SC4259-101-04 FREEBOARD CALCULATION

AREA: 0.0625m
2


1. EXPLANATION

This calculation is completed in accordance with The International Convention on load lines,
1966 revised by the protocol of 1988.

2. PRINCIPAL DIMENSIONS

Length (O.A.) 192.9 m
Length (B.P.) 182.0 m
Moulded breadth 27.80 m
Moulded depth 15.50 m
Draft designed 10.00m
Draft scantling 11.20m

3. RULE DEFINED DIMENSIONS

Type of Ship B
Ship Length (L) 183.557m
Ship Breadth (B) 27.8m
Moulded Depth (D) 15.50m
Depth for freeboard(D1) 15.515m
Block Coefficient (Cb) 0.747

Where: Cb = /LBd1 =0.747
d1 is 85 percent of the least moulded depth
d1 = 13.175 m
is the moulded volume of the ship taken at d1
= 50230.547 m
3


4. CALCULATION OF MINIMUM FREEBOARD

Summer freeboard calculation as following:
F = F
0
+ F
1
+ F
2
+ F
3
+F
4
+F
5


Where: F
0
Tabular freeboard, mm , See Regulation 28 Table B.
F
1
Correction to the freeboard for ships under 100 meters in length, mm , See
Regulation 29.
F
2
Correction for block coefficient, mm ,See Regulation 30.
F
3
Correction for depth for freeboard, mm , See Regulation 31.
F
4
Correction for effective superstructure and trunks, mm ,See Regulation 37.
F
5
Correction for variations from standard sheer profile, mm , See Regulation
38.
4.1 Tabular Freeboard
This ship is considered as type B ship, the tabular freeboard is determined from table B:
L = 183.557 m F
0
= 2980 mm

4.2 Correction for Length
As L > 100 m F1 = 0

4.3 Correction for Block Coefficient
Cb = 0.747>0.68
F
2
=[ (Cb+0.68)/1.36-1]F
1
=147

4.4 Correction for Depth
D1=15.515 > L/15 = 12.237 m
As L = 183.557 > 120 R = 250
F
3
= (D1 L/15) R = 819 mm


PAGE
5 3
/ XM439-101-04
SC4259-101-04 FREEBOARD CALCULATION

AREA: 0.0625m
2

4.5 Deduction for Superstructures and Trunks
Length of effective superstructures is 53.957 m, equal to 0.2940L
F0 = -1070 mm k = 14.7%
F4 = F0 k = 157 mm
Where: Effective length of superstructure calculation:
Fcle length
Lf= 37.957 m
Poop Length
La= 16.000 m
S= Lf+La = 53.957 m

4.6 Correction for variations from standard sheer profile

4.6.1 Actual sheer credit Sa , Sf (where L in meters)
Station Ordinate Factor Multiplication
A.P. 0 1 0
After L/6 from A.P. 0 3 0
L/3 from A.P. 0 3 0
Half Amidships 0 1 0
0
Sa = /8 0

Station Ordinate Factor Multiplication
Amidships 0 1 0
Forward L/3 from F.P. 0 3 0
L/6 from F.P. 11.9 3 35.7
Half F.P. 100.0 1 100.0
135.7
Sf = /8 16.962

4.6.2 Standard sheer credit Sao , Sfo
Station Ordinate Factor Multiplication
A.P. 1779.6 1 1779.6
After L/6 from A.P. 790.2 3 2370.6
L/3 from A.P. 199.3 3 597.9
Half Amidships 0 1 0
4748.1

Sao= /8
593.5

Station Ordinate Factor Multiplication
Amidships 0 1 0
Forward L/6 from F.P. 398.6 3 1195.8
L/3 from F.P. 1580.4 3 4741.2
Half F.P. 3559.2 1 3559.2
9496.2
Sfo = /8 1187.0

4.6.3 Effect of height of forecastle & poop.
Actual height of forecastle in F.P. Hf = 3000 mm
Actual height of poop in A.P. Ha= 3000 mm
Standard height of superstructure Ho =2300 mm
As Hf > Ho Yf = Hf Ho = 700 mm
As Ha > Ho Ya = Ha Ho = 700 mm
So sheer credit h = (Y L)/3L
Where : L a= 16.000 m, L f= 37.957 m, L = 183.557 m
ha= (Ya La)/3L= 20.34 mm


PAGE
5 4
/ XM439-101-04
SC4259-101-04 FREEBOARD CALCULATION

AREA: 0.0625m
2

hf= (Yf Lf )/3L = 48.25 mm


PAGE
5 5
/ XM439-101-04
SC4259-101-04 FREEBOARD CALCULATION

AREA: 0.0625m
2


4.6.3Correction for variations from standard sheer profile
F
5
= [0.5 (W + U)-h] (0.75 0.5 S/L) = 490 mm
Where: S = 53.957 m, L = 183.557 m
U = Sfo Sf = 1170.04 mm
W = Sao Sa = 593.50mm
h= ha+ hf = 68.59 mm

4.7 Calculation of summer freeboard
F = F0 + F1 + F2 + F3 +F4 +F5
= 2980+0+147+819-157+490 = 4279 mm
Designed summer freeboard F = 15515- 11200= 4315 mm
to be more than rule calculation F = 4279 mm

5. ASSIGN FREEBOARD

5.1 Summer Freeboard F = 4315 mm
5.2 Tropical Freeboard Ft = F - T / 48 = 4315-11200/48= 4082 mm
5.3 Winter Freeboard Fw = F + T / 48 = 4548 mm
5.4 Summer Fresh Water Freeboard
Ff = F 10 / (40 Tc) = 4091 mm
Where: = 42234.918 t, Tc = 47.062 t/cm
5.5 Tropical Fresh Water Freeboard
Ftf = Ft 10 / (40 Tc) = 3858 mm

6. CALCULATION OF MINIMUM BOW HEIGHT

The bow height defined as the vertical distance at the forward perpendicular between the waterline
corresponding to the assigned summer freeboard and the designed trim and the top of the exposed
deck at side shall be not less than :

As L < 250 m H = 56L(1-L/500) [1.36/(Cb + 0.68)] = 6200 mm

Actual bow height H = 7330 mm > 6200 mm to be complied with the requirement of rule.
The effective forecastle length is greater than 0.07L.So the bow height is complied with the
requirement of rule.