You are on page 1of 4

Trac Engineering and Management : Assignment - 4 Dr. V.

Lelitha Devi
Department of Civil Engineering
Due Date: October , 2014
1. Discuss the warrants for signalization under Indian trac conditions as per IRC. Also,
discuss the signal design procedure suggested by IRC.
2. Discuss the guidelines to develop various phase plans as per HCM method.
3. Dene change interval and clearance interval. Calculate the same for a 4-legged sig-
nalized intersection (2-lane, 2-way approaches on all sides) for the following data,
Average approach speed of 40 km/h,
Grade of approach is +2.7%
Standard vehicle length of 6m.
Deceleration rate of vehicles 3 m/s
2
Cross walk width is 3m.
4. Determine the cycle lost times from the above data.
5. Consider a 2-phase signal, the sum of the critical lane volume was 1200 veh/hr, target
v/c ratio is 0.87. Determine the desirable cycle length (Consider lost times from Q.4).
Trac volume for each 15 minute period for 2 hours in peak period is given below to
calculate PHF.
Table 1: Data for problem 5.
S. No Time Vehicle count
1 8:00 8:15 290
2 8:15 8:30 254
3 8:30 8:45 235
4 8:45 9:00 219
5 9:00 9:15 237
6 9:15 9:30 457
7 9:30 9:45 259
8 9:45 10:00 289
6. An analysis of pedestrian needs at a signalized intersection is undertaken. The details
about signal phases and timings are given below. Are pedestrians safely accommodate
by this signal timing? If not, what signal timing should be implemented? Assume
the standard default values for start-up lost time and extension of eective green into
yellow time and all red (2.0 seconds each) are in eect.
1
Table 2: Data for Problem 6.
Phase G (s) Y (s) Gp (s)
A 18 4.5 30
B 60 40 15
7. The average normal ow of trac on cross roads A and B during design period are
550 and 250 pcu/hour; the saturation ow values on these roads are estimated as 1275
and 1150 pcu/hour respectively. The all red time required for pedestrian crossing is
10 sec. Design two phase trac signal by Websters method. Also, give the details
about design timings of both phases.
8. Design a trac signal by using HCM method for a four legged intersection (2-lane
2-way on all sides) and the volume data is given in the below table. Assume cross
walk width is 3 m, PHF of 0.95, v/c ratio of 0.92, average approach speed 50 km/h, a
grade of -1.5%.
Table 3: Data for Problem 8.
S. No Approach Straight Left turning Right turning
1 EB 400 25 15
2 WB 300 25 5
3 NB 350 20 10
4 SB 475 25 18
9. Design a trac signal by using HCM method for a four legged intersection (East-west
road of width 16.50 m and North-south road 17.75 m) and the volume data is given in
the below table. Assume cross walk width 3 m, PHF of 0.95, v/c ratio of 0.90, average
approach speed of 45 km/h.
Table 4: Data for Problem 9.
S. No Approach Straight Left turning Right turning
1 EB 500 95 45
2 WB 600 90 55
3 NB 700 150 235
4 SB 800 165 215
10. Design a trac signal for an intersection by using HCM method(East-West road of
width 16.5 m and North-South road of width 17.5m with corresponding design speeds
of 45 kmph and 55 kmph). The volume data has been given in the following table.
Assume cross walk width 3 m, PHF of 0.85, v/c ratio of 0.90, deceleration rate is 3
m/s
2
. Both the approaches are having one-way trac. Pedestrian activity: Low
2
Table 5: Data for Problem 10.
S. No Approach Straight Left turning Right turning
1 EB 1250 375 x
2 WB x x x
3 NB 2200 x 250
4 SB x x x
11. Design a trac signal for an intersection by using HCM method (North-South road is
a 2-lane 2-way approach, East-West road is a 4-lane, 2-way approach with a width of
17m and the corresponding average speeds are 40 kmph and 50 kmph). The volume
data has been given in the following table. Assume cross walk width 3 m, PHF of
0.98, v/c ratio of 0.95, deceleration rate is 3 m/s
2
. Pedestrian activity: Medium
Table 6: Data for Problem 11.
S. No Approach Straight Left turning Right turning
1 EB 800 40 220
2 WB 725 55 335
3 NB 240 25 35
4 SB 260 20 15
12. Design a trac signal for an intersection by using HCM method (North-South road is
a 2-lane one-way approach, North-South road is a 4-lane, 2-way approach with a width
of 17.25 m and the corresponding average speeds for both directions are 55 km/h).
The volume data has been given in the following table. Assume cross walk width 3 m,
PHF of 0.95, v/c ratio of 0.92, deceleration rate is 3 m/s
2
. Pedestrian activity: Low
Table 7: Data for Problem 12.
S. No Approach Straight Left turning Right turning
1 EB 1050 125 x
2 WB 750 x 255
3 NB 950 60 40
4 SB x x x
13. A four-lane undivided multilane highway section carries a peak hour volume of 2600
veh/h in the heaviest direction. There are 15% of trucks and 2% of RVs in the trac
stream. Motorists are primarily regular users of facility. The section under the is
under level terrain. Consider the following data to nd out the level of service
PHF value from Q.5,
Lateral clearance is 3 ft. on both sides
Lane width of 10 ft. and access point density is 20/mi.
3
14. What are the microscopic and macroscopic parameters in trac and how they are
related?
Give the relation between microscopic and macroscopic parameters.
Trac in a highway is observed to have a spacing of 60 m, and an average headway
of 1.5 seconds, estimate the rate of ow, density and speed of trac.
4