SPECIFICATION REPORT TO ACCOMPANY FOR THE WORK OF CONSTRUCTION OF

OPEN AIR THEATRE AT VEDASANDUR BOYS HIGHER SECONDARY SCHOOL IN


THATARAPATTY PANCHAYAT.
SCHEME & YEAR

: MLACDS 2013-14

ESTIMATE AMOUNT

: Rs. 3.05 lakhs

ADMINISTRATIVE SANCTION NO. :


It is proposed to construct an Open Air Theatre building at Vedasandur Boys higher
secondary school in Thatarapatty panchayat Under Scheme of MLACD for the year 2013-2014
The following provisions are made in this estimate.
FOUNDATION & BASEMENT:
Earth work for foundation has to taken to a depth of1.00m and to a width of 0.90m.
Cement concrete for foundation in 1:5:10 mix using 40mm ISS HBG metal has to be laid to a depth of
0.30m.
The I footing of size 0.75m x 0.23m, II footing of size 0.60m x 0.23m & III footing of size 0.45m x 0.23m
and the Basement of size 0.38m x 0.90m has to be laid in R.R. masonry in c.m.1:5 mix using rough
stones and bond stones with simultaneous pointing.
SUPER STRUCTURE:
Plinth beam has to be laid to a size of 0.23m x 0.11m in R.C.C. 1:2:4 mix using 20mm ISS HBG metal.
Super structure will be of brick work in c.m. 1:5 mix using country bricks to a width of 0.23m and to a
height of 3.05m alround.
LINTEL:
Lintel will be laid in R.C.C.1:2:4 mix using 20mm ISS HBG metal to a size of 0.23m x 0.15m.
ROOF SLAB:
Roof slab will be laid in R.C.C. 1:2:4 mix using 20mm ISS HBG metal to a thickness of 0.12m .
PLASTERING:
Roof ceiling and Projections will be plastered in c.m. 1:3 mix to 10mm thick.
Inner & Outer exposed brick walls will be plastered in c.m. 1:5 mix to 12mm thick.
FLOORING:
Flooring will be laid in c.c. 1:5:10 mix using 40 mm ISS HBG metal to a thickness of 0.10m and the top
will be finished with Granolithic Pattern floor finish in c.c.1:2:4 mix using 10 - 12mm ISS metal to 0.025
thick.
DOORS & WINDOWS:
Necessary provisions for steel doors of size 0.90m x 2.00m , steel windows0.75m x 1.20m and N type
steel glazed ventilator of size 0.90m x 0.45m will be made.R.C.C. Jolly of size 1.50m x 1.20m will also
be provided.

WHITE WASHING, COLOUR WASHING & PAINTING:


The inner walls & ceiling will be white washed and outer walls will be colour washed with approved
colours in two coats. Steel Doors,windows and ventilators will be painted with approved ready mixed
enamel paint in two coats.
LUMPSUM PROVISIONS:
Necessary provisions have also been made for Name Board & Photo and Rain water harvesting
structures.
This estimate is prepared based on the current schedule of rates for the year 2012 - 2013 . The
work on sanction will be carried out as per standard specifications and time to time instructions given
by Higher authorities.

DETAILED ESTIMATE
Name of Work: Construction of Open Air Theatre building at Vedasandur boys higher secondary school in
Thattarapatty panchayat
Name of Union: Vedasandur

Scheme:- MLACDS

Name of Panchayat:- Thattarapatty

Year:- 2013-2014

Estimate Amount:- 3.05 Lakhs

Tech. Sanction No.:

Sl.N
o.
1

Nos.

Description of work

Quantity

Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for
foundation as per ss20B
Main wall alround

24.64

0.90

0.90

19.96

Stage entrance step

1.20

1.20

0.15

0.22

Steps

1.36

1.20

0.15

0.24

Total Quantity

20.42

Supplying and filling in foundation and basement with filling sand in layers of not more than 15cm
2 thick well rammed,watered and compacted including cost & conveyance of sand and all labour charges
etc., complete as per std. Specifications.
Basement: Stage

6.08

5.48

0.10

Total Quantity

3.33
3.33

Cement concrete 1:4:8 mix using 40mm ISS HBG metal for foundation including watering whenever
3 necessary and laid in layers not more than 15cm thick compacting etc., complete complying with std.
Specifications and as directed. Rate for 10 cum.
Main wall alround

24.64

0.90

0.23

5.10

Stage entrance step

1.20

0.90

0.10

0.11

Steps

1.36

0.90

0.10

0.12

Flooring: Stage

6.08

5.48

0.10

3.33

Total Quantity

8.66

R.R. masonry in c.m.1:5 mix for foundation and basement using rough stones and bond stones with
4 simultaneous pointing with same mortar including cost and conveyance of all materials to site and all
labour charges etc., complete.
Main wall alround
I Footing

24.64

0.60

0.46

6.80

III Footing

24.64

0.45

0.23

2.55

Basement

24.64

0.38

0.45

4.21

Rectangular portion

-1

Trapezoidal portion

-1

Deductions for column footing:

Total Quantity

0.90
0.75
0.15
0.30/3*((0.56+0.16)+SQRT((0.56*0.56
6
)+(0.16*0.16)))

-0.61
-0.78
12.17

Brick work in c.m 1:5 mix using country bricks ground moulded of size 23x11x7 cu.cm including cost &
conveyance of all materials to site and all labour charges etc., complete.
Super structure:
Side wall

2.26

0.23

3.00

3.12

Back wall

6.16

0.23

2.65

3.75

Centre wall

6.16

0.115

2.80

1.98

0.23

0.115

2.80

0.30

2.40

0.230

2.73

3.01

1.20

0.90

0.17

0.18

II step

1.20

0.60

0.17

0.12

Top step

1.20

0.30

0.17

0.06

1.36

0.90

0.17

0.21

II step

1.36

0.60

0.17

0.14

Top step

1.36

0.30

0.17

0.07

Door opening

-1

0.90

0.23

2.10

-0.87

Window opening

-1

0.90

0.23

1.20

-0.99

-1

1.50

0.23

2.80

-0.97

-1

1.36

0.23

0.15

-0.28

Inner side wall


Steps:
For Door steps Bottom step

For Entrance:

III step

Deductions:

Openning
Lintel
Total Quantity
6

9.83

Filling in basement with excavated earth other than sand in layers not more than 15cm thick and well
rammed, watered and consolidated including all labour charges as per standard specification.
Basement: Stage

6.08

5.48

0.40

Total Quantity

13.33
13.33

Supplying and erecting centering for sides & soffits including supports and strutting up to 3.29m height
for plane surfaces in all floors with all cross bracing using mild steel sheets of size 90cm x 60cm and 10
7 gauge stiffened welded with mild steel angles of size 25mm x 25mm x 3mm for boarding laid over
country wood poists of size 10cm x 6.5cm dia spaced at about 90cm center to center etc., complete
complying with std. Specifications and as directed.
Column

Lintel beam for Door & Windows:

1.20

3.25

23.40

Bottom

0.90

0.23

1.24

Ends

1.36

0.15

2.45

Sunshade for Door & Windows

Bottom

1.36

0.60

3.26

Edges

1.36

0.05

0.27

Sides all around

0.60

0.065

0.31

6.16

0.30

5.54

Beam Bottom inbetween column

Sides

6.16

0.50

18.48

3.00

1.80

3.00

0.30

3.60

2.26

1.36

2.26

0.30

2.71

6.16

3.00

18.48

6.16

2.26

13.92

Front slab projection

14.26

0.45

6.42

Back side projection

6.76

0.15

Alround

22.38

End Beam Ends

0.30

Centre Beam Ends

0.23

Stage Side beam bottom


Sides
Room side beam bottom
Sides
Roof Slab:

Stage bottom
Room bottom

0.30
0.30

1.01
0.12

2.69

0.50

1.20

0.50

0.23

Total Quantity

108.38

Supplying ,fabricating and placing in position of mild steel or ribbed for steel rods and all RCC works
8 as per the design given including cost of steel and binding wire in all floors etc., & conveyance of steel
as per std. Specification etc.,complete complying with std. Specifications and as directed.
1.00
RCC 1:1.5:3 mix using 20 mm ISS HBG metal for RCC items of works excluding cost of reinforcement
and fabricating charges and centering and shuttering charges but including curing providing fixtures
9
like fan clamps in the RCC floor or roof level wherever neccessary and bearing surfaces of walls, sides
and bottom of slab,beams etc.,
Column footing:
Rectangular portion

0.90

0.90

0.15

Trapezoidal portion

0.30/3

Column

0.30

0.30

3.75

0.68

Lintel over Door & Windows

1.36

0.23

0.15

0.28

Sunshade

1.36

0.60

0.065

0.21

Beam Bottom inbetween column

6.16

0.30

0.50

2.77

Cross beam

3.00

0.30

0.30

0.54

Middle beam

2.26

0.30

0.30

0.41

Roof slab: Stage inner

6.76

6.16

0.12

5.00

Projection

14.26

0.45

0.12

0.77

6.76

0.15

0.12

0.12

(0.56+0.16)+sqrt(0.56*0.16)

Total Quantity

0.73
0.78

12.29

Finishing the exposed surfaces of RCC items of work such as slabs, beams, sunshade facia, canopy
slab,staircase waist and landing slab, etc., with cement mortar 1:3 mix to 10mm thick including cost and
10
conveyance of all materials, beading or nosing for sunshade and staircase steps, landing slabs, etc.,
complete complying with std. Specifications.
Stage

6.16

3.00

18.48

6.16

2.26

13.92

Beam Bottom inbetween column

6.16

1.30

24.02

Side beam

3.00

0.90

5.40

Side beam

2.26

0.90

4.07

Column alround

1.20

2.80

6.72

Sunshade top & bottom

1.36

0.60

6.53

End Beam Ends

0.30

0.50

1.20

Centre Beam Ends

0.23

0.50

0.23

Projection top and Bottom

14.26

0.45

12.83

Projection back side

6.76

0.15

2.03

Total Quantity
11

95.43

Plastering with cement mortar 1:5 mix to 12mm thick including curing, cost and conveyance of all
materials & all labour charges etc., complete.
Side wall

2.26

3.00

27.12

Back wall

6.16

2.65

32.65

Inner side wall

6.16

2.80

34.50

Inner side wall

2.40

2.73

26.16

Door Steps Tread

1.36

0.90

1.22

Door Steps Rise

1.36

0.17

0.69

Entrance steps Tread

1.36

0.90

1.22

Entrance steps Rise

1.36

0.17

0.69

Door

-2

0.90

2.00

-7.20

Window

-2

0.90

1.20

-8.64

-1

1.50

2.80

-8.40

Deductions

Openning
Total Quantity

100.02

Providing 25mm thick Granolithic pattern floor finish with c.c 1:2:4 mix using 10 to 12mm ISS metal
12 and the top rubbed smooth including cost & conveyance of all materials to site and all labour charges
etc., complete.
Room

6.46

3.30

6.00

2.40

21.32
14.40

Total Quantity

35.72

Providing weathering course with best quality of broken brick jelly of size 20mm uniform gauge in
pure slacked lime (no sand to be used) over the roof slab in the proportion of brickjelly to lime 32:121/2
13 by volume and laid over in a single layer and consolidated to required finished thickness beating the
mixture with wooden beaters keeping the surface constantly wet by sprinkling lime jaggery water
including all labour charges etc., complete.
Roof top: Stage inner
Stage front
Total Quantity

6.80

3.52

0.08

1.91

6.30

2.78

0.08

1.40
3.32

Finishing the top of roof with one course of machine pressed tiles of size 20cmx20cmx20mm of approved
quality laid in cement mortar 1:3 mix to 12mm thick mixed with water proofing compound confirming
14
to ISS by 2% weightof cement used and the joint pointed neatly to full depth of tiles with same water
proofing compound with cement mortar, red oxide, etc., complete complying with std. Specifications.
Roof top: Stage inner

6.80

3.52

23.94

Stage front

6.30

2.78

17.51

Total Quantity
15

41.45

Distembering two coats with best quality of distember and the colour approved by the departmental
officers including cost & conveyance of all materials to site and all labour charges etc., complete.
Stage

6.16

3.00

18.48

6.16

2.26

Beam Bottom inbetween column

6.16

1.30

24.02

Side beam

2.40

0.90

4.32

Side beam

1.36

0.90

2.45

Column alround

1.36

2.80

7.62

Sunshade bottom

1.36

0.65

3.54

End Beam Ends

0.30

0.50

1.20

Centre Beam Ends

0.23

0.50

0.23

Projection Bottom

14.26

0.57

8.13

Projection back side

6.76

0.27

3.65

Rooms

9.60

outer

Back wall

Column

13.92

2.80

53.76

5.03

2.80

28.17

1.50

2.65

3.98

1.20

2.80

6.72

Door

-2

0.90

2.00

-7.20

Window

-1

0.90

1.20

-4.32

Total Quantity

168.66

Cement base paint (Snocem) two coats over a coat of primer including removing loose particles and
16 other materials including cost and conveyance of all materials preparation of surface by and labour
charges etc. complete.
Outer wall side

2.86

3.03

17.30

Back wall

6.76

3.15

21.29

Basement: Stage

26.16

1.00

26.16

-1

0.90

1.20

-4.32

Window
Total Quantity
17

64.76

Painting two coats with quality synthetic enamel paint over the existing priming coat including cost &
conveyance of all materials to site and all labour charges etc., complete.
Door D

0.90

2.00

7.20

Window

0.90

1.20

8.64

Total Quantity

15.84

19 Towards supply and delivery of steel door as per std. Specification


Door of size 0.90m x 2.00m

1No.

1No.

20 Towards supply and delivery of steel window as per std. Specification


Window of size 0.90m x 1.20m

2Nos.

2Nos.

21 Labour charges for fixing of Doors & Windows

LS

25 Contigencies & other unforeseen charges

LS

0.45
0.3
0.23

ABSTRACT ESTIMATE
Name of work : Construction of Open Air Theatre at Vedasandur Boys Hr sec school in
thattarapatty panchayat.
Name of Union: Vedasandur
Estimate Amount:- Rs 3.05 lakhs

Sl.No.

QTY

20.42

3.33

8.66

12.17

9.83

13.33

108.38

1.00

12.29

DESCRIPTION OF WORK
Earthwork excavation in all clauses of soils and
depositing on bank with initial lead and lift for
foundation as per ss20B
Filling with good river sand including cost &
conveyance of sand and all labour charges etc.,
complete as per std. Specifications.
Cement concrete 1:4:8 mix using 40mm ISS HBG
metal for foundation including watering whenever
necessary and laid in layers not more than 15cm
thick compacting etc., complete complying with
std. Specifications and as directed. Rate for 10 cum.
R.R. masonry in c.m.1:5 mix using rough stones and
bond stones with simultaneous pointing including
cost and conveyance of all materials to site and all
labour charges etc., complete.
Brick work in c.m 1:5 mix using country bricks
including cost & conveyance of all materials to site
and all labour charges etc., complete.
Filling with excavated earth other than sand
including all labour charges as per standard
specification.
Supply & erection of centering for sides & soffits of
all R.C.C. works including cost & conveyance of all
materials to site and all labour charges etc.,
complete.
Supplying and fabrication of steel rods including
cost & conveyance of steel as per std. Specification
etc., complete.
RCC 1:1.5:3 mix using 20 mm ISS HBG metal for
RCC items of works excluding cost of
reinforcement and fabricating charges and
centering and shuttering charges but including
curing providing fixtures like fan clamps in the
RCC floor or roof level wherever neccessary and
bearing surfaces of walls, sides and bottom of
slab,beams etc.,

RATE

UNIT

AMOUNT

83.70

Cum

1709

268.00

Cum

892

2339.56

Cum

20267

2206.35

Cum

26859

3334.80

Cum

32795

14.70

Cum

196

398.00

Sqm

43135

57144.90

MT

57145

4438.98

Cum

54549

10

95.43

11

101.30

12

35.72

13

3.32

14

41.45

15

168.66

16

64.76

17

15.84

LS

Plastering with cement mortar 1:3 mix to 10mm


thick including cost and conveyance of all materials
& all labour charges etc., complete.
Plastering with cement mortar 1:5 mix to 12mm
thick including cost and conveyance of all materials
& all labour charges etc., complete.
Providing Granolithic pattern floor finish with c.c
1:2:4 mix using 10 to 12mm ISS metal including cost
& conveyance of all materials to site and all labour
charges etc., complete.
Providing weathering course with best quality of
broken jelly of size 20mm uniform gauge in pure
slacked lime (no sand to be used) over the roof slab
in the proportion of brickjelly lime 32:121/2 by
volume and laid over in a single layer and
consolidated
Finishing the top of roof with one course of
machine pressed tiles of size 20cmx20cmx20 mm of
approved quality laid in cement mortar 1:3 mix to
12mm thick mixed with water proofing compound
confirming to ISS by 2% weightof cement used and
the joint pointed
Distembering two coats with best quality of
distember and the colour approved by the
departmental officers including cost & conveyance
of all materials to site and all labour charges etc.,
complete.
Cement base paint (Snocem) two coats over a coat
of primer including removing loose particles and
other materials including cost and conveyance of all
materials preparation of surface by and labour
charges etc. complete.
Painting two coats with enamel paint over new iron
work including cost & conveyance of all materials
to site and all labour charges etc., complete.
Contigencies & other unforeseen charges

TOTAL

109.17

Sqm

10418

97.14

Sqm

9840

79.56

Sqm

2842

1939.58

Cum

6439

550.53

Sqm

22819

53.10

Sqm

8956

59.75

Sqm

3869

86.10

Sqm

1364

LS

904
305000

cement

steel
bitumen
Emulsion
Brick
Brick jelly
(20mm)
Brick jelly
(40mm)
rough stone
bond stone
rough stone
(revetment)
KM stone
Hectameter
stone
(0.9x0.15x0.15)

COST OF MATERIALS ,LABOUR &WORK 2013-2014


MATERIALS
4700.00 Mangalore ridge
23790.00
ISS METAL
tiles/1000
Mangalore tiles/1000
8295.00
Mangalore ceiling tiles
5000.00
45600.00 Pressed
8710.00 40mm
742.00
tiles(20x20x2cm) /1000
45100.00 pan tiles(23x8x
339.00 25mm
638.00
1.7cm)/1000
40500.00 Blasted soling stone
138.60 20mm
1034.00
3985.00 un blasted stone
84.70 12mm
958.00
550.00 C.W.reeper(50x25mm)/R
29.00 10mm
705.00 10-12MM
metal ISS
M
495.00 C.W.reeper(50x12mm)/R
21.10
M
332.00 country wood planks
33030.00 6mm
478.00
IRC METAL
455.00 C.W.scantling (upto 4m) 28790.00
293
288.00 U S Gravel
130.00 90mm&
328.00
75mm
328.00 Well Gravel
107.80 63mm
423.00
165.00 sand for mortor
110.00 53mm
514.00

slacked lime

shell lime

stone lime
Mangalore tiles
AA

869.00
sand for filling
1180.00 Cuddappah slab 50mm
Tk
77.00 Cuddappah slab 38/40
Tk
8295.00 Cuddappah slab 20/30
Tk

Binding wire

Mason 1
Mason 2
except BW
Mazdoor 1
Mazdoor 2

WBM
WBM Patch work
BT patch
Picking

6.7mm,
6mm,
5.60mm
48.00 4.75m

894.00
608.00
451
451
451
400

228 Fitter 1

322.00

326

206

300.00

Road mazdoor 2
228 Head mazdoor
206 Carpenter 1

Carpenter 2

Fitter 2
236 Painter 1
355 Painter 2
Fitter 1 ( For
326 pipe laying &
Barbending)

293.00
271.00
316.00

326
WORK
jungle clearence

Refilling sand
Refilling soil
laying of well
gravel
including rolling
tack coat over BT
over WBM
Hire &labour
PC& SC

304.00 11.2mm

689
689
703
665
665
965.00

LABOUR
363 Road mazdoor 1

236
Wodder
Mason II class

110.00 45mm&
46.5mm
37.50mm
342.00 26.5mm&
25mm
22.40mm
330.00 13.2mm

13.00 JC scrub
14.70 JC light
4.14 JC heavy
10.56 Juliflora with uprooting
5.12 Juliflora without uprooting
12.74
Stacking
457.11 metal
Gravel
259.24 sand
77.86 mixing charges
167.5 Grinding lime mortor ordinary
5.59

earth work
2.15 For street
41.85
2.35 Drain
62.78
3.10 for foundation
83.70
3.45 Road
2.65 Silt
1 st lead
1 st lift
3.15 Benching
3.05 Centering
Charges

44.60
35.00
5.25
4.20
1.75
398.00

3.05 Ghat

509.45

43.35
105.9

832

ESTIMATE -CONVEYANCE 2013-2014

Distence KM

Lime stone
,brick Jelly,
wood work
for 1m3

Mangalore Bricks I,II class,


Rough stone
tiles(1000
standard size
Third Class
,broken
No)Machine
bricks,Metric
Country
stone ,sand
preesed tiles bricks ,chamber
bricks (1000
,Gravel
(2000 no)
burnt bricks,
no)
Suruki
Hyd.preesed flooring squre
tiles(500 no)
bricks (1000)

cement, &
steel items

0.00

0.00

0.00

0.00

0.00

0.00

5.40

7.80

6.60

8.80

11.00

4.90

10.80

15.60

13.20

17.60

22.00

9.80

16.20

23.40

19.80

26.40

33.00

14.70

21.60

31.20

26.40

35.20

44.00

19.60

27.00

39.00

33.00

44.00

55.00

24.50

32.40

46.80

39.60

52.80

66.00

29.40

37.80

54.60

46.20

61.60

77.00

34.30

43.20

62.40

52.80

70.40

88.00

39.20

48.60

70.20

59.40

79.20

99.00

44.10

10

54.00

78.00

66.00

88.00

110.00

49.00

11

58.65

84.70

71.65

95.60

119.25

53.20

12

63.30

91.40

77.30

103.20

128.50

57.40

13

67.95

98.10

82.95

110.80

137.75

61.60

14

72.60

104.80

88.60

118.40

147.00

65.80

15

77.25

111.50

94.25

126.00

156.25

70.00

16

81.90

118.20

99.90

133.60

165.50

74.20

17

86.55

124.90

105.55

141.20

174.75

78.40

18

91.20

131.60

111.20

148.80

184.00

82.60

19

95.85

138.30

116.85

156.40

193.25

86.80

20

100.50

145.00

122.50

164.00

202.50

91.00

21

104.60

150.90

127.50

170.70

210.85

94.70

22

108.70

156.80

132.50

177.40

219.20

98.40

23

112.80

162.70

137.50

184.10

227.55

102.10

24

116.90

168.60

142.50

190.80

235.90

105.80

25

121.00

174.50

147.50

197.50

244.25

109.50

26

125.10

180.40

152.50

204.20

252.60

113.20

27

129.20

186.30

157.50

210.90

260.95

116.90

28

133.30

192.20

162.50

217.60

269.30

120.60

29

137.40

198.10

167.50

224.30

277.65

124.30

30

141.50

204.00

172.50

231.00

286.00

128.00

31

145.60

209.90

177.50

237.70

294.35

131.70

32

149.70

215.80

182.50

244.40

302.70

135.40

33

153.80

221.70

187.50

251.10

311.05

139.10

34

157.90

227.60

192.50

257.80

319.40

142.80

35

162.00

233.50

197.50

264.50

327.75

146.50

36

166.10

239.40

202.50

271.20

336.10

150.20

37

170.20

245.30

207.50

277.90

344.45

153.90

38

174.30

251.20

212.50

284.60

352.80

157.60

39

178.40

257.10

217.50

291.30

361.15

161.30

40

182.50

263.00

222.50

298.00

369.50

165.00

41

185.95

267.95

226.70

303.60

376.50

168.10

42

189.40

272.90

230.90

309.20

383.50

171.20

43

192.85

277.85

235.10

314.80

390.50

174.30

44

196.30

282.80

239.30

320.40

397.50

177.40

45

199.75

287.75

243.50

326.00

404.50

180.50

46

203.20

292.70

247.70

331.60

411.50

183.60

47

206.65

297.65

251.90

337.20

418.50

186.70

48

210.10

302.60

256.10

342.80

425.50

189.80

49

213.55

307.55

260.30

348.40

432.50

192.90

50

217.00

312.50

264.50

354.00

439.50

196.00

51

220.45

317.45

268.70

359.60

446.50

199.10

52

223.90

322.40

272.90

365.20

453.50

202.20

53

227.35

327.35

277.10

370.80

460.50

205.30

54

230.80

332.30

281.30

376.40

467.50

208.40

55

234.25

337.25

285.50

382.00

474.50

211.50

56

237.70

342.20

289.70

387.60

481.50

214.60

57

241.15

347.15

293.90

393.20

488.50

217.70

58

244.60

352.10

298.10

398.80

495.50

220.80

59

248.05

357.05

302.30

404.40

502.50

223.90

60

251.50

362.00

306.50

410.00

509.50

227.00

61

254.95

366.95

310.70

415.60

516.50

230.10

62

258.40

371.90

314.90

421.20

523.50

233.20

63

261.85

376.85

319.10

426.80

530.50

236.30

64

265.30

381.80

323.30

432.40

537.50

239.40

65

268.75

386.75

327.50

438.00

544.50

242.50

66

272.20

391.70

331.70

443.60

551.50

245.60

67

275.65

396.65

335.90

449.20

558.50

248.70

68

279.10

401.60

340.10

454.80

565.50

251.80

69

282.55

406.55

344.30

460.40

572.50

254.90

70

286.00

411.50

348.50

466.00

579.50

258.00

71

289.45

416.45

352.70

471.60

586.50

261.10

72

292.90

421.40

356.90

477.20

593.50

264.20

73

296.35

426.35

361.10

482.80

600.50

267.30

74

299.80

431.30

365.30

488.40

607.50

270.40

75

303.25

436.25

369.50

494.00

614.50

273.50

76

306.70

441.20

373.70

499.60

621.50

276.60

77

310.15

446.15

377.90

505.20

628.50

279.70

78

313.60

451.10

382.10

510.80

635.50

282.80

79

317.05

456.05

386.30

516.40

642.50

285.90

80

320.50

461.00

390.50

522.00

649.50

289.00

81

323.60

465.50

394.25

527.05

655.80

291.85

82

326.70

470.00

398.00

532.10

662.10

294.70

83

329.80

474.50

401.75

537.15

668.40

297.55

84

332.90

479.00

405.50

542.20

674.70

300.40

85

336.00

483.50

409.25

547.25

681.00

303.25

86

339.10

488.00

413.00

552.30

687.30

306.10

87

342.20

492.50

416.75

557.35

693.60

308.95

88

345.30

497.00

420.50

562.40

699.90

311.80

89

348.40

501.50

424.25

567.45

706.20

314.65

90

351.50

506.00

428.00

572.50

712.50

317.50

91

354.60

510.50

431.75

577.55

718.80

320.35

92

357.70

515.00

435.50

582.60

725.10

323.20

93

360.80

519.50

439.25

587.65

731.40

326.05

94

363.90

524.00

443.00

592.70

737.70

328.90

95

367.00

528.50

446.75

597.75

744.00

331.75

96

370.10

533.00

450.50

602.80

750.30

334.60

97

373.20

537.50

454.25

607.85

756.60

337.45

98

376.30

542.00

458.00

612.90

762.90

340.30

99

379.40

546.50

461.75

617.95

769.20

343.15

100

382.50

551.00

465.50

623.00

775.50

346.00

ABSTRACT- DATA -2013-14


DESCRIPTION

SL.NO.

PER

RATE

CC 1:5:10

CU. M.

2187.13

CC 1:4:8

CU. M.

2339.56

CC 1:2:4

CU. M.

3364.56

CC 1:3:6 WITH 40 MM METAL

CU. M.

2593.63

CC 1:3:6 WITH 20 MM METAL

CU. M.

2856.43

RR MASONRY WITH IN CM 1:5 MIX

CU. M.

2206.35

BW IN CM 1:5 MIX ABOVE FOOTING


UPTO PLINTH LEVEL(ie., FLOOR LVL.)

CU. M.

3334.8

BW IN CM 1:5 MIX ABOVE PLINTH LEVEL


UPTO 4.5 M HT.

CU. M.

3364.35

R.C.C. 1:2:4 MIX , 20 MM JELLY FROM


CU. M.
FOUNDATION BASE UPTO PLINTH LEVEL
R.C.C. 1:2:4 MIX , 20 MM JELLY FROM
FOUNDATION ABOVE PLINTH LEVEL UPTO CU. M.
4.5 M HT.

3932.26

R.C.C. 1:1.5:3 MIX , 20 MM JELLY FROM


CU. M.
FOUNDATION BASE UPTO PLINTH LEVEL
R.C.C. 1:1.5:3 MIX , 20 MM JELLY FROM
FOUNDATION ABOVE PLINTH LEVEL UPTO CU. M.
4.5 M HT.

4438.98

13

SUPPLY AND FABRICATION OF STEEL

57144.9

14

CENTRING FOR ROOF SLAB,LINTEL,BEAMS SQ. M.

398.00

15

CENTRING FOR SUNSHADE

SQ. M.

437.80

16

CENTRING FOR COLOUMN , PILLARS

SQ. M.

338.94

17

CENTRING BELOW GL( INCL. PLINTH


BEAMS SIDES)

SQ. M.

199.00

18

Plastering 1:3,10mm TK

SQ. M.

109.17

19

Plastering 1:5,12mm TK

SQ. M.

97.14

10
11
12

MT.

3976.91

4483.63

20

Plastering 1:5,20mm TK

SQ. M.

193.55

21

Plastering 1:4, 20 MM THK

SQ. M.

201.01

22

Plastering 1:3,

SQ. M.

213.43

23

Plastering 1:3,12 mm TK

SQ. M.

109.78

24

POINTING 1:3 FOR PRES. TIL

SQ. M.

116.01

25

POINTING 1:3 (R.R. Masonry work)

SQ. M.

109.23

26

Granolithic Flooring

SQ. M.

79.56

27

CERAMIC FLOOR FINISH 200 x 200 x 6 MM

SQ. M.

747.07

28

DADOOING WALL TILES (COLOR GLAZED)


15O x 150 x 6 MM

SQ. M.

784.47

29

BRICK JELLY LIME CONCRETE(weathering


course)

CU. M.

1939.58

30

PRESSED TILES WITH NEW PRESSED


TILES

SQ. M.

550.53

31

PRESSED TILES WITH OLD PRESSED


TILES LAYING LABOUR CHARGE ONLY

SQ. M.

332.78

32

Roofing with Mangalore tiles

SQ. M.

226.58

33

Tiled roofing with Mangalore tiles over ceiling tiles


SQ. M.

390.54

34

Removing & readjusting old mangalore tiles

SQ. M.

95.31

35

WHITE WASH

SQ. M.

12.74

36

COLOUR WASHING

SQ. M.

19.12

37

Snowcem

SQ. M.

59.75

38

Distember

SQ. M.

53.1

39

Enamel PAINTING

SQ. M.

86.1

40

Distemper with primer for old surface -1 Sq.m.

SQ. M.

87.3

20mm THK

41

Distemper with primer for New surface -1


Sq.m.

SQ. M.

85.6

42

EXTERIOR Plastic Emulsion with one coat


primer

SQ. M.

124.00

43

PAINTING Black Board

SQ. M.

63.00

44

Supply and fixing of hollow MS pipes &


painting two coats etc.,

KG.

76.50

45

US GRAVEL FILLING FOR BUILDING

CU. M.

150.80

46

WELL GRAVEL FILLING FOR BUILDING

CU. M.

128.6

47

Direct Filling with US Gravel

CU. M.

141.94

48

Direct Filling with Well Gravel

CU. M.

119.74

LEAD &COST OF MATERIALS-2013-14


DESCRIPTION
Cement
Steel/MT
Sand for mortor
Sand for filling
Rough
stone(reverment)
Rough stone
Bond stone
Country bricks
40 mm metal ISS
25mm metal ISS
12mm metel ISS
10mm metal ISS
10-12mm metal ISS
20mm metal ISS
6mm metal ISS
90mm metal IRC
63mm metal IRC
53mm metal IRC
45mm metal IRC
22.40mm metal IRC
13.2mm metal IRC
11.2mm metal IRC
6.7mm metal IRC
lime stone
Shell lime
Brick Jelly 20mm
Brick Jelly 40mm
Slaked lime
Pressed tiles
Binding wire/MT
10MM
Rough Jelly
stone(reverment)
bricks class I,II
wood
U S gravel
well gravel
suruki
Mangalore tiles
Mangalore ridge tiles
Ceiling tiles

LEAD (km)

Conveyance

cost of materials

total

1
1
20
20

4.90
4.90
145.00
145.00

4700.00
45600.00
110.00
110.00

4704.90
45604.90
255.00
255.00

6
6
6
7
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
0
0
7
7
0
0

46.80
46.80
46.80
46.20
46.80
46.80
46.80
46.80
46.80
46.80
46.80
46.80
46.80
46.80
46.80
46.80
46.80
46.80
46.80
0.00
0.00
37.80
37.80
0.00
0.00
0.00
0.00
46.80
0.00
0.00
7.80
7.80
0.00
0.00
0.00
0.00

288.00
332.00
455.00
3985.00
742.00
638.00
958.00
705.00
831.50
1034.00
478.00
243.00
350.00
514.00
571.00
800.00
894.00
608.00
374.00
77.00
1180.00
550.00
495.00
869.00
8710.00
48.00
705.00
0.00

334.80
378.80
501.80
4031.20
788.80
684.80
1004.80
751.80
878.30
1080.80
524.80
289.80
396.80
560.80
617.80
846.80
940.80
654.80
420.80
77.00
1180.00
587.80
532.80
869.00
8710.00
48.00
705.00
46.80
0.00
0.00
137.80
115.60
0.00
8295.00
23790.00
5000.00

1
1
0
0
0

130.00
107.80
8295.00
23790.00
5000.00

PLEASE INSERT LEAD HERE


Cement/steel
Sand
Metal
Country Brick

5
25
6
7

Pressed Tiles
Gravel

0
1

DATA - 2013-14
CEMENT MORTOR
CEMENT MORTOR 1:2
720 cement
4704.9
1 sand
255
total

3387.53
255.00
3642.53
43.35
3685.88

CEMENT MORTOR 1:5


288 cement
4704.9
1 sand
255
total
mixing
including mixing for
masonary works

1355.01
255.00
1610.01
43.35
1653.36

CEMENT MORTOR 1:1.5


960 cement
4704.9
4516.70
1 sand
255
255.00
total

4771.70

CEMENT MORTOR 1:3


480 cement
4704.9
1 sand
255
total
mixing
including mixing for
masonary works

CEMENT MORTOR 1:6


240 cement
4704.9
1 sand
255
total
mixing
including mixing for
masonary works

Lime mortar 1:2


0.5 lime
869
1 sand
255
1 Grinding
105.9
total

2258.35
255.00
2513.35
43.35
2556.70

1129.18
255.00
1384.18
43.35
1427.53

434.50
255.00
105.90
795.40

CEMENT MORTOR 1:4


360 cement
4704.9
1 sand
255
total
mixing
including mixing for
masonary works

CEMENT MORTOR 1:2.5


576 cement
4704.9
1 sand
255
total
mixing
including mixing for
masonary works

Filling with sand


1 sand
255
1 filling charge
13
total

1693.76
255.00
1948.76
43.35
1992.11

2710.02
255.00
2965.02
43.35
3008.37

255.00
13.00
268.00

CC 1:5:10
9
4.5
1.8
17.7
14.1

40mm metal
cm 1:5
mason II
mazdoor I
mazdoor II
sundries
total

788.8
1610.01
326
228
206

FOR 1CM

RCC 1:2:4
7099.20
7245.05
586.80
4035.60
2904.60
0.00
21871.25

2187.13

RCC 1:1.5:3
9
4.5
4308
3.5
21.2
35.3

9
4.5
3231
3.5
21.2
35.3

20mm
sand mortor
cement
masonII
mazdoor I
mazdoor II
sundries
total
FOR 1CM
above
basement

1080.8
255
4704.9
326
228
206

44.65

20mm
sand mortor
cement
masonII
mazdoor I
mazdoor II
sundries
total
FOR 1CM
above
basement

bricks
CM 1:5
mason I
mason II
mazdoor I
mazdoor II
sundries
total 10cft
for 1cm
2.832
above
basement

4031.2
1653.36
363
326
228
206

RR
9727.20
1147.50
15201.53
1141.00
4833.60
7271.80
0.00
39322.63

9727.20
1147.50
20268.71
1141.00
4833.60
7271.80
0.00
44389.81
4438.98

Rough stone
Bond stone
CM 1:5
mason I
mason II
mazdoor I
mazdoor II
sundries
total
FOR 1CM

0.14
1.1
0.5
1.1

CM 1:5
mason I
mazdoor I
mazdoor II

3932.26
44.65

0.1
1.1
1.1
1.1

CM 1:3
mason II
mazdoor I
mazdoor II

2556.70
326
228
206

sundries
total
FOR1CM

378.8
501.8
1653.36
363
326
228
206

3788.00
501.80
5621.43
2577.30
3455.60
3214.80
2904.60
0.00
22063.53
2206.35

3976.91
255.67
358.60
250.80
226.60

Plastering 1:5,12mm TK

0.00
1091.67
109.17

1653.36
363
228
206

sundries
total
FOR1CM

231.47
399.30
114.00
226.60

0.00
971.37
97.14

4483.63

STEEL
5240.56
1170.58
363.00
978.00
456.00
1236.00

1 qtl- steel
45604.9
1 qtl-binding wire
48.00
3.5 fitter I
316
sundries

Granolithic Flooring
4560.49
48.00
1106.00
0.00
5714.49

total
9444.14
3334.80
29.55

10
1
3.4
7.1
10.6
14.1
14.1

Plastering 1:3,10mm TK

BW 1:5
1300
0.708
1
3
2
6

1080.8
255
4704.9
326
228
206

3364.35

total

9
4.5
1.8
17.7
14.1

10-12mm jelly
CM 1:2
mason II
mazdoor I
mazdoor II
total

57144.90

totalx0.25

878.3
3642.53
326
228
206

7904.70
16391.38
586.80
4035.60
2904.60
31823.08
79.56

Plastering 1:5,20mm TK
0.22
2.2
0.5
3.2

CM 1:5
mason I
mazdoor I
mazdoor II

1653.36
363
228
206

sundries
total

FOR 1CM

363.74
798.60
114.00
659.20

POINTING 1:3 FOR PRES. TIL


0.04
2.2
0.5
1.1

CM1:3
mason II
mazdoor I
mazdoor II

shell lime
mason II
mazdoorI
mazdoorII
sundries
total
for1m2
colour wash
for1m2

1180
326
228
206

sundries
total

1160.07

193.55

for 1m2

116.01

20MMmetal
CM 1:2
mason II
mazdoor I
mazdoor II
sundries

9
4.5
1.8
17.7
14.1

1274.40
12.74
1911.60
19.12

for 1CM

1080.8
3642.53
326
228
206

(top roof) pressed tiles


250
0.12
10
1.15
1.1
2.1
2.2
1.1

P.Tiles
8710.00
CM 1:3
2556.70
Pointing CM1:3
116.01
water p. comp.
42.35
mason I
363
mason II
326
mazdoor I
228
mazdoor II
206
sundries
total
for 1m2
Only labour charge without
Pressed Tiles

CC 1:4:8
82.60
521.60
114.00
556.20

40MMmetal
CM 1:4
mason II
mazdoor I
mazdoor II
sundries

788.8
1948.76
326
228
206

1300
0.71
1
3
2
6

bricks
CM 1:3
mason I
mason II
mazdoor I
mazdoor II
sundries
total 10cft
for 1 cm 2.83

Snowcem
9727.20
16391.38
586.80
4035.60
2904.60
0.00
33645.58
3364.56

3.23
0.5
0.5
0.8

Distember
Painter I
mazdoor I
mazdoor II
sundries
for 1m2

53.10
293.00
228
206

2177.50
306.80
1160.10
48.79
399.30
684.60
501.60
226.60
5505.29
550.53
3327.79
332.78

BW 1:3
7099.20
8769.44
586.80
4035.60
2904.60

23395.64
2339.56

FOR 1CM

CC 1:2:4
9
4.5
1.8
17.7
14.1

102.27
717.20
114.00
226.60

1935.54

WHITE WASH
0.07
1.6
0.5
2.7

2556.70
326
228
206

4031.2
2556.70
363
326
228
206

5240.56
1810.15
363.00
978.00
456.00
1236.00
10083.71
3560.63

Distember
171.51
146.50
114.00
164.80
0.69
597.50
59.75

1.34
0.5
0.5
0.8

Distember
Painter I
mazdoor I
mazdoor II
sundries
for 1m2

78.50
293.00
228
206

105.19
146.50
114.00
164.80
0.51
531.00
53.10

cc 1:3:6
9
4.5
1.8
17.7
14.1

40 mm metal
788.8
CM 1:3
2513.35
mason II
326
mazdoor I
228
mazdoor II
206
sundries
Total
for 1CM
With CC 1:3:6 20 mm
metal

Plastering 1:4, 20 MM THK


7099.20
11310.08
586.80
4035.60
2904.60
0.00
25936.28
2593.63

138.5
293.00

sundries

307.47
322.30

0.23
630.00

for 1m2

63.00

WALL TILES(DADDOOING)
450 glazed tiles
0.10 cm1:2
white cement
with colour
4.00 pigment
1.10 mason I
4.10 mason II
2.70 Mazdoor I
3.30 Mazdoor II
for 1m2

cm 1:4
mason I
mazdoor I
mazdoor II
sundries

1992.11
363
228
206

Total
for 1CM

438.27
798.60
114.00
659.20

2010.07
201.01

Enamel PAINTING
2.22 Paint
1.1 painter I
sundries

242.55
293.00

538.46
322.30
0.24
861.00

for 1CM

86.10

2856.43

PAINTING Black Board


2.22 paint
1.1 painter I

0.22
2.2
0.5
3.2

FLOORING TILES(CERAMIC)

BRICK JELLY LIME CONCRETE(weathering

260 ceramic tiles


0.1 cm1;2

4
1
3.7
3.3
2.2

white cement
with colour
pigment

masonI
masonII
mazdoor I
mazdoor II
sundries

4225
364.25

12.8 20mm brick jelly


5 slacked lime

587.8
869.00

7523.84
4345

26.65
363
326
228
206

106.6
363
1206.2
752.4
453.2

1.8 mason II
17.7 mazdoor I
14.1 mazdoor II
sundries

326.00
228
206

586.8
4035.6
2904.6
0
19395.84

7470.65
747.07

for 1m2

Plastering 1:3,

9.65
3642.53

4342.50
364.25

0.22 cm 1:3
2.2 mason I

26.65
363.00
326.00
228.00
206.00

106.60
399.30
1336.60
615.60
679.80
7844.65
784.47

0.5 mazdoorI
3.2 mazdoor I I
sundries
1.15 water proof

course)

16.25
3642.53

20mm THK
2556.70
363

562.47
798.60

228
206

114.00
659.20
0.00

1939.58

rough stone dry packing


11 rough stone
3.5 wooder

10.6 mazdoor I
7.1 mazdoor II
sundries

42.35

334.80
236

3682.80
826.00

228
206

2416.80
1462.60
0.80
8389.00

2134.27
for 1m2

213.43

for 1m2

838.90

Roofing with Mangalore tiles


160
0.09
0.5
1.1
2.2

Manglore tiles
lime mortar
mason II
mazdoorI
mazdoor I I
sundries

8295.00
795.40
326
228
206

1327.20
71.59
163.00
250.80
453.20
0.00

Tiled roofing with Mangalore tiles


over ceiling tiles
10
250
0.5
1.1

Manglore tiles
ceiling tiles
mason II
mazdoorII

2265.79
5000
326
206

2265.79
1250.00
163.00
226.60

sundries

0.00

2265.79
for 1m2

226.58

145.5
293.00

for 1m2

193.52
205.10
398.62

10 Priming coat
398.62
2.22 paint
220.50
1.1 painter I
293.00
Brush cleaning etc.,
for 1m2

398.62
489.51
322.30
5.40
1215.83
121.58

for 1m2

390.54

0.225 paint
4 Labour for fixing

lime mortar
Carpenter I
mazdoorI
mazdoor I I
sundries

795.40
355
228
206

9
4.5
1.8
17.7
14.1

40MMmetal
CM 1:2.5
mason II
mazdoor I
mazdoor II
sundries

788.8
2965.02
326
228
206

for 1m2

95.31

7099.20
13342.60
586.80
4035.60
2904.60

1.4 Plastic Emulsion


0.98 Primer (Liquid)
2.2 Painter I class

315.15
156.75
293

27968.80
2796.88

441.21
153.62
644.60

0.57
1240.00
124.00

for 1m2

POINTING 1:3 (R.R. Masonry work)

48.00

192.00

2556.70

357.94

2556.70

230.10

121.58

27.36

1.1 mason I

363

399.30

1.6 mason II

326

521.60

19.25

77.00

0.5 mazdoor I

228

114.00

0.5 mazdoor I

228

114.00

9.65

1.1 mazdoor II

206

226.60

1.1 mazdoor II

206

226.60

306.01

1.1 water proof

42.35

Brush cleaning etc.,

Rate for 1 Kg 298/4

76.50

0.14 CM 1:3

953.09

sundries

FOR 1CM

71.59
177.50
250.80
453.20
0.00

EXTERIOR Plastic Emulsion with


one coat primer

CC 1:2.5:5

Plastering 1:3,12 mm TK
Steel size
4 3"x11/2"

0.09
0.5
1.1
2.2

3905.39

Supply and fixing of hollow MS pipes &


painting two coats etc.,

Red oxide
1.33 primer
0.7 painter I

Removing & readjusting old


mangalore tiles

sundries
total
FOR1CM

0.00
1097.84
109.78

0.09 CM1:3

sundries
total
for 1m2

1092.30
109.23

Distember with one coat


primer
One coat of Primer
Scrapping
10 charge
0.98 Pimer(liquid)
0.7 Painter I

US GRAVEL FILLING FOR BUILDING


1 US Gravel

1.7

17.00

132.00

129.36

293.00

205.10

For 10 Sq.m.

1 filling charge

137.8

137.80

13

13.00

total

150.80

Direct Filling with US Gravel


1 US Gravel

1 filling charge

137.8

137.80

4.14

4.14

total

141.94

351.46

MAIN DATA
10 Priming 1 coat

35.15

351.46

71.4

95.68

293.00

146.50

1 US Gravel

0.5 mazdoor I

228

114.00

1 filling charge

0.8 mazdoor II

206

164.80

1.34 Distember
0.5 Painter I

WELL GRAVEL FILLING FOR BUILDING

total
sundries

115.6

115.60

13

13.00

128.60

Direct Filling with Well Gravel


1 US Gravel
1 filling charge

total

115.6

115.60

4.14

4.14

119.74

0.56
873.00

Distemper with primer for


old surface -1 Sq.m.
Distemper with primer for
New surface -1 Sq.m.

87.30
85.60

Dismantling
1 Brick / Stone masonry in L.M

cum

2 Brick / Stone masonry in C.M


cum
3 Mangalore tiles without roof
sqm
Mangalore tiles over flat tiles without roof timber 4 Sqm
5 AC sheet roof without roof timber
sqm
6 Door, window incl moral of hinges
sqm
7 Dismantling P.C.C
cum
8 Dismantiling RCC
cum
9 Chipping of concrete
sqm
10 Pressed tiles & weathering course
sq.m
11 Pressed tiles only
sq.m
12 Cleaning & Removing of cement plaster
sq.m.
Dismantling B.W & clearing from site

78.65
96.40
6.90
9.60
6.30
45.35
165.60
2515.00
13.90
16.00
8.90
3.05

Supplying and fixing PVC Rain water down fall


pipes of following dia meter etc., complete.
110mm dia PVC Rain water Pipe
Cost of 110mm dia
3 PVC Pipe
114.5
343.50
1 110mm dia PVC shoe
72.7
72.70
1 110mm dia PVC Bend
94
94.00
1 CI Gratings
29.3
29.30
2 PVC Clamp
11
22.00
1 Plumber I class
322
322.00
Sundries for cement
0.37
For 3 Rm
883.87
Rate Rs.
294.62 /1Rm
Say Rs.
295.00 /1Rm

Supplying and fixing in position best Indian make White glazed earthern
ware Oriya type Indian Water Closet
Sub Data
9.5
3.8
1.8
17.7
14.1

1
0.6
0.45
0.11
1
1
0.25
1
1
6
400

Brick Jelly Lime Concrete 1:2:5


Brik jelly 40mm
532.8 m3
5062 m3
Lime Mortar 1:2
795.40 m3
3023 m3
Mason II Class
326 Nos
587 Nos
Mazdoor I Class
228 Nos 4036 Nos
Mazdoor II Class
206 Nos 2905 Nos
15611.12
Rate Rs.
15611.12 /1M3
Say Rs.
1561.11 /1M3
Main Data
White glazed Indian type Water closet
1089 with
EachP or
1089
S Trap
Nos
110mm dia PVC pipe
107.5 Rm
64.5 Rm
Sand for filling
268.00 Cum 121 Cum
Brick jelly lime concrete 1:2:5 1561.11 1 Cum 172 Cum
Plumber I Class
322 Each 322 Nos
Mason I Class
363 Each 363 Nos
Plumber II Class
300 Each
75 Nos
Mazdoor I Class
228 Each 228 Nos
White Cement
23.00 1 Kg
23 kgs
Cement
4704.9 MT
28.2 kgs
Spun yarn
12 1 Kg
4.8 gms
2490
Rate Rs.
2489.8515 /1No
Say Rate Rs. 2489.85 /1No

Dry Brick work using country bricks 83/4"x41/4"x23/4"


including cost and onveyance of all materials to site and all
labour charges etc complete
4.59 x1000nos
Country bricks
4031.20
18503.21
3.50 nos Mason I class
363.00
1270.50
7.20 nos Mason II class
326.00
2347.20
7.10 nos Mazdoor I class
228.00
1618.80
14.10 nos Mazdoor II class
206.00
2904.60
26644.31
2664.43
RATE @RS

S.no Itm.No
155

20

156

21

a
b

2664.43 /cum

Schedule of rates 12-13


Description
Unit
Labour wrought & put
For Windows &
Ventilators
Sq.m.
Labour wrought & put
Single leaf shutter Sq.m.
Double leaf Shutter Sq.m.

Appr. Rates

108.10
80.2
124.20

Roofing with AC corrugated


sheet 6mm thk with "J' bolts
andAC
Bitumen
washer etc.,
sheets
11.00 6mm thick
2.20 Fitter II class
Carpenter I
class
1.10
Mazdoor I
class
3.20
Adj. J bolt
with nuts
20.00 6mm dia.
Bitumen
washer 15
mm dia.
20.00
Sundries for
white lead

175.50
300.00

1930.50
660.00

355.00

390.50

228.00

729.60

3.60

72.00

1.20

24.00

3806.60
for 1m2

380.66

DATA - 2013-14
Snowcum painting two coats with best quality of Cement paint distember including cost & conveyance of
all materials to site and all labour charges etc., complete.,
3.23 KG
Cost of Distember
53.1 Kg
171.51
0.5 Nos
Painter I class
293 E
146.50
0.5 Nos
Mazdoor I class
228 E
114.00
0.8 Nos
Mazdoor II class
206 E
164.80
Sundries
0.69
Total for 10sqm
597.50
Rate for 1sqm
59.75

Distembering two coats with best quality of Cement paint distember including cost & conveyance of all
materials to site and all labour charges etc., complete.,
1.34 KG
Cost of Distember
78.5 Kg
105.19
0.5 Nos
Painter I class
293 E
146.50
0.5 Nos
Mazdoor I class
228 E
114.00
0.8 Nos
Mazdoor II class
206 E
164.80
Sundries
0.51
Total for 10sqm
531.00
Rate for 1sqm
53.10
Supply and fixing of Hallow MS pipes 2'' X 1'' for bpurlion and 3'' x 1 1/2'' Hallow MS pipes trusses
including cost and conveyance all materials to site and painting two coats with priming coat etc.,
complete
SUB DATA
1.33 Lt
Red oxide primer needy mixer
145.5 LT
193.52
0.7 Nos
Painter - I
293 A
205.10
398.62
39.86
Painting two coats with needy mixed enamel paints over new Iron work with priming cost 10m2 including
cost and conveyance all materials to site and painting two coats with priming coat etc., complete.
10 m2
Priming coat
398.62 10m2
3986.15
2.22 CT
Paint
242.55 LT
538.46
1.1 m2
Painter - I
293 ER
322.30
Add sunderies / Brush & Cleaning
135.00
4981.91
3''X 11/2'' size = 4kg / 1m
Painting Area : 1x0.225=0.225
1120.93
112.093
MAIN DATA
4 Kg
Steel size 3'' X 11/2''
48
192.00
0.225 m2
Painting
112.093
25.22
4 kg
Labour charges fixing
19.25
77.00
Welding
11.78
Add sunderies / Brush & Cleaning
306.00
Rate for 1kg
76.50
76.50

Black Board painting two coats with including cost & conveyance of all materials to site and all labour
charges etc., complete.
2.22 LT
Cost of Black board paint 138.5 LT
307.47
1.1 Nos
Painter I class
293 ER
322.30
SUNDRIES
0.23
Total 42.37
630.00
63.00
Lime Mortar
0.5 cum
Cost of lime
869 LT
434.50
1 cum
Sand
255 ER
255.00
1 m3
grinding mortar
105.9
105.90
795.40

Roofing with best mangalore tiles over reeper of size 0.05X0.025m including cost and conveyance and
all labour charges etc., complete.
160 Nos
Mangalore Tiles
8295
1327.20
0.09 M3
Cost of lime mortar
795.40
71.59
0.5 Nos
Mason II class
326
163.00
1.1 Nos
mazdoor I class
228
250.80
2.2 Nos
Mazdoor II class
206
453.20
2265.79
RATE
FOR 1 SQ.M.
226.58
Best Tiled Roofing with mangalore tiles over ceiling tiles over of best quality including cost and
conveyance and all labour charges etc., complete.
10 Sqm
Mangalore Tiles
2265.79 10sqm
2265.79
250 Nos
Ceiling tiles
5000
1250.00
0.5 Nos
Mason II class
326
163.00
1.1 Nos
mazdoor II class
206
226.60
Conticens
3905.39
RATE
FOR 1 SQ.M.
390.54
Supply and erecting centering for sides and soffits including support and strutting up to 3.29m high for plane surface such
as using mild steel sheets of size 90X40cm and BG for stiffened with welded mild steel angle of size 25x25x3mm for
boarding laid over silver oak (country wood) joists of size 10x6.50cm spaced at about 90 centre to centre and supported by
casaurina props of 10-13cm dia spaced at 75cm c/c etc. complete.
Such as RCC slabs, rectangular beam, Tee or L beam , etc.,
Sub Data
Weight of MS sheet
Weight of MS angle
13.46 Kg
4 Kg

90x10
25X25X3mm

Cost of MS sheet 10mm


Cost of MS angle of size 25x25x3m

Gauge

48 Kg
48 Kg

13.46
4.00
646.08
192.00

Add for cutting, bending & welding


charges etc.,
LS

29.08
867.16
Sub Data

Cost of MS sheets and angles and silver oak and casaurina


19 Nos
0.12 cum
98.5 RM

Cost of MS sheet and MS angles

867.16 Each

Silver oad (CW) joists of size 10X6


Casaurina props 10-13 cm dia

13060
21.1

16476.04
1567.20
2078.35
3645.55

Adopting 40 uses for steel sheets and angles and 5 use of silver oad
1/40 Use
1/5 Use

1
2
LS
3.8
5.4
1
LS
LS

Uss
Uss
Nos
Nos
No

(i)

Cost of steel angle


Cost of Silver oak

16476.04 Use
3645.55 Use

Main Data
Cost of MS sheet and angle
411.90 Use
Cost of silver oad joists of size 10
729.11 Use
Add for silver oak props
Carpenter I class
355
Mazdoor I class
228
Mazdoor II nd class
206
Add for periodical cleaning and painting silver oad props
Add for welding and Nails, etc
Rate for 1 sqm
Rate for Roof Slab , Lintel, Beam
For Ghat

411.90
729.11
1141.01

411.901
729.11
1349
1231.2
206
29.000
23.5
3980

398.00
509.45
509.45

567

(ii)

(iii)
98.5 RM
0.3 Nos
0.3 Nos

Rate for Sunshade


Add 10% Above Rate
Rate for 1 sqm

398.00
39.8

437.80

Rate For Column (Post)


Casaurina props 10-13 cm dia

19.2 1891.20/5

Carpenter I class
Masdoor I class

355 Nos
228 Nos
3980.00

590.57

Centring Below Ground Level


50% of the above rate

106.50
68.40
590.57
3389.43

338.94

Rate for 1 sqm

(iv)

415.67

335/2

199.00

199.00
Rate for 1 sqm

DATA - 2013-14
Centring for OHT - Curved surfaces
Plain Surface (Steel)
Sl. No.

Description of Height
Basic Rate

Add for
strutting

Total

Up to 3.3 m

398.00

0.00

398.00

3.3 to 4.3 m

398.00

19.69

417.69

4.3 to 5.3 m

398.00

39.38

437.38

5.3 to 6.3 m

398.00

59.07

457.07

6.3 to 7.3 m

398.00

78.76

476.76

8.3 to 9.3 m

398.00

98.45

496.45

9.3 to 10.3 m

398.00

118.14

516.14

10.3 to 11.3 m

398.00

137.83

535.83

12.3 to 13.3 m

398.00

157.52

555.52

10

13.3 to 14.3 m

398.00

177.21

575.21

11

14.3 to 15.3 m

398.00

196.90

594.90

-14

ved surfaces
Curved Surface

Sl. No:
Square Column Round Column
1

Up to 1 LL ST

Above 1 LL SR

597.00

668.71

477.60

955.20

616.69

701.79

497.29

1014.27

636.38

734.88

516.98

1073.34

656.07

767.96

536.67

1132.41

675.76

801.04

556.36

1191.48

695.45

834.13

576.05

1250.55

715.14

867.21

595.74

1309.62

734.83

900.29

615.43

1368.69

754.52

933.37

635.12

1427.76

774.21

966.46

654.81

1486.83

793.90

999.54

674.50

1545.90

R .C.C. 1:1.5: 3
For Various Height

Rate

Vibration
Charges

Lifting
Charges

Total

Upto 1.59 m below GL

4438.98

35.25

4474.23

From 1.59 m to 4.50 m below


GL

4438.98

35.25

44.05

4518.28

From GL to 4.50 m Above GL

4438.98

35.25

44.65

4518.88

4438.98

35.25

133.65

4607.88

4438.98

35.25

222.65

4696.88

4438.98

35.25

311.65

4785.88

From 4.50 m to 9.00 m


Above GL
From 9.00 m to 13.50 m
Above GL
From 13.50 m to 17.00 m
Above GL

DATA - 2013-14
Providing two legged scaffolding using 15 cm diameter blue-gum posts or casuarine posts or
best quality bamboo posts of 4m overall length (3m height + 0.5m projection + 0.5m into the
ground ) the distance between the two rows being 1.25 m. and the spacing of posts being 2m. in
both the rows with two horizontal posts with 0.5m. overlap on either side and braces at 2m c/c.
including longitudinal and transverse middle braces to step up and providing a platform with
country wood planks 40 mm. thick and 1m. width, etc in a complete form using coir and nails
1m. run.
Such as RCC slabs, rectangular beam, Tee or L beam , etc.,

Schedule item (no. 153)


Rate for 6m run

70

15 cm. diameter posts (blue-gum


m.
posts or casuarine or bomboo
run
posts)

0.3 Cu.m.

Country wood planks


Total cost of materials

25.30

1m run

1771.00

30030

1 Cu.m.

9009.00

A =

10780.00

B=

1078.00

Materials can be used for 10 Times


Cost per operation - A/10
Detailed data-

1 time Cost of materials for one operation- B =


2 Nos Masdoor Class 1

1078.00 1 time
228.00 Each

Coir, nails, etc.,

Total for 6 m. run


For 1 m. Run.

= C/6

Rate for Scaffolding for


Height of 3m. And Length of
1 m.

1078.00
456.00
86.00

C=

1620.00

D=

270.00

D=

270.00

For Every additional height of 2.5 m .Taking 6m. Run.

70

Extra Materials requiredm.


Vertical Post
run

0.3 Cu.m. Country wood Planks


Total cost of materials

25.30

1m run

1771.00

30030.00 1 Cu.m.

9009.00

E=

10780.00

F=

1078.00

Materials can be used for 10 Times


Cost per operation - E/10
Detailed data-

1 time Cost of materials for one operation- F =


2 Nos Masdoor Class 1

1078.00 1 time
228.00 Each

Coir, nails, etc.,

Total for 6 m. run


For 1 m. Run.

= G/6

Rate for Scaffolding for


Height of 2.5 m. And Length
of 1 m.

1078.00
456.00
86.00

G=

1620.00

H=

270.00

H=

270.00

COMPARATIVE STATEMENT
Name of work : Construction of Open Air Theatre at Vedasandur Boys Hr sec school in thattarapatty panchayat.
Estimate Amount:- Rs 3.05 lakhs
S.No

Qty

Description of Work

As per Estimate

Thiru P.Muthusamy

Thiru K.Selvaraj

Rate

Amount

Rate

Amount

Rate

Amount

20.42

Earthwork excavation in all


clauses of soils and
depositing on bank with
initial lead and lift for
foundation as per ss20B

83.70

1709.09

83.00

1694.79

85

1735.63

3.33

Filling with good river


sand including cost &
conveyance of sand and all
labour charges etc.,
complete as per std.
Specifications.

268.00

892.44

268.00

892.44

270.00

899.10

8.66

Cement concrete 1:4:8 mix


using 40mm ISS HBG
metal for foundation
including watering
whenever necessary and
laid in layers not more than
15cm thick compacting etc.,
complete complying with

2339.56

20266.95

2339.00

20262.10

2340.00

20270.76

12.17

R.R. masonry in c.m.1:5


mix using rough stones
and bond stones with
simultaneous pointing
including cost and
conveyance of all materials
to site and all labour
charges etc., complete.

2206.35

26858.91

2206.00

26854.65

2207.00

26866.83

9.83

Brick work in c.m 1:5 mix


using country bricks
including cost &
conveyance of all materials
to site and all labour
charges etc., complete.

3334.80

32795.49

3334.00

32787.62

3335.00

32797.46

13.33

Filling with excavated


earth other than sand
including all labour
charges as per standard
specification.

14.70

195.95

14.00

186.62

15.00

199.95

108.38

Supply & erection of


centering for sides & soffits
of all R.C.C. works
including cost &
conveyance of all materials
to site and all labour
charges etc., complete.

398.00

43135.24

398.00

43135.24

400.00

43352.00

1.00

12.29

10

95.43

11

101.30

Supplying and fabrication


of steel rods including cost
& conveyance of steel as
per std. Specification etc.,
complete.
RCC 1:1.5:3 mix using 20
mm ISS HBG metal for
RCC items of works
excluding cost of
reinforcement and
fabricating charges and
centering and shuttering
charges but including
curing providing fixtures
Plastering with cement
mortar 1:3 mix to 10mm
thick including cost and
conveyance of all materials
& all labour charges etc.,
complete.
Plastering with cement
mortar 1:5 mix to 12mm
thick including cost and
conveyance of all materials
& all labour charges etc.,
complete.

57144.90

57144.90

57140.00

57140.00

57150.00

57150.00

4438.98

54548.64

4438.50

54542.74

4440.00

54561.17

109.17

10418.09

109.00

10401.87

110.00

10497.30

97.14

9840.28

97.00

9826.10

98.00

9927.40

12

35.72

13

3.32

14

41.45

15

168.66

Providing Granolithic
pattern floor finish with c.c
1:2:4 mix using 10 to 12mm
ISS metal including cost &
conveyance of all materials
to site and all labour
charges etc., complete.
Providing weathering
course with best quality of
broken jelly of size 20mm
uniform gauge in pure
slacked lime (no sand to be
used) over the roof slab in
the proportion of brickjelly
lime 32:121/2 by volume
Finishing the top of roof
with one course of machine
pressed tiles of size
20cmx20cmx20 mm of
approved quality laid in
cement mortar 1:3 mix to
12mm thick mixed with
water proofing compound
Distembering two coats
with best quality of
distember and the colour
approved by the
departmental officers
including cost &
conveyance of all materials
to site and all labour

79.56

2841.88

79.00

2821.88

80.00

2857.60

1939.58

6439.41

1939.00

6437.48

1940.00

6440.80

550.53

22819.47

550.00

22797.50

551.00

22838.95

53.10

8955.85

53.00

8938.98

54.00

9107.64

16

17

64.76

Cement base paint


(Snocem) two coats over a
coat of primer including
removing loose particles
and other materials
including cost and
conveyance of all materials
preparation of surface by
and labour charges etc.
complete.

59.75

3869.41

59.00

3820.84

60.00

3885.60

15.84

Painting two coats with


enamel paint over new iron
work including cost &
conveyance of all materials
to site and all labour
charges etc., complete.

86.10

1363.82

15.00

237.60

87.00

1378.08

Total

Thiru P.Muthusamy

Thiru K.Selvaraj

304095.82

302778.46

304095.82

304095.82

302778.46

x 100

304095.82

304095.82

304766.27

x 100

304766.27

0.43 % less

-0.22 % Exess

The lowest rate quanted by the contractor Thiru P.Muthusamy was 0.44 % less then the estimate rate. So this rate is may
be approved

COMPLETION REPORT
Name of work : Construction of Open Air Theatre at Vedasandur Boys Hr sec school in thattarapatty panchayat.
Estimate Amount:- Rs 3.05 lakhs
As per Estimate
Rate
Amount

S.No

Description of Work

Earthwork excavation in all


clauses of soils and depositing
on bank with initial lead and
lift for foundation as per ss20B

20.42

83.70

1709

Filling with good river sand


including cost & conveyance
of sand and all labour charges
etc., complete as per std.
Specifications.

3.33

268.00

892

Cement concrete 1:4:8 mix


using 40mm ISS HBG metal for
foundation including watering
whenever necessary and laid
in layers not more than 15cm
thick
compacting
etc.,
complete complying with std.
Specifications and as directed.
Rate for 10 cum.

8.66

2339.56

20267

Qty

As per Excution
Qty
Rate
Amount

6.65

9.20

83.00

551.95

268.00

2339.00

21518.80

Increase Decrease

R.R. masonry in c.m.1:5 mix


using rough stones and bond
stones
with
simultaneous
pointing including cost and
conveyance of all materials to
site and all labour charges etc.,
complete.

12.17

2206.35

26859

21.05

2206.00

46436.30

Brick work in c.m 1:5 mix


using country bricks including
cost & conveyance of all
materials to site and all labour
charges etc., complete.

9.83

3334.80

32795

8.80

3334.00

29339.20

Filling with excavated earth


other than sand including all
labour charges as per standard
specification.

13.33

14.70

196

17.94

14.00

251.16

Supply & erection of centering


for sides & soffits of all R.C.C.
works
including cost &
conveyance of all materials to
site and all labour charges etc.,
complete.

108.38

398.00

43135

76.36

398.00

30391.28

Supplying and fabrication of


steel rods including cost &
conveyance of steel as per std.
Specification etc., complete.

1.00

57144.90

57145

1.23684

57140.00

70673.0376

RCC 1:1.5:3 mix using 20 mm


ISS HBG metal for RCC items
of works excluding cost of
reinforcement and fabricating
charges and centering and
shuttering
charges
but
including curing providing
fixtures like fan clamps in the
RCC floor or roof level
wherever
neccessary
and
bearing surfaces of walls, sides
and bottom of slab,beams etc.,

12.29

4438.98

54549

10

Plastering with cement mortar


1:3 mix to 10mm thick
including cost and conveyance
of all materials & all labour
charges etc., complete.

95.43

109.17

11

Plastering with cement mortar


1:5 mix to 12mm thick
including cost and conveyance
of all materials & all labour
charges etc., complete.

101.30

97.14

10.00

4438.50

44385.00

10418

109.00

9840

97.00

12

Providing Granolithic pattern


floor finish with c.c 1:2:4 mix
using 10 to 12mm ISS metal
including cost & conveyance
of all materials to site and all
labour charges etc., complete.

35.72

79.56

2842

79.00

13

Providing weathering course


with best quality of broken
jelly of size 20mm uniform
gauge in pure slacked lime (no
sand to be used) over the roof
slab in the proportion of
brickjelly lime 32:121/2 by
volume and laid over in a
single layer and consolidated

3.32

1939.58

6439

1939.00

14

Finishing the top of roof with


one course of machine pressed
tiles of size 20cmx20cmx20
mm of approved quality laid
in cement mortar 1:3 mix to
12mm thick mixed with water
proofing
compound
confirming to ISS by 2%
weightof cement used and the
joint pointed

41.45

550.53

22819

550.00

15

Distembering two coats with


best quality of distember and
the colour approved by the
departmental
officers
including cost & conveyance
of all materials to site and all
labour charges etc., complete.

168.66

53.10

8956

53.00

16

Cement base paint (Snocem)


two coats over a coat of primer
including removing loose
particles and other materials
including cost and conveyance
of all materials preparation of
surface by and labour charges
etc. complete.

64.76

59.75

3869

59.00

17

Painting two coats with


enamel paint over new iron
work
including
cost
&
conveyance of all materials to
site and all labour charges etc.,
complete.

15.84

86.10

1364

15.00

20

Contigencies
&
unforeseen charges

LS

LS

904

other

Total

305000
Difference =

61453

243546.73
Difference =

M.F. Form No.83


P.U. Form No.55

CC I and Part
MLACD-2013-14

Voucher No.

CONTRACT CERTIFICATE
Name of work : Construction of Open Air Theatre at
Vedasandur Boys Hr sec school in thattarapatty
panchayat.
How executed

Amount of Estimate:Rs
Authority
Name of Contractor :

Last Certificate granted for this if any Voucher No


Quantity Executed
or Supplied
Since
Up to
last
date
Certificat
e

Month
Amount

Rate
ITEMS

Rs P

Per

Up to date

Since last
Certificate

551.95

551.95

6.65

Earthwork excavation in all clauses of


soils and depositing on bank with
initial lead and lift for foundation as
per ss20B

9.20

9.20

Cement concrete 1:4:8 mix using


40mm ISS HBG metal for foundation
including
watering
whenever
necessary and laid in layers not more
2339.00
than 15cm thick compacting etc.,
complete
complying
with
std.
Specifications and as directed. Rate
for 10 cum.

21518.80

21518.80

21.05

R.R. masonry in c.m.1:5 mix using


rough stones and bond stones with
21.05 simultaneous pointing including cost 2206.00
and conveyance of all materials to site
and all labour charges etc., complete.

46436.30

46436.30

8.80

8.80

Brick work in c.m 1:5 mix using


country bricks including cost &
3334.00
conveyance of all materials to site and
all labour charges etc., complete.

29339.20

29339.20

17.94

Filling with excavated earth other


17.94 than sand including all labour
charges as per standard specification.

251.16

251.16

6.65

83.00

14.00

Remar
ks

76.36

Supply & erection of centering for


sides & soffits of all R.C.C. works
76.36 including cost & conveyance of all
materials to site and all labour
charges etc., complete.

30391.28

30391.28

1.24

1.24

Supplying and fabrication of steel


rods including cost & conveyance of
57140.00
steel as per std. Specification etc.,
complete.

70673.04

70673.04

10.00

RCC 1:1.5:3 mix using 20 mm ISS


HBG metal for RCC items of works
excluding cost of reinforcement and
fabricating charges and centering and
shuttering charges but including
10.00
4438.50
curing providing fixtures like fan
clamps in the RCC floor or roof level
wherever neccessary and bearing
surfaces of walls, sides and bottom of
slab,beams etc.,

44385.00

44385.00

Carried Over

398.00

243546.73 243546.73