTILITIES (in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 18 UTILITIES (Continued) 18.2 Removing and Disposing or Relocating Existing Utilities (Continued) 18.2.6(iii)b Supply and installation of overhead 33 KV electrical lin.m. 200 conductors (3 conductors together) complete including poles, stay wires, insulators, AB switches, lightning arrestors, jumpers, stringing, jointing excavation & backfilling of poles connecting jointing, excavation & backfilling of poles, connecting to the existing supply, testing, commissioning, carting spoil to tips as directed, all necessary labor, operation, materials, accessories, earthing and any special protection to the poles (Wadi Area). (Quantity measured as Route length). 18.2.6(iii)c Supply and installation of underground proposed lin.m. 8,400 11KV Electrical cable complete including excavation, backfilling, cable covering tiles, warning tapes, route markers, joints, connecting to the existing supply, testing, commissioning, carting spoil to tips as directed, all necessary labor, operation, materials and any other accessories including earthing, etc. Carried to Collection Page - 1
9a/9 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 9a UTILITIES (in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 18 UTILITIES (Continued) 18.2 Removing and Disposing or Relocating Existing Utilities (Continued) 18.2.6(iii)d Supply and installation of underground proposed lin.m. 900 33KV Electrical cable complete including excavation, backfilling, cable covering tiles, warning tapes, joints, connecting to the existing supply, testing, commissioning carting spoil to tips as directed all commissioning, carting spoil to tips as directed, all necessary labor, operation, materials and any other accessories including earthing, etc. 18.2.6(iii)e Supply and installation of underground proposed pilot lin.m. 9,000 cable, (12 fiber FOC) for R.O.P. Speed Control Camera complete including joints, connecting to the controller, testing, commissioning, carting spoil to tips as directed, all necessary labor, operation, materials and any other accessories etc. Carried to Collection Page - 2
9a/10 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 9a UTILITIES (in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 18 UTILITIES (Continued) 18.2 Removing and Disposing or Relocating Existing Utilities (Continued) Supply & Installation of New Water Lines: The New Pipe lines installed to replace affected pipe lines should have all the fittings, accessories, Valves (Gate valves, Drain valves, Air Valves, etc), Fire Hydrants any other specials and related Fire Hydrants, any other specials and related Chambers complete necessary to reinstate the network functional as that of the existing as shown on the Drawings 18.2.6(iii)f Supply and install 300mm HDPE Water pipes (PN16) lin.m. 3,200 complete with all the specials, fittings, and chambers including but not limited to tees, bends, shut off valves, air valves, washout valves, Fire hydrants, thrust blocks etc and also excavation, backfilling, warning tape, bedding and surrounding, jointing to existing water pipe and jointing material, Flushing, Disinfecting, pressure testing and any other items necessary to complete the work Carried to Collection Page - 2
9a/11 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 9a UTILITIES (in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 18 UTILITIES (Continued) 18.2 Removing and Disposing or Relocating Existing Utilities (Continued) 18.2.6(iii)g Supply and install 400mm DI Water pipes (PN24,DN400) lin.m. 2,000 complete with all the specials, fittings, and chambers including but not limited to tees, bends, shut off valves, air valves, washout valves, Fire hydrants, thrust blocks etc and also excavation backfilling warning tape etc and also excavation, backfilling, warning tape, bedding and surrounding, jointing to existing water pipe and jointing material, Flushing, Disinfecting, pressure testing and any other items necessary to complete the work 18.2.6(iii)h Supply and install 4Way uPVC duct for telephone lin.m. 400 cables, including but not limited to excavation, backfilling, warning tape, bedding and surrounding, jointing and jointing material, manholes, handholes, junction boxes and any other items necessary to complete the work Carried to Collection Page - 2
9a/12 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 9a UTILITIES (in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 18 UTILITIES (Continued) 18.2 Removing and Disposing or Relocating Existing Utilities (Continued) 18.2.6(iii)i Supply and install 2Way uPVC duct for telephone lin.m. 2,400 cables, including but not limited to excavation, backfilling, warning tape, bedding and surrounding, jointing and jointing material, manholes, handholes, junction boxes and any other items necessary to junction boxes and any other items necessary to complete the work 18.2.6(iii)j Supply and install 1Way uPVC duct for telephone lin.m. 200 cables, including but not limited to excavation, backfilling, warning tape, bedding and surrounding, jointing and jointing material, manholes, handholes, junction boxes and any other items necessary to complete the work 18.2.6(iii)k Supply, install and laying EEF 30x0.65 telephone lin.m. 1,000 cable including jointing, jointing material and any other items necessary to complete and commission the work Carried to Collection Page - 2
9a/13 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 9a UTILITIES (in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 18 UTILITIES (Continued) 18.2 Removing and Disposing or Relocating Existing Utilities (Continued) 18.2.6(iii)l Supply, install and laying EEF 50x0.5 telephone lin.m. 400 cable including jointing, jointing material and any other items necessary to complete and commission the work 18.2.6(iii)m Supply, install and laying EEF 10x0.9 telephone lin.m. 1,000 cable including jointing, jointing material and any other items necessary to complete and commission the work 18.2.6(iii)n Supply, install and laying 72 FOC (for Nawras) cable lin.m. 1,000 including jointing, jointing material and any other items necessary to complete and commission the work 18.2.6(iii)o Supply, install and laying 36 FOC (for Nawras) cable lin.m. 1,000 including jointing, jointing material and any other items necessary to complete and commission the work Carried to Collection Page - 2
9a/14 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 9a UTILITIES (in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 18 UTILITIES (Continued) 18.3 Service / Future Utility Road Crossing Ducts 18.3.6(i)a Supply and Install proposed 2way 100mm dia lin.m. 200 uPVC duct for electrical cables with concrete surround (class 25/20), laid and jointed in trenches beneath carriageway including excavation, backfilling, compaction end caps draw ropes and duct markers compaction, end caps, draw ropes and duct markers etc. complete at locations shown in the drawings or as directed by the Engineer 18.3.6(i)b Supply and Install proposed 2way 150mm dia lin.m. 200 uPVC duct for electrical cables with concrete surround (class 25/20), laid and jointed in trenches beneath carriageway including excavation, backfilling, compaction, end caps, draw ropes and duct markers etc. complete at locations shown in the drawings or as directed by the Engineer Carried to Collection Page - 2
9a/15 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 9a UTILITIES (in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 18 UTILITIES (Continued) 18.3 Service / Future Utility Road Crossing Ducts (Continued) 18.3.6(i)c Supply and Install proposed 4way 150mm and 2way lin.m. 200 50mm dia uPVC duct for electrical cables with concrete surround (class 25/20), laid and jointed in trenches beneath carriageway including excavation, backfilling compaction end caps draw ropes and backfilling, compaction, end caps, draw ropes and duct markers etc. complete at locations shown in the drawings or as directed by the Engineer 18.3.6(i)d Supply and install 2way 200mm dia uPVC duct for lin.m. 200 proposed Omantel / Nawras / MOD cables complete with concrete protection (class 25/20) including excavation, backfilling, compaction, end caps and draw ropes etc. at locations shown in the drawings or as directed by the Engineer as per Omantel / Nawras / MOD Standards and Specifications Carried to Collection Page - 2
9a/16 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 9a UTILITIES (in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 18 UTILITIES (Continued) 18.3 Service / Future Utility Road Crossing Ducts (Continued) 18.3.6(i)e Supply and install 2way 100mm dia uPVC duct for lin.m. 200 proposed Omantel / Nawras / MOD cables complete with concrete protection (class 25/20) including excavation, backfilling, compaction, end caps and draw ropes etc at locations shown in the drawings or draw ropes etc. at locations shown in the drawings or as directed by the Engineer as per Omantel / Nawras / MOD Standards and Specifications Future Ducts 18.3.6(i)f Supply and Install proposed 2way 200mm dia lin.m. 200 uPVC duct for 33kv electrical cables with concrete protection (class 25/20), laid and jointed in trenches beneath carriageway including excavation, backfilling, compaction, end caps, draw ropes and duct markers etc. complete at locations shown in the drawings or as directed by the Engineer Carried to Collection Page - 2
9a/17 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 9a UTILITIES (in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 18 UTILITIES (Continued) 18.3 Service / Future Utility Road Crossing Ducts (Continued) 18.3.6(i)g Supply and Install proposed 4way 150mm dia uPVC lin.m. 200 duct for 11kv electrical cables with concrete protection (class 25/20), laid and jointed in trenches beneath carriageway including excavation, backfilling, compaction end caps draw ropes and duct markers compaction, end caps, draw ropes and duct markers etc. complete at locations shown in the drawings or as directed by the Engineer 18.3.6(i)h Supply and Install proposed 2way 100mm dia uPVC lin.m. 300 duct for LV cables with concrete protection (class 25/20), laid and jointed in trenches beneath carriageway including excavation, backfilling, compaction, end caps, draw ropes and duct markers etc. complete at locations shown in the drawings or as directed by the Engineer Carried to Collection Page - 3
9a/18 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 9a UTILITIES (in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 18 UTILITIES (Continued) 18.3 Service / Future Utility Road Crossing Ducts (Continued) 18.3.6(i)i Supply and Install proposed 2way 100mm dia lin.m. 400 uPVC duct for Street Lighting cables with concrete protection (class 25/20), laid and jointed in trenches beneath carriageway including excavation, backfilling, compaction, end caps, draw ropes and duct markers p , p , p etc. complete at locations shown in the drawings or as directed by the Engineer 18.3.6(i)j Supply and Install proposed 2way 300mm dia lin.m. 400 uPVC duct for Irrigation Line with concrete protection (class 25/20), laid and jointed in trenches beneath carriageway including excavation, backfilling, compaction, end caps, draw ropes and duct markers etc. complete at locations shown in the drawings or as directed by the Engineer Carried to Collection Page - 3
9a/19 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 9a UTILITIES (in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity 18 UTILITIES (Continued) 18.3 Service / Future Utility Road Crossing Ducts (Continued) 18.3.6(i)k Supply and Install proposed 4way 100mm dia lin.m. 300 uPVC duct for Telephone Line with concrete protection (class 25/20), laid and jointed in trenches beneath carriageway including excavation, backfilling, compaction, end caps, draw ropes and duct markers p , p , p etc. complete at locations shown in the drawings or as directed by the Engineer Carried to Collection Page - 3
9a/20 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 9a UTILITIES (in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity COLLECTION PAGE - 1 Page 9a/1 Page 9a/2 Page 9a/3 Page 9a/4 Page 9a/5 Page 9a/6 Page 9a/7 Page 9a/8 Carried to Summary
9a/21 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 9a UTILITIES (in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity COLLECTION PAGE - 2 Page 9a/9 Page 9a/10 Page 9a/11 Page 9a/12 Page 9a/13 Page 9a/14 Page 9a/15 Page 9a/16 Carried to Summary
9a/22 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 9a UTILITIES (in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity COLLECTION PAGE - 3 Page 9a/17 Page 9a/18 Page 9a/19 Carried to Summary
9a/23 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 9a UTILITIES (in figures) (in words) R.O. Bzs. Unit Rate (Rial Omani) Amount Item No. Item Description Unit Estimated Quantity SUMMARY COLLECTION PAGE 1 - 9a/20 COLLECTION PAGE 2 - 9a/21 COLLECTION PAGE 3 - 9a/22 Carried to Grand Summary - 2 10a/1 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 10a PROVISIONAL SUM (in figures) (in words) R.O. Bzs. PROVISIONAL SUM A Design of three Interchanges No. 4, 4A, 5 and Two PS 800,000 000 Pedestrian Underpasses (including topo survey) B Design Fee for Design of Landscaping Works PS 180,000 000 C Construction of Landscaping Works PS 2,820,000 000 D Geotechnical Investigation complete with Report for PS 45 000 000 Unit Rate (Rial Omani) Amount Item No. Item Description Unit D Geotechnical Investigation complete with Report for PS 45,000 000 three Interchanges and Two Pedestrian Underpasses E Unforeseen utility relocation / protection PS 600,000 000 Carried to Grand Summary - 2 4,445,000 000 11a/1 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 11a DAYWORKS (in figures) (in words) R.O. Bzs. 19 DAYWORKS 19.1 Wages These include proper wages, all used allowance, medical expenses and all other charges provided for by local laws. 19.1a Labourer - Skilled (Omani) hour 10 Item No. Item Description Unit Estimated Quantity Unit Rate (Rial Omani) Amount 19.1b Labourer - Skilled (Expatriate) hour 10 19.1c Labourer - Unskilled (Omani) hour 10 19.1d Labourer - Unskilled (Expatriate) hour 10 19.1e Carpenter hour 10 19.1f Mason/Concrete finisher hour 10 19.1g Driver: Heavy Duty hour 10 19.1h Driver: Light Duty hour 10 Carried to Collection Page - 1 11a/2 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 11a DAYWORKS (in figures) (in words) R.O. Bzs. Item No. Item Description Unit Estimated Quantity Unit Rate (Rial Omani) Amount 19.1i Pipe fitter hour 10 19.1j Plant Operator: Heavy hour 10 19.1k Plant Operator: Light hour 10 19.1l Steel Fixer hour 10 19.1m Welder hour 10 19.1n Painter hour 10 19.1o Electrician hour 10 19.1p Plumber hour 10 19.1q Driller hour 10 19.1r Gangers hour 10 19.1s Plasterers hour 10 19.1t Scaffolders hour 10 Carried to Collection Page - 1 11a/3 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 11a DAYWORKS (in figures) (in words) R.O. Bzs. Item No. Item Description Unit Estimated Quantity Unit Rate (Rial Omani) Amount 19.1u .. 19.1v .. 19.1w .. 19.1x .. 19.2 Operating Equipment on Site The rates inserted by the tenderer shall be deemed to include for the use of the plant inclusive of all fuel and consumable stores, overhauls, repairs and replacements, spare parts, tyres, insurance and all other charges relating to plant including haulage to and from the site but exclusive of driver and attendants who shall be paid as laid down in the Labour Schedule. Payments for working plants shall be for the hours worked only. No allowance for standing time will be made. 19.2a Bulldozer up to 100HP hour 5 19.2b Bulldozer 100 to 200HP hour 5 Carried to Collection Page - 1 11a/4 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 11a DAYWORKS (in figures) (in words) R.O. Bzs. Item No. Item Description Unit Estimated Quantity Unit Rate (Rial Omani) Amount 19.2c Bulldozer over 200HP hour 5 19.2d Motor grader up to 140 HP hour 5 19.2e Motor grader over 140 HP hour 5 19.2f Vibratory roller up to 3 tones hour 5 19.2g Vibratory roller above 3 tones hour 5 19.2h Pneumatic roller over 10 tones hour 5 19.2i Tandem roller up to 10 tones hour 5 19.2j Tandem roller over 10 tones hour 5 19.2k Wheel loader up to 3 cu.m. hour 5 19.2l Wheel loader above 3 cu.m. hour 5 19.2m Excavator up to 1 cu.m. hour 5 19.2n Excavator over 1 cu.m. hour 5 Carried to Collection Page - 1 11a/5 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 11a DAYWORKS (in figures) (in words) R.O. Bzs. Item No. Item Description Unit Estimated Quantity Unit Rate (Rial Omani) Amount 19.2o Water tanker, Minimum 6 cu.m. hour 5 19.2p Concrete vibrator (poker/screed) up to dia 50mm hour 5 19.2q Dump Truck up to 5 tones hour 5 19.2r Dump Truck from 5 to 10 tones hour 5 19.2s Dump truck over 10 tones hour 5 19.2t Water pump 2 inch hour 5 19.2u Water pump 3 inch hour 5 19.2v Air compressor up to 6000 liters capacity hour 5 19.2w Air compressor over 6000 liters capacity hour 5 19.2x Bituminous mixing plant with batching apparatus from hour 5 80t/hto 150 t/h 19.2y Finisher up to 80t./h hour 5 19.2z Finisher from 80t./h to 120t./h hour 5 Carried to Collection Page - 1 11a/6 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 11a DAYWORKS (in figures) (in words) R.O. Bzs. Item No. Item Description Unit Estimated Quantity Unit Rate (Rial Omani) Amount 19.2aa Bituminous sprayer up to 6 tones hour 5 19.2ab Crane, with boom and jib 5 to 10 tones hour 5 19.2ac Crane with boom and jib over 10 tones hour 5 19.2ad Generator 60 kW hour 5 19.2ae Low Bed hour 5 19 2af Hiab hour 5 19.2af Hiab hour 5 19.2ag Generator 75 kW hour 5 19.2ah Generator 100 kW hour 5 19.2ai Generator 150 kW hour 5 19.2aj Generator 200 kW hour 5 19.2ak Welding plant hour 5 19.2al Concrete mixer up to 0.5 cu.m. hour 5 19.2am Concrete mixer over 0.5 cu.m. hour 5 Carried to Collection Page - 1 11a/7 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 11a DAYWORKS (in figures) (in words) R.O. Bzs. Item No. Item Description Unit Estimated Quantity Unit Rate (Rial Omani) Amount 19.2an Automatic concrete batching plant hour 5 19.2ao Pick up truck up to 3 tones hour 5 19.2ap Pick up truck over 3 tones hour 5 19.2aq Van or Utility Vehicle hour 5 19.2ar Welding set, 300A, including electrodes hour 5 19.2as .. 19.2at .. 19.2au .. Carried to Collection Page - 1 11a/8 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 11a DAYWORKS (in figures) (in words) R.O. Bzs. Item No. Item Description Unit Estimated Quantity Unit Rate (Rial Omani) Amount 19.3 MATERIALS These rates includes all the charges for the supply of the materials, loading, transportation to site, unloading and stores as well as the charges provided in the General and Special Specification and in the Contract. 19.3a Aggregates for granular sub base course in accordance cu.m. 30 with the General and Special Specification, in place as specified specified. 19.3b Aggregates for aggregate base course in accordance cu.m. 30 with the General and Special Specification, in place as specified. 19.3c Aggregates for bituminous base course in accordance cu.m. 30 with the General and Special Specification, near the asphalt plant, in bulk 19.3d Fine aggregate for concrete in accordance with the cu.m. 30 General and Special Specification, in place, in bulk 19.3e Course aggregate for concrete in accordance with the cu.m. 50 General and Special Specification, in place, in bulk Carried to Collection Page - 2 11a/9 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 11a DAYWORKS (in figures) (in words) R.O. Bzs. Item No. Item Description Unit Estimated Quantity Unit Rate (Rial Omani) Amount 19.3f Stone for Drainage masonry and slope protection in cu.m. 50 accordance with the General and Special Specification, in place, in bulk 19.3g Asphalt cement, grade 60-70 on site t. 10 19.3h Asphalt cement, grade 50-60 on site t. 10 19.3i Emulsion asphalt, grade RS-1, on site t. 10 19.3j Cutback asphalt, MC and RC type, on site t. 10 19.3k Portland Cement, on site t. 10 19.3l Deformed billet steel bars AASHTO M31 grade 60 t. 10 (High yield) of any dia. 19.3m Highway signs sq.m. 10 19.3n Highway signs Supports - 1 post nr. 10 19.3o Highway signs Supports - 2 post nr. 10 19.3p W -Beam type Guardrail lin.m. 10 Carried to Collection Page - 2 11a/10 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 11a DAYWORKS (in figures) (in words) R.O. Bzs. Item No. Item Description Unit Estimated Quantity Unit Rate (Rial Omani) Amount 19.3q End anchorage for W -beam type Guardrails nr. 10 19.3r Water depth gauges nr. 10 19.3s Wire mesh Gabions on site t. 10 19.3t Gasoline on site liter 100 19.3u Lubricant Kg. 100 19.3v .. 19.3w .. 19.3x .. Carried to Collection Page - 2 11a/11 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 11a DAYWORKS (in figures) (in words) R.O. Bzs. Item No. Item Description Unit Estimated Quantity Unit Rate (Rial Omani) Amount COLLECTION PAGE - 1 Page 11a/1 Page 11a/2 Page 11a/3 Page 11a/3 Page 11a/4 Page 11a/5 Page 11a/6 Page 11a/7 Carried to Summary 11a/12 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 11a DAYWORKS (in figures) (in words) R.O. Bzs. Item No. Item Description Unit Estimated Quantity Unit Rate (Rial Omani) Amount COLLECTION PAGE - 2 Page 11a/8 Page 11a/9 Page 11a/10 Carried to Summary 11a/13 . Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES Bill No. 11a DAYWORKS (in figures) (in words) R.O. Bzs. Item No. Item Description Unit Estimated Quantity Unit Rate (Rial Omani) Amount SUMMARY COLLECTION PAGE 1 - 11a/11 COLLECTION PAGE 2 - 11a/12 Carried to Grand Summary - 2 Construction of Batinah Expressway - Package 7 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway Page No. BILL OF QUANTITIES GS 2 GRAND SUMMARY - 2 R.O Bzs. GRAND SUMMARY - 2 2a EARTHWORKS 2a/6 3a GRANULAR SUB-BASE, AGGREGATE BASE COURSE, AND STABILISED BASE COURSES 3a/1 4a BITUMINOUS PAVEMENT 4a/3 5a CONCRETE AND CONCRETE STRUCTURES 5a/13 BILL No. ITEM DESCRIPTION Page No. Amount 6a INCIDENTAL CONSTRUCTION 6a/18 7a ROAD LIGHTING AND ELECTRICAL INSTALLATION 7a/17 9a UTILITIES 9a/23 10a PROVISIONAL SUM 10a/1 4,445,000 000 11a DAY WORKS 11a/13 ADD CONTINGENCIES @ 10% OF SUB-TOTAL EXCLUDING BILLS 10a & 11a TOTAL VALUE CARRIED TO GENERAL SUMMARY Construction of Batinah Expressway - Package 7 Page No. BILL OF QUANTITIES GENERAL SUMMARY GS I
R.O Bzs. GENERAL SUMMARY 1 PRELIMINARIES (For Part A+Part B) 1/7 2 Part A: Link Roads 2, 4, 4A and Interchange No. 2 at Batinah Expressway GS-1 3 Part B: Design and Construction of Interchange Nos. 4, 4A & 5 on Batinah Highway GS-2 BILL No. ITEM DESCRIPTION Page No. Amount TOTAL TENDER VALUE CARRIED TO FORM OF TENDER In Words, the total Tender Value carried to the Form of Tender in Rials Omani