This document contains information about 5 mercury removal unit (MRU) projects, including:
1. An MRU for Kertih Refinery in Terengganu, Malaysia to remove mercury from 340 m3/hr of light naptha from 25 ppb to <1 ppb.
2. An MRU for an offshore platform in Malaysia to remove mercury from 32.44 mmscfd of natural gas from 600 ug/Nm3 to <1 ug/Nm3.
3. An MRU for a tank farm in New Zealand to remove mercury from 60 m3/hr of NGL from 3-6 ppb to <1 ppb.
4. An MRU for
This document contains information about 5 mercury removal unit (MRU) projects, including:
1. An MRU for Kertih Refinery in Terengganu, Malaysia to remove mercury from 340 m3/hr of light naptha from 25 ppb to <1 ppb.
2. An MRU for an offshore platform in Malaysia to remove mercury from 32.44 mmscfd of natural gas from 600 ug/Nm3 to <1 ug/Nm3.
3. An MRU for a tank farm in New Zealand to remove mercury from 60 m3/hr of NGL from 3-6 ppb to <1 ppb.
4. An MRU for
This document contains information about 5 mercury removal unit (MRU) projects, including:
1. An MRU for Kertih Refinery in Terengganu, Malaysia to remove mercury from 340 m3/hr of light naptha from 25 ppb to <1 ppb.
2. An MRU for an offshore platform in Malaysia to remove mercury from 32.44 mmscfd of natural gas from 600 ug/Nm3 to <1 ug/Nm3.
3. An MRU for a tank farm in New Zealand to remove mercury from 60 m3/hr of NGL from 3-6 ppb to <1 ppb.
4. An MRU for
CUSTOMER CONTRACT LOCATION PRODUCT YEAR OF MATERIAL OF PRODUCT CONDITION
TYPE STREAM INSTALLATION CONSTRUCTION Flow Rate Design Design PURASPEC Volume Hg Removal Pressure Temperature Type (m3) 1 OWNER / CLIENT : EPCC Kertih Refinery, Light Naptha J uly 2010 Carbon Steel 340 m3/hr 19.6 barg 200/ 20 deg C 5158 68 Inlet <25 ppb(wt) PETRONAS PENAPISAN Terengganu Outlet <1 ppb (wt) (TERENGGANU) SDN BHD 2 OWNER : EPC PM329 East Piatu Natural Gas Sept 2011 Duplex 32.44 mmscfd 45.5/FV barg 93/ -29 deg C 1163 6 Inlet 600 ug/Nm3 NEWFIELD PENINSULA Offshore Platform Outlet <1 ug/Nm3 MALAYSIA INC. MAIN CONTRACTOR: KENCANA HL SDN BHD SUB-CONTRACTOR: JET ALLIED SDN BHD 3 OWNER/CLIENT FEED Paritutu Tank Farm NGL J uly 2012 Carbon Steel 60 m3/hr 127.6 barg 38/ -5 deg C 5158 5.5 Inlet 3-6 ppb(wt) SHELL TODD OIL New Plymouth Outlet <1 ppb (wt) SERVICES New Zealand (New Zealand) 4 OWNER: EPCC IRPC Plant Light Naptha+LPG Sept 2013 Carbon Steel 70m3/hr 15.3/ FV barg 87/ 20 deg C 5168 19.7 Inlet 1000 ppb(wt) IRPC PUBLIC COMPANY Rayong Outlet <1 ppb (wt) LIMITED Thailand Heavy Naptha 90 m3/hr 10.3/ FV barg 100/ 20 deg C 5158 22.5 Inlet 1000 ppb(wt) Outlet <1 ppb (wt) Offgas 2500 Nm3/hr 6.8/ FV barg 87/ 20 deg C Activated Carbon 1 Inlet 1000 ppb(wt) Outlet <1 ppb (wt) FEED/EPC/EPCC MRU JOBS JMC 5 OWNER: PROJECT : PETROCHEMICAL NAPHTHA TREATING UNIT (MERCURY REMOVAL) CLIENT : PETRONAS PENAPISAN (TERENGGANU) SDN BHD LOCATION : KERTIH AROMATICS MALAYSIA SDN BHD, KERTIH TERENGGANU CONTRACT COMPLETION PERIOD : MAY 2009 - JULY 2010 DIALOG E & C SDN BHD DIALOG Design, supply, fabricate, installation and precommisioning: BASE PRODUCT - 6 units of Pressure Vessels c/w platforms & ladders CAPACITY: ie Feed Surge Drum, Prefilter, Coalescer, Afterfilter and Absorber. DESIGN PRESSURE: - Fireproofing of Vessel Skirts and Steel Columns DESIGN TEMPERATURE: - 2 units of Centrifugal Pumps CATALYST PROVIDER - One Closed System Sampling Connections Cabinet CATALYST TECHNOLOGY - Structural Steel works(24 tons) MERCURY REMOVAL SPEC. - Piping works (4220 dia-inches) - Underground Piping for DOC (Oil Contaminated Drain) - Electrical & Instrumentation works including DCS upgrade. (E & I cable runs 4880 meter) PECO PREFILTER - 9 Tie In Points including one 10"/ 30" hot tap branch. PECO COALESCER Down to 15ppm (wt) or 10 ppm (v) H2O - Supply and loading of Mercury Removal Absorbent (Puraspec) PECO AFTERFILTER - Estimated Project Manhours - 145,000 m-hr LUMP SUM EPCC SCOPE OF WORKS GENERAL SPECIFICATION OF SYSTEM From 25 wt ppb to <1 wt ppb LIGHT NAPHTHA 19.6 barg 200 deg C JOHNSON MATTHEY CATALYST PURASPEC 340 M 3 /HR Remove 99+% solids 5 and larger Remove 99+% solids 5 and larger st ated oject a ou s 5,000 PROJECT : GAS MERCURY REMOVAL UNIT FOR PM329 EAST PIATU TOPSIDES CLIENT : NEWFIELD PENINSULA PTE. INC. LOCATION : TOPSIDES OF PM329 EAST PIATU DEVELOPMENT PROJECT CONTRACT COMPLETION PERIOD : OCT 2010 - JULY 2011 DIALOG E & C SDN BHD DIALOG Design, supply, fabricate, installation : BASE PRODUCT - 3 units of pressure vessels c/w platforms & ladders SKID DIMENSION ie Coalescer, Absorber and After Filter WEIGHT - One Closed Gas Sampling System CAPACITY: - Structural Steel works (10 tons) DESIGN PRESSURE: 45.5/ FV barg - Piping works (1050 dia-inches) DESIGN TEMPERATURE: 93/ -29 deg C - 5 piping tie in points CATALYST JOHNSON MATTHEY CATALYST - Supply and loading of Mercury Removal Absorbent (PURASPEC 1163) MERCURY REMOVAL SPEC. from 600 ug/Nm3 to <1 ug/Nm3 - Estimated Project Manhours - 42,500 m-hr COALESCER AFTERFILTER 32.44 MMSCFD Remove 99.98% solids 1 and larger Remove 99.99% solids particles & liquid droplet => 0.3 EPC SCOPE OF WORKS GENERAL SPECIFICATION OF SYSTEM HYDROCARBON GAS 29 tons / 37.5 tons (Empty/Operating) 7.5m X 4m x 9 m(L X W X H) PROJECT : NATURAL GAS LIQUID (NGL) MERCURY REMOVAL UNIT CLIENT : SHELL TODD OIL SERVICES (NEW ZEALAND) LOCATION : PARITUTU TANK FARM CONTRACT COMPLETION PERIOD : MAY 2012 - JUNE 2012 DIALOG E & C SDN BHD DIALOG FEED Development of: BASE PRODUCT - 3 units of pressure vessels c/w platforms & ladders SKID DIMENSION ie Pre-Filter, Coalescer & Absorber WEIGHT - One Closed Gas Sampling System CAPACITY: - Structural Steel works DESIGN PRESSURE: 127.6 barg - Piping works DESIGN TEMPERATURE: 38/ -5 deg C - 4 piping tie in points CATALYST JOHNSON MATTHEY CATALYST - Supply and loading of Mercury Removal Absorbent (PURASPEC) MERCURY REMOVAL SPEC. from 3-6 ppb (wt) to <1 ppb (wt) COALESCER AFTERFILTER 60 m3/hr 15 ppm (v) freewater Remove 99 % solids 5 and larger EPC SCOPE OF WORKS GENERAL SPECIFICATION OF SYSTEM Natural Gas Liquid 7 m X 5 m x 8 m (L X W X H) 22 tons /30 tons (Empty/Operating) PROJECT : EPCC OF IRPC MERCURY REMOVAL UNIT FOR CRUDE OIL OPPORTUNITY PROJECT CLIENT : INTERNATIONAL REFINERY PUBLIC COMPANY (IRPC) THAILAND LOCATION : RAYONG, THAILAND CONTRACT COMPLETION PERIOD : FEB 2013 - SEPT 2013 DIALOG E & C SDN BHD DIALOG Design, supply, fabricate, installation, precommisioning and commissioning assistance: BASE PRODUCT LN (Light Naphtha) +LPG Stream HN (Heavy Naphtha) Stream - 10 units of Pressure Vessels c/w platforms & ladders CAPACITY: 70 M 3 /HR 90 M 3 /HR ie Prefilter, Coalescer and Absorber. DESIGN PRESSURE: 15.3/FV barg 10.3/FV barg - Fireproofing of Vessel Skirts and Steel Columns DESIGN TEMPERATURE: 87/20 deg C 100/20 deg C - Two Manual Sampling Connections Cabinets (Open System & Closed System) CATALYST PROVIDER JMC JMC - Structural Steel works CATALYST TECHNOLOGY PURASPEC 5158 PURASPEC 5156 - Piping works MERCURY REMOVAL SPEC. From <1000 ppb(wt) to <1 ppb(wt) From <1000 ppb(wt) to <1 ppb(wt) - Underground Piping for OWS (Oil Water System) PECO PREFILTER Remove 99 % solids 1 and larger Remove 99 % solids 1 and larger - Electrical & Instrumentation works including DCS upgrade. PECO COALESCER Down to 15 -20 ppm (v) free water Down to 15 -20 ppm (v) free water - 11 Piping Tie In Points - Supply and loading of Mercury Absorbent (PURASPEC) - Precommissioning, Start-up & Commissioning Assistance - Performance Guarantee Test LUMP SUM EPCC SCOPE OF WORKS GENERAL SPECIFICATION OF SYSTEMS - Performance Guarantee Test PROJECT : EPCC OF IRPC MERCURY REMOVAL UNIT FOR CRUDE OIL OPPORTUNITY PROJECT CLIENT : INTERNATIONAL REFINERY PUBLIC COMPANY (IRPC) THAILAND LOCATION : RAYONG, THAILAND CONTRACT COMPLETION PERIOD : FEB 2013 - SEPT 2013 DIALOG E & C SDN BHD DIALOG Design, supply, fabricate, installation, precommisioning and commissioning assistance: BASE PRODUCT OFFGAS to Flareline - 1 units of Activated Adsorber c/w platforms & ladders CAPACITY: 2500/1260 Nm3/hr - One Standalone Manual Sampling Connections Cabinets DESIGN PRESSURE: 6.8/FV barg - Piping works DESIGN TEMPERATURE: 87/20 deg C - 4 Piping Tie In Points ADSORBENT PROVIDER CALGON - Supply and loading of Activated Carbon (CALGON HGR 4x10) ADSORBENT TECHNOLOGY HGR 4 X10 - Precommissioning MERCURY REMOVAL SPEC. From <1000 ppb(wt) to <1 ppb(wt) - Start-up and Commissioning - Performance Guarantee Test LUMP SUM EPCC SCOPE OF WORKS GENERAL SPECIFICATION OF SYSTEMS