You are on page 1of 6

NO.

CUSTOMER CONTRACT LOCATION PRODUCT YEAR OF MATERIAL OF PRODUCT CONDITION


TYPE STREAM INSTALLATION CONSTRUCTION Flow Rate Design Design PURASPEC Volume Hg Removal
Pressure Temperature Type (m3)
1 OWNER / CLIENT : EPCC Kertih Refinery, Light Naptha J uly 2010 Carbon Steel 340 m3/hr 19.6 barg 200/ 20 deg C 5158 68 Inlet <25 ppb(wt)
PETRONAS PENAPISAN Terengganu Outlet <1 ppb (wt)
(TERENGGANU) SDN BHD
2 OWNER : EPC PM329 East Piatu Natural Gas Sept 2011 Duplex 32.44 mmscfd 45.5/FV barg 93/ -29 deg C 1163 6 Inlet 600 ug/Nm3
NEWFIELD PENINSULA Offshore Platform Outlet <1 ug/Nm3
MALAYSIA INC.
MAIN CONTRACTOR:
KENCANA HL SDN BHD
SUB-CONTRACTOR:
JET ALLIED SDN BHD
3 OWNER/CLIENT FEED Paritutu Tank Farm NGL J uly 2012 Carbon Steel 60 m3/hr 127.6 barg 38/ -5 deg C 5158 5.5 Inlet 3-6 ppb(wt)
SHELL TODD OIL New Plymouth Outlet <1 ppb (wt)
SERVICES New Zealand
(New Zealand)
4 OWNER: EPCC IRPC Plant Light Naptha+LPG Sept 2013 Carbon Steel 70m3/hr 15.3/ FV barg 87/ 20 deg C 5168 19.7 Inlet 1000 ppb(wt)
IRPC PUBLIC COMPANY Rayong Outlet <1 ppb (wt)
LIMITED Thailand
Heavy Naptha 90 m3/hr 10.3/ FV barg 100/ 20 deg C 5158 22.5 Inlet 1000 ppb(wt)
Outlet <1 ppb (wt)
Offgas 2500 Nm3/hr 6.8/ FV barg 87/ 20 deg C Activated Carbon 1 Inlet 1000 ppb(wt)
Outlet <1 ppb (wt)
FEED/EPC/EPCC MRU JOBS
JMC
5 OWNER:
PROJECT : PETROCHEMICAL NAPHTHA TREATING UNIT (MERCURY REMOVAL)
CLIENT : PETRONAS PENAPISAN (TERENGGANU) SDN BHD
LOCATION : KERTIH AROMATICS MALAYSIA SDN BHD, KERTIH TERENGGANU
CONTRACT COMPLETION PERIOD : MAY 2009 - JULY 2010
DIALOG E & C SDN BHD
DIALOG
Design, supply, fabricate, installation and precommisioning: BASE PRODUCT
- 6 units of Pressure Vessels c/w platforms & ladders CAPACITY:
ie Feed Surge Drum, Prefilter, Coalescer, Afterfilter and Absorber. DESIGN PRESSURE:
- Fireproofing of Vessel Skirts and Steel Columns DESIGN TEMPERATURE:
- 2 units of Centrifugal Pumps CATALYST PROVIDER
- One Closed System Sampling Connections Cabinet CATALYST TECHNOLOGY
- Structural Steel works(24 tons) MERCURY REMOVAL SPEC.
- Piping works (4220 dia-inches)
- Underground Piping for DOC (Oil Contaminated Drain)
- Electrical & Instrumentation works including DCS upgrade. (E & I cable runs 4880 meter) PECO PREFILTER
- 9 Tie In Points including one 10"/ 30" hot tap branch. PECO COALESCER Down to 15ppm (wt) or 10 ppm (v) H2O
- Supply and loading of Mercury Removal Absorbent (Puraspec) PECO AFTERFILTER
- Estimated Project Manhours - 145,000 m-hr
LUMP SUM EPCC SCOPE OF WORKS GENERAL SPECIFICATION OF SYSTEM
From 25 wt ppb to <1 wt ppb
LIGHT NAPHTHA
19.6 barg
200 deg C
JOHNSON MATTHEY CATALYST
PURASPEC
340 M
3
/HR
Remove 99+% solids 5 and larger
Remove 99+% solids 5 and larger
st ated oject a ou s 5,000
PROJECT : GAS MERCURY REMOVAL UNIT FOR PM329 EAST PIATU TOPSIDES
CLIENT : NEWFIELD PENINSULA PTE. INC.
LOCATION : TOPSIDES OF PM329 EAST PIATU DEVELOPMENT PROJECT
CONTRACT COMPLETION PERIOD : OCT 2010 - JULY 2011
DIALOG E & C SDN BHD
DIALOG
Design, supply, fabricate, installation : BASE PRODUCT
- 3 units of pressure vessels c/w platforms & ladders SKID DIMENSION
ie Coalescer, Absorber and After Filter WEIGHT
- One Closed Gas Sampling System CAPACITY:
- Structural Steel works (10 tons) DESIGN PRESSURE: 45.5/ FV barg
- Piping works (1050 dia-inches) DESIGN TEMPERATURE: 93/ -29 deg C
- 5 piping tie in points CATALYST JOHNSON MATTHEY CATALYST
- Supply and loading of Mercury Removal Absorbent (PURASPEC 1163) MERCURY REMOVAL SPEC. from 600 ug/Nm3 to <1 ug/Nm3
- Estimated Project Manhours - 42,500 m-hr COALESCER
AFTERFILTER
32.44 MMSCFD
Remove 99.98% solids 1 and larger
Remove 99.99% solids particles & liquid droplet => 0.3
EPC SCOPE OF WORKS GENERAL SPECIFICATION OF SYSTEM
HYDROCARBON GAS
29 tons / 37.5 tons (Empty/Operating)
7.5m X 4m x 9 m(L X W X H)
PROJECT : NATURAL GAS LIQUID (NGL) MERCURY REMOVAL UNIT
CLIENT : SHELL TODD OIL SERVICES (NEW ZEALAND)
LOCATION : PARITUTU TANK FARM
CONTRACT COMPLETION PERIOD : MAY 2012 - JUNE 2012
DIALOG E & C SDN BHD
DIALOG
FEED Development of: BASE PRODUCT
- 3 units of pressure vessels c/w platforms & ladders SKID DIMENSION
ie Pre-Filter, Coalescer & Absorber WEIGHT
- One Closed Gas Sampling System CAPACITY:
- Structural Steel works DESIGN PRESSURE: 127.6 barg
- Piping works DESIGN TEMPERATURE: 38/ -5 deg C
- 4 piping tie in points CATALYST JOHNSON MATTHEY CATALYST
- Supply and loading of Mercury Removal Absorbent (PURASPEC) MERCURY REMOVAL SPEC. from 3-6 ppb (wt) to <1 ppb (wt)
COALESCER
AFTERFILTER
60 m3/hr
15 ppm (v) freewater
Remove 99 % solids 5 and larger
EPC SCOPE OF WORKS GENERAL SPECIFICATION OF SYSTEM
Natural Gas Liquid
7 m X 5 m x 8 m (L X W X H)
22 tons /30 tons (Empty/Operating)
PROJECT : EPCC OF IRPC MERCURY REMOVAL UNIT FOR CRUDE OIL OPPORTUNITY PROJECT
CLIENT : INTERNATIONAL REFINERY PUBLIC COMPANY (IRPC) THAILAND
LOCATION : RAYONG, THAILAND
CONTRACT COMPLETION PERIOD : FEB 2013 - SEPT 2013
DIALOG E & C SDN BHD
DIALOG
Design, supply, fabricate, installation, precommisioning and commissioning assistance: BASE PRODUCT LN (Light Naphtha) +LPG Stream HN (Heavy Naphtha) Stream
- 10 units of Pressure Vessels c/w platforms & ladders CAPACITY: 70 M
3
/HR 90 M
3
/HR
ie Prefilter, Coalescer and Absorber. DESIGN PRESSURE: 15.3/FV barg 10.3/FV barg
- Fireproofing of Vessel Skirts and Steel Columns DESIGN TEMPERATURE: 87/20 deg C 100/20 deg C
- Two Manual Sampling Connections Cabinets (Open System & Closed System) CATALYST PROVIDER JMC JMC
- Structural Steel works CATALYST TECHNOLOGY PURASPEC 5158 PURASPEC 5156
- Piping works MERCURY REMOVAL SPEC. From <1000 ppb(wt) to <1 ppb(wt) From <1000 ppb(wt) to <1 ppb(wt)
- Underground Piping for OWS (Oil Water System) PECO PREFILTER Remove 99 % solids 1 and larger Remove 99 % solids 1 and larger
- Electrical & Instrumentation works including DCS upgrade. PECO COALESCER Down to 15 -20 ppm (v) free water Down to 15 -20 ppm (v) free water
- 11 Piping Tie In Points
- Supply and loading of Mercury Absorbent (PURASPEC)
- Precommissioning, Start-up & Commissioning Assistance
- Performance Guarantee Test
LUMP SUM EPCC SCOPE OF WORKS GENERAL SPECIFICATION OF SYSTEMS
- Performance Guarantee Test
PROJECT : EPCC OF IRPC MERCURY REMOVAL UNIT FOR CRUDE OIL OPPORTUNITY PROJECT
CLIENT : INTERNATIONAL REFINERY PUBLIC COMPANY (IRPC) THAILAND
LOCATION : RAYONG, THAILAND
CONTRACT COMPLETION PERIOD : FEB 2013 - SEPT 2013
DIALOG E & C SDN BHD
DIALOG
Design, supply, fabricate, installation, precommisioning and commissioning assistance: BASE PRODUCT OFFGAS to Flareline
- 1 units of Activated Adsorber c/w platforms & ladders CAPACITY: 2500/1260 Nm3/hr
- One Standalone Manual Sampling Connections Cabinets DESIGN PRESSURE: 6.8/FV barg
- Piping works DESIGN TEMPERATURE: 87/20 deg C
- 4 Piping Tie In Points ADSORBENT PROVIDER CALGON
- Supply and loading of Activated Carbon (CALGON HGR 4x10) ADSORBENT TECHNOLOGY HGR 4 X10
- Precommissioning MERCURY REMOVAL SPEC. From <1000 ppb(wt) to <1 ppb(wt)
- Start-up and Commissioning
- Performance Guarantee Test
LUMP SUM EPCC SCOPE OF WORKS GENERAL SPECIFICATION OF SYSTEMS