You are on page 1of 3

SL NO DESC OBSERVATION

1 Manually operated earth switches for isolators Not yet installed.


2 Castle key interlock for isolator operation Not yet installed.
3 LIGHTNING ARRESTORS Corona ring & discharge counters not yet fixed.(shall be of readily access at ground)
4 ANTIEARTHQUAKE CLAMPING DEVICE Not yet installed.
5 SUBSTATION GANTRY STRUCTURE Too many lock nuts not provided in the gantry foundation.
6 ARMOURING POWER CABLES Found in loose condition. It shall be clamped with minimum gap of one wire space.
Too many bolts not provided in clamp pads of conductor (CT'S, PT'S & VCB)
Nuts are not tightened in earth flats.
Ununiform length of bolts are provided.
8 NEUTRAL C.T.& Time delay earth fault protection Not yet installed.
9 POWER TRANSFORMER CABLES
XLPE insulated cables are laid instead of 1100V Grade,heavy duty PVC insulated, armoured,
PVC sheathered multicore with copper conductors of 2.5mm.
10
VISUAL CHECK OF SUBSTAN BUS(About insulators broken,
lightening arrestor crack)
Checked & found satisfactory.
11 OIL LEAK if any in transformers,metering tanks NO LEAK FOUND.
12 VISUAL CHECK OF TRANSFORMERS All dust particles shall be blown off.
13 YARD FENCING & GATE LOCKS Fencing -ok. Locking arrangement shall be installed.
14 DC Distribution board All spare holes are to be suitably & temporarily closed.
33KVA SUBSTATION INSPECTION REPORT
THERMAL POWERTECH CORPORATION INDIA LTD
3X660MW STPP, NELATHUR/PYANAPURAM
CONDUCTORS LAYING 7
SUBSTATION TRANSFORMER AREA
15 YARD FENCING & GATE LOCKS Fencing Gate not yet fixed.
16 GROUND MAT Satisfactory
17 STRUCTURE Nuts are not provided in AB Switch frame bolts.
18 COLUMN PAINTING Identified locations are to be cleaned & re-painted.
19 MISCELLENOUS Trivector meter door knobs are not available.
20 AB Switch operating lever 2Nos not yet assembled.
21 AB Switch limb fixing bolt 24 bolts are not provided(Two nos in each switch)
22 COLUMN PAINTING Satisfactory
23 YARD FENCING & GATE LOCKS Not yet provided.
24 EARTHING & GROUNDING Checked & found satisfactory.
25 OCB CABINET DOORS WORKING Dust particles shall be blown off.
26 FOUNDATIONS Checked & found satisfactory.
27 WARNING SIGNS display on FENCING & BUILDINGS DANGER & WARNING DISPLAYS not provided.
28 OUTGOING FEEDER NO.1 STRUCTURE DAMAGE Lightning arrestor - 1no to be fixed.
29 CABLE TRENCH Not yet closed with concrete slabs.
30 HOUSE KEEPING Unnecessary materials found are to be removed
31 Any visible damage on sub station Building Checked & found satisfactory.
32 POLES INSPECTION
Four pole structure at N1584, E413 is found slanting & it shall be rectified and stay wires are
found loose in all other poles at site.
33 Hi mast light Hi mast cables has been damaged at three locations.
GENERAL
8 POLE STRUCTURE
6 POLE STRUCTURE
DESC. DTR 1 DTR 2 DTR 3 DTR 4 DTR 6 DTR 7 DTR 8 DTR 9 DTR 10 DTR 5 DTR 11
CABLES
Pnl side not
O.K.
NOT O.K. Pnl side not O.K.
TFR SIDE NOT
O.K.
LOOSE O.K. O.K. LOOSE
Pnl side not
O.K.
Foundations
Bolt/Nut not
fixed in panel
board & capac.
Bank
Foundn
bolt/Nut not
provided in
panel board.
Panel board nuts
not provided due to
insufficient bolt
length.
Foundn
bolt/Nut not
provided in
panel board.
Nuts found
loose.
Nuts found
loose.
O.K. O.K. O.K.
TR. STOPPER
Isolators O.K. O.K. O.K. O.K. O.K. O.K. O.K. O.K. U/P
TR. Conectins &
clearences
O.K. O.K. O.K. O.K. O.K. O.K. O.K. O.K. O.K.
Fuse in DB O.K. O.K. O.K. O.K. O.K. O.K. O.K. O.K. O.K.
Lightning arrestors O.K. O.K. O.K. O.K. O.K. O.K. O.K. O.K. O.K.
ACB Operation O.K. O.K. O.K. O.K. O.K. O.K. O.K. O.K. O.K.
Fencing and Gate PENDING PENDING PENDING PENDING PENDING PENDING PENDING PENDING PENDING
TR. LT bushing box
MISC.
TR.wheel not
fitted.
LT bushing
box - gasket
not provided
LT bushing box -
gasket not provided
LT bushing box
- gasket not
provided
Nut not provided
in capacitor bank.
Level and Grading PENDING PENDING PENDING PENDING PENDING PENDING PENDING PENDING PENDING
Too many Bolt/Nuts are not provided in the LT Bushing box cover plate assembly of all DTR'S.
INSPECTION REPORT OF DISTRIBUTION TRANSFORMERS
The cables between TRFR & LT Distribn board shall be properly buried by digging & filling.
D
T
R

i
s

i
n

d
i
s
m
a
n
t
l
e
d

c
o
n
d
i
t
i
o
n
.
W
O
R
K

I
S

U
N
D
E
R

P
R
O
G
R
E
S
S
THERMAL POWERTECH CORPORATION INDIA LTD
3X660MW STPP, NELATHUR/PYANAPURAM
Cable glands
However, cable gland seating in all Distribution transformers is poor due to improper workmanship.
Transformer stoppers are to be provided in all DTR'S to arrest the self movement.