Romania Investment Case

A road infrastructure perspective


Agenda


Current macroeconomic developments in Romania
Configuring the legal framework for PPPs and public
procurement
Projects proposed for implementation (public budget
and/or private finance)
Short- and medium-term road strategy
Current developments in Romania (1)
2012-2013 are years of macroeconomic stability;
economic growth resumed in 2011, reaching 0.7% in 2012 and is
seen accelerating in 2013 (1.6% estimated)
largely as a result of strengthening industrial activity / export-
oriented sectors
impact in the current account balance
the years to follow (2014-2016) are dedicated to economic
relaunch
Inflation followed a downward path (volatility influenced
mainly by the non-core components)
Flat multi-annual inflation target (December / December): 2.5%
starting 2013
Current developments in Romania (2)
Romania is no longer in the excessive deficit procedure (ESA,
% GDP); the EU assumed deficit limit of 3% is respected (in
the first 3 months of 2013);
The default probability is smaller than that of Spain, Slovenia,
Portugal, Italy and Hungary; the CDS has registered a
decreasing tendency;
The growth rate of public debt has slowed down, enabling
fiscal space for larger investments in education, health,
infrastructure and agriculture;
Public debt well below the Maastricht criterion
The Ministry of Finance issued 300 million Lei denominated
bonds to be reimbursed in 2016 at a 4,90% interest rate;
Fitch confirmed Romanias credit rating at BBB- with stable
perspective;
What we want for the future
To reduce fiscal evasion
To bring more money into the economy:
o Attracting investments
o Daimler case: 300 million Euro plus 400 new jobs
o Exxon, OMV and Romgaz: offshore energy explorations
(about 1 billion Euro)
o OMV Petrom: 200 million Euro at Suplacu de Barcau,
500 million euro at Brazi
o China Huadian Engineering: 1 billion Euro at Rovinari
o Increasing the absorption rate of EU funds:
o Extraordinary impact on the infrastructure development
o Close cooperation with the European Commission for
the next budgetary programming period

PPP legal framework: our vision
To finalize the legislation in the field, thus enabling
contracts with the following characteristics:
An optimised Value for Money for the infrastructure projects on
long-term basis (the whole-life contract)
Attraction of new (private) capital sources into the provision of
infrastructure
o private economic operators,
o investment funds,
o institutional investors (pension funds and other private
financing institutions), relieving the pressure from public
sector (project associated debt or risk);
PPP legal framework: principles
Large upfront investment capital cost (for public infrastructure)
is avoided
Later payments (from final users or from the public authority),
to cover construction and maintenance costs, generally come
once the assets are ready for operation (when involving works)
or when services are provided;
Projects can also be classified as off-balance sheet for the
public sector:
Assets involved in these projects could be classified as non-
governmental assets (with no immediate impact on the public
debt and budget deficit): subject to fulfilling Eurostat criteria
(ESA 2010)
Public procurement legal framework
The cumulated estimated value of the public procurement
awarding procedures was approximately 20% of the GDP in
2012
An analysis was done on the time spent in the awarding
procedures, internally, by the contracting authorities.
And where the action / inaction of the public authorities have an
impact on the entering into force of the public procurement
contracts
EGO 34/2006 was modified to impose new deadlines with
regard the evaluation of bids in different awarding procedures
Stages which do not depend on the bidders or which would
impose new constraints for the bidders
Special attention for improving efficiency in the public
procurement process
Infrastructure projects
15 infrastructure projects to which the Government pays
special attention:
Transport (roads, inland waterway and port)
Energy (nuclear, hydro, shale gas)
IT (access to justice and land registry)
Mining (gold and copper)
Sources to attract private finance:
Through privatization or concession / PPP
3 road projects for which the tender has already started
(Comarnic-Brasov, South Section of the Bucharest Ring Road
and Craiova-Pitesti)

CURRENTLY, THE ROAD NETWORK IN ROMANIA, ADMINISTERED
EXCLUSIVELY BY CNADNR, IS STRUCTURED IN :

MOTORWAYS 548 KM
EUROPEAN NATIONAL ROADS 6.037 KM
MAIN NATIONAL ROADS 4.465 KM
SECONDARY NATIONAL ROADS 5.998 KM

TOTAL: 17.048 KM

THE NATIONAL ROADS NETWORK
Motorway construction program
Motorways in exploitation
548 km
Motorways in execution
188 km
Motorways in tender
362 km
Motorways in preparation
1826 km
TOTAL
Motorway program
2924 km
12
Urziceni
ILIA
E79
TUSNAD
CAREI
Nusfalau
MARGHITA
Virfurile
NUCET
HUNEDOARA
Sarmisegetuza
BAILEHERCULANE
BAIADEARAMA
Carasova
58
ORAVITA
MOLDOVANOUA
Bozovici
Pojejana
57A
Socol
E70
Naidas
57
Gradinari
57
57B
Topleta
ORSOVA
57
Berzeasca
56B
E771
E
7
0
Iablanita
57B
ANINA
67D
6
76
Dragesti
Les
NADLAC
Biled
Carpinis
SINNICOLAU
59B
59C
MARE
JIMBOLIA
Lovrin
6
Cenad
E68
7
E68
Capruta
LIPOVA
69
58B
MORAVITA
DETA
E70
Voiteg
59
Berzovia
BOCSA
TIMISOARA
E671
59A
Ortisoara
Vinga
E70
LUGOJ
CARANSEBES
OTELUROSU
E
7
0
58
Saceni
RESITA
6
58A
68
E673
Savirsin
Faget
68A Cosava
7
Inana
SALONTA
CHISINEU-CRIS 79A
ARAD
E671
Nadab
Turnu
Paulis
79A
VARSAND
79
E671
79A
INEU
Gurahont
E79
VASCAU
76
E79
Copaceni
Pocola
BEIUS
E60
BORS
Sacueni
Baile Felix
Biharia
ORADEA
1
19
ALESD
E60
1H
de Bacau
Supiacu
19B
Valea lui Mihai
19
1F
Cataloi Ianca
BUZAU Vernesti
VALENII
Schitu
Domnesti lui Neag
22D
73C 67A E79
PLOIESTI
DEMUNTE
OTOPENI
Adunatii-
Copaceni
Calugareni
41
64
OCNELE
Dobroteasa
Babeni
MARI
DRAGASANI
CARACAL
Brincoveni BALS E79
56
CALAFAT Rast
Maglavit
Cetate
56A
E79
55A
Dabuleni
Bechet 54A
55
Rodovan
CRAIOVA
6
Leu
Bumbesti-
Scoarta
Pesteana-Jiu
MOTRU
E
7
9
Brosteni
TURNUSEVERIN
VINJUMARE
67A
Simian 6
Floresti
DROBETA
67
STREHAIA
FILIASI
6
6
Runcu
Pieptani
67D
67
67
TIRGUJIU
ROVINARI
Jiu
66
Balcesti
Tintareni
E70
65C
Hurezani
67B
Ganeasa
Giulesti
HOREZU
Maldaresti
Gradistea
TIRGUCARBUNESTI
Cimpu Mare
67B
Bengesti
Polovraci
NOVACI
GOVORA
65C 64
BAILE
67
64
Clejani
DEVEDE
TURNUMAGURELE
ROSIORII
52
54
CORABIA
E70
Stoenesti
54
Daneasa
65A
6
65A
GIURGIU
Smirdioasa
ZIMNICEA
51
51A
E85
E70
5C
Ghimpati
ALEXANDRIA
Draganesti Vlasca
6
E70 5B
Daia
E85
5
6 61
Dragomiresti
72A
Cerbu Vedea
67B
Ungheni
SLATINA
65
E574
COSTESTI
Redea
65A
E70
CURTEA
DEARGES
E81
7C
RIMNICU
VILCEA
Budau
73C
PITESTI
73
7
E574
Golesti
E60
Bildana
Cringasi
Crevedia Mare
TITU
GAESTI
7
A1
BUFTEA
1
TIRGOVISTE
I.L.Caragiale
72 71
FIENI
1A
72
CIMPINA
1
A2
21
3
Vlad Tepes
Cuza
Budesti
OLTENITA Greaca
4
Minastirea
3B
CALARASI
Ostrov
Voda
31
Baneasa
Corvin
3
Cilibia
Pogoanele
2A
Fundulea
E85
Branesti
Pasarea
E60
2
3
Gara
Lehliu
Lehliu
URZICENI
E60
Malu
Costesti
MIZIL
1D
Albesti
1B
E85
2C
2B
3A
SLOBOZIA
Drajna
TANDAREI
21
Dragalina
Stefan Voda
3A
Amara
2C
FETESTI
Facaeni
3B
Insuratei
Grivita
FAUREI
GIURGENI
21A
E577
2B
21
22C
CONSTANTA
EFORIENORD
NEPTUN
JUPITER
MANGALIA
COSTINESTI
EFORIESUD
Vama Veche
E87
E675
Ovidiu
Cobadin
Amzacea
Negru voda
38
Pietreni
Basarabi
E87
VENUS
SATURN
Agigea
39
BABADAG
Capul Midia
NAVODARI
Mihai
Scraiu
CERNAVODA
Kogalniceanu
Mihail
2A
E60
22
22B
E87
Viteazu
22D
Horia
Nalbant
Ciucurova
Rohman
22A
Topolog
Cerna
E87
Caugagia
22D
22
22A
Cimpului
Varful
Cracaoani
Praxia
Tarcau
Ghimes-Faget
MIERCUREACIUC
COMANESTI
INTORSATURA
BUZAULUI
Ungureni
Maneciu-
E85
29A
15 E576
BORSEC Deda
Zimbar
VESTEM
BUCURESTI
TIRNAVENI
MEDIAS
Blajel
Axente Sever
COPSAMICA
15
Criscior 14B 74
SEBES
7A PETROSANI
Pui
HATEG
URICANI
Cimpu
Cirnesti
E79
66
66
66A
SIMERIA
CALAN
68B
DEVA
76
Soimus
ORASTIE
ZLATNA
7
Talmaciu
Obirsia Lotrului
Voineasa
BREZOI
7A
Malaia
7
E81
E81
Sugag
57C
E68
1/7
SIBIU
14
ALBAIULIA
Buru
Albac
BRAD
74
Buces
Arieseni
CIMPENI
Bucium
ABRUD
Lupsa
75
HUEDIN
1 1G
1F
CIMPIATURZII TURDA
BLAJ
Teius
1
14B
AIUD
Miraslau
E81
14A
Iernut
E60
CLUJ NAPOCA
Apahida
E60
Rascruci
Dimbu
Camarasu
16
Hoghiz
RUPEA
Sercaia
73A
Bilea Lac
Poienari
7C
CIMPULUNG
Rucar
E574
Voila
Cirtisoara
1
Avrig
E68
FAGARAS
Sinca
Veche
1
10
BRASOV
PREDEAL
SINAIA
COMARNIC
Moroeni
71
E60
RISNOV
Bran
73A
73
1A
Cheia
SACELE
GHEORGHE
SFINTU
E68
CODLEA
1
3
E574
Reci
Chichis
Prejmer
11
SECUIESC
12
TIRGU
13A
TOPLITA
ODORHEIU
SECUIESC
Corund
13A MURES Praid
SIGHISOARA
Singeorgiu
DUMBRAVENI
13
14
Balauseri
E
6
0
Lupeni
TIRGU
REGHIN
16
15
1
5
A
15
SOVATA
BAILETUSNAD
VLAHITA
Sinmartin
Cozmeni
11B
Sindominic
GHEORGHIENI Joseni
13B 12
12
Ditrau
12A
BICAZ
Lacu Rosu
12C
VISEUDESUS
Romuli
MARMATIEI Petea
Livada SIGHETU
E
8
1
E
5
8
1C
OAS
Somcul Mare
Surduc
Sinmihaiu Almasului
Sarmasag
Romanasi
E
8
1
ZALAU
SIMLEU
SILVANIEI
1F
Tihau
JIBOU
1H
1H
Supuru de jos
SATUMARE
Ardud
E81
19A
Dorolf
E671
Satulung
E671
1C
Seini
1C
Vama
17C
GHERLA
1
7
1C
DEJ
Gilgau
E58
Rastoci
E
5
7
6
1
7
Cosbuc
17D
Feresti
BAIASPRIE
BAIAMARE
18
Mara
Sacel
18
E81/E58
1C
HALMEU
Mare
Tarna
19
Sapinta
de Sus
Vicovu
RADAUTI
DORNEI
VATRA
E
5
76
Iacobeni
Rodna
Prundu Birgaului
SINGEORZ-BAI
17C
BISTRITA
NASAUD
E
5
8
1
7
Borsa
Moisei
17D
18
Cirlibaba
Chiril
Brosteni
17B
Borca
15B
Poiana
Largului
15
MOLDOVENESC
CIMPULUNG
GURAHUMORULUI
Moldovitei
Vatra
Vama
Sucevita
17A
E
5
8
Ilisesti
1
7
Marginea
2
SIRET
E85
Ralos
29C
E581
ROMAN 15D
26
HUSI
Falciu
Oancea
Foltesti
Smirdan
Tulucesti
E581
Bretcu
FOCSANI
MARASESTI
2D
Nehoiu
Cislau
Ciuta
Siriu
RIMNICUSARAT
10
2D
Lepsa
Vidra
25
Independenta
Balta Alba 22
2
Sendreni
Sarat
BRAILA
Traian
Lacu Movila
Miresii
2B
GALATI
Gara Berheci
TECUCI
E85
24
Hanu Conachi
BACAU
Secuieni
15D
2GScorteni
Sanduleni
TIRGU
OCNA
Oituz
11
SLANIC
MOLDOVA
12B
Darmanesti
MOINESTI
11A
ONESTI
E574
E85
PIATRANEAMT
BUHUSI
15
Sirbi
BIRLAD
ADJUD
Podu Turcu
11A
24A
26
Murgeni
Zorleni
E581
VASLUI
Vulturesti
15D
Dragomiresti
2F
NEGRESTI
24B
Crasna
ALBITA
24B
ISACCEA
Garvan
MACIN
22
2B
E87
24A
E583/E58
Stanca 29B
E583
Stefanesti
TIRGUFRUMOS
Nicolae Balcescu
Miclauseni
PASCANI
Sabaoani
TIRGU
NEAMT
Dobreni
15C
15C
Motoc
Strunga
28
Ruginoasa
28A
BOTOSANI
SUCEAVA
FALTICENI
29C
29
Rutani
E58
HIRLAU
28B
29D
SCULENI
Vinatori
BUCIUM
IASI
28
Podu Iloaiei E58
24
28
Prut
Radauti
DARABANI
George Enescu
DOROHOI
29A
Manoleasa
SAVENI
Ungureni
29
TULCEA
HIRSOVA
Ungheni
Bacau
Sibiu
Brasov
Calafat
Albita
Focsani
Craiova
MOTORWAY CONSTRUCTION PROGRAM
Fagaras
Sighisoara
Dr. Turnu
Severin
Alexandria
Gilau
Suplacu de
Barcau
Targu Mures
Campia
Turzii
Mihaiesti
Ploiesti
Comarnic
Iasi
Bucuresti
Buzau
Nadlac
Arad
Timisoara
Lugoj
Deva
Orastie
Sebes
Constanta
Turda
Bors
Agigea
Pitesti
Motorways in preparation
1826,08 km
Motorways in exploitation
547,74 km
Motorways in execution
188 km
Motorways in tender
362 km
TOTAL motorway program
2923,36 km
Motorway construction program / 2.924 KM
Status of the motorway construction program (1)
October 2013

A. Motorways in exploitation (548 km), out of which, in 2013 (up to October), 17.7
km were received / completed, representing Simeria - Ortie section, km 0 +000 -
km 17 +700;


B. Motorways in execution (188 km):
Cohesion Fund financing, 182 km motorway (within the Pan-European
Transport Corridor no. IV)
Lugoj Deva motorway, sections 1 4,
Orastie Sibiu and bypass Sebes, sections 1 4
State budget funding, Bucuresti Moara Vlasiei section (6,5 km)
C. Motorways in tender: 135 km, with Cohesion Fund financing, are in tender
(the works contracts will be signed progressively, in the last quarter of 2013 and first
quarter of 2014:
Nadlac Arad (sections 1 and 2)
Timisoara Lugoj (section 2)
Sebes Turda (all 4 sections)

D. Motorways in preparation: 1409 km, out of which 622,66 km are proposed
for financing in the future programming period (2014-2020), covering the
following sections:
Sibiu Pitesti,
Brasov Sibiu,
Brasov Bacau Iasi Ungheni and
Craiova Calafat.
Status of the motorway construction program (2)
Urziceni
ILIA
E79
TUSNAD
CAREI
Nusfalau
MARGHITA
Virfurile
NUCET
HUNEDOARA
Sarmisegetuza
BAILEHERCULANE
BAIADEARAMA
Carasova
58
ORAVITA
MOLDOVANOUA
Bozovici
Pojejana
57A
Socol
E70
Naidas
57
Gradinari
57
57B
Topleta
ORSOVA
57
Berzeasca
56B
E771
E
7
0
Iablanita
57B
ANINA
67D
6
76
Dragesti
Les
NADLAC
Biled
Carpinis
SINNICOLAU
59B
59C
MARE
JIMBOLIA
Lovrin
6
Cenad
E68
7
E68
Capruta
LIPOVA
69
58B
MORAVITA
DETA
E70
Voiteg
59
Berzovia
BOCSA
TIMISOARA
E671
59A
Ortisoara
Vinga
E70
LUGOJ
CARANSEBES
OTELUROSU
E
7
0
58
Saceni
RESITA
6
58A
68
E673
Savirsin
Faget
68A Cosava
7
Inana
SALONTA
CHISINEU-CRIS 79A
ARAD
E671
Nadab
Turnu
Paulis
79A
VARSAND
79
E671
79A
INEU
Gurahont
E79
VASCAU
76
E79
Copaceni
Pocola
BEIUS
E60
BORS
Sacueni
Baile Felix
Biharia
ORADEA
1
19
ALESD
E60
1H
de Bacau
Supiacu
19B
Valea lui Mihai
19
1F
Cataloi Ianca
BUZAU Vernesti
VALENII
Schitu
Domnesti lui Neag
22D
73C 67A E79
PLOIESTI
DEMUNTE
OTOPENI
Adunatii-
Copaceni
Calugareni
41
64
OCNELE
Dobroteasa
Babeni
MARI
DRAGASANI
CARACAL
Brincoveni BALS E79
56
CALAFAT Rast
Maglavit
Cetate
56A
E79
55A
Dabuleni
Bechet 54A
55
Rodovan
CRAIOVA
6
Leu
Bumbesti-
Scoarta
Pesteana-Jiu
MOTRU
E
7
9
Brosteni
TURNUSEVERIN
VINJUMARE
67A
Simian 6
Floresti
DROBETA
67
STREHAIA
FILIASI
6
6
Runcu
Pieptani
67D
67
67
TIRGUJIU
ROVINARI
Jiu
66
Balcesti
Tintareni
E70
65C
Hurezani
67B
Ganeasa
Giulesti
HOREZU
Maldaresti
Gradistea
TIRGUCARBUNESTI
Cimpu Mare
67B
Bengesti
Polovraci
NOVACI
GOVORA
65C 64
BAILE
67
64
Clejani
DEVEDE
TURNUMAGURELE
ROSIORII
52
54
CORABIA
E70
Stoenesti
54
Daneasa
65A
6
65A
GIURGIU
Smirdioasa
ZIMNICEA
51
51A
E85
E70
5C
Ghimpati
ALEXANDRIA
Draganesti Vlasca
6
E70 5B
Daia
E85
5
6 61
Dragomiresti
72A
Cerbu Vedea
67B
Ungheni
SLATINA
65
E574
COSTESTI
Redea
65A
E70
CURTEA
DEARGES
E81
7C
RIMNICU
VILCEA
Budau
73C
PITESTI
73
7
E574
Golesti
E60
Bildana
Cringasi
Crevedia Mare
TITU
GAESTI
7
A1
BUFTEA
1
TIRGOVISTE
I.L.Caragiale
72 71
FIENI
1A
72
CIMPINA
1
A2
21
3
Vlad Tepes
Cuza
Budesti
OLTENITA Greaca
4
Minastirea
3B
CALARASI
Ostrov
Voda
31
Baneasa
Corvin
3
Cilibia
Pogoanele
2A
Fundulea
E85
Branesti
Pasarea
E60
2
3
Gara
Lehliu
Lehliu
URZICENI
E60
Malu
Costesti
MIZIL
1D
Albesti
1B
E85
2C
2B
3A
SLOBOZIA
Drajna
TANDAREI
21
Dragalina
Stefan Voda
3A
Amara
2C
FETESTI
Facaeni
3B
Insuratei
Grivita
FAUREI
GIURGENI
21A
E577
2B
21
22C
CONSTANTA
EFORIENORD
NEPTUN
JUPITER
MANGALIA
COSTINESTI
EFORIESUD
Vama Veche
E87
E675
Ovidiu
Cobadin
Amzacea
Negru voda
38
Pietreni
Basarabi
E87
VENUS
SATURN
Agigea
39
BABADAG
Capul Midia
NAVODARI
Mihai
Scraiu
CERNAVODA
Kogalniceanu
Mihail
2A
E60
22
22B
E87
Viteazu
22D
Horia
Nalbant
Ciucurova
Rohman
22A
Topolog
Cerna
E87
Caugagia
22D
22
22A
Cimpului
Varful
Cracaoani
Praxia
Tarcau
Ghimes-Faget
MIERCUREACIUC
COMANESTI
INTORSATURA
BUZAULUI
Ungureni
Maneciu-
E85
29A
15 E576
BORSEC Deda
Zimbar
VESTEM
BUCURESTI
TIRNAVENI
MEDIAS
Blajel
Axente Sever
COPSAMICA
15
Criscior 14B 74
SEBES
7A PETROSANI
Pui
HATEG
URICANI
Cimpu
Cirnesti
E79
66
66
66A
SIMERIA
CALAN
68B
DEVA
76
Soimus
ORASTIE
ZLATNA
7
Talmaciu
Obirsia Lotrului
Voineasa
BREZOI
7A
Malaia
7
E81
E81
Sugag
57C
E68
1/7
SIBIU
14
ALBAIULIA
Buru
Albac
BRAD
74
Buces
Arieseni
CIMPENI
Bucium
ABRUD
Lupsa
75
HUEDIN
1 1G
1F
CIMPIATURZII TURDA
BLAJ
Teius
1
14B
AIUD
Miraslau
E81
14A
Iernut
E60
CLUJ NAPOCA
Apahida
E60
Rascruci
Dimbu
Camarasu
16
Hoghiz
RUPEA
Sercaia
73A
Bilea Lac
Poienari
7C
CIMPULUNG
Rucar
E574
Voila
Cirtisoara
1
Avrig
E68
FAGARAS
Sinca
Veche
1
10
BRASOV
PREDEAL
SINAIA
COMARNIC
Moroeni
71
E60
RISNOV
Bran
73A
73
1A
Cheia
SACELE
GHEORGHE
SFINTU
E68
CODLEA
1
3
E574
Reci
Chichis
Prejmer
11
SECUIESC
12
TIRGU
13A
TOPLITA
ODORHEIU
SECUIESC
Corund
13A MURES Praid
SIGHISOARA
Singeorgiu
DUMBRAVENI
13
14
Balauseri
E
6
0
Lupeni
TIRGU
REGHIN
16
15
1
5
A
15
SOVATA
BAILETUSNAD
VLAHITA
Sinmartin
Cozmeni
11B
Sindominic
GHEORGHIENI Joseni
13B 12
12
Ditrau
12A
BICAZ
Lacu Rosu
12C
VISEUDESUS
Romuli
MARMATIEI Petea
Livada SIGHETU
E
8
1
E
5
8
1C
OAS
Somcul Mare
Surduc
Sinmihaiu Almasului
Sarmasag
Romanasi
E
8
1
ZALAU
SIMLEU
SILVANIEI
1F
Tihau
JIBOU
1H
1H
Supuru de jos
SATUMARE
Ardud
E81
19A
Dorolf
E671
Satulung
E671
1C
Seini
1C
Vama
17C
GHERLA
1
7
1C
DEJ
Gilgau
E58
Rastoci
E
5
7
6
1
7
Cosbuc
17D
Feresti
BAIASPRIE
BAIAMARE
18
Mara
Sacel
18
E81/E58
1C
HALMEU
Mare
Tarna
19
Sapinta
de Sus
Vicovu
RADAUTI
DORNEI
VATRA
E
5
76
Iacobeni
Rodna
Prundu Birgaului
SINGEORZ-BAI
17C
BISTRITA
NASAUD
E
5
8
1
7
Borsa
Moisei
17D
18
Cirlibaba
Chiril
Brosteni
17B
Borca
15B
Poiana
Largului
15
MOLDOVENESC
CIMPULUNG
GURAHUMORULUI
Moldovitei
Vatra
Vama
Sucevita
17A
E
5
8
Ilisesti
1
7
Marginea
2
SIRET
E85
Ralos
29C
E581
ROMAN 15D
26
HUSI
Falciu
Oancea
Foltesti
Smirdan
Tulucesti
E581
Bretcu
FOCSANI
MARASESTI
2D
Nehoiu
Cislau
Ciuta
Siriu
RIMNICUSARAT
10
2D
Lepsa
Vidra
25
Independenta
Balta Alba 22
2
Sendreni
Sarat
BRAILA
Traian
Lacu Movila
Miresii
2B
GALATI
Gara Berheci
TECUCI
E85
24
Hanu Conachi
BACAU
Secuieni
15D
2GScorteni
Sanduleni
TIRGU
OCNA
Oituz
11
SLANIC
MOLDOVA
12B
Darmanesti
MOINESTI
11A
ONESTI
E574
E85
PIATRANEAMT
BUHUSI
15
Sirbi
BIRLAD
ADJUD
Podu Turcu
11A
24A
26
Murgeni
Zorleni
E581
VASLUI
Vulturesti
15D
Dragomiresti
2F
NEGRESTI
24B
Crasna
ALBITA
24B
ISACCEA
Garvan
MACIN
22
2B
E87
24A
E583/E58
Stanca 29B
E583
Stefanesti
TIRGUFRUMOS
Nicolae Balcescu
Miclauseni
PASCANI
Sabaoani
TIRGU
NEAMT
Dobreni
15C
15C
Motoc
Strunga
28
Ruginoasa
28A
BOTOSANI
SUCEAVA
FALTICENI
29C
29
Rutani
E58
HIRLAU
28B
29D
SCULENI
Vinatori
BUCIUM
IASI
28
Podu Iloaiei E58
24
28
Prut
Radauti
DARABANI
George Enescu
DOROHOI
29A
Manoleasa
SAVENI
Ungureni
29
TULCEA
HIRSOVA
GILAU
SECTIONS IN EXECUTION
188 km
SECTIONS IN TENDER
135 km
AUTOSTRADA BUCURESTI PLOIESTI
Tronsonul Bucuresti Moara Vlasiei,
Sectiunea km 0+000 km 6+500
Lungime: 6,5 km
Constructor: Pizzarotti & Tirrena Scavi
Consultant: Consitrans & Consugal
ORASTIE SIBIU si Bypass SEBES
Lot 4 km 65+965 km 82+070
Lungime: 16,1 km
Constructor: Asocierea Astaldi SpA,
Euroconstruct 98 SRL & Astalrom SA
Consultant: Asocierea Consitrans,
Via Design & Omicron-Ampero

ORASTIE SIBIU
Lot 1 km 0+000 km 24+100
Lungime: 24,1 km
Constructor: SC STRABAG SRL
Consultant: Asocierea Consitrans,
Via Design & Omicron-Ampero
MOTORWAY CONSTRUCTION PROGRAM WITH FINANCING FROM
EU AND STATE BUDGET
LUGOJ DEVA Lot 4 km77+361-99+508
Lungime: 22,14 km
Constructor: Asocierea S.C. Tehnostrade &
S.C. Spedition UMB
Consultant: in curs de lansare procedura
achizitie publica servicii de consultanta
LUGOJ - DEVA
Lot 2 km 27+620 km 56+220
Lungime: 28,600
Lot 3 km 56+220 km 77+361
Lungime: 21,14 km
SEBES TURDA
Lungime: 70 km


LUGOJ - DEVA
Lot 1 Lugoj Dumbrava km0+000-27+400
Lungime: 27,4 km
Constructor: Asocierea Tirena Scavi SpA
Societa Italiana per Condotte dAcqua SpA
Cossi Constructioni
Consultant: Asocierea Search Corp
ConsulgalConsultores
ORASTIE SIBIU si Bypass SEBES
Lot 2 km 24+100 km 43+855
Lungime: 19,7 km
Constructor: Asocierea Straco Grup
Studio Corona SRL Civil Engineering
Consultant: Asocierea Consitrans,
Via Design & Omicron-Ampero
ORASTIE SIBIU si Bypass SEBES
Lot 3 km 43+855 km 65+965
Lungime: 22,1 km
Constructor: Impregilo SpA
Consultant: Asocierea Consitrans,
Via Design & Omicron-Ampero
Nadlac
Arad
NADLAC ARAD si drum de legatura
Lot 1 km 0+000 km 22+218
Lungime: 22,218
Lot 2 km 22+218 km 38+882
Lungime: 16,6 km
Lugoj
Deva
Orastie
Sebes
Sibiu
Ploiesti
Bucuresti
Turda
TIMISOARA - LUGOJ
Lot 2 km 54+000 km 79+625
Lungime: 25,625

Lungime: 322,36 km
17
Urziceni
ILIA
E79
TUSNAD
CAREI
Nusfalau
MARGHITA
Virfurile
NUCET
HUNEDOARA
Sarmisegetuza
BAILEHERCULANE
BAIADEARAMA
Carasova
58
ORAVITA
MOLDOVANOUA
Bozovici
Pojejana
57A
Socol
E70
Naidas
57
Gradinari
57
57B
Topleta
ORSOVA
57
Berzeasca
56B
E771
E
7
0
Iablanita
57B
ANINA
67D
6
76
Dragesti
Les
NADLAC
Biled
Carpinis
SINNICOLAU
59B
59C
MARE
JIMBOLIA
Lovrin
6
Cenad
E68
7
E68
Capruta
LIPOVA
69
58B
MORAVITA
DETA
E70
Voiteg
59
Berzovia
BOCSA
TIMISOARA
E671
59A
Ortisoara
Vinga
E70
LUGOJ
CARANSEBES
OTELUROSU
E
7
0
58
Saceni
RESITA
6
58A
68
E673
Savirsin
Faget
68A Cosava
7
Inana
SALONTA
CHISINEU-CRIS 79A
ARAD
E671
Nadab
Turnu
Paulis
79A
VARSAND
79
E671
79A
INEU
Gurahont
E79
VASCAU
76
E79
Copaceni
Pocola
BEIUS
E60
BORS
Sacueni
Baile Felix
Biharia
ORADEA
1
19
ALESD
E60
1H
de Bacau
Supiacu
19B
Valea lui Mihai
19
1F
Cataloi Ianca
BUZAU Vernesti
VALENII
Schitu
Domnesti lui Neag
22D
73C 67A E79
PLOIESTI
DEMUNTE
OTOPENI
Adunatii-
Copaceni
Calugareni
41
64
OCNELE
Dobroteasa
Babeni
MARI
DRAGASANI
CARACAL
Brincoveni BALS E79
56
CALAFAT Rast
Maglavit
Cetate
56A
E79
55A
Dabuleni
Bechet 54A
55
Rodovan
CRAIOVA
6
Leu
Bumbesti-
Scoarta
Pesteana-Jiu
MOTRU
E
7
9
Brosteni
TURNUSEVERIN
VINJUMARE
67A
Simian 6
Floresti
DROBETA
67
STREHAIA
FILIASI
6
6
Runcu
Pieptani
67D
67
67
TIRGUJIU
ROVINARI
Jiu
66
Balcesti
Tintareni
E70
65C
Hurezani
67B
Ganeasa
Giulesti
HOREZU
Maldaresti
Gradistea
TIRGUCARBUNESTI
Cimpu Mare
67B
Bengesti
Polovraci
NOVACI
GOVORA
65C 64
BAILE
67
64
Clejani
DEVEDE
TURNUMAGURELE
ROSIORII
52
54
CORABIA
E70
Stoenesti
54
Daneasa
65A
6
65A
GIURGIU
Smirdioasa
ZIMNICEA
51
51A
E85
E70
5C
Ghimpati
ALEXANDRIA
Draganesti Vlasca
6
E70 5B
Daia
E85
5
6 61
Dragomiresti
72A
Cerbu Vedea
67B
Ungheni
SLATINA
65
E574
COSTESTI
Redea
65A
E70
CURTEA
DEARGES
E81
7C
RIMNICU
VILCEA
Budau
73C
PITESTI
73
7
E574
Golesti
E60
Bildana
Cringasi
Crevedia Mare
TITU
GAESTI
7
A1
BUFTEA
1
TIRGOVISTE
I.L.Caragiale
72 71
FIENI
1A
72
CIMPINA
1
A2
21
3
Vlad Tepes
Cuza
Budesti
OLTENITA Greaca
4
Minastirea
3B
CALARASI
Ostrov
Voda
31
Baneasa
Corvin
3
Cilibia
Pogoanele
2A
Fundulea
E85
Branesti
Pasarea
E60
2
3
Gara
Lehliu
Lehliu
URZICENI
E60
Malu
Costesti
MIZIL
1D
Albesti
1B
E85
2C
2B
3A
SLOBOZIA
Drajna
TANDAREI
21
Dragalina
Stefan Voda
3A
Amara
2C
FETESTI
Facaeni
3B
Insuratei
Grivita
FAUREI
GIURGENI
21A
E577
2B
21
22C
CONSTANTA
EFORIENORD
NEPTUN
JUPITER
MANGALIA
COSTINESTI
EFORIESUD
Vama Veche
E87
E675
Ovidiu
Cobadin
Amzacea
Negru voda
38
Pietreni
Basarabi
E87
VENUS
SATURN
Agigea
39
BABADAG
Capul Midia
NAVODARI
Mihai
Scraiu
CERNAVODA
Kogalniceanu
Mihail
2A
E60
22
22B
E87
Viteazu
22D
Horia
Nalbant
Ciucurova
Rohman
22A
Topolog
Cerna
E87
Caugagia
22D
22
22A
Cimpului
Varful
Cracaoani
Praxia
Tarcau
Ghimes-Faget
MIERCUREACIUC
COMANESTI
INTORSATURA
BUZAULUI
Ungureni
Maneciu-
E85
29A
15 E576
BORSEC Deda
Zimbar
VESTEM
BUCURESTI
TIRNAVENI
MEDIAS
Blajel
Axente Sever
COPSAMICA
15
Criscior 14B 74
SEBES
7A PETROSANI
Pui
HATEG
URICANI
Cimpu
Cirnesti
E79
66
66
66A
SIMERIA
CALAN
68B
DEVA
76
Soimus
ORASTIE
ZLATNA
7
Talmaciu
Obirsia Lotrului
Voineasa
BREZOI
7A
Malaia
7
E81
E81
Sugag
57C
E68
1/7
SIBIU
14
ALBAIULIA
Buru
Albac
BRAD
74
Buces
Arieseni
CIMPENI
Bucium
ABRUD
Lupsa
75
HUEDIN
1 1G
1F
CIMPIATURZII TURDA
BLAJ
Teius
1
14B
AIUD
Miraslau
E81
14A
Iernut
E60
CLUJ NAPOCA
Apahida
E60
Rascruci
Dimbu
Camarasu
16
Hoghiz
RUPEA
Sercaia
73A
Bilea Lac
Poienari
7C
CIMPULUNG
Rucar
E574
Voila
Cirtisoara
1
Avrig
E68
FAGARAS
Sinca
Veche
1
10
BRASOV
PREDEAL
SINAIA
COMARNIC
Moroeni
71
E60
RISNOV
Bran
73A
73
1A
Cheia
SACELE
GHEORGHE
SFINTU
E68
CODLEA
1
3
E574
Reci
Chichis
Prejmer
11
SECUIESC
12
TIRGU
13A
TOPLITA
ODORHEIU
SECUIESC
Corund
13A MURES Praid
SIGHISOARA
Singeorgiu
DUMBRAVENI
13
14
Balauseri
E
6
0
Lupeni
TIRGU
REGHIN
16
15
1
5
A
15
SOVATA
BAILETUSNAD
VLAHITA
Sinmartin
Cozmeni
11B
Sindominic
GHEORGHIENI Joseni
13B 12
12
Ditrau
12A
BICAZ
Lacu Rosu
12C
VISEUDESUS
Romuli
MARMATIEI Petea
Livada SIGHETU
E
8
1
E
5
8
1C
OAS
Somcul Mare
Surduc
Sinmihaiu Almasului
Sarmasag
Romanasi
E
8
1
ZALAU
SIMLEU
SILVANIEI
1F
Tihau
JIBOU
1H
1H
Supuru de jos
SATUMARE
Ardud
E81
19A
Dorolf
E671
Satulung
E671
1C
Seini
1C
Vama
17C
GHERLA
1
7
1C
DEJ
Gilgau
E58
Rastoci
E
5
7
6
1
7
Cosbuc
17D
Feresti
BAIASPRIE
BAIAMARE
18
Mara
Sacel
18
E81/E58
1C
HALMEU
Mare
Tarna
19
Sapinta
de Sus
Vicovu
RADAUTI
DORNEI
VATRA
E
5
76
Iacobeni
Rodna
Prundu Birgaului
SINGEORZ-BAI
17C
BISTRITA
NASAUD
E
5
8
1
7
Borsa
Moisei
17D
18
Cirlibaba
Chiril
Brosteni
17B
Borca
15B
Poiana
Largului
15
MOLDOVENESC
CIMPULUNG
GURAHUMORULUI
Moldovitei
Vatra
Vama
Sucevita
17A
E
5
8
Ilisesti
1
7
Marginea
2
SIRET
E85
Ralos
29C
E581
ROMAN 15D
26
HUSI
Falciu
Oancea
Foltesti
Smirdan
Tulucesti
E581
Bretcu
FOCSANI
MARASESTI
2D
Nehoiu
Cislau
Ciuta
Siriu
RIMNICUSARAT
10
2D
Lepsa
Vidra
25
Independenta
Balta Alba 22
2
Sendreni
Sarat
BRAILA
Traian
Lacu Movila
Miresii
2B
GALATI
Gara Berheci
TECUCI
E85
24
Hanu Conachi
BACAU
Secuieni
15D
2GScorteni
Sanduleni
TIRGU
OCNA
Oituz
11
SLANIC
MOLDOVA
12B
Darmanesti
MOINESTI
11A
ONESTI
E574
E85
PIATRANEAMT
BUHUSI
15
Sirbi
BIRLAD
ADJUD
Podu Turcu
11A
24A
26
Murgeni
Zorleni
E581
VASLUI
Vulturesti
15D
Dragomiresti
2F
NEGRESTI
24B
Crasna
ALBITA
24B
ISACCEA
Garvan
MACIN
22
2B
E87
24A
E583/E58
Stanca 29B
E583
Stefanesti
TIRGUFRUMOS
Nicolae Balcescu
Miclauseni
PASCANI
Sabaoani
TIRGU
NEAMT
Dobreni
15C
15C
Motoc
Strunga
28
Ruginoasa
28A
BOTOSANI
SUCEAVA
FALTICENI
29C
29
Rutani
E58
HIRLAU
28B
29D
SCULENI
Vinatori
BUCIUM
IASI
28
Podu Iloaiei E58
24
28
Prut
Radauti
DARABANI
George Enescu
DOROHOI
29A
Manoleasa
SAVENI
Ungureni
29
TULCEA
HIRSOVA
Ungheni
Bacau
Sibiu
Brasov
Pitesti
Calafat
Albita
Focsani
SECTIONS IN PREPARATION
1409 km
Motorway construction program
IN PREPARATION (projects proposed to be implemented in concession regime
are not included)
Fagaras
Sighisoara
Lugoj
Dr. Turnu
Severin
Gilau
Suplacu de
Barcau
Targu Mures
Campia
Turzii
Mihaiesti
Ploiesti
Comarnic
Iasi
Bors
E. Starting with 2012, a Concession program has been launched, covering
644,26 km newly built motorway.

Motorways (in concession regime) in tender the following projects are in various
stages of the competitive dialogue awarding procedure for the works concession contract
(design, build, finance, operate and maintain) more specifically, 537,2 km, out of which
227,2 km newly built motorway :
South Section of the Bucharest Ring Road (with operation and maintenance and
A1 and A2 motorways)
Craiova Pitesti motorway,
Bucuresti Brasov motorway, Comarnic Brasov section.

Motorways (in concession regime) in preparation 417 KM:
North Section of the Bucharest Ring Road Nord (52,77 km);
Ploiesti Buzau Focsani motorway (142,3 km);
Bucuresti Alexandria Craiova motorway (222 km).


Status of the motorway construction program (3)
Urziceni
ILIA
E79
TUSNAD
CAREI
Nusfalau
MARGHITA
Virfurile
NUCET
HUNEDOARA
Sarmisegetuza
BAILEHERCULANE
BAIADEARAMA
Carasova
58
ORAVITA
MOLDOVANOUA
Bozovici
Pojejana
57A
Socol
E70
Naidas
57
Gradinari
57
57B
Topleta
ORSOVA
57
Berzeasca
56B
E771
E
7
0
Iablanita
57B
ANINA
67D
6
76
Dragesti
Les
NADLAC
Biled
Carpinis
SINNICOLAU
59B
59C
MARE
JIMBOLIA
Lovrin
6
Cenad
E68
7
E68
Capruta
LIPOVA
69
58B
MORAVITA
DETA
E70
Voiteg
59
Berzovia
BOCSA
TIMISOARA
E671
59A
Ortisoara
Vinga
E70
LUGOJ
CARANSEBES
OTELUROSU
E
7
0
58
Saceni
RESITA
6
58A
68
E673
Savirsin
Faget
68A Cosava
7
Inana
SALONTA
CHISINEU-CRIS 79A
ARAD
E671
Nadab
Turnu
Paulis
79A
VARSAND
79
E671
79A
INEU
Gurahont
E79
VASCAU
76
E79
Copaceni
Pocola
BEIUS
E60
BORS
Sacueni
Baile Felix
Biharia
ORADEA
1
19
ALESD
E60
1H
de Bacau
Supiacu
19B
Valea lui Mihai
19
1F
Cataloi Ianca
BUZAU Vernesti
VALENII
Schitu
Domnesti lui Neag
22D
73C 67A E79
PLOIESTI
DEMUNTE
OTOPENI
Adunatii-
Copaceni
Calugareni
41
64
OCNELE
Dobroteasa
Babeni
MARI
DRAGASANI
CARACAL
Brincoveni BALS E79
56
CALAFAT Rast
Maglavit
Cetate
56A
E79
55A
Dabuleni
Bechet 54A
55
Rodovan
CRAIOVA
6
Leu
Bumbesti-
Scoarta
Pesteana-Jiu
MOTRU
E
7
9
Brosteni
TURNUSEVERIN
VINJUMARE
67A
Simian 6
Floresti
DROBETA
67
STREHAIA
FILIASI
6
6
Runcu
Pieptani
67D
67
67
TIRGUJIU
ROVINARI
Jiu
66
Balcesti
Tintareni
E70
65C
Hurezani
67B
Ganeasa
Giulesti
HOREZU
Maldaresti
Gradistea
TIRGUCARBUNESTI
Cimpu Mare
67B
Bengesti
Polovraci
NOVACI
GOVORA
65C 64
BAILE
67
64
Clejani
DEVEDE
TURNUMAGURELE
ROSIORII
52
54
CORABIA
E70
Stoenesti
54
Daneasa
65A
6
65A
GIURGIU
Smirdioasa
ZIMNICEA
51
51A
E85
E70
5C
Ghimpati
ALEXANDRIA
Draganesti Vlasca
6
E70 5B
Daia
E85
5
6 61
Dragomiresti
72A
Cerbu Vedea
67B
Ungheni
SLATINA
65
E574
COSTESTI
Redea
65A
E70
CURTEA
DEARGES
E81
7C
RIMNICU
VILCEA
Budau
73C
PITESTI
73
7
E574
Golesti
E60
Bildana
Cringasi
Crevedia Mare
TITU
GAESTI
7
A1
BUFTEA
1
TIRGOVISTE
I.L.Caragiale
72 71
FIENI
1A
72
CIMPINA
1
A2
21
3
Vlad Tepes
Cuza
Budesti
OLTENITA Greaca
4
Minastirea
3B
CALARASI
Ostrov
Voda
31
Baneasa
Corvin
3
Cilibia
Pogoanele
2A
Fundulea
E85
Branesti
Pasarea
E60
2
3
Gara
Lehliu
Lehliu
URZICENI
E60
Malu
Costesti
MIZIL
1D
Albesti
1B
E85
2C
2B
3A
SLOBOZIA
Drajna
TANDAREI
21
Dragalina
Stefan Voda
3A
Amara
2C
FETESTI
Facaeni
3B
Insuratei
Grivita
FAUREI
GIURGENI
21A
E577
2B
21
22C
CONSTANTA
EFORIENORD
NEPTUN
JUPITER
MANGALIA
COSTINESTI
EFORIESUD
Vama Veche
E87
E675
Ovidiu
Cobadin
Amzacea
Negru voda
38
Pietreni
Basarabi
E87
VENUS
SATURN
Agigea
39
BABADAG
Capul Midia
NAVODARI
Mihai
Scraiu
CERNAVODA
Kogalniceanu
Mihail
2A
E60
22
22B
E87
Viteazu
22D
Horia
Nalbant
Ciucurova
Rohman
22A
Topolog
Cerna
E87
Caugagia
22D
22
22A
Cimpului
Varful
Cracaoani
Praxia
Tarcau
Ghimes-Faget
MIERCUREACIUC
COMANESTI
INTORSATURA
BUZAULUI
Ungureni
Maneciu-
E85
29A
15 E576
BORSEC Deda
Zimbar
VESTEM
BUCURESTI
TIRNAVENI
MEDIAS
Blajel
Axente Sever
COPSAMICA
15
Criscior 14B 74
SEBES
7A PETROSANI
Pui
HATEG
URICANI
Cimpu
Cirnesti
E79
66
66
66A
SIMERIA
CALAN
68B
DEVA
76
Soimus
ORASTIE
ZLATNA
7
Talmaciu
Obirsia Lotrului
Voineasa
BREZOI
7A
Malaia
7
E81
E81
Sugag
57C
E68
1/7
SIBIU
14
ALBAIULIA
Buru
Albac
BRAD
74
Buces
Arieseni
CIMPENI
Bucium
ABRUD
Lupsa
75
HUEDIN
1 1G
1F
CIMPIATURZII TURDA
BLAJ
Teius
1
14B
AIUD
Miraslau
E81
14A
Iernut
E60
CLUJ NAPOCA
Apahida
E60
Rascruci
Dimbu
Camarasu
16
Hoghiz
RUPEA
Sercaia
73A
Bilea Lac
Poienari
7C
CIMPULUNG
Rucar
E574
Voila
Cirtisoara
1
Avrig
E68
FAGARAS
Sinca
Veche
1
10
BRASOV
PREDEAL
SINAIA
COMARNIC
Moroeni
71
E60
RISNOV
Bran
73A
73
1A
Cheia
SACELE
GHEORGHE
SFINTU
E68
CODLEA
1
3
E574
Reci
Chichis
Prejmer
11
SECUIESC
12
TIRGU
13A
TOPLITA
ODORHEIU
SECUIESC
Corund
13A MURES Praid
SIGHISOARA
Singeorgiu
DUMBRAVENI
13
14
Balauseri
E
6
0
Lupeni
TIRGU
REGHIN
16
15
1
5
A
15
SOVATA
BAILETUSNAD
VLAHITA
Sinmartin
Cozmeni
11B
Sindominic
GHEORGHIENI Joseni
13B 12
12
Ditrau
12A
BICAZ
Lacu Rosu
12C
VISEUDESUS
Romuli
MARMATIEI Petea
Livada SIGHETU
E
8
1
E
5
8
1C
OAS
Somcul Mare
Surduc
Sinmihaiu Almasului
Sarmasag
Romanasi
E
8
1
ZALAU
SIMLEU
SILVANIEI
1F
Tihau
JIBOU
1H
1H
Supuru de jos
SATUMARE
Ardud
E81
19A
Dorolf
E671
Satulung
E671
1C
Seini
1C
Vama
17C
GHERLA
1
7
1C
DEJ
Gilgau
E58
Rastoci
E
5
7
6
1
7
Cosbuc
17D
Feresti
BAIASPRIE
BAIAMARE
18
Mara
Sacel
18
E81/E58
1C
HALMEU
Mare
Tarna
19
Sapinta
de Sus
Vicovu
RADAUTI
DORNEI
VATRA
E
5
76
Iacobeni
Rodna
Prundu Birgaului
SINGEORZ-BAI
17C
BISTRITA
NASAUD
E
5
8
1
7
Borsa
Moisei
17D
18
Cirlibaba
Chiril
Brosteni
17B
Borca
15B
Poiana
Largului
15
MOLDOVENESC
CIMPULUNG
GURAHUMORULUI
Moldovitei
Vatra
Vama
Sucevita
17A
E
5
8
Ilisesti
1
7
Marginea
2
SIRET
E85
Ralos
29C
E581
ROMAN 15D
26
HUSI
Falciu
Oancea
Foltesti
Smirdan
Tulucesti
E581
Bretcu
FOCSANI
MARASESTI
2D
Nehoiu
Cislau
Ciuta
Siriu
RIMNICUSARAT
10
2D
Lepsa
Vidra
25
Independenta
Balta Alba 22
2
Sendreni
Sarat
BRAILA
Traian
Lacu Movila
Miresii
2B
GALATI
Gara Berheci
TECUCI
E85
24
Hanu Conachi
BACAU
Secuieni
15D
2GScorteni
Sanduleni
TIRGU
OCNA
Oituz
11
SLANIC
MOLDOVA
12B
Darmanesti
MOINESTI
11A
ONESTI
E574
E85
PIATRANEAMT
BUHUSI
15
Sirbi
BIRLAD
ADJUD
Podu Turcu
11A
24A
26
Murgeni
Zorleni
E581
VASLUI
Vulturesti
15D
Dragomiresti
2F
NEGRESTI
24B
Crasna
ALBITA
24B
ISACCEA
Garvan
MACIN
22
2B
E87
24A
E583/E58
Stanca 29B
E583
Stefanesti
TIRGUFRUMOS
Nicolae Balcescu
Miclauseni
PASCANI
Sabaoani
TIRGU
NEAMT
Dobreni
15C
15C
Motoc
Strunga
28
Ruginoasa
28A
BOTOSANI
SUCEAVA
FALTICENI
29C
29
Rutani
E58
HIRLAU
28B
29D
SCULENI
Vinatori
BUCIUM
IASI
28
Podu Iloaiei E58
24
28
Prut
Radauti
DARABANI
George Enescu
DOROHOI
29A
Manoleasa
SAVENI
Ungureni
29
TULCEA
HIRSOVA
Autostrada
Ploiesti Buzau Focsani
Lungime: 142,3 km
Autostrada de Centura
Bucuresti Nord
Lungime: 52,77 km
Autostrada de Centura
Bucuresti Sud
Lungime: 48 km
Autostrada Bucuresti Brasov
Tronson Comarnic Brasov
Lungime: 58 km
Autostrada Craiova - Pitesti
Lungime: 121.19 km
CONCESSION PROGRAM

Length: 644,26 km
Motorway construction program (in concession regime)
MOTORWAYS IN TENDER
227,19 km
MOTORWAYS IN PREPARATION
417,07 km
Craiova
Pitesti
Ploiesti
Brasov
Comarnic
Bucuresti
Focsani
Buzau
Craiova
Alexandria
Autostrada
Bucuresti Alexandria - Craiova
Lungime: 222 km
October 2013
During January October 2013, 288 km of rehabilitated roads were completed
and other 173 km are scheduled to be completed until December this year.

Currently (October time), we have in execution 1532.26 km of national roads, out
of which:
310.08 km of national roads are financed through reimbursable financing /
EIB loan (5th stage),
470.96 km, the same financing source (6th stage),
696.2 km with funding from the state budget,
26.51 km financed from ERDF,
28.52 km financed through ISPA facility,

Other 181.41 kilometres of national roads are under tender procedure for
awarding the works contracts.



Rehabilitation/modernization program for national roads


Until October 2013, 18,48 km of bypasses (for Oradea and Alexandria) were
completed and section 3 of the Brasov bypass (6,34) will be finalized until
December this year.


Currently, 126,37 km are in execution, out of which:
95,05 km are bypasses with financing from the State budget;
31,32 km are bypasses with non-reimbursable ERDF financing.

In addition, 127,19 km are in the tender / re-tender stage (non-reimbursable
ERDF financing).
Construction program for bypasses
Urziceni
ILIA
E79
TUSNAD
CAREI
Nusfalau
MARGHITA
Virfurile
NUCET
HUNEDOARA
Sarmisegetuza
BAILEHERCULANE
BAIADEARAMA
Carasova
58
ORAVITA
MOLDOVANOUA
Bozovici
Pojejana
57A
Socol
E70
Naidas
57
Gradinari
57
57B
Topleta
ORSOVA
57
Berzeasca
56B
E771
E
7
0
Iablanita
57B
ANINA
67D
6
76
Dragesti
Les
NADLAC
Biled
Carpinis
SINNICOLAU
59B
59C
MARE
JIMBOLIA
Lovrin
6
Cenad
E68
7
E68
Capruta
LIPOVA
69
58B
MORAVITA
DETA
E70
Voiteg
59
Berzovia
BOCSA
TIMISOARA
E671
59A
Ortisoara
Vinga
E70
LUGOJ
CARANSEBES
OTELUROSU
E
7
0
58
Saceni
RESITA
6
58A
68
E673
Savirsin
Faget
68A Cosava
7
Inana
SALONTA
CHISINEU-CRIS 79A
ARAD
E671
Nadab
Turnu
Paulis
79A
VARSAND
79
E671
79A
INEU
Gurahont
E79
VASCAU
76
E79
Copaceni
Pocola
BEIUS
E60
BORS
Sacueni
Baile Felix
Biharia
ORADEA
1
19
ALESD
E60
1H
de Bacau
Supiacu
19B
Valea lui Mihai
19
1F
Cataloi Ianca
BUZAU Vernesti
VALENII
Schitu
Domnesti lui Neag
22D
73C 67A E79
PLOIESTI
DEMUNTE
OTOPENI
Adunatii-
Copaceni
Calugareni
41
64
OCNELE
Dobroteasa
Babeni
MARI
DRAGASANI
CARACAL
Brincoveni BALS E79
56
CALAFAT Rast
Maglavit
Cetate
56A
E79
55A
Dabuleni
Bechet 54A
55
Rodovan
CRAIOVA
6
Leu
Bumbesti-
Scoarta
Pesteana-Jiu
MOTRU
E
7
9
Brosteni
TURNUSEVERIN
VINJUMARE
67A
Simian 6
Floresti
DROBETA
67
STREHAIA
FILIASI
6
6
Runcu
Pieptani
67D
67
67
TIRGUJIU
ROVINARI
Jiu
66
Balcesti
Tintareni
E70
65C
Hurezani
67B
Ganeasa
Giulesti
HOREZU
Maldaresti
Gradistea
TIRGUCARBUNESTI
Cimpu Mare
67B
Bengesti
Polovraci
NOVACI
GOVORA
65C 64
BAILE
67
64
Clejani
DEVEDE
TURNUMAGURELE
ROSIORII
52
54
CORABIA
E70
Stoenesti
54
Daneasa
65A
6
65A
GIURGIU
Smirdioasa
ZIMNICEA
51
51A
E85
E70
5C
Ghimpati
ALEXANDRIA
Draganesti Vlasca
6
E70 5B
Daia
E85
5
6 61
Dragomiresti
72A
Cerbu Vedea
67B
Ungheni
SLATINA
65
E574
COSTESTI
Redea
65A
E70
CURTEA
DEARGES
E81
7C
RIMNICU
VILCEA
Budau
73C
PITESTI
73
7
E574
Golesti
E60
Bildana
Cringasi
Crevedia Mare
TITU
GAESTI
7
A1
BUFTEA
1
TIRGOVISTE
I.L.Caragiale
72 71
FIENI
1A
72
CIMPINA
1
A2
21
3
Vlad Tepes
Cuza
Budesti
OLTENITA Greaca
4
Minastirea
3B
CALARASI
Ostrov
Voda
31
Baneasa
Corvin
3
Cilibia
Pogoanele
2A
Fundulea
E85
Branesti
Pasarea
E60
2
3
Gara
Lehliu
Lehliu
URZICENI
E60
Malu
Costesti
MIZIL
1D
Albesti
1B
E85
2C
2B
3A
SLOBOZIA
Drajna
TANDAREI
21
Dragalina
Stefan Voda
3A
Amara
2C
FETESTI
Facaeni
3B
Insuratei
Grivita
FAUREI
GIURGENI
21A
E577
2B
21
22C
CONSTANTA
EFORIENORD
NEPTUN
JUPITER
MANGALIA
COSTINESTI
EFORIESUD
Vama Veche
E87
E675
Ovidiu
Cobadin
Amzacea
Negru voda
38
Pietreni
Basarabi
E87
VENUS
SATURN
Agigea
39
BABADAG
Capul Midia
NAVODARI
Mihai
Scraiu
CERNAVODA
Kogalniceanu
Mihail
2A
E60
22
22B
E87
Viteazu
22D
Horia
Nalbant
Ciucurova
Rohman
22A
Topolog
Cerna
E87
Caugagia
22D
22
22A
Cimpului
Varful
Cracaoani
Praxia
Tarcau
Ghimes-Faget
MIERCUREACIUC
COMANESTI
INTORSATURA
BUZAULUI
Ungureni
Maneciu-
E85
29A
15 E576
BORSEC Deda
Zimbar
VESTEM
BUCURESTI
TIRNAVENI
MEDIAS
Blajel
Axente Sever
COPSAMICA
15
Criscior 14B 74
SEBES
7A PETROSANI
Pui
HATEG
URICANI
Cimpu
Cirnesti
E79
66
66
66A
SIMERIA
CALAN
68B
DEVA
76
Soimus
ORASTIE
ZLATNA
7
Talmaciu
Obirsia Lotrului
Voineasa
BREZOI
7A
Malaia
7
E81
E81
Sugag
57C
E68
1/7
SIBIU
14
ALBAIULIA
Buru
Albac
BRAD
74
Buces
Arieseni
CIMPENI
Bucium
ABRUD
Lupsa
75
HUEDIN
1 1G
1F
CIMPIATURZII TURDA
BLAJ
Teius
1
14B
AIUD
Miraslau
E81
14A
Iernut
E60
CLUJ NAPOCA
Apahida
E60
Rascruci
Dimbu
Camarasu
16
Hoghiz
RUPEA
Sercaia
73A
Bilea Lac
Poienari
7C
CIMPULUNG
Rucar
E574
Voila
Cirtisoara
1
Avrig
E68
FAGARAS
Sinca
Veche
1
10
BRASOV
PREDEAL
SINAIA
COMARNIC
Moroeni
71
E60
RISNOV
Bran
73A
73
1A
Cheia
SACELE
GHEORGHE
SFINTU
E68
CODLEA
1
3
E574
Reci
Chichis
Prejmer
11
SECUIESC
12
TIRGU
13A
TOPLITA
ODORHEIU
SECUIESC
Corund
13A MURES Praid
SIGHISOARA
Singeorgiu
DUMBRAVENI
13
14
Balauseri
E
6
0
Lupeni
TIRGU
REGHIN
16
15
1
5
A
15
SOVATA
BAILETUSNAD
VLAHITA
Sinmartin
Cozmeni
11B
Sindominic
GHEORGHIENI Joseni
13B 12
12
Ditrau
12A
BICAZ
Lacu Rosu
12C
VISEUDESUS
Romuli
MARMATIEI Petea
Livada SIGHETU
E
8
1
E
5
8
1C
OAS
Somcul Mare
Surduc
Sinmihaiu Almasului
Sarmasag
Romanasi
E
8
1
ZALAU
SIMLEU
SILVANIEI
1F
Tihau
JIBOU
1H
1H
Supuru de jos
SATUMARE
Ardud
E81
19A
Dorolf
E671
Satulung
E671
1C
Seini
1C
Vama
17C
GHERLA
1
7
1C
DEJ
Gilgau
E58
Rastoci
E
5
7
6
1
7
Cosbuc
17D
Feresti
BAIASPRIE
BAIAMARE
18
Mara
Sacel
18
E81/E58
1C
HALMEU
Mare
Tarna
19
Sapinta
de Sus
Vicovu
RADAUTI
DORNEI
VATRA
E
5
76
Iacobeni
Rodna
Prundu Birgaului
SINGEORZ-BAI
17C
BISTRITA
NASAUD
E
5
8
1
7
Borsa
Moisei
17D
18
Cirlibaba
Chiril
Brosteni
17B
Borca
15B
Poiana
Largului
15
MOLDOVENESC
CIMPULUNG
GURAHUMORULUI
Moldovitei
Vatra
Vama
Sucevita
17A
E
5
8
Ilisesti
1
7
Marginea
2
SIRET
E85
Ralos
29C
E581
ROMAN 15D
26
HUSI
Falciu
Oancea
Foltesti
Smirdan
Tulucesti
E581
Bretcu
FOCSANI
MARASESTI
2D
Nehoiu
Cislau
Ciuta
Siriu
RIMNICUSARAT
10
2D
Lepsa
Vidra
25
Independenta
Balta Alba 22
2
Sendreni
Sarat
BRAILA
Traian
Lacu Movila
Miresii
2B
GALATI
Gara Berheci
TECUCI
E85
24
Hanu Conachi
BACAU
Secuieni
15D
2GScorteni
Sanduleni
TIRGU
OCNA
Oituz
11
SLANIC
MOLDOVA
12B
Darmanesti
MOINESTI
11A
ONESTI
E574
E85
PIATRANEAMT
BUHUSI
15
Sirbi
BIRLAD
ADJUD
Podu Turcu
11A
24A
26
Murgeni
Zorleni
E581
VASLUI
Vulturesti
15D
Dragomiresti
2F
NEGRESTI
24B
Crasna
ALBITA
24B
ISACCEA
Garvan
MACIN
22
2B
E87
24A
E583/E58
Stanca 29B
E583
Stefanesti
TIRGUFRUMOS
Nicolae Balcescu
Miclauseni
PASCANI
Sabaoani
TIRGU
NEAMT
Dobreni
15C
15C
Motoc
Strunga
28
Ruginoasa
28A
BOTOSANI
SUCEAVA
FALTICENI
29C
29
Rutani
E58
HIRLAU
28B
29D
SCULENI
Vinatori
BUCIUM
IASI
28
Podu Iloaiei E58
24
28
Prut
Radauti
DARABANI
George Enescu
DOROHOI
29A
Manoleasa
SAVENI
Ungureni
29
TULCEA
HIRSOVA
Caracal
Lungime: 10,35 km
Craiova Sud
Lungime: 6,285 km
Constructor: SECOL SpA
Consultant: DRDP Craiova
Brasov LOT I
Tronson 1, DN1-DN11
Lungime: 7,292 km
Constructor: relicitare executie lucrari
Consultant: Egis Romania SA
Tecuci
Lungime: 6,945 km
Constructor: Sociedade de
Construcoes Soares Da Costa
Consultant: SC Luca WAY
Mihailesti
Lungime: 3,18 km
Targu Jiu
Lungime: 19,95 km
Objectives in execution
Length: 61,11 km
Objectives in tender
Length: 127,19 km
Suceava
Lungime: 12,43 km
Constructor: SC CCF Iasi / Grup COLAS
Consultant: SC Consilier Construct
Bypasses
Slatina
Lungime: 11,73 km
Objectives in preparation
Length: 11,73 km
Brasov LOT II
Tronson 3, DN11-DN13
Lungime: 6,34 km
Constructor: Vectra Service
Consultant: Egis Romania SA
Cluj Est
Lungime: 2,33 km
Constructor: IDECON S.A.U
Consultant: Search Corp.
Targu Mures
Lungime: 11,64 km
Bacau
Lungime: 30,7 km
Alesd Nord
Lungime: 7,70 km

Alesd Sud
Lungime: 9,14 km
Stei
Lungime: 27,23 km
Modernizare Centura Bucuresti,
Sectiunea A1-DN 7
Lungime: 8,7 km
Constructor: Asocierea SC Delta ACM 93
/ Azvirt LLC / SC Maxidesign SRL
Consultant: Search Corp.
Carei
Lungime: 10,45 km
Constructor: Grupo Empresarial
Magenta Assignia Infrastructuras SA
Transmir SRL
Consultant: Asocierea SC Ventra Project
Management SRL si Utiber Kozuti
Beruhazo KFT
Sacuieni
Lungime: 7,62 km
Constructor: IDECON S.A.U
Consultant: Asocierea SC Ventra
Project Management SRL si
Utiber Kozuti Beruhazo KFT
Total bypasses:
Length: 200,03 km