In addition to this, HMX expects to procure trial orders for DAMA / Economizer during the year.
Manpower planning: Installation activities are being carried out by factory personnel being sent
on deputation. HMX proposes to transfer / recruit new boys for installation and commissioning.
Installation & commissioning co-ordination: In the first deliveries being effected, a few co
ordination issues (between HMX & CTG) arose. These are being sorted out to avoid
recurrence. Company is preparing a dossier of ‘lessons learnt’ from each of the project sites.
This should help the company streamline the various issues pertaining to product – despatch –
site co ordination –installation – commissioning.
July-2009
SUMAYA HMX SYSTEMS PVT. LTD., BANGALORE - 560058 - ISO 9001 : 2008
(Planned : April’09 - Oct’09)
Sl. Apr-
Activity July Aug Sep Oct
No. Jun
4 Forms - HR Provided
11 Forms - MR Provided
28 Approval of Documents
August-09
i. Control Panel:
For 2nos.of 41K Hybrid machine supplied to M/s. ITC ltd. Ranjangoan thru’ ETA
Engineering, a special Control panel with Rittal Box was assembled and inspected
by ITC engineers with their Electrical consultants. This control panel is more
sophisticated than the usual control panels made in-house. Hence this is separately
highlighted.
Photos of the control panel being packed and loaded in a Lorry are enclosed as
Annexure-1.
Draft Quality manuals for Production, Purchase, Design & Quality Control done.
Manuals are under finalization stage.
iii. Service
A system to analyze service reports & take a corrective action has been discussed and
implemented on a trial basis this month.
Frequent complaints pertaining to Pump failure was reviewed. Design dept. was asked
to study an alternate pump preferably a submersible one, keeping in mind the cost of it.
CAR reports enclosed as Annexure-6.
Minutes of Meeting
Quality
control-
03 Sandeep 15-10-09
• Machine specification sheets were made for small (3K to 10K) medium(10K to 50K) and
Large Size ( 50K to 3L K )machines. The machine specification covered the entire
requirement of the Sales team which captured both mechanical and electrical data for
different static pressures.
• Quality plans drawn for components and sub-assembly was implemented for Wipro
Dabur machines. Inspection report done for these machines and submitted to Wipro
Quality dept.
• As part of ISO,Clause Elements training was conducted for all sectional incharge.
• We have commenced collecting Machine & men utilization data. Month wise utilisation
is being shown from the month of August 2009.
Train No Train Name
6530
Stn Ro
S Arri Depar Dista
Co Stn Name ute
# val ture nce
de No
SB BANGALO
1 1 - 20:10 0000
C RE CY JN
BN BANGALO 20:
2 1 20:25 0005
C RE CANT 20
DB DODBALL 21:
3 1 21:18 0048
U APUR 17
GB GAURIBID 22:
4 1 22:02 0087
D ANUR 01
HU HINDUPU 22:
5 1 22:26 0111
P R 25
PK PENUKON 22:
6 1 22:52 0148
D DA 51
SS SAI P 23:
7 1 23:17 0168
PN NILAYAM 12
DM DHARMAV 00:
8 1 00:25 0201
M ARAM JN 20
AT ANANTAP 01:
9 1 01:10 0235
P UR 09
02:
10 GY GOOTY 1 02:50 0292
49
GT GUNTAKA 03:
11 1 03:20 0320
L L JN 15
04:
12 AD ADONI 1 04:05 0372
04
MA MANTHRA 04:
13 1 04:40 0413
LM LAYAM RD 39
05:
14 RC RAICHUR 1 05:10 0441
09
KS 05:
15 KRISHNA 1 05:40 0466
N 39
NR NARAYAN 05:
16 1 06:00 0486
PD PET ROAD 59
06:
17 YG YADGIR 1 06:20 0510
19
06:
18 NW NALWAR 1 06:40 0535
39
WA 07:
19 WADI 1 08:00 0549
DI 55
SD SHAHABA 08:
20 1 08:13 0559
B D 12
GULBARG 08:
21 GR 1 08:50 0585
A 49
GU GANAGAP 09:
22 1 09:15 0612
R UR ROAD 14
DU 09:
23 DUDHANI 1 09:40 0635
D 39
AK AKALKOT 10:
24 1 10:10 0663
OR ROAD 09
SU SOLAPUR 11:
25 1 11:30 0698
R JN 15
KW KURDUVA 12:
26 1 12:35 0777
V DI 34
DAUND 14:
27 DD 1 14:25 0886
JN 20
PU 15:
28 PUNE JN 1 15:55 0962
NE 50
LONAVAL 17:
29 LNL 1 17:05 1025
A 04
KY KALYAN 18:
30 1 18:40 1100
N JN 39
19:
31 DR DADAR 1 19:25 1144
24
CS MUMBAI 19:
32 1 - 1153
TM CST 50
Bottom of Form