You are on page 1of 13

NEW ISLAMABAD INTERNATIONAL AIRPORT PROJECT

DATE

12-Jun-14

DAILY PROGRESS REPORT


PACKAGE 1
QUANTITIES
Sr #

DESCRIPTION

UNIT

Earthworks (at Zero Point)

CM

BALANCE

ACHIEVED TILL DATE

PERCENTAGE
COMPLETE

56,000

43,338

77%

REMARKS

PACKAGE 8A
QUANTITIES
Sr #

DESCRIPTION

UNIT

MT

Asphalt

BALANCE

ACHIEVED TILL DATE

PERCENTAGE
COMPLETE

13,086

4,898

37%

REMARKS

HAND BACK BY PACKAGE-8B/SIEMENS


QUANTITIES
Sr #

DESCRIPTION

UNIT

BALANCE

ACHIEVED TILL DATE

PERCENTAGE
COMPLETE

Road Crossing

Nos

172

123

72%

MV/Telecom Duct at NW Apron

RM

1,378

210

15%

LV cable installed in Footpath

RM

11,462

0%

UNIT

TOTAL

% COMPLETE

REMARKS

WATCH TOWERS
ACTIVTIES
1

Finishing works

Nos

55

73%

Plumbing & Electrical works

Nos

55

30%

REMARKS

STONE PITCHING AND GROUTING


QUANTITIES
Sr

DESCRIPTION

UNIT

% COMPLETE
TOTAL

TODAY

TILL DATE

BALANCE

Rip Rap / Stone Dumping (300mm


thick)

CM

14,271

13,442

829

94.19%

Grouting of 300mm thick stone on


slopes of embankment

SM

45,454

42,581

2,873

93.68%

35,535

22,736

12,799

63.98%

2,438

435

84.86%

REMARKS

HEXAGONAL TILES INSTALLATION


3

Hexagonal Tiles 50mm thick

SM

HAND RAILING ALONG ROAD 1 & UNDER PASSES


4

Hand Railing along R1 & UPs

RM

2,873

WATER WORKS - TANK REPAIR - WATER PROOFING


Sr

DESCRIPTION

Tank Repair

CAPACITY IN
M.GALLONS

7.224

Percentage Complete
Surface
Repair

Foam Injection

Dewatering

Internal
Coating

Total Percentage Complete

Water Filling

100%

100%

100%

93%

86%

97%

Package-8A: Security Watch Tower Status Sheet

Interior
Plaster

Exterior
Plaster

MEP WORKS

Septic Tank

Internal &
External
Paint

Floor Tile
Terrazo

Bath Tile

Description of Work

WT # 01

100%

100%

30%

100%

70%

100%

100%

WT # 02

100%

100%

30%

100%

70%

100%

100%

WT # 03

100%

100%

30%

100%

70%

100%

100%

WT # 04

100%

100%

30%

100%

70%

100%

100%

WT # 05

100%

100%

30%

100%

70%

100%

100%

WT # 06

100%

100%

30%

100%

70%

100%

100%

WT # 07

100%

100%

30%

100%

70%

100%

100%

WT # 08

100%

100%

30%

100%

70%

100%

100%

10

WT # 10

100%

100%

30%

100%

70%

100%

100%

11

WT # 11

100%

100%

30%

100%

70%

100%

100%

12

WT # 12

100%

100%

30%

100%

70%

100%

100%

13

WT # 13

100%

100%

30%

100%

70%

100%

100%

14

WT # 14

100%

100%

30%

100%

70%

100%

100%

15

WT # 15

100%

100%

30%

100%

70%

100%

100%

16

WT # 16

100%

100%

30%

100%

70%

100%

100%

17

WT # 17

100%

100%

30%

100%

70%

100%

100%

18

WT # 18

100%

100%

30%

100%

70%

100%

100%

19

WT # 19

100%

100%

30%

100%

70%

100%

100%

20

WT # 20

100%

100%

30%

100%

70%

100%

100%

21

WT # 21

100%

100%

30%

100%

70%

100%

100%

22

WT # 22

100%

100%

30%

100%

70%

100%

100%

23

WT # 23

100%

100%

30%

100%

70%

100%

100%

Sr. No

Watch Tower No's

9
24

61
24

WT # 25

25

WT # 26

26

WT # 27

27

WT # 28

28

WT # 29

29

WT # 62

100%

100%

30%

100%

70%

100%

100%

30

WT # 63

100%

100%

20%

100%

70%

100%

70%

31

WT # 64

100%

100%

30%

100%

70%

100%

100%

32

WT # 65

100%

100%

30%

100%

50%

100%

100%

33

WT # 66

100%

100%

30%

100%

100%

100%

34

WT # 67

100%

100%

30%

100%

100%

100%

35

WT # 68

100%

100%

30%

100%

100%

100%

36

WT # 69

100%

100%

30%

100%

100%

100%

OVER ALL PERCENTAGE


Liveable+Non Liveable A+B Average %
LIVEABLE WATCH TOWER MEP OVERALL %

30%

62
27
72

Steel Railing

Steel Stair

Over all
percentage

100%

100%

96%

100%

100%

96%

100%

100%

96%

100%

100%

96%

100%

100%

96%

100%

100%

96%

100%

100%

96%

100%

100%

96%

100%

100%

96%

100%

100%

96%

100%

100%

96%

100%

100%

96%

100%

100%

96%

100%

100%

96%

100%

100%

96%

100%

100%

96%

100%

100%

96%

100%

100%

96%

100%

100%

96%

100%

100%

96%

100%

100%

96%

100%

100%

96%
0%
0%

0%
0%
0%
0%
0%
0%
100%

100%

96%

100%

100%

93%

100%

100%

96%

100%

100%

94%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

76%
73%

NL - Finishing Works
Package-8A: Security Watch Tower Status Sheet
Description of Work
Sr. No

Watch Tower No's

Internal &
Roof
External water i/c
Plaster Tile work
100%

100%

Flooring
100%

Roof
water Steel Stair
proofing & Railing

WT # 38

100%

50%

WT # 39

WT # 40

WT # 41

Existing

WT # 42

Location will be decided after completion of


Boundary wall (Boundary wall design issue)

WT # 43

0%

0%

50%

0%

0%

WT # 44

0%

0%

50%

0%

0%

WT # 45

0%

0%

50%

0%

0%

10

WT # 46

11

WT # 47

0%

0%

50%

0%

0%

12

WT # 48

0%

0%

50%

0%

0%

13

WT # 49

Existing

14

WT # 50

Existing

15

WT # 51

100%

100%

100%

100%

100%

16

WT # 52

100%

100%

100%

100%

100%

17

WT # 53

100%

100%

100%

100%

100%

18

WT # 54

19

WT # 55

100%

100%

100%

100%

100%

20

WT # 56

100%

100%

100%

100%

100%

21

WT # 57

100%

100%

100%

100%

0%

22

WT # 58

100%

100%

100%

100%

100%

23

WT # 59

24

WT # 60

100%

100%

Location will be decided after completion of


Boundary wall (Boundary wall design issue)
100%

0%

100%

0%

50%

Existing

Existing

Existing
100%

100%

100%

OVER ALL PERCENTAGE

Over all
percentage
90%
0%
50%
0%
0%
10%
10%
10%
0%
10%
10%
0%
0%
100%
100%
100%
0%
100%
100%
75%
100%
0%
100%

42%

Package-8A: Security Watch Tower Status Sheet

Internal &
External
Plaster

Roof water
i/c Tile work

Flooring

Roof water
proofing

Steel Stair &


Railing

Description of Work

WT # 30

100%

100%

100%

100%

100%

WT # 31

100%

100%

100%

100%

100%

WT # 32

100%

100%

100%

100%

100%

WT # 33

100%

100%

100%

100%

100%

WT # 34

100%

100%

100%

100%

100%

WT # 35

100%

100%

100%

100%

100%

WT # 80

100%

100%

100%

100%

100%

WT # 81

100%

100%

100%

100%

100%

10

WT # 82

100%

100%

100%

100%

100%

11

WT # 83

100%

100%

100%

100%

100%

12

WT # 84

100%

100%

100%

100%

100%

13

WT # 85

100%

100%

100%

100%

100%

14

WT # 86

100%

100%

100%

100%

100%

15

WT # 87

100%

100%

100%

100%

100%

16

WT # 88

100%

100%

100%

100%

100%

Sr. No

Watch Tower No's

OVER ALL PERCENTAGE

Over all
percentage
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%

100%

WATER WORKS - TANK REPAIR - WATER PROOFING


Sr
1
2
3
4
5
6
7
8
9
10
11
12
13
14

DESCRIPTION
Potable Water Tank 1.1
Potable Water Tank 1.2
Potable Water Tank 1.3
Potable Water Tank 2.1
Potable Water Tank 2.2
Potable Water Tank 2.3
Raw Water Tank 1.1
Raw Water Tank 1.2
Raw Water Tank 1.3
Raw Water Tank 2.1
Raw Water Tank 2.2
Raw Water Tank 2.3
Potable Water Pumphouse -1
Potable Water Pumphouse -2
Total

CAPACITY IN WEIGHT
Surface
M.GALLONS FACTOR
Repair
0.615
8.5%
100%
0.615
8.5%
100%
0.615
8.5%
100%
0.615
8.5%
100%
0.615
8.5%
100%
0.615
8.5%
100%
0.503
7.0%
100%
0.503
7.0%
100%
0.503
7.0%
100%
0.503
7.0%
100%
0.503
7.0%
100%
0.503
7.0%
100%
0.260
3.6%
100%
0.260
3.6%
100%
7.224
100.0%
100%

Percentage Complete
Water
Foam
Filling
Injection
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%

centage Complete
Dewatering
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
0%
93%

Internal
Coating
0%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
0%
86%

Total
Percentage
Complete
6.8%
8.5%
8.5%
8.5%
8.5%
8.5%
7.0%
7.0%
7.0%
7.0%
7.0%
7.0%
3.6%
2.2%
97%