You are on page 1of 6

A)

S.No. Name of Item Quantity Rate (`) Unit Amount (`)


1 OFC 3500 50 P/m 175000
2 PLB 3500 26 P/m 91000
3 WSC 2 2650 Each 5300
4 GI pipe 3 2 240 P/m 480
5 Coupler 35 45 Each 1575
6 SJC/ BJC 5 1000 Each 5000
7 Pig tail 24 450 Each 10800
Total 289155
B)
S.No. Name of Item Quantity Rate (`) Unit Amount (`)
1 OFCT excavation trench and refilling after laying PLB charges 0 27.26 P/m 0
2 HDPE laying of PLB 0 2.29 P/m 0
a) GIHB road / rail horizontal boring HDD 3500 140 P/m 490000
b) GIHB road / rail horizontal boring manual 0 80 P/m 0
6 GIBC laying GI on bridge and culvert 0 1900 Pcm 0
7 RCCT laying of split RCC in trench 50 5 P/m 250
8 OFCP polling of OFC 3500 5 p/m 17500
9 OFST splicing OFC at joint and end 5 2000 Each 10000
10 JCBR contraction of joints chamber 5 1400 P/c 7000
11 ORJF fixing of rout and joint indicator 20 146.3 p/u 2926
12 DOCT documentation of OFC rout 24 50 p/km 1200
2.4 SRCC supply of SRCC 0 50 P/m 0
Total 528876
7.1 Drum recovery of empty drum 2 200 Each -400
B) Grand Total 528476
C)
1
Forest Dept.
600000
2
PWD Dept. & Municipality and Railway
600000
Total 1200000
A) Cable Items for laying OFC : ` 289155
B) OFC laying charges : ` 528476
C) NOC charges : ` 1200000
D) : ` 20000
Grand total : ` 2037631
D E (TRANSMISSION) S D E (TRANSMISSION)
MATHURA MATHURA
List for cable items for laying OFC for Chhatikara-Akshay Patra 2 MB ILL commissioning :
List for cable items for laying OFC for Chhatikara-Akshay Patra 2 MB ILL commissioning :
3
NOC charges of railway, forests PWD, NH-2, Municipality Departments :
Transportation of stores at Different sites and miscellanies
A)
S.No. Name of Item Quantity Rate (`) Unit Amount (`)
1 OFC 46000 50 P/m 2300000
2 PLB 45000 26 P/m 1170000
3 WSC 2 2650 Each 5300
4 GI pipe 3 500 240 P/m 120000
5 Coupler 450 45 Each 20250
6 SJC/ BJC 25 1000 Each 25000
7 Pig tail 100 450 Each 45000
Total 3685550
B)
S.No. Name of Item Quantity Rate (`) Unit Amount (`)
1 OFCT excavation trench and refilling after laying PLB charges 8000 27.26 P/m 218080
2 HDPE laying of PLB 44500 2.29 P/m 101905
a) GIHB road / rail horizontal boring HDD 17000 140 P/m 2380000
b) GIHB road / rail horizontal boring manual 20000 80 P/m 1600000
6 GIBC laying GI on bridge and culvert 45 1900 Pcm 85500
7 RCCT laying of split RCC in trench 2000 5 P/m 10000
8 OFCP polling of OFC 46000 5 p/m 230000
9 OFST splicing OFC at joint and end 30 2000 Each 60000
10 JCBR contraction of joints chamber 30 1400 P/c 42000
11 ORJF fixing of rout and joint indicator 225 146.3 p/u 32917.5
12 DOCT documentation of OFC rout 45 50 p/km 2250
2.4 SRCC supply of SRCC 2000 50 P/m 100000
Total 4862652.5
7.1 Drum recovery of empty drum 23 200 Each -4600
B) Grand Total 4858052.5
C)
1
Forest Dept.
800000
2
PWD Dept. & Municipality and Railway
500000
Total 1300000
A) Cable Items for laying OFC : ` 3685550
B) OFC laying charges : ` 4858052.5
C) NOC charges : ` 1300000
D) : ` 20000
Grand total : ` 9863603
D E (TRANSMISSION)
MATHURA MATHURA
List for cable items for laying OFC for shifting the OFC route along National Highway # 2 between
Kosi to Mathura due to widening of NH#2 from four Lane to six Lane in Mathura SSA :
List of OFC laying charges for shifting the OFC route along National Highway # 2 between Kosi to
Mathura due to widening of NH#2 from four Lane to six Lane in Mathura SSA:
3
NOC charges of railway, forests PWD, NH-2, Municipality Departments :
Transportation of stores at Different sites and miscellanies
S D E (TRANSMISSION)
A)
S.No. Name of Item Quantity Rate (`) Unit Amount (`)
1 OFC 3500 50 P/m 175000
2 PLB 3000 26 P/m 78000
3 WSC 2 2650 Each 5300
4 GI pipe 3 50 240 P/m 12000
5 Coupler 60 45 Each 2700
6 SJC/ BJC 5 1000 Each 5000
7 Pig tail 100 450 Each 45000
Total 323000
B)
S.No. Name of Item Quantity Rate (`) Unit Amount (`)
1 OFCT excavation trench and refilling after laying PLB charges 500 27.26 P/m 13630
2 HDPE laying of PLB 3000 2.29 P/m 6870
a) GIHB road / rail horizontal boring HDD 2000 140 P/m 280000
b) GIHB road / rail horizontal boring manual 500 80 P/m 40000
6 GIBC laying GI on bridge and culvert 4.5 1900 Pcm 8550
7 RCCT laying of split RCC in trench 0 5 P/m 0
8 OFCP polling of OFC 3500 5 p/m 17500
9 OFST splicing OFC at joint and end 3 2000 Each 6000
10 JCBR contraction of joints chamber 3 1400 P/c 4200
11 ORJF fixing of rout and joint indicator 20 146.3 p/u 2926
12 DOCT documentation of OFC rout 3 50 p/km 150
2.4 SRCC supply of SRCC 0 50 P/m 0
Total 379826
7.1 Drum recovery of empty drum 2 200 Each -800
B) Grand Total 379426
C)
1
Forest Dept.
150000
2
PWD Dept. & Municipality and Railway
50000
Total 200000
A) Cable Items for laying OFC : ` 323000
B) OFC laying charges : ` 379426
C) NOC charges : ` 200000
D) : ` 5000
Grand total : ` 907426
D E (TRANSMISSION)
MATHURA MATHURA
List for cable items for laying OFC for shifting the OFC route along National Highway # 59 at
Sadabad due to widening of NH#59 in Mathura SSA :
List of OFC laying charges for shifting the OFC route along National Highway # 59 at Sadabad due
to widening of NH#59 in Mathura SSA:
3
NOC charges of railway, forests PWD, NH-2, Municipality Departments :
Transportation of stores at Different sites and miscellanies
S D E (TRANSMISSION)
A)
S.No. Name of
Item
Quantity Rate (`) Unit Amount
(`)
1 OFC 25000 50 P/m 1E+06
2 PLB 23600 26 P/m 613600
3 WSC 2 2650 Each 5300
4 GI pipe
3
400 240 P/m 96000
5 Coupler 250 45 Each 11250
6 SJC/
BJC
20 1000 Each 20000
7 Pig tail 100 450 Each 45000
Total 2E+06
B)
S.No. Name of
Item
Quantity Rate (`) Unit Amount
(`)
1 OFCT
excavatio
n trench
and
refilling
after
laying
PLB
charges
6000 27.26 P/m 163560
2 HDPE
laying of
PLB
24000 2.29 P/m 54960
a) GIHB
road / rail
horizonta
l boring
HDD
14000 140 P/m 1960000
List for cable items for laying OFC for shifting
List of OFC laying charges for shifting the OFC
route along National Highway # 2 between
3
b) GIHB
road / rail
horizonta
l boring
manual
4000 80 P/m 320000
6 GIBC
laying GI
on bridge
and
culvert
40 1900 Pcm 76000
7 RCCT
laying of
split
RCC in
trench
1000 5 P/m 5000
8 OFCP
polling
of OFC
25000 5 p/m 125000
9 OFST
splicing
OFC at
joint and
end
20 2000 Each 40000
10 JCBR
contracti
on of
joints
chamber
20 1400 P/c 28000
11 ORJF
fixing of
rout and
joint
indicator
145 146.3 p/u 21213.5
12 DOCT
documen
tation of
OFC rout
24 50 p/km 1200
2.4 SRCC
supply of
SRCC
1000 50 P/m 50000
Total 2844934
3
7.1 Drum
recovery
of empty
drum
12 200 Each -2400
B) Grand
Total
2842534
C)
1
Forest
Dept.
600000
2
PWD
Dept. &
Municipa
lity and
Railway
600000
Total 1200000
A) Cable Items for laying OFC : ` 2041150
B) OFC laying charges : ` 2842534
C) NOC charges : ` 1200000
D) : ` 20000
Grand total : ` 6103684
D E (TRANSMISSION)
MATHURA MATHURA
NOC charges of railway, forests PWD, NH-2, Municipality Departments :
Transportation of
S D E (TRANSMISSION)