1 Manually operated earth switches for isolators Not yet installed.
2 Castle key interlock for isolator operation Not yet installed. 3 LIGHTNING ARRESTORS Corona ring & discharge counters not yet fixed.(shall be of readily access at ground) 4 ANTIEARTHQUAKE CLAMPING DEVICE Not yet installed. 5 SUBSTATION GANTRY STRUCTURE Too many lock nuts not provided in the gantry foundation. 6 ARMOURING POWER CABLES Found in loose condition. It shall be clamped with minimum gap of one wire space. Too many bolts not provided in clamp pads of conductor (CT'S, PT'S & VCB) Nuts are not tightened in earth flats. Ununiform length of bolts are provided. 8 NEUTRAL C.T.& Time delay earth fault protection Not yet installed. 9 POWER TRANSFORMER CABLES XLPE insulated cables are laid instead of 1100V Grade,heavy duty PVC insulated, armoured, PVC sheathered multicore with copper conductors of 2.5mm. 10 VISUAL CHECK OF SUBSTAN BUS(About insulators broken, lightening arrestor crack) Checked & found satisfactory. 11 OIL LEAK if any in transformers,metering tanks NO LEAK FOUND. 12 VISUAL CHECK OF TRANSFORMERS All dust particles shall be blown off. 13 YARD FENCING & GATE LOCKS Fencing -ok. Locking arrangement shall be installed. 14 DC Distribution board All spare holes are to be suitably & temporarily closed. 33KVA SUBSTATION INSPECTION REPORT THERMAL POWERTECH CORPORATION INDIA LTD 3X660MW STPP, NELATHUR/PYANAPURAM CONDUCTORS LAYING 7 SUBSTATION TRANSFORMER AREA 15 YARD FENCING & GATE LOCKS Fencing Gate not yet fixed. 16 GROUND MAT Satisfactory 17 STRUCTURE Nuts are not provided in AB Switch frame bolts. 18 COLUMN PAINTING Identified locations are to be cleaned & re-painted. 19 MISCELLENOUS Trivector meter door knobs are not available. 20 AB Switch operating lever 2Nos not yet assembled. 21 AB Switch limb fixing bolt 24 bolts are not provided(Two nos in each switch) 22 COLUMN PAINTING Satisfactory 23 YARD FENCING & GATE LOCKS Not yet provided. 24 EARTHING & GROUNDING Checked & found satisfactory. 25 OCB CABINET DOORS WORKING Dust particles shall be blown off. 26 FOUNDATIONS Checked & found satisfactory. 27 WARNING SIGNS display on FENCING & BUILDINGS DANGER & WARNING DISPLAYS not provided. 28 OUTGOING FEEDER NO.1 STRUCTURE DAMAGE Lightning arrestor - 1no to be fixed. 29 CABLE TRENCH Not yet closed with concrete slabs. 30 HOUSE KEEPING Unnecessary materials found are to be removed 31 Any visible damage on sub station Building Checked & found satisfactory. 32 POLES INSPECTION Four pole structure at N1584, E413 is found slanting & it shall be rectified and stay wires are found loose in all other poles at site. 33 Hi mast light Hi mast cables has been damaged at three locations. GENERAL 8 POLE STRUCTURE 6 POLE STRUCTURE DESC. DTR 1 DTR 2 DTR 3 DTR 4 DTR 6 DTR 7 DTR 8 DTR 9 DTR 10 DTR 5 DTR 11 CABLES Pnl side not O.K. NOT O.K. Pnl side not O.K. TFR SIDE NOT O.K. LOOSE O.K. O.K. LOOSE Pnl side not O.K. Foundations Bolt/Nut not fixed in panel board & capac. Bank Foundn bolt/Nut not provided in panel board. Panel board nuts not provided due to insufficient bolt length. Foundn bolt/Nut not provided in panel board. Nuts found loose. Nuts found loose. O.K. O.K. O.K. TR. STOPPER Isolators O.K. O.K. O.K. O.K. O.K. O.K. O.K. O.K. U/P TR. Conectins & clearences O.K. O.K. O.K. O.K. O.K. O.K. O.K. O.K. O.K. Fuse in DB O.K. O.K. O.K. O.K. O.K. O.K. O.K. O.K. O.K. Lightning arrestors O.K. O.K. O.K. O.K. O.K. O.K. O.K. O.K. O.K. ACB Operation O.K. O.K. O.K. O.K. O.K. O.K. O.K. O.K. O.K. Fencing and Gate PENDING PENDING PENDING PENDING PENDING PENDING PENDING PENDING PENDING TR. LT bushing box MISC. TR.wheel not fitted. LT bushing box - gasket not provided LT bushing box - gasket not provided LT bushing box - gasket not provided Nut not provided in capacitor bank. Level and Grading PENDING PENDING PENDING PENDING PENDING PENDING PENDING PENDING PENDING Too many Bolt/Nuts are not provided in the LT Bushing box cover plate assembly of all DTR'S. INSPECTION REPORT OF DISTRIBUTION TRANSFORMERS The cables between TRFR & LT Distribn board shall be properly buried by digging & filling. D T R
i s
i n
d i s m a n t l e d
c o n d i t i o n . W O R K
I S
U N D E R
P R O G R E S S THERMAL POWERTECH CORPORATION INDIA LTD 3X660MW STPP, NELATHUR/PYANAPURAM Cable glands However, cable gland seating in all Distribution transformers is poor due to improper workmanship. Transformer stoppers are to be provided in all DTR'S to arrest the self movement.