Project na

P
PROPOSAL
Thank you
project. W
of unders
I.
II.
III.
If you hav
you and w
Once agai

Yours fait
for IDA &





IDA-HtooM
Architect

IDA & L.S.K

Offices:Rm0
New Univers
Yangon, Mya
Ph#01-54751

No. 271 Shwe
Yangon, Mya
Ph#01-55820
L.S.K Arch
ce Services
aho Road
n Thar Ward,
Myanmar
Ye Min Thein
, 2013
ame:
roposed 3-sto
L FOR PROFES
u for inviting
We are please
tanding.
PROJECTIO
SCOPE OF
PROFESSIO
ve any questio
we are looking
in, thank you
thfully,
L.S.K Archite
Myat Thant

Architect Grou
02, Bldg-C, New U
ity Avenue Road,
anmar
18, 0943207322 E
egonedine Road, B
anmar
08/ 543664, 09420

hitect Gro
s Enterprise
Sanchaung T
n
orey Car Show
SSIONAL ARC
us to quote f
ed to offer ou
ON DESCRIPTI
PROFESSIONA
ONAL FEE
ons please do
g forward to
for choosing
ect Group


p
University Avenue
Bahan Township
Email:hthant.ida@g
Bahan Township
018843 Email: kha
oup
e Co; Ltd.
Tsp.
wroom with O
HITECTURE D
for providing
ur professiona
ION
AL ARCHITECT
o not hesitate
your kind con
g IDA & L.S.K
L.S.K-Kha
Architect
Condominium
gmail.com
aingthuznyo81@gm
Offices @ Bah
DESIGN SERVIC
professional
al architectur
TURE DESIGN
e to contact u
nfirmation.
Architect Gro
aingThuzarNy
t
mail.com
o Road, Yang
CE
architecture
re design serv
SERVICE
us. We hope t
oup.
yo

gon, Myanmar
design servic
vice with the
the proposal
L.S.K-Ma
Architec
r
ce for the abo
following te
is agreeable
ay Zin
ct
ove
rms
to

I. PROJECT DESCRIPTION
Proposed 3-storey Car Showroom with Offices @ Baho Road, Yangon Myanmar
1) Site area: 3,672 sq-ft
2) Site coverage: not yet available
3) Construction area per floor: not yet available
4) Number of storey: 3 levels
5) Gross floor area: not yet available

II. SCOPE OF PROFESSIONAL ARCHITECTURE SERVICE

A. ARCHITECTURE DESIGN SERVICE

A1. Concept Design:

1) Receive the Design Brief from the Client
2) Present the Concept Design to the Client
3) Concept Design drawings shall include:
- Site plan
- Building floor plans, sections and elevations
- External perspectives
4) After presentation of this Concept Design, the Concept Design stage is completed. All
further amendments to be carried into the next stage of Schematic Design or Design
Development.
Deliverables: 01 set (A3 size)

To provide revised designs up to (2) two revisions maximum, if more than two design
revisions are requested additional fee will be charged with extension of time of
completion.

A2. Schematic Design:

1) Develop the Schematic design in consideration of the approved concept design
2) Present the design to the Client
3) The schematic design shall include:
- Floor plans
- Elevations
- Sections
- External perspectives
4) Provide schematic documents for use by other Consultants (if required)
Deliverables: 01 set (A3 size)

A3. Design Development:

1) Update other Consultants design into the architectural design
2) The Design Development Document shall include:
- Detail plans
- Detail Elevations
- Detail Sections
- Architectural typical details
3) Provide design development documents for use by other Consultants (if required)
Deliverables: 01 set (A3 size)


B. Y.C.D.C SUPPLY WORK

1. Carry on all Y.C.D.C work(will start during concept design stage)

C. ESTIMATION WORK

1. Provide building estimation cost(will start during concept design stage)

D. STRUCTURAL DESIGN

1. Provide structural design calculation (will start during schematic design stage)


III. PROFESSIONAL FEE


The professional fee for the provision of IDA & L.S.K Architect Group service to be a Lump
Sum of7,000,000.00 Kyats (10% discount). The stage of payments is as follows.

DESCRIPTION OF STAGE % of Fees Per Stage Cumulative Total % of Fees
1) Upon confirmation (Mobilization Fee 1,400,000.00 kyats 20% 1,400,000.00 kyats 20%
2) Upon completion of Concept Design 1,400,000.00 kyats 20% 2,800,000.00 kyats 40%
3) Upon completion of Schematic Design 1,400,000.00 kyats 20% 3,200,000.00 kyats 60%
4) Upon completion of Design Development 2,800,000.00 kyats 40% 7,000,000.00 kyats 100%

In additional to the fee stated, for supervision a minimum of 2 site visits per week during